Attachment_3_-_Exhibit_A_-_Fairchild_CDRLS.pdf

PDF 15 MB Posted

Attached to
Rotary Maintenance Contract Consolidation (Formerly FA6800-18-R-0005)
Solicitation number
FA6800-19-R-A002
Issued by

About this file

This document provides an overview of a solicitation for helicopter maintenance contract consolidation services. The solicitation will award multiple contracts to provide organizational and intermediate level maintenance, repairs, scheduled and unscheduled maintenance, inspections, fleet management, and aircrew services for UH-1N, HH-60, MH-139, and V-22 helicopters at locations including Andrews AFB, F.E. Warren AFB, Minot AFB, Malmstrom AFB, Fairchild AFB, Yokota AB Japan, and Kirtland AFB. A firm-fixed-price contract with both fixed-price and cost reimbursement CLINs is contemplated, with a period of performance from October 2019 to September 2029 and two ordering periods. Two competition pools will be utilized, with small business set-aside and full and open competition and up to five contractors to be selected for each pool. A pre-proposal conference will be held on February 19th at Fairchild AFB and February 21st at Kirtland AFB, with questions due by February 15th. The NAICS code is 488190 and small business size standard is $32.5M.

Fairchild CDRLs

View the file

Other files

File Type Posted
AMENDMENT_0004_Attachment_13C_-_Kirtland_TEP_Matrix.xlsx XLSX spreadsheet
Signed_-_FA680019RA0020004_Amendment_0004.pdf PDF
FBO_AMENDMENT_0004_RFP_Industry_Comments_CRM.docx DOCX document
AMENDMENT_0004_Attachment_13B_-_Kirtland_CPFF_Rate_Tables.xlsx XLSX spreadsheet
Fairchild_Site_Visit_CRM.docx DOCX document
AMENDMENT_0003_Attachment_20_MINIMUM_INSURANCE_REQUIREMENTS.pdf PDF
AMENDMENT_0003_Attachment_8SB_9SB_-_SMALL_BUSINESS_PPQ_Cover_Letter_PPQ.docx DOCX document
Kirtland_Site_Visit_CRM.docx DOCX document
(2)_AMENDMENT_0003_EVALUATION_CRITERIA_-_SMALL_BUSINESS_POOL_-_Section_M.docx DOCX document
AMENDMENT_0003_Attachment_13A_-_Fairchild_TEP_Matrix.xlsx XLSX spreadsheet
AMENDMENT_0003_Attachment_18B_-_Kirtland_Technical_Order_Listing.pdf PDF
AMENDMENT_0003_Attachment_2A_-_Fairchild_Manpower_Matrix.xlsx XLSX spreadsheet
AMENDMENT_0003_Attachment_6_-_Proposed_Teaming-Subcontracting_List.docx DOCX document
AMENDMENT_0003_Attachment_12B_-_FO_Cross_Reference_Matrix.docx DOCX document
Signed-FA680019RA0020003_Amendment_0003.pdf PDF
AMENDMENT_0003_Fairchild_AFB_Site_Visit_Mission_Brief.pptx PPTX presentation
AMENDMENT_0003_Attachment_7_-_PPI_Template_for_Offerors.docx DOCX document
AMENDMENT_0003_Attachment_19A_-_Fairchild_GFP_Master_Inventory.pdf PDF
AMENDMENT_0003_Attachment_18A_-_Fairchild_Technical_Order_Listing.pdf PDF
AMENDMENT_0003_Attachment_1FO_-_Kirtland_AFB_PWS_Summary_of_Changes.pdf PDF
FBO_AMENDMENT_0003_RFP_Industry_Comments_CRM.docx DOCX document
AMENDMENT_0003_Attachment_1_-_AF_Consolidated_Basic_Contract_PWS.pdf PDF
AMENDMENT_0003_Attachment_1A_Fairchild_AFB_PWS.pdf PDF
