AMENDMENT_0003_Attachment_18B_-_Kirtland_Technical_Order_Listing.pdf
PDF 350 KB Posted
- Solicitation number
- FA6800-19-R-A002
About this file
This solicitation seeks proposals for rotary aircraft maintenance and support services at multiple Air Force bases. Contractors will perform full-spectrum organizational and intermediate level maintenance for UH-1N, HH-60, MH-139 helicopters and associated mission equipment owned by the Air Force District of Washington, Air Education and Training Command, Air Force Global Strike Command, and Pacific Air Forces. Services include aircraft handling, inspections, maintenance, repairs, weapons operations, and emergency support. The acquisition will result in multiple fixed-price contracts with both fixed-price and cost reimbursement contract line items. Two pools are designated for small businesses and full and open competition, with up to five awardees per pool. The base contract term is ten years with two five-year ordering periods. Task orders will be competed for maintenance at individual bases as current contracts expire, starting with Fairchild AFB and Kirtland AFB. A pre-proposal conference will be held on February 19th and 21st, with questions due by February 15th. Responses are to be submitted under Solicitation FA6800-19-R-A002.
Attachment 18B
View the file
Other files
Show 40 more
Latest 50 of 70 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rotary Wing Aircraft Maintenance and Support Services
– Kirtland Aircraft Maintenance
Technical Order Number Title
1H-60(H)G-01 All Applicable Pubs for HH-60G
1H-60(H)G-06 WUC Handbook
1H-60(H)G-1-1 Partial Flight Manual (Comms_Radios)
1H-60(H)G-1 Flight Manual
1H-60(H)G-112 Weapons and Armament
1H-60(H)G-17-1 Storage of Aircraft (Shipment)
1H-60(H)G-17 Storage of Aircraft
1H-60(H)G-1CL-1 Pilots Flight Crew Checklist
1H-60(H)G-1CL-2 Gunners Flight Crew Checklist
1H-60(H)G-2-1 Aircraft General
1H-60(H)G-2-2 Airframe
1H-60(H)G-2-3 Landing Gear, Power Plant, Rotors
1H-60(H)G-2-4 Drive System, Pneudraulics, Instruments, Electrical, Fuel
1H-60(H)G-2-5 Flight Controls, Utility Systems, APU
1H-60(H)G-2-6 Mission Equipment, Ground Support Equipment
1H-60(H)G-2-9 Fault Isolation Procedures
1H-60(H)G-2-11 Avionic General
1H-60(H)G-2-12-1 AFCS and Comm Fault Isolation Procedures
1H-60(H)G-2-12-2 Navigation Fault Isolation Procedures
1H-60(H)G-2-12-3 Avionics Missile Defense
1H-60(H)G-2-13 Avionics Maintenance Task Manual
1H-60(H)G-2-15 Vibration Analysis
1H-60(H)G-2-1CL-1 Jacking
1H-60(H)G-2-1CL-2 Refuel/Defuel
1H-60(H)G-2-1CL-3 Application of External Power
1H-60(H)G-2-1CL-4 APU Operation
1H-60(H)G-2-1CL-5 Towing
1H-60(H)G-2-1CL-6 Engine Run
1H-60(H)G-2-1CL-7 Aircraft Wash/Rinse
1H-60(H)G-21 Inventory Accountability (-21)
1H-60(H)G-23 Corrosion
1H-60(H)G-33-1-2 Nonnuclear Munitions Loading
1H-60(H)G-33-1-2CL-6 Checklist - Nonnuclear Munitions Loading
1H-60(H)G-36 NDI Procedures
1H-60(H)G-4-1 IPB
1H-60(H)G-4-2 IPB
1H-60(H)G-4-3 IPB
1H-60(H)G-4-4 IPB
1H-60(H)G-4-5 IPB
1H-60(H)G-4-6 IPB
1H-60(H)G-5 Basic Weight and Loading Data
1H-60(H)G-6 Scheduled Inspections and Maintenance Requirements
1H-60(H)G-6CF-1 FCF Procedures
1 HH-60G
1H-60(H)G-6CL-1 Checklist - FCF
1H-60(H)G-6WC-2 600 Hour (Phase) Workcards
1H-60(H)G-6WC-3 50 Hour Cards
1H-60(H)G-6WC-4 Thruflight
1H-60(H)G-6WC-5 Post Wash Corrosion
1H-60(H)G-6WC-6 Preflight_Postflight
1H-60(H)G-6WC-7 150 Hour Cards
1H-60(H)G-6WC-8 300 Hour Cards
2J-T700-16 Power Plant (Intermediate Level Maintenance) + IPB
2 HH-60G
Technical Order Number Title
1H-1(U)N-01 All Applicable Pubs for UH-1N
1H-1(U)N-06 WUC Handbook
1H-1(U)N-1 Flight Manual
1H-1(U)N-10 Power Package Buildup
1H-1(U)N-17 Storage of Aircraft
1H-1(U)N-2-1 Operational Maintenance (Flight Line)
1H-1(U)N-2-1CL-1 Towing
1H-1(U)N-2-1CL-2 Refuel/Defuel
1H-1(U)N-2-1CL-3 Jacking
1H-1(U)N-2-2 Power Plant (Flight Line)
1H-1(U)N-2-6 Ground Support Equipment
1H-1(U)N-21 Equipment Inventory List (-21)
1H-1(U)N-3-1 Structural Repair
1H-1(U)N-3 Structural Repair
1H-1(U)N-33-1-2 Nonnuclear Munitions Loading (Bell)
1H-1(U)N-33-1-2CL-2 Checklist - Nonnuclear Munitions Loading 7.62MM
1H-1(U)N-33-1-2CL-3 Checklist - Nonnuclear Munitions Loading M60D
1H-1(U)N-33-1-2CL-5 Functional Check - Nonnuclear Munitions Loading
1H-1(U)N-36 NDI Procedures
1H-1(U)N-4 IPB (Aircraft Parts)
1H-1(U)N-5 Basic Weight & Loading Data
1H-1(U)N-6 Scheduled Inspections and Maintenance Requirements
1H-1(U)N-6CF-1 FCF Procedures
1H-1(U)N-6CL-1 Checklist - FCF
1H-1(U)N-6WC-1 Preflight_Thruflight_BPO Cards
1H-1(U)N-6WC-2 Phase Cards (400 Hours)
1H-1(U)N-1-39 Air Shipment
2J-T400-4 IPB (Engine Parts)
2J-T400-6-1 Power Plant (Intermediate Level Maintenance)
13C1-41-2 Electric Hoist and Hoist IPB
3 UH-1N
File details come from the government source that posted it. Updated .