Attch_3_-_Wage_Determination_(Bernalillo_County)__Heavy_dated_7-20-2012.pdf
PDF 141 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA9401-12-R-0002
About this file
Attch 3 - Wage Determination (Bernalillo County) Heavy dated 7-20-2012
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: NM120013 07/20/2012 NM13
Superseded General Decision Number: NM20100018
State: New Mexico
Construction Type: Heavy
County: Bernalillo County in New Mexico.
HEAVY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 01/06/2012
1 04/13/2012
2 05/25/2012
3 07/20/2012
BRAZ0003-002 11/23/2009
Rates Fringes
BRICKLAYER.......................$ 24.62 4.57
* CARP1319-002 06/01/2012
CARPENTER (Excluding Form
Work)............................$ 22.94 7.92
ELEC0611-008 05/01/2012
Electrician
Zone 1......................$ 29.90 5%+8.10
ZONE 1: 0 to 40 miles from the main Post Office in
ALBUUERQUE.
ZONE 2: Extending up to 10 miles beyond Zone 1, shall receive
9% above Zone 1 rate.
ZONE 3: Extending up to 20 miles beyond Zone 1, shall receive 15% above Zone 1 rate.
ZONE 4: Extending more than 20 miles beyond Zone 1, shall receive 26% above Zone 1 rate.
ENGI0953-005 04/01/2011
Power Equipment Operator
(3) Forklift................$ 19.40 5.44
(4) Bulldozer...............$ 19.54 5.44
SHAFT AND TUNNEL WORK - $.15 per hour above regular rate.
HAZARDOUS PAY - The following pay shall be applicable for every hour an operating engineer is required by governmental regulations and does wear special equipment for hazardous work at the designated levels. This is applicable in all three zones
LEVEL C - 10% above regular hourly wage
LEVEL B - 10% above regular hourly wage
LEVEL A - 15% above regular hourly wage
ZONE PAY The reference point for determining zone pay shall be from the intersection of Interstate Highway 25 and I-40.
ZONE 1 - Albuquerque - 0 to 50 mile radius from I-40 shall be a Free Zone
- Farmington - 0 to 15 mile radius of Farmington City
Hall shall be a Free Zone
Zone 2 - Shall be $3.50 per hour above base pay. Will apply outside of above parameters up to 35 miles
Zone 3 - Shall be $2.50 cents per hour above Zone 2 for a total of $6.00 per hour and will apply after 35 miles of
Zone one's parameters.
PLUM0412-003 10/01/2010
PIPEFITTER.......................$ 28.30 11.05
SUNM2009-007 09/14/2010
CARPENTER (Form Work Only).......$ 16.84 4.71
CEMENT MASON/CONCRETE FINISHER...$ 18.05 3.19
IRONWORKER, REINFORCING..........$ 26.30 8.59
LABORER: Common or General......$ 12.68 1.97
LABORER: Flagger................$ 10.65 1.91
LABORER: Landscape..............$ 11.00 0.35
LABORER: Mason Tender -
Cement/Concrete..................$ 12.46 0.00
LABORER: Pipelayer..............$ 13.60 0.00
OPERATOR: Backhoe...............$ 19.14 4.08
OPERATOR: Bobcat/Skid
Steer/Skid Loader................$ 13.77 0.00
OPERATOR: Grader/Blade..........$ 18.56 0.00
OPERATOR: Loader (Front End)....$ 14.62 1.28
OPERATOR: Tractor...............$ 14.74 0.26
PAINTER: Brush, Roller and
Spray............................$ 17.10 0.44
TRUCK DRIVER: Dump Truck........$ 12.45 0.26
TRUCK DRIVER: Pickup Truck......$ 12.10 1.73
TRUCK DRIVER: Water Truck.......$ 14.74 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be
July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .