MS 015 Fire Protection and Sprinkler.pdf

PDF 8 MB Posted

Attached to
Repair Maintenance Shop BLDG 8040
Solicitation number
FA4661-21-R-0001
Issued by

View the file

Other files

File Type Posted
AF Form 3065 Dyess Progress Report 42 Gov.pdf PDF
12-0053 Addendum Four - New Contractor (11-19-20) v2.doc DOC document
12-0053 Addendum Three - New Contractor (11-9-20).pdf PDF
Solicitation Amendment FA466121R00010001 SF 30.pdf PDF
12-0053 Attachment C - Contractor Pricing Breakdown 11.29.16.xlsx XLSX spreadsheet
MS 004 Staging Plan.pdf PDF
MS 039 HM Doors Frames and Hardware.pdf PDF
MS 026 Cove Base Submittal.pdf PDF
MS 032 Concrete Vapor Barrier.pdf PDF
MS 042A Overhead Coiling Doors.pdf PDF
MS 030 Steel Shop Drawings.pdf PDF
MS 024 MBCI Panel Roof and Color Chart.pdf PDF
MS 037 MBCI and Welding Certifications.pdf PDF
AF Form 3065 Dyess Progress Report 42 Gov.pdf PDF
MS 044 Casework.pdf PDF
MS 079 Radius Bullnose for Doorways.pdf PDF
MS 007 Mech and Plumb Consumables.pdf PDF
MS 027-028 Metal Slat Fencing - Color.pdf PDF
MS 011 Fire Alarm and Mass Notification MS 005a.pdf PDF
MS 025 VCT.pdf PDF
MS 070 Water Meter Specifications.pdf PDF
MS 073 Breakroom Sink Type and Color.pdf PDF
MS 031A Toilet Partions and Accessories.pdf PDF
MS 016 HVAC Controls.pdf PDF
MS 055 South Structural Steel.pdf PDF
MS 006 Mech and Plumb.pdf PDF
MS 008 Abatement Plan.pdf PDF
MS 069 Sidewall Sprinkler Head.pdf PDF
MS 076 Backflow Preventer.pdf PDF
MS 064 Dryvit Backstop Air Barrier.pdf PDF
MS 021 HVAC.pdf PDF
MS 050 Welder Certification.pdf PDF
MS 083 Aerospace Air Shower Substitution.pdf PDF
MS 030 Steel Shop Drawings Page 2.pdf PDF
MS 029 Anchor Rod Shop Drawings and Details.pdf PDF
MS 001 QC Plan.pdf PDF
MS 065 Concrete Test Reports.pdf PDF
MS 020A Electrical Transformer.pdf PDF
MS 041 Toilet Accessories and Fire Ext.pdf PDF
MS 022 Louvers and Color Chart.pdf PDF
MS 035 Geotech Compaction Testing.pdf PDF
MS 078 078A Overhead Doors Warranty.pdf PDF
MS 023 Metal Panels.pdf PDF
MS 047 28 Day Concrete Test Results.pdf PDF
MS 061 Masonry Sealant Substitution.pdf PDF
MS 066 Roof Flashing.pdf PDF
REF 12 0053 PR 42 Thru 09 30 2019.xlsx XLSX spreadsheet
MS 010 Insulation.pdf PDF
MS 067 Steel Building Certifications.pdf PDF
MS 052 CMU Specs and Certs.pdf PDF
Show 40 more

Latest 50 of 163 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

MS#15 8040 FS Material Comments

1. Please identify application of the Steel Pipe as required by the following in Spec Section 21 13 13, par 2.4.1.1.1 Steel Pipe that is not clearly indicated in the submittal:

B. Concealed Spaces - All wet pipe fire suppression system piping located in concealed spaces such as furred ceilings, wall cavities, pipe chases, and under floor spaces shall be Schedule 40 black steel with welded or threaded joints. Cut groove mechanical joints may be used in concealed spaces where indicated on the drawings if access doors are provided for inspection of the joints in accordance with the NFPA. All tees shall be welded groove-o-let fittings.

C. Non-Concealed Spaces (Piping 2 inch diameter and smaller) - All wet pipe fire suppression system pipe 2 inches in diameter and smaller exposed to view or accessible above lay-in ceilings shall be Schedule 40 black steel with welded or cut groove mechanical joints. All tees shall be welded groove-o-let fittings. Screw threaded pipe joints are permissible only for installation of sprinkler heads, automatic air vents, drain line valves, or test fittings.

D. Non-Concealed Spaces (Piping 2 1/2 inch diameter and larger) - All wet pipe fire suppression system pipe 2 1/2 inches in diameter and larger exposed to view or accessible above lay-in ceilings shall be either Schedule 40 or Schedule 10 black steel. Joints shall be welded, cut groove (Schedule 40), or roll groove (Schedule 10) mechanical joints. All tees shall be welded groove-o-let fittings. Screw threaded fittings are permissible only for installation of sprinkler heads, automatic air vents, drain line valves, or test fittings.

2. Please confirm that the internal coating for Steel Pipe submitted shall be provided as required in the following Spec Section 21 13 13, par 2.4.1.1.1 Steel Pipe:

E. All Schedule 40 and Schedule 10 pipe shall be internally factory coated with a UL and FM Listed thermosetting resin and a thermoplastic polyethylene, polypropylene, polybutylene material or UL/FM Listed equivalent coating incorporating an antimicrobial agent such as chlorinated phenol applied by electrostatic, fluidized bed, or flame spraying technique to help prevent biofilm formation and electrochemical reactions. Only saw cutting (no abrasive cutting) of the pipe shall be permitted to minimize damage to the pipe coatings.

3. Please provide the correct valves as required in the following Spec Section 21 13 13, in lieu of the butterfly valves submitted:

Par 2.4.3.2 Control Valve and Gate Valve

Manually operated sprinkler control valve and gate valve shall be outside stem and yoke (OS&Y) type and shall be listed in UL Bld Mat Dir or FM APP GUIDE.

