B.3.5 - 01020E - Appendix D NFPA 780 LP Requirement Determination.xls

NFPA Standard XLS spreadsheet 170 KB Posted

Attached to
A&E DESIGN/BUILD FIRST ARTICLE TESTING STORAGE FACILITY
Solicitation number
F3QCCL1025A008
Issued by

About this file

Appendix D NFPA 780 LP Requirements Determination

View the file

Other versions and copies of NFPA 780

Who attaches NFPA 780

Other files

File Type Posted
Site Visit Attendees.pdf PDF
First Article Testing Storage Facility questions 06APR11.docx DOCX document
BFS Part 7 - Communications 2007.pdf PDF
BFS Part 4 - Architectural General and Compatibility.pdf PDF
K - 01560 - Environmental Requirements - Jun 10.doc DOC document
O - UHHZ 100138 Appendix C Safety Plan.docx DOCX document
BFS Part 3 - Civil-Structural.pdf PDF
J.1 - 01540 - Green Procurement ATTACHMENT 2.doc DOC document
F - 01310 - CADD As-Built Drawings.doc DOC document
BFS Part 5 - Mechanical.pdf PDF
E.1 - 01300A - AF Form 66_Example.pdf PDF
N.0 - 133419 - Pre-engineered Metal Building.doc DOC document
BFS Part 6 - Electrical.pdf PDF
BFS Part 2 - Environmental .pdf PDF
J.2 - 01540 - Green Procurement ATTACHMENT 3.doc DOC document
001 Index of Drawings.pdf PDF
L - 01580 - Safety Requirements.doc DOC document
301 Bldg Section.pdf PDF
J.3 - 01540 - Green Procurement ATTACHMENT 7.doc DOC document
B.3.0 - 01020 - Construction Design Performance Requirements.doc DOC document
Wage Determination.pdf PDF
I.1 - 01503 - Contract Administration.doc DOC document
E.0 - 01300 - Submittals Contractor-Furnished Items.doc DOC document
BFS Part 1 - Intro and General .pdf PDF
101 Floor Plan.pdf PDF
B.3.3 - 01020C - Appendix C GEC Soils Report - First Art TestStor Fa.pdf PDF
B.3.1 - 01020A - Appendix A References.doc DOC document
M - 01730 - Operations and Maintenance Data.doc DOC document
J.0 - 01540 - Green Procurement.doc DOC document
B.2 - 01005 - Statement Of Work.doc DOC document
B.3.2 - 01020B - Appendix B Fire Protection Life Safety.doc DOC document
201 Elevations.pdf PDF
101 Site Demolition Plan.pdf PDF
FA8501-11-R-0018 solicitation.doc DOC document
D - 01040 - Site Requirements.doc DOC document
G - 01501 - Temporary Services - Contractor.doc DOC document
102 Site Plan.pdf PDF
B.3.4 - 01020D - Appendix D NFPA 780 LP Determination Explanation.doc DOC document
C - 01030 - Design-Build Design After Award.doc DOC document
H - 01502 - Temporary Services - Cont Occupancy.doc DOC document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

App D LIGHTNING PROTECTION REQUIREMENT DETERMINATION
PROJECT:
LOCATION:
DATE / BY:
The calculations below indicate LP is required as follows:
Lightning Protection Optional
This is based on NFPA 780 (2004 edition) Lightning Risk Assessment (Annex L). The lightning risk assessment methodology is provided to assist the building owner or architect/engineer to determine the risk of damage due to lightning. Once the risk has been determined, deciding on the need for protection measures is much easier. The methodology considers only the damage caused by a direct strike to the building or structure to be protected and currents flowing through the lightning protection system. This risk assessment method is a guide that takes into account the following factors:
# Building Environment# Type of Construction
# Structure Occupancy# Structure Contents
# Strike Consequences# Lightning Flash Density
Select one index value from each of the following tables (C1,C2,C3,C4,C5,Ng) and enter that number in the green box at the bottom of each table. Also enter the building width, length and height.
C1 -- Environmental Coefficient
Structure located within a space containing structures or trees of the same height or taller within a distance of 3H.0.25
Structure surrounded by smaller structures within a distance of 3H0.50
Isolated structure. No others structures within a distance of 3H.1.00
Isolated structure on hilltop.2.00
C1=0.25
C2 -- Structural Coefficient
Roof
StructureMetalNonmetallicFlammable
Metal0.51.02.0
Nonmetallic1.01.02.5
Flammable2.02.53.0
C2=0.5
C3 -- Structure Contents
Low value and nonflammable0.5
Standard value and nonflammable1.0
High value, moderate flammability2.0
Exceptional value, flammable, computer electronics3.0
Exceptional value, irreplaceable cultural items4.0
C3=0.5
C4 -- Structure Occupancy
Unoccupied0.5
Normally Occupied1.0
Difficult to evacuate or risk of panic3.0
C4=0.5
C5 -- Lightning Consequence Coefficient
Continuity of facility services not required, no environmental impact1
Continuity of facility services required, no environmental impact5
Consequences to environment10
C5=1.0
Ng -- Lightning Flash Density
Please enter the number corresponding to the structure's location on the following map
Ng=5(Central Georgia = 5)
Equivalent Collection Area (Ae)
Rectangular StructureStructure with prominent part
ftkmftkm
L=1000.03048H=00
W=400.012192
H=250.00762
Ae1=0.003964Ae2=0.000000
Results
C = (C2)(C3)(C4)(C5) =0.12500
Nc = 1.5 x 10-3/C =0.01200Nc is tolerable damage level.
Ae = MAX (Ae1, Ae2) =0.00396
Nd = (Ng)(Ae)(C1) =0.00496Nd is probable damage level.
Nd/Nc=0.41Required if > 1.0, Optional if <= 1.0.
Lightning Protection Optional
** All Calculations Per NFPA 780 Lightning Risk Assessment
For Further information, questions or quotations, contact Bill McSherry at Midwest Lightning Protection 708-479-2249

H L W H 3H 3H 3H 3H 3H W L C2 C3 C1 C4 C5 Ng Ae Results

Sheet2

Sheet3

File details come from the government source that posted it. Updated .