MACC RFP FA9401-12-R-0002 Q A Round 4.pdf

PDF 23 KB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA9401-12-R-0002
Issued by
Department of the Air Force Global Strike Command

About this file

MACC RFP FA9401-12-R-0002 Q A Round 4

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Attch_2_-_Wage_Determination_(Bernalillo_County)__Residential_dated_4-6-2012.pdf PDF
MACC_RFP_FA9401-12-R-0002_Amendment_10.pdf PDF
Attch_1_-_Wage_Determination_(Bernalillo_County)__Building_dated_7-20-2012.pdf PDF
MACC_RFP_FA9401-12-R-0002_Amendment_9.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 8.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 9.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 8.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 6-Conformed Copy.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 6.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 6.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 7.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 5.pdf PDF
RFP FA9401-12-R-0002 Pre-Proposal Conference-Site Visit Final Sign-in Sheet.pdf PDF
MACC Pre-Proposal Brief.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 5-Conformed Copy.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 4.pdf PDF
Attch 5 - Past Performance Information Questionnaire Package.docx DOCX document
MACC RFP FA9401-12-R-0002 Amendment 3.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 2.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 1.doc DOC document
Attch 40 - Kirtland AFB-West Map.pdf PDF
Attch 37 - Seed Project - Future Expansion Power Requirements Table.pdf PDF
Attch 35 - Seed Project Water flow Test Results.pdf PDF
Attch 25 - Appendix 14.1 - Guidance and Standards-Irrigation.pdf PDF
Attch 18 - Appendix 7 Air Force Federal Mandates Quick Reference.pdf PDF
Attch 2 - Wage Determination —
Attch 16 - Appendix 5 - AF Form 592 —
Attch 28 - Appendix 14.4 Guidance Standards-Minimum Communication Standards.pdf PDF
Attch 6 - MACC General Provisions.pdf PDF
Attch 5 - Past Performance Information Questionnaire Package.docx DOCX document
Attch 23 - Appendix 12 - Waste Diversion Report.pdf PDF
Attch 36 - Seed Project - Westside Shoppette Geotechnical Report.pdf PDF
Attch 31 - Seed Project Price Schedule - AF3052.xlsx XLSX spreadsheet
Attch 30 - Seed Project Statement of Work.pdf PDF
Attch 22 - Appendix 11 - DoD Minimum Antiterrorism Construction Standards Pre-Final Checklist.pdf PDF
Attch 39 - AF Form 3065 - Progress Report.pdf PDF
Attch 21 - Appendix 10 - Base Access Procedures KAFB.pdf PDF
Attch 24 - Appendix 13 - AF LEED SDD Implementation Guidance.pdf PDF
Attch 12 - Appendix 4.3 - 16710 Communications.pdf PDF
Attch 27 - Appendix 14.3 - Guidance and Standards-Toilet Accessory Requirements.pdf PDF
Attch 7 - Appendix 1 - General Design Guidelines.pdf PDF
Attch 17 - Appendix 6 - AF Form 103 Digging Permit.pdf PDF
Attch 29 - Appendix 14.5 - Guidance and Standards-Metering.pdf PDF
Attch 3 - Wage Determination —
Attch 1 - Wage Determination —
Attch 34 - Seed Project ACM-LCM Survey Report B909.pdf PDF
Attch 8 - Appendix 2 - Architectural Compatibility Plan.pdf PDF
Attch 38 - AF Form 3064 - Progress Schedule.xls XLS spreadsheet
Attch 11 - Appendix 4.2 - 13281 Lead Containing Materials Remediation.pdf PDF
Attch 19 - Appendix 8 - Recycling Specification for KAFB.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Multiple Award Construction Contract (MACC)

RFP, Pre-Proposal Conference and Site Visit Questions

Solicitation FA9401-12-R-0002

29 March 2012

ROUND 4

MACC FA9401-12-R-0002

The purpose of this document is to provide answers to RFP, Pre-Proposal Conference and Site

Visit questions for Solicitation FA9401-12-R-0002.

39. With respect to the SOW for the Seed Project (Attachment 30) for this solicitation, there does not appear to be any requirements to design or build doors for access to/from the addition. Please clarify.

ANSWER: The design will include a door or doors directly linking the existing space with the addition. The sketch in the Design Analysis is conceptual, and should not be mistaken for a final floor plan.

40. Also, is it the intent that the design/build task use the location, dimensions

(length/width) and other details presented in Attachment 33, Design Analysis Package, as additional requirements to supplement the SOW for the Seed Project?

ANSWER: Yes, Certain details may change over the course of the design process;

however the Design Analysis and the SOW are both to be incorporated into the Type B design.

41. Please consider shifting the Past Performance Volume (Vol 3) due date for 3 days because of the close timing of the pre-proposal conference, held on 30 Mar 2012, and the

Past Performance Volume due date (3 Apr 2012 1:00PM). Request there be additional time allowed after the pre-proposal conference to:

Return to the company facilities

Review the data gathered at the conference and the data gathered while "walking" the site for the "seed" project including questions raised and any amendments released

Determine if additional past performance questionnaires need to be released and/or the Volume 3 updated

Update the Vol 3 and other affected document and submit prior to the 1:00 time constraint.

I believe this is in the best interest of the government and allows for submittal of a Past

Performance package that is less apt to be rushed.

ANSWER: Extension is denied. Due date for Past Performance Volume III is 1:00PM

MST, 3 April 2012.

Multiple Award Construction Contract (MACC)

RFP, Pre-Proposal Conference and Site Visit Questions

Solicitation FA9401-12-R-0002

29 March 2012

ROUND 4

MACC FA9401-12-R-0002

42. Is there a Volume Organization section for the Past Performance Section Volume III?

ANSWER: No, IAW Section L 5.1, each offeror shall submit a past performance volume with its proposal, containing past performance information in accordance with the format contained in Attachment 5 of the RFP.