4. Identify which of the four Riser Manifold Assemblies that were submitted (depicted on the drawing with various accessories) is intended to be provided.

5. Identify which of the four Grooved Ends Assemblies that were submitted (depicted on the drawing with various accessories) is intended to be provided.

6. Verify that the “K Factor” for the sprinkler heads submitted will be provided with the “K Factor” used in the hydraulic calculations (not yet received).

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse)

Form Approved OMB No 9000-0062

Expires May 31, 2005

Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and

Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCP, 1060 Air Force Pentagon, Washington DC

TO: (Contracting Officer) FROM: (Contractor) DATE

CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL

PREVIOUS SUBMISSION NUMBER PROJECT NUMBER

TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY

ITEM

NO.

SPECIFICATION SECTION/

PARA NO./DRAWING NO.

DESCRIPTION OF MATERIAL

(Include Type, Model Number, Catalog Number, Mfg., etc.)

AP-

PROVED

DISAP-

PROVED

SEE

REVERSE

INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.

DATE (YYYYMMDD) TYPE OR PRINT NAME AND GRADE SIGNATURE

FOR GOVERNMENT USE ONLY

TO: (Base Civil Engineering Officer)

For Evaluation and Action RNLT ________________ OR SOONER

TO: (AF Contracting Office)

RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE

TO: (Contractor)

APPROVED

DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUEST

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN ____ DAYS OF DATE SHOWN BELOW.

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE.

New Resubmittal

20171129 Patrick Rolan, GS 12

COMMENTS

(Number to correspond with applicable Item Number on reverse)

INSTRUCTIONS TO CONTRACTORS

1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.

4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No.". This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This Material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

AF IMT 3000, 20030901, V1 (REVERSE)

MS#15 8040 FS Material Comments - Murray Bouquet

1. Please identify the intended application of the Steel Pipe as required by the following in Spec Section 21 13 13, par 2.4.1.1.1 Steel Pipe that is not clearly indicated in the submittal:

B. Concealed Spaces - All wet pipe fire suppression system piping located in concealed spaces such as furred ceilings, wall cavities, pipe chases, and under floor spaces shall be Schedule 40 black steel with welded or threaded joints. Cut groove mechanical joints may be used in concealed spaces where indicated on the drawings if access doors are provided for inspection of the joints in accordance with the NFPA. All tees shall be welded groove-o-let fittings.

C. Non-Concealed Spaces (Piping 2 inch diameter and smaller) - All wet pipe fire suppression system pipe 2 inches in diameter and smaller exposed to view or accessible above lay-in ceilings shall be Schedule 40 black steel with welded or cut groove mechanical joints. All tees shall be welded groove-o-let fittings. Screw threaded pipe joints are permissible only for installation of sprinkler heads, automatic air vents, drain line valves, or test fittings.

D. Non-Concealed Spaces (Piping 2 1/2 inch diameter and larger) - All wet pipe fire suppression system pipe 2 1/2 inches in diameter and larger exposed to view or accessible above lay-in ceilings shall be either Schedule 40 or Schedule 10 black steel. Joints shall be welded, cut groove (Schedule 40), or roll groove (Schedule 10) mechanical joints. All tees shall be welded groove-o-let fittings. Screw threaded fittings are permissible only for installation of sprinkler heads, automatic air vents, drain line valves, or test fittings.

2. Please confirm that the internal coating for Steel Pipe submitted shall be provided as required in the following Spec Section 21 13 13, par 2.4.1.1.1 Steel Pipe:

E. All Schedule 40 and Schedule 10 pipe shall be internally factory coated with a UL and FM Listed thermosetting resin and a thermoplastic polyethylene, polypropylene, polybutylene material or UL/FM Listed equivalent coating incorporating an antimicrobial agent such as chlorinated phenol applied by electrostatic, fluidized bed, or flame spraying technique to help prevent biofilm formation and electrochemical reactions. Only saw cutting (no abrasive cutting) of the pipe shall be permitted to minimize damage to the pipe coatings.

3. Please provide the correct valves as required in the following Spec Section 21 13 13, in lieu of the butterfly valves submitted:

Par 2.4.3.2 Control Valve and Gate Valve Manually operated sprinkler control valve and gate valve shall be outside stem and yoke (OS&Y) type and shall be listed in UL Bld Mat Dir or FM APP GUIDE.

4. Identify which of the four Riser Manifold Assemblies that were submitted (depicted on the drawing with various accessories) is intended to be provided.

5. Identify which of the four Grooved Ends Assemblies that were submitted (depicted on the drawing with various accessories) is intended to be provided.

6. Verify that the “K Factor” for the sprinkler heads submitted will be provided with the “K Factor” used in the hydraulic calculations (not yet received).

TO Contracting Officer: Capt. Hillary Ince

FROM Contractor: FARR Builders LLC S. Gevers, San Antonio, TX 78210

DATE: 21 Nov. 17

CONTRACT NUMBER: FA4661-15-D-0001

SUBMISSION NUMBER: 015

PREVIOUS SUBMISSION NUMBER:

PROJECT NUMBER: FNWZ 12-0053

ITEM NORow1: 1

SPECIFICATION SECTION PARA NODRAWING NORow1: Per Sow

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow1: FIRE PROTECTION SPRINKLER

INITIALRow1: PR

ITEM NORow2:

SPECIFICATION SECTION PARA NODRAWING NORow2:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow2: SYSTEM EQUIPMENT LIST

INITIALRow2: PR

ITEM NORow3:

SPECIFICATION SECTION PARA NODRAWING NORow3:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow3:

INITIALRow3:

ITEM NORow4:

SPECIFICATION SECTION PARA NODRAWING NORow4:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow4:

INITIALRow4:

ITEM NORow5:

SPECIFICATION SECTION PARA NODRAWING NORow5:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow5:

INITIALRow5:

ITEM NORow6:

SPECIFICATION SECTION PARA NODRAWING NORow6:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow6:

INITIALRow6:

ITEM NORow7:

