Text version
Multiple Award Construction Contract (MACC)
RFP, Pre-Proposal Conference and Site Visit Questions
Solicitation FA9401-12-R-0002
12 April 2012
ROUND 8
MACC FA9401-12-R-0002
The purpose of this document is to provide answers to RFP questions for Solicitation
FA9401-12-R-0002.
192. Sheet 11 of Attachment 33 indicates a building height of 40'. Is this dimension requirement an exterior building height, or interior total clear space? What is the clear space height requirement inside the proposed building?
Answer: The building height will be driven by the minimum interior hook height of 35’
AFF. This may or may not result in a 40’ overall building height. The 40’ height was a preliminary estimate.
193. Per Attachment 33, the building exterior is to be constructed of integrally colored, split-face CMU blocks:
1. If the walls are to be split-face CMU and stucco exterior, is the split-face side going to be on the interior surface of the wall?
Answer: The split-face should be on the exterior of the building.
2. What side of the split-face CMU will be visible on the interior of the building, and what side of the CMU will the stucco be applied to?
Answer: The smooth side of the CMU will be visible on the interior. There will be no stucco requirement for the project.
194. There will be a 4' wide containment trench around the interior of the building as indicated on page 11 of Attachment 33.
1. Is a grate or other covering to be provided over this trench?
Answer: Yes.
2. What type of loads should this grate/covering be able to support?
Answer: For the purposes of the proposal, please assume a live floor load of 250 psf distributed, 3000 lb. concentrated.
3. What type of material should this grate be made of? Does the liquid being contained in the trench have any corrosive or negative impact to any specific materials?
Answer: The liquid that may be in the trench is non-corrosive, and is not expected to have a negative impact on the grating. The Grating may be comprised of any material that will perform in accordance with the requirements.
Solicitation FA9401-12-R-0002
12 April 2012
ROUND 8
195. Circuit receptacle ratings are not an accurate indicator of connected loads. Attachment
33, page 31 indicates that HDR based the lab power load total on “client equipment list.
Can you please provide an updated lab equipment list?
Answer: That list will vary during use of the building. There is not a definitive list available at this time. The requirements for the project were developed with the User, and made use of the best information available at the time.
196. From an electrical supply concept perspective, it would be quite useful to have an existing single line diagram from the 12.47 kV underground feeder to the main 480 V distribution switchgear within the existing building 909A. Is this available for use? If so, please send out.
Answer: The single line diagram is not available.
197. Our notes from the site visit indicated that “evaluation of existing power” is required.
little definition would help—walk-through of the existing facility to verify as-build conditions only, demand load monitoring to assess the adequacy of the current distribution equipment, etc.? Walk-through of surrounding buildings to determine as-built conditions was not permitted. What options are available to evaluate the existing power conditions?
Answer: A new service entrance and transformer are required for this project. No power will be taken from the existing building. No new requirements are being added to any distribution equipment located in the existing building.
198. An air handling unit presently located on the east side of building 909A will need to be relocated to make way for the Laboratory Addition.
1. Is there a location already determined for this unit to be relocated too?
Answer: No. That will be developed during design.
2. The unit currently feeds into the side wall of building 909A. Is the new location required to be into a side wall, or is entrance through the roof an option?
Answer: No option is ruled out at this time.
3. Because we were not permitted into building 909A, how are we to determine where the air supply is needed and can be connected in building 909A?
Answer: Record drawings and access to building 909A will be available during design.
4. If additional ducting is required to attach the unit from its new proposed location to an acceptable building entrance, what evaluation is available to determine if the unit
Solicitation FA9401-12-R-0002
12 April 2012
ROUND 8
is able to support the new load? What if the existing unit is determined to not meet the additional load required by the addition of duct?
Answer: The contractor is required to meet all requirements of the project. Design decisions, including unit locations, will be made in light of the project requirements and
Contract scope of work.
199. Attachment 33 requests electrical connection points for equipment along the east wall of the proposed addition. Aside from where shown and to meet code requirements, are any additional power/data connections requested in other areas? (ie open floor area inside secondary containment trench, south wall, north wall).