AMENDMENT_0003_Attachment_13C_-_Kirtland_TEP_Matrix.xlsx XLSX spreadsheet
(1)_AMENDMENT_0003_INSTRUCTIONS_TO_OFFERORS_-_FULL_OPEN_POOL_Section_L.docx DOCX document
AMENDMENT_0003_Kirtland_DD254_2019.pdf PDF
AMENDMENT_0003_Attachment_1B_-_Kirtland_AFB_PWS.pdf PDF
AMENDMENT_0003_Attachment_8FO_9FO_-_FULL_OPEN_PPQ_Cover_Letter_PPQ.docx DOCX document
AMENDMENT_0003_Attachment_19B_-_Kirtland_GFE_Master_Inventory.pdf PDF
AMENDMENT_0003_Attachment_13B_-_Kirtland_CPFF_Rate_Tables.xlsx XLSX spreadsheet
(1)_AMENDMENT_0003_INSTRUCTIONS_TO_OFFERORS_-_SMALL_BUSINESS_POOL_-_Section_L.docx DOCX document
AMENDMENT_0003_Attachment_1SB_Fairchild_AFB_PWS_Summary_of_Changes.pdf PDF
AMENDMENT_0003_Attachment_2B_-_Kirtland_Manpower_Matrix.xlsx XLSX spreadsheet
AMENDMENT_0003_Attachment_6_-_Proposed_Teaming-Subcontracting_List.docx DOCX document
AMENDMENT_0003_Attachment_12A_-_SB_Cross_Reference_Matrix.docx DOCX document
Signed-Solicitation_Amendment_FA680019RA0020002_SF_30.pdf PDF
Signed-Solicitation_Amendment_FA680019RA0020001_SF_30.pdf PDF
Attachment_16_-_AFGSC_Aircrew_Flight_Equipment_Listing.docx DOCX document
Attachment_12A_-_SB_Cross_Reference_Matrix.docx DOCX document
Attachment_8FO_9FO_-_FULL_OPEN_PPQ_Cover_Letter_PPQ.docx DOCX document
Attachment_13C_-_Kirtland_CPFF_Rate_Tables.xlsx XLSX spreadsheet
Attachment_2A_-_Fairchild_Manpower_Matrix.xlsx XLSX spreadsheet
Attachment_15_-_Performance_Incentive_Plan_Fairchild.docx DOCX document
Attachment_10_-_Consent_Letter.docx DOCX document
INSTRUCTIONS_TO_OFFERORS_-_SMALL_BUSINESS_POOL--Section_L.docx DOCX document
EVALUATION_CRITERIA_-_SMALL_BUSINESS_POOL--Section_M.docx DOCX document
Attachment_2B_-_Kirtland_Manpower_Matrix.xlsx XLSX spreadsheet
FAFB_Site_Visit-Map-Instructions.pptx PPTX presentation
Attachment_7_-_PPI_for_Offerors.docx DOCX document
Attachment_4A_-_Fairchild_CBA_&_WD.pdf PDF
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10 Jan 2019 ATTACHMENT A000

CONTRACT DATA REQUIREMENTS LIST

FA6800-19-R-A002

CDRL # TYPE TO FREQ Reference

A001

Government

Property

Management Plan

CO & COR

Pre-performance Conference and within five (5) workdays after changes occur

PWS 2.6.4,

PWS 5.6.5.1

A002 Property Inventory and Accountability

CO & COR

Thirty (30) calendar days prior to follow-on contract start date

PWS 2.6.5.1

A003

Names and phone numbers of the contract manager and all contract management and supervisory personnel

CO & COR

Pre-performance Conference and within five (5) workdays whenever changes occur

PWS 2.9.1.2.2

A004 Substance Abuse

Test Results CO As Requested PWS 2.9.2.2

A005

Names of its company officers, parent companies, and parent company officers

CO, COR & HQ

AETC/A4PM

Pre-performance Conference and within thirty (30) calendar days after the change

PWS 2.9.3.1

A006

Listing of the names of newly hired employees and the position assigned

FC, CO & COR

Within five (5) workdays after changes occur

PWS 2.9.3.2 and

5.12.