SPECIFICATION SECTION PARA NODRAWING NORow7:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow7:

INITIALRow7:

ITEM NORow8:

SPECIFICATION SECTION PARA NODRAWING NORow8:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow8:

INITIALRow8:

ITEM NORow9:

SPECIFICATION SECTION PARA NODRAWING NORow9:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow9:

INITIALRow9:

ITEM NORow10:

SPECIFICATION SECTION PARA NODRAWING NORow10:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow10:

INITIALRow10:

ITEM NORow11:

SPECIFICATION SECTION PARA NODRAWING NORow11:

DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow11:

INITIALRow11:

DATE YYYYMMDD: 2017-11-21

TYPE OR PRINT NAME AND GRADE: WAYNE OWENS, PS

TO Base Civil Engineering Officer: 502 CE

RNLT:

DATE YYYYMMDD_2: 20171201

TYPE OR PRINT NAME AND GRADE_2: SrA Vitaliy Poprozhuk

TO AF Contracting Office:

DATE YYYYMMDD_3:

TYPE OR PRINT NAME AND GRADE_3:

TO Contractor:

DATE YYYYMMDD_4: 20171201

TYPE OR PRINT NAME AND GRADE_4: Capt Hilary Ince

2017-12-01T14:49:09-0600

POPROZHUK.VITALIY.NIKOLAYEVI.1462881092

2017-11-29T12:49:05-0600

ROLAN.PATRICK.M.1515150249

2017-12-01T14:57:51-0600

INCE.HILARY.RAE.1368173785

Text5:

Check Box6: Yes

Check Box7: Off

Check Box8: Yes

Check Box9: Yes

Check Box10: Off

Check Box11: Yes

Check Box12: Off

Check Box13: Off

Check Box14: Off

Check Box15: Off

Check Box16: Off

Check Box17: Off

Check Box18: Off

Check Box19: Off

Check Box20: Off

Check Box21: Off

Check Box22: Off

Check Box23: Off

Check Box24: Off

Check Box25: Off

Check Box26: Off

Check Box27: Off

Check Box28: Off

Check Box29: Off

Check Box30: Off

Check Box31: Off

Check Box32: Off

Check Box33: Off

Check Box34: Off

Check Box35: Off

Check Box36: Off

Check Box37: Off

Check Box38: Off

Check Box3: Yes

Check Box4: Yes

Check Box5: Off

Check Box40: Off

COMMENTS Number to correspond with applicable Item Number on reverseRow1:

Check Box39: Yes

Check Box50: Off

Section 21 13 13 Dyess AFB, Texas WET PIPE SPRINKLER SYSTEM FNWZ 12‐0053, Repair Maintenance Shop, Building 8040

Section 21 13 13

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE)

ASSE 1015 (2011) Performance Requirements for Double

Check Backflow Prevention Assemblies and Double Check Fire Protection Backflow Prevention Assemblies - (ANSI approved 2010)

ASME INTERNATIONAL (ASME)

ASME B16.1 (2015) Gray Iron Pipe Flanges and Flanged

Fittings Classes 25, 125, and 250

ASME B16.11 (2011) Forged Fittings, Socket-Welding and Threaded

ASME B16.21 (2011) Nonmetallic Flat Gaskets for Pipe

Flanges

ASME B16.3 (2011) Malleable Iron Threaded Fittings, Classes 150 and 300

ASME B16.4 (2011) Standard for Gray Iron Threaded

Fittings; Classes 125 and 250

ASME B16.9 (2012) Standard for Factory-Made Wrought Steel Buttwelding Fittings

ASME B18.2.2 (2010) Nuts for General Applications:

Machine Screw Nuts, Hex, Square, Hex Flange, and Coupling Nuts (Inch Series)

ASTM INTERNATIONAL (ASTM)

ASTM A135/A135M (2009; R2014) Standard Specification for

Electric-Resistance-Welded Steel Pipe

ASTM A183 (2014) Standard Specification for Carbon Steel Track Bolts and Nuts

ASTM A193/A193M (2015a) Standard Specification for

Alloy-Steel and Stainless Steel Bolting

Section 21 13 13 Dyess AFB, Texas WET PIPE SPRINKLER SYSTEM FNWZ 12‐0053, Repair Maintenance Shop, Building 8040

Materials for High-Temperature Service and Other Special Purpose Applications

ASTM A449 (2014) Standard Specification for Hex Cap

Screws, Bolts, and Studs, Steel, Heat Treated, 120/105/90 ksi Minimum Tensile Strength, General Use

ASTM A47/A47M (1999; R 2014) Standard Specification for

Ferritic Malleable Iron Castings

ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A536 (1984; R 2014) Standard Specification for

Ductile Iron Castings

ASTM A563 (2015) Standard Specification for Carbon and Alloy Steel Nuts

ASTM A563M (2007; R 2013) Standard Specification for

Carbon and Alloy Steel Nuts (Metric)

ASTM A795/A795M (2013) Standard Specification for Black and Hot-Dipped Zinc-Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use

ASTM B62 (2015) Standard Specification for

Composition Bronze or Ounce Metal Castings

ASTM F436 (2011) Hardened Steel Washers

ASTM F436M (2011) Hardened Steel Washers (Metric)

FM GLOBAL (FM)

FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/

MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS

INDUSTRY (MSS)

MSS SP-71 (2011; Errata 2013) Gray Iron Swing Check

Valves, Flanged and Threaded Ends

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 101 (2015; ERTA 2015) Life Safety Code

NFPA 13 (2013; TIA 10-1; TIA 11-2; ERTA 2014; TIA

14-3) Standard for the Installation of Sprinkler Systems

NFPA 1963 (2014) Standard for Fire Hose Connections

Section 21 13 13 Dyess AFB, Texas WET PIPE SPRINKLER SYSTEM FNWZ 12‐0053, Repair Maintenance Shop, Building 8040

NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES

(NICET)

NICET 1014-7 (2010) Program Detail Manual for

Certification in the Field of Fire Protection Engineering Technology (Field Code 003) Subfield of Automatic Sprinkler System Layout

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-310-04 (2013) Seismic Design for Buildings

UNDERWRITERS LABORATORIES (UL)

UL 668 (2004; Reprint Dec 2012) Hose Valves for Fire-Protection Service

UL Bld Mat Dir (2012) Building Materials Directory

UL Fire Prot Dir (2012) Fire Protection Equipment Directory

1.2 SYSTEM DESCRIPTION

Furnish piping offsets, fittings, and any other accessories as required to provide a complete installation and to eliminate interference with other construction. Install sprinkler system over and under ducts, piping and platforms when such equipment can negatively effect or disrupt the sprinkler discharge pattern and coverage. Provide wet pipe sprinkler system in areas indicated on the drawings. Except as modified herein, the system shall be designed and installed in accordance with NFPA 13. Rack sprinklers shall be in accordance with NFPA 13. Pipe sizes which are not indicated on drawings shall be determined by hydraulic calculation. Design any portions of the sprinkler system that are not indicated on the drawings including locating sprinklers, piping and equipment, and size piping and equipment when this information is not indicated on the drawings or is not specified herein. The design of the sprinkler system shall be based on hydraulic calculations, and the other provisions specified herein.

1.2.1 Hydraulic Design

Hydraulically design the system to discharge a minimum density of 0.2 gpm/square foot over the hydraulically most demanding 3250 square feet of floor area. The minimum pipe size for branch lines in gridded systems shall be 1-1/4 inch. Hydraulic calculations shall be in accordance with the Area/Density Method of NFPA 13. Water velocity in the piping shall not exceed 20 ft/s.

1.2.1.1 Hose Demand

Add an allowance for exterior hose streams of 250 gpm to the sprinkler system demand at the point of connection to the existing system.

1.2.1.2 Basis for Calculations

The fire sprinkler contractor shall perform a new flow test at the building site. The basis of design of the system shall be based upon a water supply

Section 21 13 13 Dyess AFB, Texas WET PIPE SPRINKLER SYSTEM FNWZ 12‐0053, Repair Maintenance Shop, Building 8040 with a static pressure of 60, and a flow of 530 at a residual pressure of

60. Water supply shall be presumed available at the point of connection to existing. Hydraulic calculations shall be based upon the Hazen-Williams formula with a "C" value of 120 for steel piping, 150 for copper tubing, 140 for new cement-lined ductile-iron piping, and 100 for existing underground piping.

1.2.1.3 Hydraulic Calculations

Submit hydraulic calculations, including a drawing showing hydraulic reference points and pipe segments and as outlined in NFPA 13, except that calculations shall be performed by computer using software intended specifically for fire protection system design using the design data shown on the drawings. Software that uses k-factors for typical branch lines is not acceptable. Calculations shall be based on the water supply data shown on the drawings to substantiate that the design area used in the calculations is the most demanding hydraulically. Water supply curves and system requirements shall be plotted on semi-logarithmic graph paper so as to present a summary of the complete hydraulic calculation. Provide a summary sheet listing sprinklers in the design area and their respective hydraulic reference points, elevations, actual discharge pressures and actual flows. Elevations of hydraulic reference points (nodes) shall be indicated. Documentation shall identify each pipe individually and the nodes connected thereto. Indicate the diameter, length, flow, velocity, friction loss, number and type fittings, total friction loss in the pipe, equivalent pipe length and Hazen-Williams coefficient for each pipe. For gridded systems, calculations shall show peaking of demand area friction loss to verify that the hydraulically most demanding area is being used.

Also for gridded systems, a flow diagram indicating the quantity and direction of flows shall be included. A drawing showing hydraulic reference points (nodes) and pipe designations used in the calculations shall be included and shall be independent of shop drawings.

1.2.2 Sprinkler Coverage

Sprinklers shall be uniformly spaced on branch lines. In buildings protected by automatic sprinklers, sprinklers shall provide coverage throughout 100 percent of the building. This includes, but is not limited to, telephone rooms, electrical equipment rooms, boiler rooms, switchgear rooms, transformer rooms, and other electrical and mechanical spaces.

Coverage per sprinkler shall be in accordance with NFPA 13, but shall not exceed 100 square feet for extra hazard occupancies, 130 square feet for ordinary hazard occupancies, and 225 square feet for light hazard occupancies. Exceptions are as follows:

a. Facilities that are designed in accordance with NFPA 13R and NFPA 13D.

b. Sprinklers may be omitted from small rooms which are exempted for specific occupancies in accordance with NFPA 101.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

Section 21 13 13 Dyess AFB, Texas WET PIPE SPRINKLER SYSTEM FNWZ 12‐0053, Repair Maintenance Shop, Building 8040

SD-02 Shop Drawings

Shop Drawings; G As- Built Drawings

SD-03 Product Data

Fire Protection Related Submittals Materials and Equipment; G Spare Parts Preliminary Tests; G Final Acceptance Test; G Onsite Training; G Fire Protection Specialist; G Sprinkler System Installer; G

SD-05 Design Data

Sway Bracing; G Hydraulic Calculations; G

SD-06 Test Reports

Preliminary Test Report Final Acceptance Test Report

SD-07 Certificates

Inspection by Fire Protection Specialist

SD-10 Operation and Maintenance Data

Operating and Maintenance Manuals; G

1.4 QUALITY ASSURANCE

Compliance with referenced NFPA standards is mandatory. In the event of a conflict between specific provisions of this specification and applicable NFPA standards, this specification governS. Interpret reference to "authority having jurisdiction" to mean the Contracting Officer.

1.4.1 Fire Protection Specialist

Perform work specified in this section under the supervision of and certified by the Fire Protection Specialist who is an individual registered professional engineer who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveys (NCEES) or who is certified as a Level III Technician by National Institute for Certification in Engineering Technologies (NICET) in the Automatic Sprinkler System Layout subfield of Fire Protection Engineering Technology in accordance with NICET 1014-7.