Answer: See Attachment 37 for complete requirement. Code requirements must be met as well. No other connection points are required.
200. Is the existing electrical transformer loop fed with taps we can tie the new transformer into or is it radial fed? If so, we may have to go much farther away to obtain adequate current capacity for the new transformer. We may also need to add a new vault to contain the taps.
Answer: There are 2 connection points for the new 2mva transformer by B909. The first is Z10244. It is currently feeding 2 transfomers on the SW corner of 909. There are no spare 200A connection points unless the new transformer feeds the existing load of one of the existing transformers, otherwise the Z-box would need tobe replaced by a new one with 3-200A connection points.
The second is Z11244. It is currently feeding 1 load consisting of a single Z-box supplying 3 transformers, one of the is the newest 1500kva transformer. It has no spare
200A connection points so it would also need to be replaced with a new Z-box consisting of 2-200A connection points. Both of these proposed connection points are fed from Sub 24A, Fdr 4, which currently has a load of 55 amps and a capacity of 600 amps.
201. Are heat loads for the planned equipment inside the building available?
ANSWER: Answer: Please use 6 watts/SF for Lab Equipment, 2 watts/SF for lighting, and 250 BTU/hr/person sensible and latent. High-powered User furnished equipment will be energized for very short durations of 5 minutes or less, 3-10 times/day.
202. Where can the HVAC units be placed on the ground around the building? Can they be split into two separate areas?
Answer: Locations and configuration for HVAC units will be determined during design.
Solicitation FA9401-12-R-0002
12 April 2012
ROUND 8
203. Does the contractor supply the actual anechoic chamber or simply construct the pit? If we are to provide a chamber, please provide parameters.
Answer: The anechoic chamber will be procured and installed under separate contract.
204. Is there a loading requirement for the main floor or in the pit area?
Answer: For the purposes of the proposal, please assume a live floor load of 250 psf distributed, 3000 lb. concentrated.
205. What height is the crane system expected to be mounted at? Are the rails required to be wall-mounted or column-supported or is at Contractor's discretion?
Answer: The crane height will be driven by a minimum hook height of 35’ AFF.
Mounting/support details will be determined during design.
206. Are the HVAC and heat systems intended to cool and heat the entire volume or only the area near the floor (1st story area)? This will greatly affect the type of distribution system required. Can the ducting be mounted to the walls at approximately 13' off the floor around the perimeter?
Answer: The design must meet the criteria listed in the DA.
207. Will radiant strip-type gas heaters be acceptable?
Answer: No.
208. Are we to provide a grating system over the trench? Is the trench system a continuous loop around the perimeter or is it broken up as shown on the drawing? Is there any plumbing required for the trench system?
Answer: A grating system over the trench must be included in this project. The trench may or may not be continuous as shown on the preliminary drawing. That will be determined during design. There is no plumbing associated with the trench.
209. Is it preferred that the new addition have a flat sloped roof or pitched? Is the expected
40' height to the top of shortest wall or to the top of the roof? In other words, how much headroom above the floor is required inside the building?
Answer: There is no preference for a sloped or flat roof, per se. The 40’ height may or may not be the final height, depending on the structural design and the more importance requirement for a 35” minimum hook height for the crane.
Solicitation FA9401-12-R-0002
12 April 2012
ROUND 8
210. Is there a preference for discharge location of storm water from the roof?
Answer: Storm water discharge must comply with EISA requirements and applicable codes.
211. To obtain a reasonable preliminary estimate of HVAC equipment sizes, please provide more information about the anticipated heat gain loads. In Attachment 33, page 23 the space heat load criteria for laboratory/instrument areas is “as required for instrument loads”, however no instrument load or load profiles have been provided. In the same
Attachment on page 18 the estimated electrical peak demand of HVAC is listed but there is no indication of the assumptions that were used to generate that peak electrical load.
212. Will one fire sprinkler system be sufficient for the new addition, or will a separate system (ie pre-action system) be required above the anechoic chamber? In addition, fire sprinkler system design is typically not provided in a 30% design due to a lack of flow testing and other associated engineering. Will a fire sprinkler design be required in the
30% proposal concept design?
