BFS Part 5 - Mechanical.pdf

PDF 183 KB Posted

Attached to
A&E DESIGN/BUILD FIRST ARTICLE TESTING STORAGE FACILITY
Solicitation number
F3QCCL1025A008
Issued by

About this file

Base Facility Standard (27 Jun 2006) Part 5- Mechanical

View the file

Other files

File Type Posted
Site Visit Attendees.pdf PDF
First Article Testing Storage Facility questions 06APR11.docx DOCX document
BFS Part 7 - Communications 2007.pdf PDF
BFS Part 4 - Architectural General and Compatibility.pdf PDF
K - 01560 - Environmental Requirements - Jun 10.doc DOC document
O - UHHZ 100138 Appendix C Safety Plan.docx DOCX document
BFS Part 3 - Civil-Structural.pdf PDF
J.1 - 01540 - Green Procurement ATTACHMENT 2.doc DOC document
F - 01310 - CADD As-Built Drawings.doc DOC document
E.1 - 01300A - AF Form 66_Example.pdf PDF
N.0 - 133419 - Pre-engineered Metal Building.doc DOC document
BFS Part 6 - Electrical.pdf PDF
BFS Part 2 - Environmental .pdf PDF
J.2 - 01540 - Green Procurement ATTACHMENT 3.doc DOC document
001 Index of Drawings.pdf PDF
L - 01580 - Safety Requirements.doc DOC document
301 Bldg Section.pdf PDF
J.3 - 01540 - Green Procurement ATTACHMENT 7.doc DOC document
B.3.0 - 01020 - Construction Design Performance Requirements.doc DOC document
Wage Determination.pdf PDF
I.1 - 01503 - Contract Administration.doc DOC document
E.0 - 01300 - Submittals Contractor-Furnished Items.doc DOC document
BFS Part 1 - Intro and General .pdf PDF
101 Floor Plan.pdf PDF
B.3.3 - 01020C - Appendix C GEC Soils Report - First Art TestStor Fa.pdf PDF
B.3.1 - 01020A - Appendix A References.doc DOC document
M - 01730 - Operations and Maintenance Data.doc DOC document
J.0 - 01540 - Green Procurement.doc DOC document
B.2 - 01005 - Statement Of Work.doc DOC document
B.3.2 - 01020B - Appendix B Fire Protection Life Safety.doc DOC document
201 Elevations.pdf PDF
101 Site Demolition Plan.pdf PDF
B.3.5 - 01020E - Appendix D NFPA 780 LP Requirement Determination.xls XLS spreadsheet
FA8501-11-R-0018 solicitation.doc DOC document
D - 01040 - Site Requirements.doc DOC document
G - 01501 - Temporary Services - Contractor.doc DOC document
102 Site Plan.pdf PDF
B.3.4 - 01020D - Appendix D NFPA 780 LP Determination Explanation.doc DOC document
C - 01030 - Design-Build Design After Award.doc DOC document
H - 01502 - Temporary Services - Cont Occupancy.doc DOC document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Robins AFB Facility Standard

BASE FACILITY STANDARD (BFS) -- ROBINS AFB, GA

(Also known as Installation Design Guide)

FOR ARCHITECT-ENGINEER FIRMS AND CONTRACTORS

PERFORMING DESIGN SERVICES AND CONSTRUCTION FOR ROBINS AFB

PART 5 - MECHANICAL

Revised 27 June 2006

MECHANICAL STANDARDS

a. This is one part of the Robins AFB Base Facility Standards. Refer questions or exception requests to the Design Chief in 778 CES/CEPD. Any exceptions granted to these requirements shall be noted clearly in the project design analysis by using a Deviation Request.

2. DESIGN STANDARDS:

a. Mechanical systems shall be designed in accordance with current ASHRAE Standards, UFC's, AFI's, ETL's, NFPA Standards, and other codes and standards referenced in this Standard.

b. Fire Protection:

(1) A qualified Registered Fire Protection Engineer shall provide all fire protection system design. The fire protection engineer shall be a professional engineer, registered by the fire protection written examination of the Council of Examiners for Engineers and Surveyors (NCEE).

(2) Comply with all Air Force Engineering Technical Letters for fire protection.

(3) Under no circumstances will any fire suppression or alarm system be left inoperative overnight

3. MAINTENANCE CONSIDERATIONS: Consideration shall be given to maintenance requirements of all mechanical equipment. The following shall be incorporated into mechanical designs:

a. Provide access doors for all equipment requiring maintenance such as valves, dampers, smoke detectors, filters and control components.

b. Provide manufacturer's recommended service clearance and coil pull space for all equipment.

