Amendment 4 to Solicitation FA9401-12-R-0002

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Attch_3_-_Wage_Determination_(Bernalillo_County)__Heavy_dated_7-20-2012.pdf PDF
Attch_2_-_Wage_Determination_(Bernalillo_County)__Residential_dated_4-6-2012.pdf PDF
MACC_RFP_FA9401-12-R-0002_Amendment_10.pdf PDF
Attch_1_-_Wage_Determination_(Bernalillo_County)__Building_dated_7-20-2012.pdf PDF
MACC_RFP_FA9401-12-R-0002_Amendment_9.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 9.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 7.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 8.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 6-Conformed Copy.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 6.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 6.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 7.pdf PDF
RFP FA9401-12-R-0002 Pre-Proposal Conference-Site Visit Final Sign-in Sheet.pdf PDF
MACC Pre-Proposal Brief.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 4.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 3.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 5-Conformed Copy.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 4-Conformed Copy.pdf PDF
Attch 5 - Past Performance Information Questionnaire Package.docx DOCX document
MACC RFP FA9401-12-R-0002 Amendment 3.pdf PDF
Attch 40 - Kirtland AFB-West Map.pdf PDF
Attch 37 - Seed Project - Future Expansion Power Requirements Table.pdf PDF
Attch 35 - Seed Project Water flow Test Results.pdf PDF
Attch 25 - Appendix 14.1 - Guidance and Standards-Irrigation.pdf PDF
Attch 18 - Appendix 7 Air Force Federal Mandates Quick Reference.pdf PDF
Attch 2 - Wage Determination —
Attch 16 - Appendix 5 - AF Form 592 —
Attch 28 - Appendix 14.4 Guidance Standards-Minimum Communication Standards.pdf PDF
Attch 6 - MACC General Provisions.pdf PDF
Attch 5 - Past Performance Information Questionnaire Package.docx DOCX document
Attch 10 - Appendix 4.1 - 13280 Asbestos Containing Materials Remediation.pdf PDF
Attch 13 - Appendix 4.4 - 16721 New Construction Automatic Fire Detection and Alarm System.pdf PDF
Attch 26 - Appendix 14.2 - Guidance and Standards-Backflow Prevention.pdf PDF
Attch 15 - Appendix 4.6 - Native Grass Seeding Specification.pdf PDF
Attch 9 - Appendix 3 - DUSD —
Attch 41 - Historical Data by Project Type and Cost.pdf PDF
MACC RFP FA9401-12-R-0002.doc DOC document
Attch 14 - Appendix 4.5 - 16721 Existing Bldg Remodel-Automatic Fire Detection and Alarm System.pdf PDF
Attch 33 - Seed Project Building 909-Study - Cost Removed.pdf PDF
Attch 23 - Appendix 12 - Waste Diversion Report.pdf PDF
Attch 36 - Seed Project - Westside Shoppette Geotechnical Report.pdf PDF
Attch 31 - Seed Project Price Schedule - AF3052.xlsx XLSX spreadsheet
Attch 30 - Seed Project Statement of Work.pdf PDF
Attch 22 - Appendix 11 - DoD Minimum Antiterrorism Construction Standards Pre-Final Checklist.pdf PDF
Attch 39 - AF Form 3065 - Progress Report.pdf PDF
Attch 21 - Appendix 10 - Base Access Procedures KAFB.pdf PDF
Attch 24 - Appendix 13 - AF LEED SDD Implementation Guidance.pdf PDF
Attch 12 - Appendix 4.3 - 16710 Communications.pdf PDF
Attch 27 - Appendix 14.3 - Guidance and Standards-Toilet Accessory Requirements.pdf PDF
Attch 7 - Appendix 1 - General Design Guidelines.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to accomplish the follow ing:

1) Amend Section J, Attachment 5, Past Performance Questionnaire, revised 3/23/2012.

2) Attachment 5, Past Performance Questionnaire, section 1(G) revised; the w ord Mission changed to Technical.

3) Attachment 5, Past Performance Questionnaire, section 1(H) revised; the w ord Mission Capability changed to Technical/Technical Risk.

4) All other terms and conditions remain unchanged.

Contract Administrator: Gilbert L. Martinez

Email: gilbert.martinez@kirtland.af.mil

Phone: (505)846-2921

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Mar-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA9401-12-R-0002

X 9B. DATED (SEE ITEM 11)

09-Mar-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Mar-2012

CODE

AFNWC/PKOD

2000 WYOMING BLVD SE

BLDG 20604

ALBUQUERQUE NM 87117

FA9401 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA9401-12-R-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS

ATTACHMENT DESCRIPTION DATE

1 Wage Determination (Bernalillo County) – Building 02/10/2012

2 Wage Determination (Bernalillo County) – Residential 01/06/2012

3 Wage Determination (Bernalillo County) – Heavy 01/06/2012

4 Wage Determination (Bernalillo County) – Highway 01/06/2012

5 Past Performance Information/Questionnaire Package 03/23/2012

6 MACC General Provisions 02/02/2012

7 General Provisions Appendix 1, General Design Guidelines 02/02/2012

8 General Provisions Appendix 2, KAFB Architectural Compatibility Plan 02/02/2012

9 General Provisions Appendix 3, DUSD (IE) Section 438 EISA Policy

Memo

02/02/2012

10 General Provisions Appendix 4.1, 13280 Asbestos Containing Materials Remediation

02/02/2012

11 General Provisions Appendix 4.2, 13281 Lead Containing Materials Remediation

02/02/2012

12 General Provisions Appendix 4.3, 16710 Communications 02/02/2012

13 General Provisions Appendix 4.4, 16721 New Construction Automatic Fire Detection and Alarm System

02/02/2012

14 General Provisions Appendix 4.5, 16721 Existing Bldg. Remodel

Automatic Fire Detection and Alarm System

02/02/2012

15 General Provisions Appendix 4.6, 1012 Native Grass Seeding Specification

02/02/2012

16 General Provisions Appendix 5, AF Form 592, Sample Burn Permit 02/02/2012

17 General Provisions Appendix 6, AF 103, Digging Permit 02/02/2012

18 General Provisions Appendix 7, Air Force Federal Mandates Quick Reference

02/02/2012

19 General Provisions Appendix 8, Recycling Specification for KAFB 02/02/2012

20 General Provisions Appendix 9, Environmental Requirements KAFB 02/02/2012

21 General Provisions Appendix 10, Base Access Procedures KAFB 02/02/2012

22 General Provisions Appendix 11, DoD Minimum Antiterrorism

Construction Standards – Pre-Final Checklist

02/02/2012

23 General Provisions Appendix 12, Waste Diversion Report 02/02/2012

24 General Provisions Appendix 13, AF LEED SDD Implementation Guidance

02/02/2012

25 General Provisions Appendix 14.1, Guidance and Standards-Irrigation 02/02/2012

26 General Provisions Appendix 14.2, Guidance and Standards-Backflow Prevention

02/02/2012

27 General Provisions Appendix 14.3, Guidance and Standards-Toilet Accessory Requirements

02/02/2012

FA9401-12-R-0002

28 General Provisions Appendix 14.4, Guidance and Standards-Minimum Communication Standards

02/02/2012

29 General Provisions Appendix 14.5, Guidance and Standards-Metering 02/02/2012

30 Seed Project - Statement of Work, LRPD Advanced HPM Research

Facility Expansion, Project # MHMV 10112

01/26/2012

31 Seed Project Price Schedule (AF Form 3052) 02/02/2012

32 Seed Project Bid Schedule 02/02/2012

33 Seed Project Building 909-Study - Cost Removed 02/02/2012

34 Seed Project ACM-LCM Survey Report B909 02/02/2012

35 Seed Project Water flow Test Results 02/02/2012

36 Seed Project - Westside Shoppette Geotechnical Report 02/02/2012

37 Seed Project - Future Expansion Power Requirements Table 02/02/2012

38 AF Form 3064 - Progress Schedule 02/02/2012

39 AF Form 3065 - Progress Report 02/02/2012

40 Kirtland AFB-West Map 03/14/2012

41 Historical Data by Project Type and Cost 03/15/2012

(End of Summary of Changes)