Attch 21 - Appendix 10 - Base Access Procedures KAFB.pdf

PDF 176 KB Posted

Attached to
Multiple Award Construction Contract (MACC)
Solicitation number
FA9401-12-R-0002
Issued by

View the file

Other files

File Type Posted
Attch_1_-_Wage_Determination_(Bernalillo_County)__Building_dated_7-20-2012.pdf PDF
MACC_RFP_FA9401-12-R-0002_Amendment_10.pdf PDF
Attch_2_-_Wage_Determination_(Bernalillo_County)__Residential_dated_4-6-2012.pdf PDF
Attch_3_-_Wage_Determination_(Bernalillo_County)__Heavy_dated_7-20-2012.pdf PDF
MACC_RFP_FA9401-12-R-0002_Amendment_9.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 8.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 9.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 7.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 8.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 6.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 6-Conformed Copy.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 6.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 7.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 5.pdf PDF
RFP FA9401-12-R-0002 Pre-Proposal Conference-Site Visit Final Sign-in Sheet.pdf PDF
MACC Pre-Proposal Brief.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 4.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 3.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 2.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 5-Conformed Copy.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 5.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 4.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 4-Conformed Copy.pdf PDF
Attch 5 - Past Performance Information Questionnaire Package.docx DOCX document
MACC RFP FA9401-12-R-0002 Amendment 3-Conformed Copy.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 3.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 2-Conformed Copy.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 2.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 1.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 1.doc DOC document
Attch 32 - Seed Project Bid Schedule.xlsx XLSX spreadsheet
Attch 20 - Appendix 9 - Environmental Requirements KAFB.pdf PDF
Attch 10 - Appendix 4.1 - 13280 Asbestos Containing Materials Remediation.pdf PDF
Attch 40 - Kirtland AFB-West Map.pdf PDF
Attch 37 - Seed Project - Future Expansion Power Requirements Table.pdf PDF
Attch 13 - Appendix 4.4 - 16721 New Construction Automatic Fire Detection and Alarm System.pdf PDF
Attch 26 - Appendix 14.2 - Guidance and Standards-Backflow Prevention.pdf PDF
Attch 15 - Appendix 4.6 - Native Grass Seeding Specification.pdf PDF
Attch 9 - Appendix 3 - DUSD —
Attch 23 - Appendix 12 - Waste Diversion Report.pdf PDF
Attch 25 - Appendix 14.1 - Guidance and Standards-Irrigation.pdf PDF
Attch 18 - Appendix 7 Air Force Federal Mandates Quick Reference.pdf PDF
Attch 35 - Seed Project Water flow Test Results.pdf PDF
Attch 31 - Seed Project Price Schedule - AF3052.xlsx XLSX spreadsheet
Attch 36 - Seed Project - Westside Shoppette Geotechnical Report.pdf PDF
Attch 39 - AF Form 3065 - Progress Report.pdf PDF
Attch 30 - Seed Project Statement of Work.pdf PDF
Attch 22 - Appendix 11 - DoD Minimum Antiterrorism Construction Standards Pre-Final Checklist.pdf PDF
Attch 41 - Historical Data by Project Type and Cost.pdf PDF
MACC RFP FA9401-12-R-0002.doc DOC document
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2 Feb 2012 Page 1 of 1 Attachment 21 Solicitation FA9401-12-R-0002

Base Access Procedures for MACC Contractors

These instructions will be for the MAIN personnel requiring access through the duration of the contract, and not sub-tier contractors with periodic access requirements. These individuals will be issued a SFMIS Pass/DBIDS card for the duration of the base-period contract. The initial SFMIS Pass/DBIDS card issued will be valid through XXXXXX (end date for base year contract) and will need to be renewed and in place by XXXXXX (start date for first option year extension) of each option year exercised to coincide with the option year start date for the present year. It is highly recommended this be re-accomplished at least one month prior to the start date for each option year to ensure no down time between the SFMIS Pass/DBIDS card expiring and getting the extension granted.

Kirtland Air Force Base (KAFB) procedures to follow to be issued base access via SFMIS Pass/DBIDS card:

1. The contractor shall fill out the “SFMIS Pass Request Sheet” for the individuals who will require continuous access to the installation for their services for the duration of the contract.

2. The INDIVIDUAL obtaining the pass shall fill out the “Criminal Background Check Information” form by hand and ensure legibility. This needs to physically be done by the individual to eliminate any issues with incorrect SSNs being provided. SFS could look at falsified SSNs being provided as intentionally providing false information to the government and take appropriate actions if necessary.

3. In addition, please provide an email to Susan Leitner containing a MS Excel attachment of the individuals requesting a SFMIS Pass/DBIDS card. Your list should include columns for the eleven specific categories identified on the “Contractor SFMIS Pass Request” document provided.

4. The AE shall select two individuals from of the list provided to grant base access for their sub-contractors (probably the PM and another management position). This will be done by placing a phone call to the Truman Gate (505-846-6438) and providing the sub-contractor’s company name, the name of the individuals requiring access and the requesting individual’s Social Security Number. This process will also apply to individuals within the company who have not already been given a SFMIS Pass/DBIDS Card.

These passes will be three (3) day duration passes. If the sub requires access to exceed three days, this will have to be accomplished every third day. There is also an option to have this temporary pass issued with the sponsoring individual present at the Truman Gate. For this option, a 30 day pass can be issued to the individual requiring access.

Note: The PM or alternate will be responsible to ensure their subs have access prior to the sub arriving at the Truman gate.

File details come from the government source that posted it. Updated .