Submit the name and documentation of certification of the proposed Fire Protection Specialists, no later than 14 days after the Notice to Proceed and prior to the submittal of the sprinkler system drawings and hydraulic calculations. The Fire Protection Specialist shall prepare and submit a list of the fire protection related submittals, no later than 7 days after the approval of the Fire Protection Specialist, from the Contract Submittal

Section 21 13 13 Dyess AFB, Texas WET PIPE SPRINKLER SYSTEM FNWZ 12‐0053, Repair Maintenance Shop, Building 8040

Register that relate to the successful installation of the sprinkler systems(s). The submittals identified on this list shall be accompanied by a letter of approval signed and dated by the Fire Protection Specialist when submitted to the Government. The Fire Protection Specialist shall be regularly engaged in the design and installation of the type and complexity of system specified in the contract documents, and shall have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.

1.4.2 Sprinkler System Installer

Work specified in this section shall be performed by the Sprinkler System Installer who is regularly engaged in the installation of the type and complexity of system specified in the contract documents, and who has served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months. Submit the name and documentation of certification of the proposed Sprinkler System Installer, concurrent with submittal of the Fire Protection Specialist Qualifications.

1.4.3 Shop Drawings

Shop Drawings shall conform to the requirements established for working plans as prescribed in NFPA 13. Submit 3 copies of the Sprinkler System shop drawings, no later than 21 days prior to the start of sprinkler system installation. Drawings shall include plan and elevation views demonstrating that the equipment will fit the allotted spaces with clearance for installation and maintenance. Each set of drawings shall include the following:

a. Descriptive index of drawings in the submittal with drawings listed in sequence by drawing number. A legend identifying device symbols, nomenclature, and conventions used.

b. Floor plans drawn to a scale not less than 1/8" = 1'-0" which clearly show locations of sprinklers, risers, pipe hangers, seismic separation assemblies, sway bracing, inspector's test connections, drains, and other applicable details necessary to clearly describe the proposed arrangement. Each type of fitting used and the locations of bushings, reducing couplings, and welded joints shall be indicated.

c. Actual center-to-center dimensions between sprinklers on branch lines and between branch lines; from end sprinklers to adjacent walls; from walls to branch lines; from sprinkler feed mains, cross-mains and branch lines to finished floor and roof or ceiling. A detail shall show the dimension from the sprinkler and sprinkler deflector to the ceiling in finished areas.

d. Longitudinal and transverse building sections showing typical branch line and cross-main pipe routing as well as elevation of each typical sprinkler above finished floor.

e. Details of each type of riser assembly; pipe hanger; sway bracing for earthquake protection, and restraint of underground water main at point-of-entry into the building, and electrical devices and interconnecting wiring. Submit load calculations for sizing of sway bracing, for systems that are required to be protected against damage from earthquakes.

Section 21 13 13 Dyess AFB, Texas WET PIPE SPRINKLER SYSTEM FNWZ 12‐0053, Repair Maintenance Shop, Building 8040

1.5 DELIVERY, STORAGE, AND HANDLING

All equipment delivered and placed in storage shall be housed in a manner to preclude any damage from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Additionally, all pipes shall either be capped or plugged until installed.

1.6 EXTRA MATERIALS

Submit spare parts data for each different item of material and equipment specified. The data shall include a complete list of parts and supplies, with current unit prices and source of supply, and a list of parts recommended by the manufacturer to be replaced after 1 year and 3 years of service. Include a list of special tools and test equipment required for maintenance and testing of the products supplied.

PART 2 PRODUCTS

2.1 STANDARD PRODUCTS

Provide materials and equipment which are standard products of a manufacturer regularly engaged in the manufacture of such products and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening.

2.2 NAMEPLATES

All equipment shall have a nameplate that identifies the manufacturer's name, address, type or style, model or serial number, and catalog number.

2.3 REQUIREMENTS FOR FIRE PROTECTION SERVICE

Provide Materials and Equipment that have been tested by Underwriters Laboratories, Inc. and are listed in UL Fire Prot Dir or approved by Factory Mutual and listed in FM APP GUIDE. Where the terms "listed" or "approved" appear in this specification, such shall mean listed in UL Fire Prot Dir or FM APP GUIDE. Submit manufacturer's catalog data included with the Sprinkler System Drawings for all items specified herein. The data shall be highlighted to show model, size, options, etc., that are intended for consideration. Data shall be adequate to demonstrate compliance with all contract requirements. In addition, provide a complete equipment list that includes equipment description, model number and quantity.

2.4 ABOVEGROUND PIPING COMPONENTS

Aboveground piping shall be steel .

2.4.1 Steel Piping Components

2.4.1.1 Steel Pipe

2.4.1.1.1 Steel Pipe (Wet Pipe Systems)

A. All pipe shall be coated black steel pipe as permitted by NFPA 13 and shall conform to applicable provisions of ASTM A 795/A 795M, ASTM A 53/A 53M, or ASTM A 135/A 135M. All pipe and fittings shall be listed by Underwriters'

Section 21 13 13 Dyess AFB, Texas WET PIPE SPRINKLER SYSTEM FNWZ 12‐0053, Repair Maintenance Shop, Building 8040

Laboratories, Inc. and Factory Mutual Insurance Company tested and approved.

All pipe and fittings shall be marked with the name of the manufacturer, pipe Schedule, and ASTM/UL/FM designations. All piping materials stored at the site shall be supported off the ground with the ends protected to prevent dirt or debris from entering the pipe.

B. Concealed Spaces - All wet pipe fire suppression system piping located in concealed spaces such as furred ceilings, wall cavities, pipe chases, and under floor spaces shall be Schedule 40 black steel with welded or threaded joints. Cut groove mechanical joints may be used in concealed spaces where indicated on the drawings if access doors are provided for inspection of the joints in accordance with the NFPA. All tees shall be welded groove-o-let fittings.