Locate all valves, pumps, strainers, controls, sensors, and other items requiring regular service such that they can be maintained from floor level where possible. All units shall be mounted on a concrete housekeeping pad. Permanent Maintenance platforms and access ladders shall be provided to all suspended mechanical units in hangers and high bay areas or above ceilings. Roof mounted units shall incorporate protection for roofing to allow regular maintenance.

c. Provide snap-on plastic pipe labeling only (no tape or stenciling). Comply with ANSI A13.1.

Label all valves, instruments, piping, etc. Provide a special tag on system isolation valves identifying area served (e.g. "chilled water shutoff to AHU's 1 - 4"). Require "valve" chart identifying all labeled items. Provide piping diagrams framed under glass in mechanical rooms.

d. Provide metal identification tag attached to each steam trap. Provide in the O&M manual a listing of each trap, trap capacity, type, and location.

4. COMPRESSED AIR DISTRIBUTION REQUIREMENTS:

a. Outlets shall terminate approximately five feet above floor and shall have a valve drain cock.

b. Each compressed air pipe shall have a pitch to it when it goes to a drain.

c. Provide properly sized air dryers with a maximum pressure drop of 3 psi. A pre filter with an automatic condensate drain shall be used ahead of the air dryer with a maximum pressure drop of

.5 psi. Use oil separators/filters with a max pressure drop of 1 psi ahead of equipment sensitive to oil contamination.

d. Pressure tanks shall be sized to provide adequate compressed air storage for the system. Pressure tanks shall have an ASME National Board number. Tanks shall be equipped with a manual condensate drain, an automatic condensate drain, a liquid filled pressure gage, and a pressure relief valve.

e. Automatic condensate drains shall be design basis Drain-All brand.

f. Each system shall be evaluated for the need of a demand controller.

g. Provide a pressure-regulating valve at the point of use to maintain operating pressure.

h. For compressors installed inside of a facility, duct the exhaust to the exterior of the facility, with louvers designed to match the building exterior for architectural compatibility. Provide duct rated to withstand the heat generated.

5. ENERGY CONSERVATION MEASURES:

a. The designer shall consider energy conservation measures that are life cycle cost effective.

b. The facility energy consumption shall be in accordance with ETL 86-1.

c. All mechanical equipment shall comply with applicable energy codes.

d. Solar Energy - Per HQ AFMC, solar assessment of active solar applications as mandated by

ETL 84-1 is not cost effective. Passive Solar shall be analyzed and incorporated by A-E.

6. ENVIRONMENTAL CONSIDERATIONS:

a. All new HVAC equipment shall be provided with eitherR-407C, R-134a or R-410a refrigerants. . All new residential HVAC window units shall be provided only with THR-03.

Do not provide any service or product with any specification, standard, drawing, or other document that requires the use of a Class I or Class II ODS in the test, operation, or maintenance of any system, subsystem, item, component, or process.

Refer to section 01560 for the list of products which are Class I and Class II ODS:

b. Natural gas burning equipment, paint spray booth systems or any other mechanical device that emits pollution may require permits from the Georgia EPD prior to installation. These permits could take as long as 90 days to receive after the application has been submitted to the state. Contact the Base Environmental Compliance Management (78 CEG/CEV) at (478) 327-8104 to discuss emission issues. Provide all necessary permitting information in the design documents.

7. FIRE PROTECTION (See Electrical Section for Detection and Alarms)

a. Construction Submittal Requirements: Contractor shall submit fire protection system design drawings (design-built projects) and shop drawings, as-builts, and hydraulic calculations prepared and stamped by a Georgia Registered Fire Protection Engineer. A level III Technician certified by the

National Institute for Certification in Engineering Technologies (NICET) in the Automatic Sprinkler

System Layout sub-field of Fire Protection Engineering Technology in accordance with NICET 1014 is acceptable for design of new areas or new additions of less than 4000 SF where no fire riser nor fire pump is required.

b. Suppression:

(1) Water supply analysis/modification requirements: The designer is fully responsible for all water supply analyses required for each project, including making water flow tests, fire pump tests, etc. The Civil Engineering Plumbing Shop will assist the project A-E and/or contractor in making the tests and will provide previous flow test data when available. All flow tests shall be witnessed by the

Contracting Officer Representative (COR), plumbing shop personnel and the base fire chief.

(2) Calculations: Provide a hardcopy printout of the sprinkler hydraulic calculations in the

HASS format (by HRS Systems, Atlanta, GA). Provide the final sprinkler design in the form of both the specified hardcopy printout plus the design data file compatible with the HASS sprinkler hydraulics program on a CD Rom.

(3) Provide a preliminary sprinkler design by at least the Preliminary design stage.

Hydraulic calculations shall be provided by at least the First Final design stage.