A007

Contractor

Manpower

Reporting

Application

Department of the

Air Force eCMRA

No later than 31 October of each calendar year

PWS 2.11.3

A008 Contractor Strike

Plan

CO

Pre-performance Conference and within five (5) workdays when changes occur

PWS 2.14.1.

A009 Contingency Plan CO

NLT sixty (60) calendar days following contract start date

PWS 2.14.2.

A010 -21 Equipment

Inventory COR Annually PWS 3.4.5.1

Rotary Wing Aircraft Maintenance and Support Services

– Fairchild Aircraft Maintenance

A000-1

FA6800-19-R-A002

CDRL # TYPE TO FREQ Reference

A011 Explosive safety training program

CO, COR

Pre-performance Conference and within five (5) workdays after changes occur

PWS 3.1.9.2

A012 Lost Tools/Items COR By the fifth (5) workday of next Month (Monthly)

PWS 3.3.9.3.2.

A013

Foreign Object

Damage (FOD)

Investigation

Report

58 SOW FOD

Manager, HQ

AETC/19 AF/LGP,

COR, CO, 36

RQS/MAQ

Event

AFI 21-101,

AETC SUP 1, AFI

91-204, PWS

3.3.10.1.1

A014

AETC Form 199, Foreign Object

Damage (FOD)

Incident

Investigation

COR, 58 SOW

FOD monitor As Required

AFI 21-101,

AETC SUP 1,

PWS 3.3.10.5.1.2

A015 FOD Rates Chief COR Fifth (5th) workday of the next month (Quarterly)

AFI 21-101,

AETC SUP 1,

PWS 3.3.10.6

A016 Dropped Object

Report

COR, HQ

AETC/A4PM PM,

CO, FC, 58 SOW

Dropped Object monitor

Event

AFI 21-101,

AETC SUP 1,

PWS 3.3.10.7

A017

Implementing and

Managing Severe

Weather Aircraft

Protection Program

COR

Contract Start Date & within five (5) workdays after changes occur

PWS 3.3.11.1

A018

Monthly Logistics

Indicators Report

(MLIR)

COR, 19 AF/LGP,

36 RQS/CC

Monthly PWS 3.3.13.1.1

A019 Request for information/data COR Within 2 days of request PWS 3.3.13.2

A020 Aircraft Inventory

Reporting

COR, 19 AF/LGP,

36 RQS/MAQ

Annually

AFI 21-103, AFI

21-101, AETC

SUP,

PWS 3.3.13.3

Rotary Wing Aircraft Maintenance and Support Services

A000-2

FA6800-19-R-A002

CDRL # TYPE TO FREQ Reference

A021

Aircraft

Maintenance and

Utilization Plan

COR, 36 RQS/CC,

26 RQS/MAQ

Weekly/Monthly

AFI 21-101,

AETC SUP

PWS 3.3.15.3

PWS 3.3.15.1

A022 First Look Report COR, 19 AF/LGP PWS 3.3.15.3.2

A023 Fleet Time

Management Chief COR

By the fifth (5) workday of next Month (Monthly)

PWS 3.3.15.9

A024 Time Change Item

(TCI) Projections COR Quarterly/ Annually PWS 3.3.15.11

A025

Maintenance

Scheduling

Effectiveness

COR By the fifth (5) workday of the next month (Monthly)

PWS 3.3.15.12.

A026

Not Mission

Capable Supply

(NMCS),

COR

By the fifth (5) workday of next Month (Monthly)

PWS 3.3.15.13

A027

Partially Mission

Capable Supply

(PMCS)

COR

By the fifth (5) workday of next Month (Monthly)

PWS 3.3.15.14

A028 Maintenance

Cancellation Chief COR

By the fifth (5) workday of next Month (Monthly)

PWS 3.3.15.17

A029 Significant Events

Report COR, 19 AF/LG Event

AFI 21-101,

AETC SUP ,

PWS 3.3.19

A030

Environmental paint material usage log

COR, BE office, Local

Environmental

Flight, 36

RQS/MAQ

As Requested

AFI 21-101,

AETC SUP 1,

PWS 3.8.2

A031

Aircraft

Maintenance

Training/Qualificat ion/Certification

Plan

COR, FC, CO, HQ

AETC/19 AF/LGP

& HQ

AETC/A4PM

Pre-performance Conference and within five (5) workdays after changes occur

PWS 3.9.3.

