Attachment_15._Technical_Proposal_Evaluation _Demonstration_Project.pdf
PDF 39 KB Posted
- Attached to
- Front Range Simplified Acquisition of Base Engineering Requirements (SABER), Multi-Year, Multi-Base
- Solicitation number
- FA2517-13-R-5000
About this file
Attachment 15 Technical Proposal Evaluation Demonstration Project
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offeror:
Evaluator: Date:
Yes No a Did the offeror provide a written narrative describing their approach to the subject project?
b Did the offeror provide drawings to show the intended work?
c Did the offeror provide a schedule showing intended progression?
d Did the offeror identify any permits required by Section 01 57 20?
e Did the offeror provide a cover page(s) with project title, cost, assumptions, requirements, performance period, material lead times, and any special considerations (winter exclusion, phasing, etc)?
f Did the offeror provide any calculations per Section 01 00 00, paragraph 1.5.9.1, c (1)
Notes:
Did the offeror provide a cost proposal per Section 01 04 00?
a Did the offeror use the correct Unit Price Book?
b Did the offeror provide a Line Item Estimate per Section 01 04 00, paragraph 1.4.1.3?
c Were non-prepriced items (NPI), if provided, reasonable?
d Did the offeror provide a Division Summary per Section 01 04 00, paragraph 1.4.1.1?
e Did the offeror provide Totalling Components per Section 01 04 00, paragraph 1.4.1.2?
f Were the CCIs for prepriced items the weighted average per the (sub)division?
g Did the offeror use separate coefficients for the prepriced and NPI line items?
h Did the cost proposal include three sections: 1) Division Summary, 2) Totaling Components and 3) Line Item Estimate per Section 01 04 00, paragraph 1.4.1?
i Was the cost proposal composed of appropriate line items?
j Did contractor use line item "description field" to explain the application/purpose of each line item?
Notes:
3.1 ARCHITECTURAL
a Did the contractor provide a restroom layout which complies with the ABA (Architectural Barriers Act)?
b Did the contractors provide drawings complying with the layout as described in the SOW?
c Did the contractor account for the demolition or restroom walls [Gyp on Wood Studs]?
d Did the contractor account for the demolition or restroom floor tile?
e Did the contractor include line Item(s) for asbestos or lead abatement?
f Did the contractor account for (1) new window?
g Did the contractor provide Level IV GWB finish for all walls except restrooms?
h Did the contractor provide Level V GWB Finish for restroom?
i Did the contractor account for solid surface line item for counter?
j Did the contractor account for exterior wall infill at demo'd personell door?
k Did the contractor account for bathroom assessories? (paper towel dispenser/waste receptacle, full height mirror, lavatory mirror, soap dispenser, grab bars, toilet paper dispenser) l Did the contractor account for cementacious backer board at wall tile areas?
m Did the contractor account for tile wainscot?
Did offereror meet the requirements of the Statement of Work (SOW)?
1 Did the offeror provide a description of their approch per paragraph 1.5.9 of Section 01 00 00?
Technical Proposal Evaluation, Demonstration Project
FA2517-13-R-5000
Attachment 15 7 Mar 2014
Evaluator: Date:
Yes No n Did the contractor account for new suspended accoustic ceiling tile and grid [2x2, tegular with 15/16" grid]?
o Did the contractor account for door hardware in accordance with the SOW and the 21 CES Design Guide?
p Did the contractor account for standard carpet per the 21 CES Design Guide [26 ounce]?
q Did the contractor account for roof tear off, new roof installation, and include tapered insulation for proper roof slope?
r Did the contractor account for demo of roof ballast.
s Did the contractor account for 2X material to raise the parapet to NRCA Standards [Need 3 layers of treated 2X material].
t Did the contractor account for roof (2) conductor heads/scuppers, (2 @ 13') downspouts, and flashing?
u Did the contractor account for the brick wainscot?
v Did the contractor account for an exterior rated metal insulated door?
w Did contractor account for painting of exterior of building?
x Did contractor account for 12" dimensional brushed aluminum lettering work?
y Did the contractor account for furring out of exterior wall? [3-5/8" Mtl Studs @ 16" OC] z Did contractor account for new storefront system/door? [Dark bronze annodized] a a
Did the contractor account for wall insulation per the SOW?