Answer: One system will be sufficient for the addition. All fire suppression required for the anechoic chamber will be designed and installed under separate contract. A fire sprinkler design will not be required for the proposal concept design.
213. Is the lightning protection for the new building to be included in the Base Bid?
Answer: The requirement for lightning protection has been removed from the project.
214. Emergency power is listed as a requirement in the Statement of Work and listed as not required on sheet 19 of the Design Criteria. Can you clarify the emergency power requirement?
Answer: There is not a requirement for emergency power.
215. Matching the color requirements specified in the design criteria as well as in the previously answered questions; is an exterior insulation and finishing system (EIFS) acceptable for exterior finish of the building?
Answer: There is no exterior finish system required, aside from the integrally-colored
CMU.
Solicitation FA9401-12-R-0002
12 April 2012
ROUND 8
216. Would you consider raising the page limit to 5 pages including the Master Table of
Contents or moving it back so that the Master Table of Contents is not included in the 3 page limitation?
ANSWER: Negative.
217. Is there supposed to be a separate Executive summary and Narrative summary because the executive summary says address the key points from the offeror‘s
Technical/Technical Risk, Past Performance, and Cost/Price areas but the narrative summary says, The narrative summary of the entire proposal should be concise, to include addressing the significant risks, and highlighting any key or unique features, excluding cost/price. Can you please clarify? I thought 3.0 was just a description of what would be needed but it contradicts 3.1 so now I’m a little confused.
ANSWER: No, the Executive Summary should consist of a Narrative Summary and
Master Table of Contents.
218. The sketch shows a 4 ft wide by 2 ft deep trench around most of the interior perimter of the building. We ask these questions to know if we should price the required materials for these items in the seed project cost.
1. Will the trench require trench grate to cover it? If yes, What will the traffic weight be inside of the building?
2. Will the Anechoic Chamber require a hand/safety rail around its perimeter?
Answer: The trench will require a grate covering. Loading requirements are 250 psf, with 3000 lb concentrated load. No railing related to the anechoic chamber will be required in this project.
219. In the Technical Volume (Vol. II), 4.2.2 Volume Organization number (8) asks for a
Risk Matrix. However, there are not any requirements or evaluation criteria as to what is supposed to go in the matrix. Can you please clarify what you would like to see in the Risk Matrix?
ANSWER: A Risk Matrix should be developed IAW RFP FA9401-12-R-0002 Section
L Para 4.2.1.1. Technical Risk will be evaluated IAW Section M Table 3.
220. In the Technical Volume (Vol. II), 4.2.4 Subfactor Two: Technical
Capability/Execution and completeness of the Seed Project asks for the conceptual design proposal to include “all required drawings.” Can you please clarify which drawings are required?
Answer: The drawings required for the Seed Project proposal should be sketch-level drawings showing a conceptual design solution for the Seed Project.
Solicitation FA9401-12-R-0002
12 April 2012
ROUND 8
221. Please confirm that we do not need to provide pricing in the proposal for Section B –
Supplies or Services and Prices on pages 3-9 of the solicitation. The NOTE indicates
“Prices are not required for this section. Prices will be requested for each Task Order.”
ANSWER: No pricing information will be provided in Section B pages 3-9. Pricing must be provided IAW RFP FA9401-12-R-0002 Section L Para 6.0, “seed project” pricing must be provided in the price schedule AF Form 3052, attachment 31 and a separate detailed price breakdown describing the design effort and construction effort on bid schedule, attachment 32.
222. Is there currently any consideration for a due date extension on this project?
Answer: Negative
223. It is unclear from Attachment 6 and Attachment 30 what drawings and narratives are specifically are required to be included in the proposal for the Seed project. References made in Attachment 30 appear to be for the 35-100% submittals and final documents after the project is awarded. Attachment 6 has a similar requirements.
Answer: The proposal need not include drawings, specs, etc. to the 35% level. The expectation is that the Offeror will include sketch-level drawings showing a conceptual design solution for the Seed Project.
