Attachment 18. Building Construction 1354 Checklist 7 Feb 2010

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Base Engineering Requirements (SABER), newest first.
File Type Posted
Attachment_45_-_Education.Experience_Matrix_20_May.pdf PDF
FA485518R0003_Amendment_5.pdf PDF
Attachment_46_-_Past_Performance_Information_Sheet_20_May.pdf PDF
Questions_and_Answers_Part_6.pdf PDF
FA485518R0003_Amendment_0004.pdf PDF
Attachment_43_-_Seed_Project_Attachments_-_18_Jan_2018.pdf PDF
FA485518R0003_Q&A_Part_5.pdf PDF
Attachment_01-_SABER_General_Requirements_-_12_Jan_2018.pdf PDF
Attachment_40_-_Sample_Project_Statement_of_Objectives_-_18_Jan_2018.pdf PDF
Attachment_42_-_Seed_Project_Statement_of_Objectives_-_18_Jan_2018.pdf PDF
FA485518R0003_Q&A_Part_4.pdf PDF
Pre-Proposal_Site_Visit_Memo.Addendum.pdf PDF
FA485518R0003_Amendment_1.pdf PDF
Pre-Proposal_Site_Visit_Memo.Part1.CAFB.pdf PDF
Attachment_20_-_Base_Contractor_Storage_Lot_Agreement_-_no_date.pdf PDF
Attachment_21_-_Contractor_Security_Handbook_-_8_Oct_2015.pdf PDF
Attachment_41_-_Sample_Project_Attachments_-_no_date.pdf PDF
Attachment_11_-_UFC_1-300-8,_Real_Property_Transfer_with_change_-_2_Aug_2011.pdf PDF
Attachment_15_-_AF_Form_3000_Material_Approval_Submittal_-_1_Sep_2003.pdf PDF
Attachment_07_-_AEC_CAD_Standards_-_Aug_2015.pdf PDF
Attachment_12_-_AF_Form_3064_-_Progress_Schedule_-_1_Sep_2003.pdf PDF
Attachment_19_-_CAFB_Labeling_Standards_for_Communications_-_29_Jan_2009.pdf PDF
Attachment_03_-_Example_Drawings_-_May_1975.pdf PDF
Attachment_33-_WD_NM50_Highway_Curry_&_Roosevelt_-_6_Jan_2017.pdf PDF
Attachment_09_-_GeoBase_Initial_Operating_Capability_-_19_May_2010.pdf PDF
Attachment_44_-_Additional_Contractor_Information_-_no_date.pdf PDF
Attachment_40_-_Sample_Project_Statement_of_Objectives_-_31_Aug_2017.PDF PDF
Attachment_42_-_Seed_Project_Statement_of_Objectives_-_21_Nov_2017.pdf PDF
Attachment_25_-_AF_Carpet_Standard_-_ETL_07_4_-_28_Mar_2007.pdf PDF
Attachment_24_-_Statement_of_Work_Example_-15_Sep_2017.pdf PDF
Attachment_16_-_AF_Form_103v10_Work_Clearance_Request_-_29_Feb_2015.pdf PDF
Attachment_26_-_As-Built_Submittal_Guidelines_-_3_Feb_2014.pdf PDF
Attachment_17_-_AF_Form_592_Hot_Work_Permit_-_4_Sep_2012.pdf PDF
Attachment_01-_SABER_General_Requirements_-_6_Oct_2017.pdf PDF
Attachment_30-_NMGRT_Invoice_Certification_-_no_date.pdf PDF
Attachment_14_-_AF_Form_66_Schedule_of_Material_Submittals_-_no_date.pdf PDF
Attachment_32-_WD_NM5_Residential_Curry_&_Roosevelt_-_6_Jan_2017.pdf PDF
Attachment_06_-_CAFB_Landscape_Development_Plan_-_3_Feb_2012.pdf PDF
Attachment_34-_WD_NM23_Building_Curry_-_22_Sep_2017.pdf PDF
Attachment_05_-_CAFB_Hardware_Specifications_Guideline_-_Nov_2016.pdf PDF
Attachment_36-_WD_NM7_Heavy_Curry_-_15_Sep_2017.pdf PDF
Attachment_37-_WD_NM12_Heavy_Roosevelt_-_15_Sep_17.pdf PDF
Attachment_08_-_AFSOC_Facility_Excellence_Guide_-_2008.pdf PDF
Attachment_04_-_CAFB_Electrical_Standards_-_Apr_2016.pdf PDF
Attachment_27_-_Contractor_Base_Briefing_-_23_Mar_2016.pdf PDF
Attachment_39-_Past.Present_Performance_Questionnaire_-_no_date.pdf PDF
Attachment_13_-_AF_Form_3065_-_Contract_Progress_Report_-_1_Apr_1996.pdf PDF
Attachment_23_-_CAFB_MAFR_Contractor_Env_Guide__Appendix_A_&_B_Forms_-_2_Jul_2015.pdf PDF
Attachment_43_-_Seed_Project_Attachments_-_22_Aug_2017.pdf PDF
Attachment_35-_WD_NM34_Building_Roosevelt_-_22_Sep_2017.pdf PDF
Show all 50