Notes:
3.2 MECHANICAL per Divisions: 21 (Fire Suppression), 22 (Plumbing) and 23 (HVAC)?
a HVAC did the contractor account for the demolition and the wall repair at the HVAC unit in the small office?
b HVAC did the contractor account for the demolition of diffusers/grilles/returns?
c HVAC did the contractor account for the demolition of ductwork?
d HVAC did the contractor account for the demolition of flex ductwork?
e HVAC did the contractor's plan for the existing exhaust fan make sense?
f HVAC did the contractor adequately size the roof top unit for cooling?
g HVAC did the contractor adequately size the roof top unit for heating?
h HVAC did the contractor properly use gas-fired heating for roof top unit?
i HVAC did the contractor provide the correct amount of heat to the mechancial room?
j HVAC did the contractor provide the correct amount of heat to the electrical room?
k HVAC did the contractor provide cooling/exhaust to the electrical room in sufficent quantity?
l HVAC did the contractor provide for natural gas line to the new packaged unit?
m HVAC did the contractor provide for support systems for the natural gas lines to the new packaged unit?
n HVAC did the contractor provide for adequate support of all HVAC ductwork?
o HVAC did the contractor provide for balancing of the new roof top unit?
p HVAC did the contractor properly check the gas line size for adequacy to the new packaged unit?
q HVAC did the contractor properly size the restroom exhaust fan and ductwork?
Technical Proposal Evaluation, Demonstration Project
FA2517-13-R-5000
Attachment 15
Evaluator: Date:
Yes No r HVAC did the contractor properly utilize occupancy sensors for the control and design of the restroom exhaust system?
s HVAC did the contractor properly account for the exhaust grille in the bathroom's special finish?
t HVAC did the contractor properly account for the std finish on all the other diffusers and the grille outside the bathroom?
u HVAC did the contractor properly account for the exhaust rate in the new bathroom? (should be even 70cfm) v HVAC did the contractor properly account for the painting of the external ductwork?
w HVAC did the contractor use an appropriate amount of insulation?
x HVAC did the contractor properly account for the placement of the RTU with enough distance from the gas meter for maintenance?
y HVAC did the contractor properly account for the placement of the RTU with enough distance from the gas meter for air quality?
z HVAC did the contractor properly account for a raised air intake on the RTU to comply with ATFP?
a PLUMBING did the contractor account for the demolitionof gas piping (steel)?
b PLUMBING did the contractor account for the demolition?
c PLUMBING did the contractor provide a floor mounted bottom outlet water closet ?
d PLUMBING did the contractor provide the water closet with a manual operated flushometer?
e PLUMBING did the contractor provide the lavatory with an appropriate automatic operator?
f PLUMBING did the contractor properly handle the plugging of the water closet sewer line?
g PLUMBING did the contractor provide all copper plumbing?
h PLUMBING did the contractor adequately show the resolution of conflicts between the irrigation water, fire water, and domestic water?
i PLUMBING did the contractor adequately cover all sewer line work out of new restroom location?
j PLUMBING did the contractor adequately vent the new restroom group through a common vent through roof?
a FIRE did the contractor properly account for the PIV?
b FIRE did the contractor properly account for any duct detectors (both supply and return) if the RTU is over 2000cfm?
Notes:
3.3 ELECTRICAL per Division 21
a Did contractor include demolition of existing panel and feeder conductor?
b Did contractor include one new electrical Panel?
c Did contractor include demolition of emergency lighting?
d Did contractor include demolition of linear fluorescent light fixtures?
e Did contractor include demolition of lighted exit sign?
f Did contractor include demolition of receptacles?
g Did contractor include demolition of conduit and conductor?
h Did contractor demolish the RTU-1 disconnect switch?
i Did contractor demolish electrical light switches?
j Did contractor include R&R of communication equipment?
k Did the contractor include demolition for the garage door opener and controls?
l Did contractor provide new copper feeder wires for Panel P1?
m Did contractor include one new electrical Panel?
n Did the contractor include any aluminum conductor in estimate?
Technical Proposal Evaluation, Demonstration Project
FA2517-13-R-5000
Attachment 15
Evaluator: Date:
Yes No o Did the contractor include new EMT conduits?
p Did the contractor include new copper conductor?
q Did the contractor include new linear fluorescent lighting fixtures?
r Did the contractor include new LED wall-mounted exterior lighting fixtures?
s Did contractor correctly estimate quantity of smoke detectors?
t Did contractor provide line items for new fire alarm panel?
u Did contractor provide proper line item for fire alarm wiring in proposal? (wiring from RS Means Section 26-05-23-20) v Did contractor provide graphic map for Fire Alarm System per the Statement of Work?
w Did the contractor include a new NEMA 3R safety disconnect switch?
x Did the contractor include new receptacles and GFCI receptacles?
y Did the contractor include occupancy sensors for lighting control?
z Did the contractor include a new LED EXIT sign?
aaDid the contractor include CAT 5e copper communication conductor?
abDid the contractor include communication outlets?
Notes:
3.4 SITE WORK:
a Did the offerer's drawings address the SOW site work requirements?
b Did the contractor acknowledge that a Storm Water Pollution Prevention Plan (SWPPP) and Notice of
Intent is required due to the project being greater than 1 acre in size?
c Did the offerer's proposal include materials for storm water Best Management Practices (BMP's)?
Notes:
Technical Proposal Evaluation, Demonstration Project
FA2517-13-R-5000
Attachment 15
CONTRACTOR 1
File details come from the government source that posted it. Updated .