C. Non-Concealed Spaces (Piping 2 inch diameter and smaller) - All wet pipe fire suppression system pipe 2 inches in diameter and smaller exposed to view or accessible above lay-in ceilings shall be Schedule 40 black steel with welded or cut groove mechanical joints. All tees shall be welded groove-o-let fittings. Screw threaded pipe joints are permissible only for installation of sprinkler heads, automatic air vents, drain line valves, or test fittings.

D. Non-Concealed Spaces (Piping 2 1/2 inch diameter and larger) - All wet pipe fire suppression system pipe 2 1/2 inches in diameter and larger exposed to view or accessible above lay-in ceilings shall be either Schedule 40 or Schedule 10 black steel. Joints shall be welded, cut groove (Schedule 40), or roll groove (Schedule 10) mechanical joints. All tees shall be welded groove-o-let fittings. Screw threaded fittings are permissible only for installation of sprinkler heads, automatic air vents, drain line valves, or test fittings.

E. All Schedule 40 and Schedule 10 pipe shall be internally factory coated with a UL and FM Listed thermosetting resin and a thermoplastic polyethylene, polypropylene, polybutylene material or UL/FM Listed equivalent coating incorporating an antimicrobial agent such as chlorinated phenol applied by electrostatic, fluidized bed, or flame spraying technique to help prevent biofilm formation and electrochemical reactions. Only saw cutting (no abrasive cutting) of the pipe shall be permitted to minimize damage to the pipe coatings.

F. Hydrostatically test the complete wet pipe system for 24 hours at the pressure recommended by the NFPA prior to concealing any portion of the system. The system shall be completely filled with water. Entrapped air shall be vented at each upright mounted sprinkler head and at each high point in the system. The hydrostatic test shall be witnessed by the contractor Fire Protection Specialist and a government official designated by the contracting officer.

G. The piping system shall be provided with a UL Listed automatic air vent fitting at each high point in the system and where otherwise indicated to remove entrapped air.

H. Provide proper slope in the system piping to drain the system; and provide an inspector test and drain fitting with pressure gage at each drain location.

I. Provide a flushing fitting at the end of each distribution main in gridded and looped system; and also at the end of each branch line in looped systems as allowable by NFPA. Gridded sprinkler systems are defined as having parallel cross mains connected by multiple branch lines so that an operating

Section 21 13 13 Dyess AFB, Texas WET PIPE SPRINKLER SYSTEM FNWZ 12‐0053, Repair Maintenance Shop, Building 8040 sprinkler will receive water from both ends. Looped sprinkler systems are partial gridded systems where not all branch lines are not interconnected.

Flushing fittings shall consist of a full size, full port ball valve with a fire department hose connection and a cap.

J. Disinfect the complete piping system with a concentrated hypochloride solution in accordance with this specification section to kill the anerobic and aerobic bacteria that may cause microbiologically induced corrosion (MIC). Backflush the entire wet pipe sprinkler system main and branch lines;

fill with clean water; and vent all entrapped air at each upright sprinkler head and at each high point in the system.

2.4.1.2 Fittings for Non-Grooved Steel Pipe

Fittings shall be cast iron conforming to ASME B16.4, steel conforming to ASME B16.9 or ASME B16.11, or malleable iron conforming to ASME B16.3.

Fittings into which sprinklers, drop nipples or riser nipples (sprigs) are screwed shall be threaded type. Plain-end fittings with mechanical couplings, fittings that use steel gripping devices to bite into the pipe and segmented welded fittings shall not be used.

2.4.1.3 Grooved Mechanical Joints and Fittings

Joints and fittings shall be designed for not less than 175 psi service and shall be the product of the same manufacturer;segmented welded fittings shall not be used. Fitting and coupling houses shall be malleable iron conforming to ASTM A47/A47M, Grade 32510; ductile iron conforming to ASTM A536, Grade 65-45-12. Gasket shall be the flush type that fills the entire cavity between the fitting and the pipe. Nuts and bolts shall be heat-treated steel conforming to ASTM A183 and shall be cadmium plated or zinc electroplated.

2.4.1.4 Flanges

Flanges shall conform to NFPA 13 and ASME B16.1. Gaskets shall be non-asbestos compressed material in accordance with ASME B16.21, 1/16 inch thick, and full face or self-centering flat ring type.

2.4.1.5 Bolts, Nut, and Washers

Bolts shall be conform to ASTM A449, Type 1 and shall extend no less than three full threads beyond the nut with bolts tightened to the required torque. Nuts shall be hexagon type conforming to ASME B18.2.2 . Washers shall meet the requirements of ASTM F436. Flat circular washers shall be provided under all bolt heads and nuts.

2.4.2 Pipe Hangers

Hangers shall be listed in UL Fire Prot Dir or FM APP GUIDE and of the type suitable for the application, construction, and pipe type and sized to be supported.

2.4.3 Valves

2.4.3.1 Control Valve and Gate Valve

Manually operated sprinkler control valve and gate valve shall be outside

Section 21 13 13 Dyess AFB, Texas WET PIPE SPRINKLER SYSTEM FNWZ 12‐0053, Repair Maintenance Shop, Building 8040 stem and yoke (OS&Y) type and shall be listed in UL Bld Mat Dir or

FM APP GUIDE.

2.4.3.2 Check Valve

Check valve 2 inches and larger shall be listed in UL Bld Mat Dir or FM APP GUIDE. Check valves 4 inches and larger shall be of the swing type with flanged cast iron body and flanged inspection plate, shall have a clear waterway and shall meet the requirements of MSS SP-71, for Type 3 or 4.

2.5 ALARM CHECK VALVE ASSEMBLY

Assembly shall include a riser check valve, standard trim piping, pressure gauges, testing valves, main drain, and other components as required for a fully operational system.

2.6 WATERFLOW ALARM

Electrically operated, exterior-mounted, waterflow alarm bell shall be provided and installed in accordance with NFPA 13. Waterflow alarm bell shall be rated 24 VDC and shall be connected to the Fire Alarm Control Panel(FACP) in accordance with Section SECTION 28 31 76 INTERIOR FIRE ALARM

AND MASS NOTIFICATION SYSTEM

2.7 ALARM INITIATING AND SUPERVISORY DEVICES

2.7.1 Sprinkler Waterflow Indicator Switch, Vane Type

Switch shall be vane type with a pipe saddle and cast aluminum housing.