Simplified Base Engineering Requirements (SABER) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN WORK ORDER #

TYPE FUNDS (MCP, MC, O&M):

NEW EXISTING

a. EXTERIOR DIMENSIONS (if an addition to existing building, only show data for the addition):

Length Width Total Area Loc ID

(1) Main Bldg x = 0 sf x 0 sf x = 0 sf

(2) Wing x = 0 sf Wing x = 0 sf

(3) Offset x = 0 sf Offset x = 0 sf

(4) Basement x = 0 sf

TOTAL: = 0 SF

1 -

CONSTRUCTION:

TYPE:

TYPE:

TYPE:

TYPE:

TYPE:

Feet Code

MISC DATA:

Revised: 07 Feb 2010

TYPE WORK (C/M/R):

WORK ORDER #:

CONTRACT #:

(1) Foundations (such as concrete)

CAT CODE:

(3) Walls (such as wood siding)

APPROPRIATION FUND CODE:

PROJECT EEIC:

BUILDING NET FLOOR AREA SF:

BUILDING / FACILITY HEIGHT:

FACILITY #:

DATE CONSTRUCTION COMPLETED:

PROJECT #:

TOTAL PROJ COST:

DEMOLITION COSTS:

1. GENERAL DATA REQUIRED FOR FACILITIES

DESCRIPTION:

(4) Largest Door Opening Width

(5) Building Primary Construction Material

(3) Largest Door Opening Height

(2) Floors (such as wood, concrete)

NUMBER OF FLOORS:

(5) FIRE RATING CODE

(4) Roof (such as built-up, shingle)

OTHER BUILDING DATA:

(1) Ceiling Height Main Bldg

(2) Ceiling Height Basement

"TAB" to each field

BUILDING CHECKLIST

(Required For Each Building)

DESIGN/SIOH COST:

Page 1 1354ckls

Attachment 18 FA4855-18-R-0003 b.

Diameter of each pipe

Location

Air Conditioning

Phase Voltage Wire c.

(1)

UNIT

UM AMOUNT TOTAL COST

SF

HD

Air Circulation

SYSTEMS IN BUILDING:

Storm Sewer Pipe

Communications

Available or Connected

(Yes/No) Capacity of all inlet pipesUtility Connections Number of pipes

Gas

Sewer Pipe

Water

Steam

Condensate

CODE

UTILITY CONNECTIONS

CLSD HD A / SPRINK

Steam

Heating

System Fuel DescriptionEnergy Type

Connected Load

Hot Water

Electrical

880-211

CATEGORY

Electric

FIRE PROTECTION:

SEPTIC TANK

Connected Load -

NOMENCLATURE

Page 2 1354ckls

SF

HD

SF

HD

AUTO FIRE DETECTION SYS SF

EA

MAN FR ALARM/INT SYS EA

MAN FR ALARM/EXT SYS EA

C02 FIRE SYSTEM EA

FOAM FR SYS EA

OTHER FIRE SYSTEM EA

HALON 1301 FIRE SYSTEM EA

(2)

CATEGORY UNIT

CODE UM AMOUNT TOTAL COST

SECURITY ALARM SYSTEM EA

d.

CATEGORY UNIT

CODE UM AMOUNT TOTAL COST

SF

SF

TN

TN

TN

TN

GA

SF

MB

KW

HP

e. RELATED FACILITIES:

CATEGORY UNIT

CODE UM AMOUNT TOTAL COST

5140 LF

KVA

EA

5142 LF 812-224

POWER POLES

880-221

TRANSFORMERS

COMPRESSOR AIR PLT

812-223 PRIM DISTR LINE OH

890-125

872-841

890-124

A/C PLT 25 TO 100 TN

A/C PLT OVER 100 TN

A/C FROM CEN PLT

880-231

OPEN HEAD DELUGE SYS

890-134

880-223

AFFF PA SPRINK SY

880-233

880-234

A/C PLT LESS THAN 5 TN

A/C PLT 5 TO 25 TN

HTG FUEL OIL STORAGE

HTG FR CEN PLT

ELEC E/PWR GEN PLT

HTG PLT

811-147

880-217

821-112

890-121 826-122

821-113

821-115

NOMENCLATURE

SEC DISTR LINE OH

880-222

NOMENCLATURE

SECURITY:

