FA2517-13-R-5000 Amendment 0002
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise the follow ing sections:
1. Correct numbering in Coefficient Schedule B: Section A has been corrected to reference paragraph 6 for NPIs, and Section B-1, Wage
Determinations, has been corrected to paragraph 7.
2. Revise Attachment 1: SABER Specif ications updated 6 Jun 2014. Pages 4170-4181 are replaced w ith the correct Specif ication 32 92 23, Sodding, as outlined in the Table of Contents.
3. Revise Attachment 13: Demonstration Project Package updated 6 Jun 2014. The first sentence of Statement of w ork Section 5.3.1.4 has been revised to state, “The Contractor shall provide a new packaged unit mounted as specif ied in the project draw ings.”
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Jun-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA2517-13-R-5000
X 9B. DATED (SEE ITEM 11)
21-May-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Jun-2014
CODE
FA2517 - 21 CONS/LGCAA
OLIVIA C. GORMAN
(719) 556-4875
580 GOODFELLOW STREET, BLDG 1324
PETERSON AFB CO 80914-1648
FA2517 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA2517-13-R-5000
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The Issued By organization has changed from
FA2517 - 21 CONS/LGCAA
DEVIN ROSIN
(719) 556-4116
580 GOODFELLOW STREET, BLDG 1324
PETERSON AFB CO 80914
to
FA2517 - 21 CONS/LGCAA
OLIVIA C. GORMAN
(719) 556-4875
580 GOODFELLOW STREET, BLDG 1324
PETERSON AFB CO 80914-1648
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
COEFFICIENT SCHEDULE B
A. NON-PREPRICED ITEM (NPI) COEFFICIENT
A maximum NPI Coefficient up to 15% shall be effective for the entire contract performance period including all option periods.
The contractor shall provide maintenance, repair, design and construction services during standard, non-standard working hours and in secure and non-secure areas, in accordance with Coefficient Schedule Section B, Section C
SABER Specifications and RSMeans/e4Clicks Unit Price Book/Software for Peterson AFB, Colorado; Ft Carson, Colorado (to include Pinon Canyon, Bldg 20,000 and Pueblo Chemical Depot); Schriever AFB, Colorado; Cheyenne
Mountain Air Force Station, Colorado; United States Air Force Academy, Colorado (to include Farish Memorial
Recreation and Bullseye Auxiliary Airfield); Buckley AFB, Colorado; and FE Warren AFB, Wyoming (to include
Missile Field). (See NPI; paragraph 6 below in the Schedule Description).
B. COEFFICIENT SCHEDULE B (continued)
BASE YEAR: 2 March 2015, THROUGH 1 March 2016
NUMBER DESCRIPTION COEFFICIENT
Peterson AFB:
B0001 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0002 Standard Hours-Secured Area (Order Above $750,000) ______________
B0003 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0004 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0005 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0006 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0007 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0008 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
1274366865C Highlight
Cheyenne Mountain Air Force Station:
B0009 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0010 Standard Hours-Secured Area (Order Above $750,000) ______________
B0011 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0012 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0013 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0014 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0015 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0016 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
Ft. Carson:
B0017 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0018 Standard Hours-Secured Area (Order Above $750,000) ______________
B0019 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0020 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0021 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0022 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0023 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0024 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
Pinon Canyon:
B0025 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0026 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0027 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0028 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
Pueblo Chemical Depot:
B0029 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0030 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0031 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0032 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
Schriever AFB:
B0033 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0034 Standard Hours-Secured Area (Order Above $750,000) ______________
B0035 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0036 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0037 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0038 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0039 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0040 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
United States Air Force Academy:
(to include Farish Memorial Recreation and Bullseye Auxiliary Airfield)
B0041 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0042 Standard Hours-Secured Area (Order Above $750,000) ______________
B0043 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0044 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0045 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0046 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0047 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0048 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
Buckley AFB:
B0049 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0050 Standard Hours-Secured Area (Order Above $750,000) ______________
B0051 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0052 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0053 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0054 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0055 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0056 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
FE Warren AFB:
B0057 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0058 Standard Hours-Secured Area (Order Above $750,000) ______________
B0059 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0060 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0061 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0062 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0063 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0064 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
FE Warren Missile Field:
B0065 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0066 Standard Hours-Secured Area (Order Above $750,000) ______________
B0067 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0068 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
OPTION YEAR ONE: 2 March 2016 THROUGH 1 March 2017
B0069 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0070 Standard Hours-Secured Area (Order Above $750,000) ______________
B0071 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0072 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0073 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0074 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0075 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0076 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0077 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0078 Standard Hours-Secured Area (Order Above $750,000) ______________
B0079 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0080 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0081 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0082 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0083 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0084 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0085 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0086 Standard Hours-Secured Area (Order Above $750,000) ______________
B0087 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0088 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0089 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0090 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0091 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0092 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0093 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0094 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0095 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0096 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0097 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0098 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0099 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0100 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0101 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0102 Standard Hours-Secured Area (Order Above $750,000) ______________
B0103 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0104 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0105 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0106 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0107 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0108 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0109 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0110 Standard Hours-Secured Area (Order Above $750,000) ______________
B0111 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0112 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0113 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0114 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0115 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0116 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0117 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0118 Standard Hours-Secured Area (Order Above $750,000) ______________
B0119 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0120 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0121 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0122 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0123 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0124 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0125 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0126 Standard Hours-Secured Area (Order Above $750,000) ______________
B0127 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0128 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0129 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0130 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0131 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0132 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0133 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0134 Standard Hours-Secured Area (Order Above $750,000) ______________
B0135 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0136 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
OPTION YEAR TWO: 2 March 2017 THROUGH 1 March 2018
B0137 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0138 Standard Hours-Secured Area (Order Above $750,000) ______________
B0139 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0140 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0141 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0142 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0143 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0144 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0145 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0146 Standard Hours-Secured Area (Order Above $750,000) ______________