The electro-mechanical device shall include a flexible, low-density polyethylene paddle conforming to the inside diameter of the fire protection pipe. The device shall sense water movements and be capable of detecting a sustained flow of 10 gpm or greater. The device shall contain a retard device adjustable from 0 to 90 seconds to reduce the possibility of false alarms caused by transient flow surges. The switch shall be tamper resistant and contain two SPDT (Form C) contacts arranged to transfer upon removal of the housing cover, and shall be equipped with a silicone rubber gasket to assure positive water seal and a dustproof cover and gasket to seal the mechanism from dirt and moisture.

2.7.2 Valve Supervisory (Tamper) Switch

Switch shall be suitable for mounting to the type of control valve to be supervised open. The switch shall be tamper resistant and contain one set of SPDT (Form C) contacts arranged to transfer upon removal of the housing cover or closure of the valve of more than two rotations of the valve stem.

2.8 FIRE DEPARTMENT CONNECTION

Fire department connection shall be projecting type with cast brass body, matching wall escutcheon lettered "Auto Spkr" with a polished brass finish. The connection shall have two inlets with individual self-closing clappers, caps with drip drains and chains. Female inlets shall have 2-1/2 inch diameter American National Fire Hose Connection Screw Threads (NH) per

NFPA 1963.

Section 21 13 13 Dyess AFB, Texas WET PIPE SPRINKLER SYSTEM FNWZ 12‐0053, Repair Maintenance Shop, Building 8040

2.9 SPRINKLERS

Sprinklers with internal O-rings shall not be used. Sprinklers shall be used in accordance with their listed coverage limitations. Temperature classification shall be as indicated. Sprinklers in high heat areas including attic spaces or in close proximity to unit heaters shall have temperature classification in accordance with NFPA 13. Extended coverage sprinklers shall not be used.

2.9.1 Concealed Sprinkler

Concealed sprinkler shall be chrome-plated quick-response type and shall have a nominal 1/2 inch or 17/32 inch orifice.

2.9.2 Recessed Sprinkler

Recessed sprinkler shall be chrome-plated quick-response type and shall have a nominal 1/2 inch or 17/32 inch orifice.

2.9.3 Flush Sprinkler

Flush sprinkler shall be chrome-plated quick-response type and shall have a nominal 1/2 inch or 17/32 inch orifice.

2.9.4 Pendent Sprinkler

Pendent sprinkler shall be of the fusible strut or glass bulb type, recessed quick-response type with nominal 1/2 inchor 17/32 inch orifice.

Pendent sprinklers shall have a polished chrome finish.

2.9.5 Upright Sprinkler

Upright sprinkler shall be brass quick-response type and shall have a nominal 1/2 inch or 17/32 inch orifice.

2.9.6 Sidewall Sprinkler

Sidewall sprinkler shall have a nominal 1/2 inch orifice. Sidewall sprinkler shall have a polished chrome finish. Sidewall sprinkler shall be the quick-response type.

2.9.7 Corrosion Resistant Sprinkler

Corrosion resistant sprinkler shall be the upright pendent type installed in locations as indicated. Corrosion resistant coatings shall be factory-applied by the sprinkler manufacturer.

2.9.8 Dry Sprinkler Assembly

Dry sprinkler assembly shall be of the pendent, upright, sidewall, type as indicated. Assembly shall include an integral escutcheon. Maximum length shall not exceed maximum indicated in UL Fire Prot Dir. Sprinklers shall have a polished chrome finish.

2.10 ACCESSORIES

2.10.1 Sprinkler Cabinet

Section 21 13 13 Dyess AFB, Texas WET PIPE SPRINKLER SYSTEM FNWZ 12‐0053, Repair Maintenance Shop, Building 8040

Spare sprinklers shall be provided in accordance with NFPA 13 and shall be packed in a suitable metal or plastic cabinet. Spare sprinklers shall be representative of, and in proportion to, the number of each type and temperature rating of the sprinklers installed. At least one wrench of each type required shall be provided.

2.10.2 Pendent Sprinkler Escutcheon

Escutcheon shall be one-piece metallic type with a depth of less than 3/4 inch and suitable for installation on pendent sprinklers. The escutcheon shall have a factory finish that matches the pendent sprinkler heads.

2.10.3 Pipe Escutcheon

Escutcheon shall be polished chromium-plated zinc alloy, or polished chromium-plated copper alloy. Escutcheons shall be either one-piece or split-pattern, held in place by internal spring tension or set screw.

2.10.4 Sprinkler Guard

Guard shall be a steel wire cage designed to encase the sprinkler and protect it from mechanical damage. Guards shall be provided on sprinklers located as required by NFPA-13..

2.10.5 Identification Sign

Valve identification sign shall be minimum 6 inches wide by 2 inches high with enamel baked finish on minimum 18 gauge steel or 0.024 inch aluminum with red letters on a white background or white letters on red background.

Wording of sign shall include, but not be limited to "main drain," "auxiliary drain," "inspector's test," "alarm test," "alarm line," and similar wording as required to identify operational components.

2.11 DOUBLE-CHECK VALVE BACKFLOW PREVENTION ASSEMBLY

Double-check backflow prevention assembly shall comply with ASSE 1015. The assembly shall have a bronze, cast-iron or stainless steel body with flanged ends. The assembly shall include pressure gauge test ports and OS&Y shutoff valves on the inlet and outlet, 2-positive-seating check valve for continuous pressure application, and four test cocks. Assemblies shall be rated for working pressure of 175 psi The maximum pressure loss shall be 6 psi at a flow rate equal to the sprinkler water demand, at the location of the assembly. A test port for a pressure gauge shall be provided both upstream and downstream of the double check backflow prevention assembly valves.