(a) Design shall be IAW NFPA 13, UFC 3-600-01, Factory Mutual (FM), UL, IBC, and the System Safety Analysis for each project.

(4) Fire hydrants: Provide additional fire hydrants as required by NFPA 13, UFC-3-600-1, and the Base fire department.

(5) Fire extinguishers shall be in cabinets flush mounted to the wall.

(6) Warehouses shall have large drop sprinkler heads.

(7) Electronic equipment shall not have halon protection. Use wet pipe water suppression and shutdown of equipment. Provide control and electrical wiring as required for the shut down of all equipment in the project area.

(8) Fire Pumps are discouraged. If used, feed from another building or place a sign on the transformer feeding the building warning the shops to not disconnect the transformer during a fire.

(9) Drawing Requirements: Drawings shall be prepared and stamped by a licensed

Professional Engineer practicing in Fire Protection.

(10) Use water motor gongs at each riser.

(11) Provide floor control devices on the fire main to each floor which shall include

OS&Y valve with tamper switch, flanged check valve, water flow detector, test and drain valve and piping, and pressure gage.

(12) Post Indicator Valve (PIV): Provide one for each system. Provide electrical supervision (tamper switch) for each valve.

c. Limiting: Provide dampers, vents, partitions, fire rated doors, and other materials as needed.

d. Pipe: Do not use any type plastic, CPVC, PVC, or polybutylene pipe in any fire protection piping systems. Provide steel pipe for fire suppression system.

e. All new fire water piping 2” or greater shall be labeled every 25 feet length.

f. All exposed piping shall be painted to match with the existing conditions.

f. HYDROSTATIC PRESSURE TESTING (Fire water and domestic water piping)

A. Perform hydrostatic pressure testing for the new Fire Main and fire water: Test pressure shall be the greater of 1.5 times the working pressure or 125 psig

B. Perform hydrostatic pressure testing for the Domestic Water System: Test pressure shall be the greater of 1.5 times the working pressure or 125 psig

C. Open vents at high points to purge air pockets while piping system is filling. Venting may also be provided by loosening flanges or with equipment vents.

D. Testing:

1. After section of piping to be tested has been filled with water, apply test pressure by means of force pump of such design and capacity that required pressure can be applied and maintained without interruption for duration of test.

2. Measure test pressure by means of tested and properly calibrated recording pressure gauge acceptable to COR.

3. Maintain test pressure for sufficient length of time to permit COR to observe piping under test but not less than 4 hrs which shall be recorded with a recorder chart. Chart recorder may be provided by the COR as available.

8. PLUMBING:

a. General: Plumbing systems will be designed in accordance with the Georgia and International

Plumbing Code. Plumbing systems will include water service pipes, building soil and waste drains and building storm drains, all pipes, fixtures, vents, branches, rain leaders and special piping systems necessary for fire protection. Individual shut-off valves shall be provided for each fixture. Floor drains shall be provided in all toilets, janitor closets, and mechanical rooms to prevent flooding. Provide trap primers for all floor drains.

b. Building Water Supply:

(1) Potable Water Source: The water supply will be from the nearest Base water distribution main line. Domestic water supply must have reduced pressure principle type backflow prevention. Any solder used in domestic water supply system must be

90/10 or 95/5.

(2) Backflow preventer shall be located in an accessible location as approved by the

Plumbing Shop. Provide adequate clearance space for maintenance and repair of the backflow preventer in accordance with AFI 32-1066 and the International Plumbing

Codes.

(3) Hot Water Requirements: Domestic hot water shall be provided by the most cost-effective means.

(4) All plumbing hot and cold water piping inside the building shall be provided with 1” thick insulation.

c. Drinking Fountains: Provide refrigerated drinking fountains when fountains are required.

Drinking fountains are required in office and shop areas.

d. Sanitary Sewer System: See Civil Standards.

e. Piping Systems:

(1) Plumbing: Sanitary piping shall be schedule 40 PVC or cast iron. Domestic water piping shall be type L copper (above ground), or type K copper (below ground) or CPVC SDR 11

(Design basis is FlowGuard Gold CPVC for piping equal or smaller than 2” diameter). CPVC pipe and fittings shall meet or exceed the requirements of ASTM D2846. Do not use CPVC pipe under the slab.

(2) Hot/Chilled Water Systems: All hot and chilled water piping systems shall contain the following as a minimum.

(a) Make-up water system with reduced pressure principle backflow preventer.

(b) Freeze protection for exposed piping by means of glycol additives, drain down capabilities, or heat tape and insulation.

(c) Drains at low points of the piping system and vents at high points.

(d) Expansion tank for water expansion and air separator for air control.

(e) Balancing valves at the discharge of all pumps and at coils requiring metered flow.

