MACC RFP FA9401-12-R-0002 Q A Round 4.pdf
PDF 23 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA9401-12-R-0002
About this file
MACC RFP FA9401-12-R-0002 Q A Round 4
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Multiple Award Construction Contract (MACC)
RFP, Pre-Proposal Conference and Site Visit Questions
Solicitation FA9401-12-R-0002
29 March 2012
ROUND 4
MACC FA9401-12-R-0002
The purpose of this document is to provide answers to RFP, Pre-Proposal Conference and Site
Visit questions for Solicitation FA9401-12-R-0002.
39. With respect to the SOW for the Seed Project (Attachment 30) for this solicitation, there does not appear to be any requirements to design or build doors for access to/from the addition. Please clarify.
ANSWER: The design will include a door or doors directly linking the existing space with the addition. The sketch in the Design Analysis is conceptual, and should not be mistaken for a final floor plan.
40. Also, is it the intent that the design/build task use the location, dimensions
(length/width) and other details presented in Attachment 33, Design Analysis Package, as additional requirements to supplement the SOW for the Seed Project?
ANSWER: Yes, Certain details may change over the course of the design process;
however the Design Analysis and the SOW are both to be incorporated into the Type B design.
41. Please consider shifting the Past Performance Volume (Vol 3) due date for 3 days because of the close timing of the pre-proposal conference, held on 30 Mar 2012, and the
Past Performance Volume due date (3 Apr 2012 1:00PM). Request there be additional time allowed after the pre-proposal conference to:
Return to the company facilities
Review the data gathered at the conference and the data gathered while "walking" the site for the "seed" project including questions raised and any amendments released
Determine if additional past performance questionnaires need to be released and/or the Volume 3 updated
Update the Vol 3 and other affected document and submit prior to the 1:00 time constraint.
I believe this is in the best interest of the government and allows for submittal of a Past
Performance package that is less apt to be rushed.
ANSWER: Extension is denied. Due date for Past Performance Volume III is 1:00PM
MST, 3 April 2012.
Multiple Award Construction Contract (MACC)
RFP, Pre-Proposal Conference and Site Visit Questions
Solicitation FA9401-12-R-0002
29 March 2012
ROUND 4
MACC FA9401-12-R-0002
42. Is there a Volume Organization section for the Past Performance Section Volume III?
ANSWER: No, IAW Section L 5.1, each offeror shall submit a past performance volume with its proposal, containing past performance information in accordance with the format contained in Attachment 5 of the RFP.