826-123

NOMENCLATURE

880-232

PLANTS IN BUILDING:

880-212

Page 3 1354ckls

5141 LF

KVA

EA

5143 SEC DISTR LINE UG LF

5165 TEL DUCT FACILITY LF

LF

5160 EA

5045 LF

4043 LF

5167 LF

4055 LF

4025 EA

5117 LF

5093 SY

5115 SY

LF

SY

4049 SY

4047 LF

4070 LF

5097 LF

SF

SF

4059 LF

a.

CATEGORY UNIT

CODE UM AMOUNT REMARKS

812-226

812-225

871-183

890-158

890-187

872-248

872-247

UTIL VAULT (4 or more transformers)

LOAD & UNLOAD PLATFORM

2. DEMOLITIONS

NOMENCLATURE

DEMOLITIONS NOT BEING REPLACED:

FENCE, SECURITY

FENCE, INTERIOR

852-262

PRIM DISTR LINE UG

872-245 Boundary Fence

842-245 832-255

890-144 812-926

824-464

832-266

FIRE PROTECT WATER MAIN843-314

SIDEWALK

STORM DRAIN DSPL

TRANSFORMERS

852-289

POWER POLES

SANITARY SEWAGE MAIN

VEHICLE PARKING, N/ORGN

CURBS & GUTTERS

DRIVEWAY

ROAD851-147

COMPRESSED AIR DIST

EXTERIOR AREA LIGHTING

GAS MAINS

843-315

851-143

WATER DISTR MAINS

INDUSTRIAL WASTE MAIN

FIRE HYDRANTS

135-583

851-145

Page 4 1354ckls

SY

LF

LF

b.

CATEGORY UNIT AMT

CODE UM ON 7115 TOTAL COST

SY

TN

YES NO

a. UTILITY PLANTS OR SYSTEMS:

ADDED.

REPLACED.

REMOVED.

b. REAL PROPERTY INSTALLED EQUIP (RPIE).

ADDED.

WITH

852-262

Sidewalk Driveway

Prim Distr Line OH

Veh Pking, N/Orgn

ROAD

REPLACED

NOMENCLATURE

851-145

890-121

Sidewalk Driveway

A/C Plt 5 to 25 TN

852-289

852-289 851-145

812-223

851-147

3. ADDITION TO EXISTING BUILDING OR FACILITY

DEMOLITIONS BEING REPLACED:

CONSULT THE REAL PROPERTY CATEGORY CODES LISTING ON THE CE WEB SITE AT

THE RESOURCES/REAL ESTATE TAB FOR ADDITIONAL CATEGORY CODES AND

PROPER NOMENCLATURES.

(IF CATEGORY CODE LISTING INDICATES MORE THAN ONE UNIT OF MEASURE (UM), DATA FOR

EACH "UM" MUST BE PROVIDED; IF ADDITIONAL SPACE IS NEEDED, PROVIDE THE DATA ON A

SEPARATE SHEET OF PAPER IN THE SAME FORMAT AS AREA BEING WORKED)

Page 5 1354ckls

REPLACED.

REMOVED

4. ALTERATION OR REHABILITATION OF A BUILDING OR FACILITY

YES NO

a.

b.

c.

ADDED.

REPLACED.

REMOVED.

I certify that the above information is accurate and complete to the best of my knowledge and belief.

CONCUR:

Project has extended useful life of the facility YES NO

CHIEF, ENGINEER FLIGHT (sign/date)

CHIEF, CONSTRUCTION MGT or SABER (sign/date)

Current CC is:

ADDITION / DELETION OF PORCHES,

BALCONIES, MEZZANINES, ETC

6. STATEMENT OF CONDITION (Condition Code (CC) Descriptions are on CE Web site)

5. CERTIFICATION:

CONTRACTOR REPRESENTATIVE (sign/date)

ADDITION / DELETION OF RELATED

FACILITIES

REAL PROPERTY INSTALLED EQUIP (RPIE).

Revised 12/14/2010

PROJECT MONITOR/INSPECTOR (sign/date)

Project has upgraded CC to:

Page 6 1354ckls