B0147 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0148 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0149 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0150 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0151 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0152 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0153 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0154 Standard Hours-Secured Area (Order Above $750,000) ______________
B0155 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0156 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0157 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0158 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0159 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0160 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0161 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0162 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0163 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0164 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0165 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0166 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0167 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0168 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0169 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0170 Standard Hours-Secured Area (Order Above $750,000) ______________
B0171 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0172 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0173 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0174 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0175 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0176 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0177 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0178 Standard Hours-Secured Area (Order Above $750,000) ______________
B0179 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0180 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0181 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0182 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0183 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0184 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0185 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0186 Standard Hours-Secured Area (Order Above $750,000) ______________
B0187 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0188 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0189 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0190 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0191 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0192 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0193 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0194 Standard Hours-Secured Area (Order Above $750,000) ______________
B0195 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0196 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0197 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0198 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0199 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0200 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0201 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0202 Standard Hours-Secured Area (Order Above $750,000) ______________
B0203 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0204 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
OPTION YEAR THREE: 2 March 2018 THROUGH 1 March 2019
B0205 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0206 Standard Hours-Secured Area (Order Above $750,000) ______________
B0207 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0208 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0209 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0210 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0211 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0212 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0213 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0214 Standard Hours-Secured Area (Order Above $750,000) ______________
B0215 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0216 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0217 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0218 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0219 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0220 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0221 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0222 Standard Hours-Secured Area (Order Above $750,000) ______________
B0223 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0224 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0225 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0226 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0227 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0228 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0229 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0230 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0231 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0232 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0233 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0234 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0235 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0236 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0237 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0238 Standard Hours-Secured Area (Order Above $750,000) ______________
B0239 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0240 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0241 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0242 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0243 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0244 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0245 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0246 Standard Hours-Secured Area (Order Above $750,000) ______________
B0247 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0248 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0249 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0250 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0251 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0252 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0253 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0254 Standard Hours-Secured Area (Order Above $750,000) ______________
B0255 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0256 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0257 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0258 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0259 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0260 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0261 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0262 Standard Hours-Secured Area (Order Above $750,000) ______________
B0263 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0264 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0265 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0266 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0267 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0268 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0269 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0270 Standard Hours-Secured Area (Order Above $750,000) ______________
B0271 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0272 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
OPTION YEAR FOUR: 2 March 2019 THROUGH 1 March 2020
B0273 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0274 Standard Hours-Secured Area (Order Above $750,000) ______________
B0275 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0276 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0277 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0278 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0279 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0280 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0281 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0282 Standard Hours-Secured Area (Order Above $750,000) ______________
B0283 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0284 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0285 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0286 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0287 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0288 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0289 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0290 Standard Hours-Secured Area (Order Above $750,000) ______________
B0291 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0292 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0293 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0294 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0295 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0296 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0297 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0298 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0299 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0300 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0301 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0302 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0303 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0304 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0305 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0306 Standard Hours-Secured Area (Order Above $750,000) ______________
B0307 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0308 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0309 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0310 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0311 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0312 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0313 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0314 Standard Hours-Secured Area (Order Above $750,000) ______________
B0315 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0316 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0317 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0318 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0319 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0320 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0321 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0322 Standard Hours-Secured Area (Order Above $750,000) ______________
B0323 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0324 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0325 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0326 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0327 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0328 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0329 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0330 Standard Hours-Secured Area (Order Above $750,000) ______________
B0331 Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0332 Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0333 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0334 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B0335 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) ______________
B0336 Non-Standard Hours-Non-Secured Area (Order Above $750,000) ______________
B0337 Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0338 Standard Hours-Secured Area (Order Above $750,000) ______________
B0339 Non-Standard Hours-Secured Area (Order $750,000 and Below) ______________
B0340 Non-Standard Hours-Secured Area (Order Above $750,000) ______________
B-1 SCHEDULE DESCRIPTION
1. Construction projects will be awarded by individual task orders on an as-needed basis. Projects will be in support of real property maintenance, repair, alteration and minor construction. The contractor will receive requests for proposals from the Government, Specification Division 01 00 00, General Requirements, with specific instructions and details for proposal submittal.