PWS 3.9.3.6

PWS 3.9.3.3

A032 Employee Training

Records CO Upon Request

PWS 3.9.3.7 and

5.12.3.7.

A033 Quality Control

Plan

CO, COR, & HQ

AETC/A4PM, 19

AF/LG

Pre-performance Conference and within five (5) workdays after changes occur

PWS 3.11.1 PWS

3.11.1.1 PWS

3.11.5 PWS

5.6.5.1

Rotary Wing Aircraft Maintenance and Support Services

A000-3

FA6800-19-R-A002

CDRL # TYPE TO FREQ Reference

A034 Deficiency Report

(DR)

COR, 19 AF/LG Event

TO 00-35D-54,

AFI 91-204,

AFI 21-101,

AETC SUP 1,

PWS 3.11.8.1

A035 AFTO Form 22 CO, COR As Needed

TO 00-5-1,

PWS 3.11.9

A036

SMR Change

Request

(DREAMS)

COR, CO,

Requirement based on TO

As Needed

TO 00-20-3,

TO 00-25-195,

PWS 3.11.10

A037 QC Monthly

Summary

CO, COR,

AETC/A4PM, FC

NLT 7th workday after end of each Month (Monthly)

AFI 21-101,

AETC SUP 1,

PWS 3.5.6 PWS

3.11.18.2

A038 MFT Review N/A to Fairchild

A039

Air Force Repair

Enhancement

Program (AFREP)

N/A to Fairchild

A040

Maintain Record of

Precious Metals

Turn into DRMO

COR Quarterly AFM 23-110 Vol

6, PWS 3.12.2

A041

ITE Custodian, IT asset management appointment letter

CO & COR

NLT contract start date and within five (5) workdays when changes occur.

PWS 3.13.2.1

PWS 3.13.3

A042 E-Tool Status

Report

COR,

AETC/A4PM,

Responsible 36

RQS ITE Custodian

By the fifth (5) workday of each Month (Monthly)

PWS 3.13.5.2

A043 ITE Equipment

Moves/Relocations

Responsible 36

RQS ITE Custodian

Within two (2) work days after move occurs

PWS 3.13.5.6

A044 Service Summary

Standards

COR, CO

Not later than 30 calendar days after the affected period

PWS 3.14.1.3

A045

Aircraft

Availability

Computation

COR

By the fifth (5) workday of next Month (Monthly)

PWS 3.14.2

Rotary Wing Aircraft Maintenance and Support Services

A000-4

FA6800-19-R-A002

CDRL # TYPE TO FREQ Reference

A046

Unusual Mishap/

Incident/Occurrenc e

CO, COR, HQ

AETC/A4PM, 19

AF LG, 58

SOW/SE

Event

AFI 21-101,

AETC SUP 1,

AFI 91-204

PWS 5.1.3 PWS

5.1.3.1.1.

A047 Mishap Prevention

Plan

CO, COR, FAFB

Safety office

Pre-performance Conference and within five (5) workdays after changes occur

PWS 5.1.3.2.