PART 3 EXECUTION

3.1 FIELD MEASUREMENTS

After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.

3.2 INSTALLATION REQUIREMENTS

The installation shall be in accordance with the applicable provisions of

Section 21 13 13 Dyess AFB, Texas WET PIPE SPRINKLER SYSTEM FNWZ 12‐0053, Repair Maintenance Shop, Building 8040

NFPA 13, NFPA 24 and publications referenced therein. Installation of in-rack sprinklers shall comply with applicable provisions of NFPA 13.

3.3 INSPECTION BY FIRE PROTECTION SPECIALIST

Prior to ceiling installation and concurrent with the Final Acceptance Test Report, certification by the Fire Protection Specialist that the sprinkler system is installed in accordance with the contract requirements, including signed approval of the Preliminary and Final Acceptance Test Reports. The Fire Protection Specialist shall: 1) inspect the sprinkler system periodically during the installation to assure that the sprinkler system is being provided and installed in accordance with the contract requirements,

2) witness the preliminary and final tests, and sign the test results, 3) after completion of the system inspections and a successful final test, certify in writing that the system has been installed in accordance with the contract requirements. Any discrepancy shall be brought to the attention of the Contracting Officer in writing, no later than three working days after the discrepancy is discovered.

3.4 ABOVEGROUND PIPING INSTALLATION

3.4.1 Protection of Piping Against Earthquake Damage

Seismically protect the system piping against damage from earthquakes.

This requirement is not subject to determination under NFPA 13. Install the seismic protection of the system piping in accordance with UFC 3-310-04, NFPA 13 and Annex A. Include the required features identified therein that are applicable to the specific piping system.

3.4.2 Piping in Exposed Areas

Install exposed piping without diminishing exit access widths, corridors or equipment access. Exposed horizontal piping, including drain piping, shall be installed to provide maximum headroom.

3.4.3 Piping in Finished Areas

In areas with suspended or dropped ceilings and in areas with concealed spaces above the ceiling, piping shall be concealed above ceilings. Piping shall be inspected, tested and approved before being concealed. Risers and similar vertical runs of piping in finished areas shall be concealed.

3.4.4 Pendent Sprinklers

Drop nipples to pendent sprinklers shall consist of minimum 1 inch pipe with a reducing coupling into which the sprinkler shall be threaded.

Hangers shall be provided on arm-overs to drop nipples supplying pendent sprinklers when the arm-over exceeds 12 inches for steel pipe or 6 inches for copper tubing. Where sprinklers are installed below suspended or dropped ceilings, drop nipples shall be cut such that sprinkler ceiling plates or escutcheons are of a uniform depth throughout the finished space. The outlet of the reducing coupling shall not extend more than 1 inch below the underside of the ceiling. On pendent sprinklers installed below suspended or dropped ceilings, the distance from the sprinkler deflector to the underside of the ceiling shall not exceed 4 inches.

Recessed pendent sprinklers shall be installed such that the distance from the sprinkler deflector to the underside of the ceiling shall not exceed

Section 21 13 13 Dyess AFB, Texas WET PIPE SPRINKLER SYSTEM FNWZ 12‐0053, Repair Maintenance Shop, Building 8040 the manufacturer's listed range and shall be of uniform depth throughout the finished area. Pendent sprinklers in suspended ceilings shall be a minimum of 6 inches from ceiling grid.

3.4.5 Upright Sprinklers

Riser nipples or "sprigs" to upright sprinklers shall contain no fittings between the branch line tee and the reducing coupling at the sprinkler.

Riser nipples exceeding 30 inches in length shall be individually supported.

3.4.6 Pipe Joints

Pipe joints shall conform to NFPA 13, except as modified herein. Not more than four threads shall show after joint is made up. Welded joints will be permitted, only if welding operations are performed as required by NFPA 13 at the Contractor's fabrication shop, not at the project construction site. Flanged joints shall be provided where indicated or required by NFPA 13. Grooved pipe and fittings shall be prepared in accordance with the manufacturer's latest published specification according to pipe material, wall thickness and size. Grooved couplings, fittings and grooving tools shall be products of the same manufacturer. For copper tubing, pipe and groove dimensions shall comply with the tolerances specified by the coupling manufacturer. The diameter of grooves made in the field shall be measured using a "go/no-go" gauge, vernier or dial caliper, narrow-land micrometer, or other method specifically approved by the coupling manufacturer for the intended application. Groove width and dimension of groove from end of pipe shall be measured and recorded for each change in grooving tool setup to verify compliance with coupling manufacturer's tolerances. Grooved joints shall not be used in concealed locations, such as behind solid walls or ceilings, unless an access panel is shown on the drawings for servicing or adjusting the joint.

3.4.7 Reducers

Reductions in pipe sizes shall be made with one-piece tapered reducing fittings. The use of grooved-end or rubber-gasketed reducing couplings will not be permitted. When standard fittings of the required size are not manufactured, single bushings of the face type will be permitted. Where used, face bushings shall be installed with the outer face flush with the face of the fitting opening being reduced. Bushings shall not be used in elbow fittings, in more than one outlet of a tee, in more than two outlets of a cross, or where the reduction in size is less than 1/2 inch.

3.4.8 Pipe Penetrations

Cutting structural members for passage of pipes or for pipe-hanger fastenings will not be permitted. Pipes that must penetrate concrete or masonry walls or concrete floors shall be core-drilled and provided with pipe sleeves. Each sleeve shall be Schedule 40 galvanized steel, ductile iron or cast iron pipe and shall extend through its respective wall or floor and be cut flush with each wall surface. Sleeves shall provide required clearance between the pipe and the sleeve per NFPA 13. The space between the sleeve and the pipe shall be firmly packed with mineral wool insulation. Where pipes penetrate fire walls, fire partitions, or floors, pipes shall be fire stopped in accordance with Section 07 84 00 FIRESTOPPING. In penetrations that are not fire-rated or not a floor penetration, the space between the sleeve and the pipe shall be sealed at both ends with plastic waterproof cement that will dry to a firm but