224. The design analysis has no required cooling load. The only reference is 325 KVA at
480V. This can translate to 150 (±) tons of cooling. What is the cooling load required for this facility?
225. Are redundant HVAC units required per the design analysis provided with the RFP?
Answer: Yes. Each unit is to be sized for 2/3 capacity.
226. The seed project talks about an x-ray. Is this owner furnished equipment? If not what are the requirements for construction and location?
Answer: The x-ray is User-furnished.
227. Are the drawings and specifications included in the 40 page count for Volume II?
ANSWER: RFP 2.2.1 Page Limitations…Each page shall be counted except the following: drawings, and specifications.
Solicitation FA9401-12-R-0002
12 April 2012
ROUND 8
228. Is it permissible for ducts to be located beneath crane structure at sides of building and if so what distance beyond the interior wall surface will meet the crane clearance requirements?
Answer: The final acceptable location for ductwork will be developed during design.
229. Does KAFB has a "locked in agreement with Honeywell for Fire Alarm and Security work" throughout KAFB? If so, will the MACC Task Orders be required to use
Honeywell for the Fire Alarm and Security work? Or will the Fire Alarm and Security work be "outside" the MACC?
Answer: The MACC contract will be required to follow all current KAFB standards
Alarm work. Currently, all FA equipment is to be Honeywell-approved equipment, and all Security Alarm equipment must comply with KAFB Civil Engineering Alarm Shop standards. The KAFB Alarm Shop installs and certifies only Advantor type panels, with installation of detection devices, wiring, power by Contractor.
230. It is our assumption that the requirement for the 8(a) to perform 15 percent of the labor for this contract is measured over the life of the contract and not on an individual Task
Order basis.
ANSWER: Considering each Task Order (TO) will be issued on an individual basis, the
Prime contractor is required to perform the % for each TO. The percentage will not be determined over the Ordering Period of the IDIQ.
231. Since the Air Force is not providing as-builts for this project, would it be possible for the Air Force to provide another site visit for the SEED project?
ANSWER: Another site visit will not be provided.
232. In order to properly size the substantial cooling requirement, please provide the expected heat rejection from owner furnished equipment?
233. The exterior walls are 12" CMU walls. Do these walls (CMU wall) need to be painted on the interior of the building?
Answer: Yes.
Solicitation FA9401-12-R-0002
12 April 2012
ROUND 8
234. There are no requirements given for exterior lighting. Will exterior lighting need to be provided on the new building? If so, what type and design layout requirements?
Answer: Exterior lighting is not a requirement in the project.
235. The exterior walls of the addition at to be 12" CMU. Is the interior of the building required to have a furred wall around the perimeter of the building (at CMU wall interior)? Is insulation of the exterior CMU walls required?
Answer: No furr-out is required for the interior wall surface of the exterior walls. CMU wall should be insulated in all non-grouted cells.
236. RFP page 73 requires:
6.4.6 Probable Subcontractors
Submit a list of the proposed probable subcontractors and inter-divisional transfers showing (a) the supplier, (b) description of effort, (c) type of contract, (d) price and hours proposed by each, (e) price and hours included in prime‘s proposal to the
Government, and (f) commercial item/service determination support, if applicable.
1. Is this required for the proposal phase?
2. Are we required to select sub-contractors at the proposal phase?
3. If subs are selected at the proposal phase, is the Prime contractor required to use those subs indicated in the proposal if circumstances/cost/schedules change?
ANSWER: If subcontractors have been selected a list of there names is required.
Section H Para 1.16 gives information regarding the substitutions of key personnel and key subcontractors.
4. Is the prime required to submit hours proposed by every subcontractor?
ANSWER: Yes, IAW RFP FA9401-12-R-0002 Section L Para 6.0, “seed project” pricing must be provided in the price schedule AF Form 3052, attachment 31 and a separate detailed price breakdown describing the design effort and construction effort on bid schedule, attachment 32.