A048 Safety and Property

Damage Reports

CO, COR, Wing

Safety office & HQ

AETC/A4PM

As Required, NLT twenty-four (24) hours

PWS 5.1.3.4

A049 Visitor Access List

FSO, CO, COR &

92 SFS

Prior to the contract start date, quarterly and within five (5) workdays after changes occur

PWS 5.2.13.2.2

A050 Changeover/

Mobilization Plan

CO & COR

Pre-performance

Conference and within five

(5) workdays after changes occur

PWS 5.6.5.1,

PWS 5.12.1

PWS 5.12.3.11

A051

Contractor

Operating

Instructions (OI)s and/or directives

CO & Chief COR

Sixty (60) calendar days after contract start date, within five (5) workdays after subsequent revision(s) and annually

PWS 5.6.5.2

A052

AF Form 813, Request for

Environmental

Assessment

COR As Required PWS 5.7.20

A053

Environmental

Management

System Training

COR

Within ninety (90) duty days of assignment

PWS 5.7.3

A054

Primary and alternate POCs for satellite accumulation points

COR, CO,

Hazardous Material

Pharmacy, 92

CES/CEVR,

Environmental

Flight

Prior to the contract start date and within five (5) workdays after changes occur

PWS 5.7.1 PWS

5.7.2

A055

Support Equipment

Air Emission

Inventory Records

Environmental

Coordinator, BE, 92

CES/CEVR

As Required PWS 5.7.37

Rotary Wing Aircraft Maintenance and Support Services

A000-5

FA6800-19-R-A002

CDRL # TYPE TO FREQ Reference

A056

ESOH data collection information to local

USAF Safety

92 CES/CEVR, BE

office, COR As Required PWS 5.7.38

A057

TO/Publication changes involving hazardous materials

Hazardous Material

Pharmacy, COR

Within five (5) workdays after changes occur

PWS 5.7.10

A058 Budget Input

Requirements

CO, COR, 36

RQS/RA

Event

PWS 5.9.1.3

PWS 5.9.1.4

A059

Supply and

Equipment

Requirements

COR, 36 RQS/RA,

HQ AETC/A4PM

As Required PWS 5.18.4

A060 Contractor

Vehicles

COR, CO & HQ

AETC/A4PM

Pre-performance Conference and within five (5) workdays after changes occur

PWS 5.15.3.1.1

A061

QASP

Observations CO, COR As Required PWS 8.2.2.2

A062 Aircraft Utilization

Report

COR, 19 AF/LG

Fifth (5th) workday of the next month (Monthly)

AFI 21-103,

AETC Sup 1

PWS 3.3.15.2

A063 Monthly Flying

Hours Report

COR, 19 AF/LG,

HQ AETC/A3RA,

36 RQS/MAQ

Event

AFI 21-101,

AETC SUP 1

PWS 3.3.15.4

A064 small business participation plan N/A to Fairchild

A065

Maintenance

Assistance

Requests

COR Event

PWS 3.3.5.

TO 00-25-107

A066 Hanger Queen

Report N/A to Fairchild

A067 Overtime Usage

Report

COR, HQ

AETC/A4PM &

CO

Monthly PWS 5.17.2.2.1

A068

Appointment or

Designation Letter for Collateral Tasks

CO, COR, IAW

Appendix E PWS

Ref

Prior to the contract start date and within five (5) workdays after changes occur

Appendix E

Rotary Wing Aircraft Maintenance and Support Services

A000-6

FA6800-19-R-A002

CDRL # TYPE TO FREQ Reference

A069

Service Summary

Standards-Waiver

Submission

CO, COR,

Functional

Commander, HQ

AETC/A4PM

Not later than 15 calendar days after the affected period

PWS 3.14.1.3.1

Rotary Wing Aircraft Maintenance and Support Services

A000-7

DD FORM 1423-1, FEB 2001

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X001 A X

Aircraft Maintenance FA6800-19-R-A002 Determined upon award

A001 Government Property Management Plan N/A

DI-MGMT-80441 PWS paragraph 2.6.4 and PWS 5.6.5.1 HQ AETC/A4PM

N/A

N/A B

See Blk 16

N/A

See Blk 16

See Blk 16

CO

Government COR

0 0 0

Submit a written, comprehensive contractor USG Property Management Plan covering USG materials and equipment issued.

Block 10 & 12: No later than pre-performance conference for review and acceptance.

Block 13: Within five (5) workdays after changes occur for review and acceptance.