2. Coefficients: See Section 01 04 00 of the specifications
a. The Government will apply the coefficients as determined in the specifications. This calculation shall be the total compensation paid to the contractor for all of their direct costs, indirect costs (including General and Administrative
Expenses) and profit for performance.
b. The contractor’s coefficients (in decimal format, no more than 4 decimal places) shall contain applicable profit and all burden costs such as design fees, additional bond premiums, insurance, computer system and support costs, compliance with environmental and safety laws, taxes, protection or moving of Government property, labor laws and any other associated costs required to perform the work.
c. The contractor shall include in the coefficient any costs related in RSMeans under the Subdivisions/Major
Classifications as specified in Section 01 04 00 of the specifications, as these line items will not be allowed at the task order level.
d. Coefficients less than “1.0000”, (e.g. .9700) would result in a decrease (e.g. minus 3% in the case of the example) to the pre-priced items in the proposal. The contractor shall thoroughly consider all potential costs and the proposal environment, before submitting a coefficient less than 1.0000 for any item in the Coefficient Schedule B.
e. Coefficients will represent the maximum amount authorized on task orders. Lower coefficients may be proposed on individual task orders in order to gain a competitive advantage on that task order.
3. Standard Working Hours: See specification Section 01 00 00.
4. Non-Standard Working Hours: See specification Section 01 00 00.
5. Minimum Guarantee: The basic guaranteed minimum dollar amount of work which will be required under this contract, and which may be initiated by one or more task orders, is $5,000 for each individual contract. The total program ceiling for all contracts, to include option years, is $275,000,000. Task order ordering range is from $2,000 to $5,000,000. No contractor entries are required for these areas in the proposal Schedule, Section B. Contractors shall enter their proposed coefficients in the Coefficient Schedule B area.
6. Non-Prepriced Item (NPI): For individual task orders, items of work not covered by the RSMeans, but within the scope and general intent of the contract, may be added by the Contracting Officer. These items may then be incorporated into and made part of the basic contract at the Government’s option. For individual task orders, the items shall be provided at the negotiated price, and multiplied by the applicable NPI coefficient listed in the contract schedule. The RSMeans shall be used to the maximum extent practicable. The total value of NPIs may not exceed
25% of the total dollar value of the task order without the approval of the Contracting Officer. Each situation where
NPIs may exceed 25% of the total priced order shall be thoroughly justified by the contractor as part of their proposal for the requested work. For each task order proposal, NPIs shall be supported by two (2) competitive quotes unless waived by the Contracting Officer.
7. Wage Determinations (WDs): Concurrent with the exercise of any options, the current Davis Bacon WDs will be incorporated and shall be effective for all task orders issued on the first day of the option and through the duration of the option period (see FAR 52.222-30). The contractor shall compensate all covered employees at not less than the rates specified on the wage determination; however, no adjustment to the coefficient pricing will be made relative to the incorporation of any wage determination. See Section J for incorporated WDs. As indicated by FAR
22.404-12(c)(2) and referenced in clause 52.222-30, Davis-Bacon Act—Price Adjustment (None or Separately
Specified Method), adjustments for fluctuations in wages as a result of the annual incorporation of revised Davis
Bacon WDs will be captured through the annual update of RSMeans and City Cost Indexes.
(end Schedule B)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS
Document Type Description Number of Pages Date
Attachment 1 SABER Technical Specifications 4,583 pages 6 Jun 2014
Attachment 2 Listing of Incorporated Wage Decisions 1 page 19 May 2014
Attachment 3 Non-Appropriated Funds General Provisions 7 pages 9 Dec 2011
Attachment 4 21 Civil Engineer Squadron Design Guide 69 pages 19 Dec 2013
Attachment 5 Peterson AFB Facilities Excellence Plan 625 pages Mar 2014
Attachment 6 USAFA Design Standards 350 pages Apr 2011
Attachment 7 Buckley Facilities Excellence Plan 117 pages Jun 2013
Attachment 8 CMAFS Engineering and Design Criteria Manual 250 pages Feb 2004
Attachment 9 CMAFS Facilities Excellence Plan 68 pages Aug 2008
Attachment 10 FE Warren Facilities Excellence Plan 154 pages 12 Oct 2005
Attachment 11 Schriever Facility Excellence Plan 164 pages Feb 2010
Attachment 12 Fort Carson Installation Design Guide 192 pages 24 May 2013
Attachment 13* Demonstration Project Package 22 pages 6 Jun 2014
Attachment 14* Demonstration Project Drawing files 6 pages 7 Mar 2014
Attachment 15* Technical Proposal Evaluation, Demonstration Project 4 pages 2 Jun 2014
*Attachments 13-15 will drop off and will not be included at the time of contract award.
(End of Summary of Changes)
1274366865C Highlight
File details come from the government source that posted it. Updated .