237. RFP page 73 requires:
6.4.5 Schedule of Hours by Labor Skill Mix
Submit a schedule showing total proposed hours summarized by labor skill mix. This schedule is to include (but separately identify) subcontractor(s) and inter-divisional transfer(s) hours. In addition, provide labor classification statements for each category of labor proposed (prime, subcontracts, and inter-divisional) describing position qualifications (education, years of experience, etc).
1. Is this required for the proposal phase?
Solicitation FA9401-12-R-0002
12 April 2012
ROUND 8
ANSWER: Yes, IAW RFP FA9401-12-R-0002 Section L Para 4.2.4 a project schedule must be provided.
2. Is it required that every sub-contractor and trade be broken down and qualifications for every labor classification for every trade be given for the entire project?
ANSWER: Yes, IAW RFP FA9401-12-R-0002 Section L Para 6.4.5 and 6.2, “seed project” pricing must be provided in the price schedule AF Form 3052, attachment
31 and a separate detailed price breakdown describing the design effort and construction effort on bid schedule, attachment 32.
3. What type of format is this to be provided in?
ANSWER: RFP FA9401-12-R-0002 Section H Para 1.30 gives information regarding the preparation of schedules for construction contracts. Attachment 38
(AF Form 3064), Progress schedule shall be utilized.
237. There is absolutely no information, requirements or specifications given for the anechoic chamber:
1. The requirement for dimensions are stated as "30'x30'x6' deep. In attachment 33, page 11 the anechoic chamber is referred to as a pit. On page 12 it looks as though the chamber as partially below grade and partially above grade. Is the anechoic chamber/pit to be a total of 6' tall (3' below grade and 3' above grade)? Or is it to be 6' deep below grade and 6' above grade, creating a total interior height of 12'? Please clarify.
2. Is the contract only to provide the pit and walls, or is the anechoic chamber shielding, insulation, and equipment required as part of the deign and proposal?
3. If all components of the anechoic chamber are required as part of the seed project, we will need specifications and requirements to design and bid the anechoic chamber.
Is there a design or specifications for this chamber? If so, please provide.
4. Are we to provide a lid or roof for the anechoic chamber? If so, what are the requirements?
Answer: Only the 6’ deep pit and pit walls are required in this project. The anechoic chamber proper will be furnished and installed under separate contract.
238. There is absolutely no information, requirements or specifications given for the non-ionizing radiation shielding wall:
1. Attachment 33, page 12 indicates a 5" X-ray shielding wall which would be an ionizing radiation shielding wall. It is indicated that high powered microwaves will be present. Is the correct type of shielding to be a "non-ionizing radiation shield wall"?
2. There is no information given to indicate what specifications are to be met, what frequencies are to be blocked and to what magnitude, and what requirements this wall
Solicitation FA9401-12-R-0002
12 April 2012
ROUND 8
needs to meet. Please provide material required, specifications, design and/or requirements of this wall.
3. Is this wall design and price proposal to be included by the prime contractor under this proposal?
Answer: The shield wall will be funished and installed under separate contract.
239. The posted Amendment 0001 did not include an SF-30. Will one be provided?
ANSWER: An SF-30 was not and will not be provided for Amendment 0001.
Amendment 0001 may be acknowledged by completing section 19, 20A, 20B and 20C on the second page. IAW RFP Section 7.1, acknowledgement of all amendments must be submitted with Volume V.
240. Will there be a new conformed solicitation posted or will the one issued with Amend
0005 be the final?
ANSWER: A conformed copy for Amendment 0005 was issued at 12:14PM, 27 March
2012. Amendments may be issued anytime up to closeout of the RFP. It is the Offeror’s responsibility to monitor FEDBIZOPPS for any changes/amendments.
241. I saw the above mentioned project on the construction reporter and was wondering If we could get a set of plans to look at and see the extent of the stucco work; if there is any. We have done previous work at KAFB with XXXX and are interested in bidding this project. If you could let me know if there are plans to view or if our estimator needs to field measure I would appreciate it.
ANSWER: All information regarding RFP FA9401-12-R-0002 can be found at the
FEDBIZOPPS website, https://www.fbo.gov/index?s=opportunity&mode=form&id=7d3b3d60a8f33d16d5d359