Block 14: Submit to addressee through electronic file.

N/A

Wayne T. Scott

Adobe Professional 8.0

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X001 A X

Aircraft Maintenance FA6800-19-R-A002 Determined upon award

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X001 A X

Aircraft Maintenance FA6800-19-R-A002 Determined upon award

A002 Property Inventory and Accountability N/A

DI-MGMT-82173 PWS paragraph 2.6.5.1 HQ AETC/A4PM

N/A

N/A B

See Blk 16

N/A

See Blk 16

See Blk 16 See Block 16

CO

COR

0 0 0

Contractor shall conduct a pre-inventory and identify missing items and items in need of repair to the Government thirty (30) calendar days prior to follow-on contract start date. A joint inventory shall be completed and accepted by the successor contractor NLT the CO accepted contractor Mobilization/Changeover Plan inventory schedule.

Block 14: Submit to addressee via electronic file.

N/A

Wayne T.Scott

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X001 A X

Aircraft Maintenance FA6800-19-R-A002 Determined upon award

A003 Names and phone numbers of contract manager, contractor management and supervisory personnel

N/A

DI-MGMT-81834A PWS paragraph 2.9.1.2.2 HQ AETC/A4PM

N/A

N/A B

See Blk 16

N/A

See Blk 16

See Blk 16

CO

COR

92 ARW IP office

0 0 0

Submit names and phone numbers of the contract manager and contractor management and supervisory employees.

Submit names and phone numbers of the contract on-site manager.

Block 10 & 12: No later than pre-performance conference for review and acceptance.

Block 13: Submit proposed changes within five (5) workdays whenever changes occur for review and acceptance.

Block 14: Submit to addressees via electronic file.

N/A

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X001 A X

Aircraft Maintenance FA6800-19-R-A002 Determined upon award

A004 Substance Abuse Test Results N/A

DI-NDTI-80809 PWS paragraph 2.9.2.2 HQ AETC/A4PM

N/A

N/A B

As requested

N/A

Block 16

Block 16 See Block 16

CO

0 0 0

The CO may identify the contractor employees to be tested, the drugs for which those employees must be tested for and set the time frame the testing shall be conducted within.

The contractor shall accomplish the specified testing using a certified (i.e., a certified lab that meets Department of Health and Human Services (DHHS)/ Substance Abuse and Mental Health Services Administration (SAMHSA) certification) medical substance abuse testing facility. Results of the test(s) shall be provided to the Government solely for the purpose of completing an investigation IAW AFI 91-204, AETC SUP 1, Safety Investigations and Reports, all.

Block 14: Submit to addressee via electronic file.

N/A

Wayne T.Scott

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X001 A X

Aircraft Maintenance FA6800-19-R-A002 Determined upon award

A005 Names of company officers, parent companies, and parent company officers

N/A

DI-MGMT-81834A PWS paragraph 2.9.3.1 HQ AETC/A4PM

N/A

N/A B

See Blk 16

N/A

See Blk 16

See Blk 16 See Block 16

CO

HQ AETC/A4PM

COR

0 0 0

Submit the names of its company officers, parent companies, and parent company officers.

Block 10 & 12: No later than pre-performance conference for review and acceptance.

Block 13: Submit proposed changes within thirty (30) calendar days after the change for review and acceptance.

Block 14: Submit to addressees through electronic file.

N/A

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X001 A X

Aircraft Maintenance FA6800-19-R-A002 Determined upon award

A006 Newly hired employee listing N/A

DI-MGMT-81834A PWS paragraph 2.9.3.2 & 5.12 HQ AETC/A4PM

N/A

N/A B

See Blk 16

N/A

See Blk 16

See Blk 16 Functional Commander

CO

Government COR

0 0 0

Submit a monthly listing of newly hired, transferred, departed and leave of absence employees by name and assigned position as well as any vacant positions using the contractor’s selection proposal manning levels.

Block 12: Within 15 calendar days after contract start.

Block 14: Submit to addressees via electronic file.

N/A

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .