MACC RFP FA9401-12-R-0002 Amendment 4.pdf
PDF 50 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA9401-12-R-0002
About this file
Amendment 4 to Solicitation FA9401-12-R-0002
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to accomplish the follow ing:
1) Amend Section J, Attachment 5, Past Performance Questionnaire, revised 3/23/2012.
2) Attachment 5, Past Performance Questionnaire, section 1(G) revised; the w ord Mission changed to Technical.
3) Attachment 5, Past Performance Questionnaire, section 1(H) revised; the w ord Mission Capability changed to Technical/Technical Risk.
4) All other terms and conditions remain unchanged.
Contract Administrator: Gilbert L. Martinez
Email: gilbert.martinez@kirtland.af.mil
Phone: (505)846-2921
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Mar-2012
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA9401-12-R-0002
X 9B. DATED (SEE ITEM 11)
09-Mar-2012
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Mar-2012
CODE
AFNWC/PKOD
2000 WYOMING BLVD SE
BLDG 20604
ALBUQUERQUE NM 87117
FA9401 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA9401-12-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS
ATTACHMENT DESCRIPTION DATE
1 Wage Determination (Bernalillo County) – Building 02/10/2012
2 Wage Determination (Bernalillo County) – Residential 01/06/2012
3 Wage Determination (Bernalillo County) – Heavy 01/06/2012
4 Wage Determination (Bernalillo County) – Highway 01/06/2012
5 Past Performance Information/Questionnaire Package 03/23/2012
6 MACC General Provisions 02/02/2012
7 General Provisions Appendix 1, General Design Guidelines 02/02/2012
8 General Provisions Appendix 2, KAFB Architectural Compatibility Plan 02/02/2012
9 General Provisions Appendix 3, DUSD (IE) Section 438 EISA Policy
Memo
02/02/2012
10 General Provisions Appendix 4.1, 13280 Asbestos Containing Materials Remediation
02/02/2012
11 General Provisions Appendix 4.2, 13281 Lead Containing Materials Remediation
02/02/2012
12 General Provisions Appendix 4.3, 16710 Communications 02/02/2012
13 General Provisions Appendix 4.4, 16721 New Construction Automatic Fire Detection and Alarm System
02/02/2012
14 General Provisions Appendix 4.5, 16721 Existing Bldg. Remodel
Automatic Fire Detection and Alarm System
02/02/2012
15 General Provisions Appendix 4.6, 1012 Native Grass Seeding Specification
02/02/2012
16 General Provisions Appendix 5, AF Form 592, Sample Burn Permit 02/02/2012
17 General Provisions Appendix 6, AF 103, Digging Permit 02/02/2012
18 General Provisions Appendix 7, Air Force Federal Mandates Quick Reference
02/02/2012
19 General Provisions Appendix 8, Recycling Specification for KAFB 02/02/2012
20 General Provisions Appendix 9, Environmental Requirements KAFB 02/02/2012
21 General Provisions Appendix 10, Base Access Procedures KAFB 02/02/2012
22 General Provisions Appendix 11, DoD Minimum Antiterrorism
Construction Standards – Pre-Final Checklist
02/02/2012
23 General Provisions Appendix 12, Waste Diversion Report 02/02/2012
24 General Provisions Appendix 13, AF LEED SDD Implementation Guidance
02/02/2012
25 General Provisions Appendix 14.1, Guidance and Standards-Irrigation 02/02/2012
26 General Provisions Appendix 14.2, Guidance and Standards-Backflow Prevention
02/02/2012
27 General Provisions Appendix 14.3, Guidance and Standards-Toilet Accessory Requirements
02/02/2012
FA9401-12-R-0002
28 General Provisions Appendix 14.4, Guidance and Standards-Minimum Communication Standards
02/02/2012
29 General Provisions Appendix 14.5, Guidance and Standards-Metering 02/02/2012
30 Seed Project - Statement of Work, LRPD Advanced HPM Research
Facility Expansion, Project # MHMV 10112
01/26/2012
31 Seed Project Price Schedule (AF Form 3052) 02/02/2012
32 Seed Project Bid Schedule 02/02/2012
33 Seed Project Building 909-Study - Cost Removed 02/02/2012
34 Seed Project ACM-LCM Survey Report B909 02/02/2012
35 Seed Project Water flow Test Results 02/02/2012
36 Seed Project - Westside Shoppette Geotechnical Report 02/02/2012
37 Seed Project - Future Expansion Power Requirements Table 02/02/2012
38 AF Form 3064 - Progress Schedule 02/02/2012
39 AF Form 3065 - Progress Report 02/02/2012
40 Kirtland AFB-West Map 03/14/2012
41 Historical Data by Project Type and Cost 03/15/2012
(End of Summary of Changes)
File details come from the government source that posted it. Updated .