(f) Water treatment sampling and injection ports for all closed loops.

(g) System design shall include water treatment capability.

(h) Provide air relief valves at all high points.

(i) Provide floor sinks with basket for all air handling units’ condensate drain lines in the mechanical rooms.

f. Restroom Equipment: Provide wall mounted water closet when possible. Water closets shall incorporate flush valve operation. Tank type water closets shall not be provided. Provide wall-mounted urinals in men’s restrooms. All wall-mounted fixtures shall incorporated closet carriers or fixture carriers as applicable.

g. Installation: Install all utilities (including potable water, fire water, Chilled Water/Hot

Water/Dual Temperature Piping, Steam and Condensate, Natural gas, drainage piping, etc.) following applicable codes, i.e. International Mechanical codes, International Plumbing and Gas codes and including the following: Minimum depth for all new utilities shall be 3 ft from the top of the piping to the grade elevation. Install tracer wires and warning tape placed on the lines using #10 AWG Cu with nicked TW insulation to facilitate detection of the wire with pipe locators for all plastic and CPVC, PVC, and PE piping. Warning tape shall be located 6 inch to 12 inch below grade.

9. STORM DRAINAGE SYSTEM: See Civil Section.

10. UTILITY DISTRIBUTION SYSTEM: Plans of the existing utility distribution lines will be provided by Base Civil Engineer if available. Utility meters shall be installed on all utilities.

a. Steam and Condensate: The designer shall evaluate the feasibility of using the central utility steam system and submit a recommendation to the Base. The Base shall make the decision to use the central system. When allowed by the Base, the steam and condensate system shall comply with ETL 88-

6, Heat Distribution System Outside of Buildings.

b. Chilled Water/Hot Water/Dual Temperature Piping: Central chilled water shall be used when appropriate. Contact the Base project manager to discuss availability of central chilled water prior to design. New underground chilled water distribution piping, 4 inches and larger, shall be insulated PVC

Carrier pipe with an HDPE polyethylene jacket, 200 psi pressure class at 73.4 deg F, SDR 21, and conform to ASTM D2241. Chilled water piping smaller than 4 inches shall be insulated schedule 40 carbon steel pipe with an HDPE jacket. Provide tracer wire and warning tape for locating buried PVC piping. Provide cathodic protection for underground steel pipe.

c. Natural gas - All underground natural gas lines installed on Robins AFB shall be polyethylene type PE 3408 as designated by ASTM D2513. Minimum wall thickness shall correspond to a standard dimensional ratio (SDR) of 11. If pressure requirements exceed the PE 3408 capability, ASTM A53B carbon steel pipe (minimum schedule 40) shall be used. All aboveground or exposed piping shall be

ASTM A53B carbon steel. All underground metal piping shall be coated per the corrosion control section and shall have cathodic protection installed. Also install tracer wires and warning tape placed on the lines using #10 AWG Cu with nicked TW insulation to facilitate detection of the wire with pipe locators.

d. Installation: Install all utilities (including potable water, fire water, Chilled Water/Hot

Water/Dual Temperature Piping, Steam and Condensate, Natural gas, drainage piping, etc.) following applicable codes, i.e. International Mechanical codes, International Plumbing and Gas codes and including the following: Minimum depth for all new utilities shall be 3 ft from the top of the piping to the grade elevation. Install tracer wires and warning tape placed on the lines using #10 AWG Cu with nicked TW insulation to facilitate detection of the wire with pipe locators for all plastic and CPVC, PVC, PE and ABS piping. Warning tape shall be located 6 inch to 12 inch below grade.

11. HEATING, VENTILATION, AND AIR CONDITIONING:

a. General:

(1) When providing new HVAC and suspended ceilings in existing unconditioned spaces, such as when converting warehouse space to admin space, design shall include a structural analysis to ensure the structural system can handle the additional weight of the ceiling and ductwork. Include in the design analysis documentation and engineer PE certification.

(2) Provide modular VAV unit type which shall be capable to shut down the supply air to

25% of the diffuser specified air flow rate with a minimum setting device. Design basis is Therma-fusers from Accutherm zoned systems.

(3) Outside air intakes shall be installed above ten feet or on the roofs of single story buildings in compliance with force protection requirements and a minimum of 10 feet from any exhaust duct or plumbing vent.

b. Heat:

(1) When performing a formal Life Cycle Cost analysis, the designer shall be sure to include all associated maintenance costs for each type of system.

(1) The designer shall select the type of heat system and energy source per the priorities below:

(a) New Systems

(1) Utilize the base steam loop if available and practical.

(2) Natural gas fired infrared (if applicable).

(3) High efficiency natural gas fired systems. This is preferred for all situations where infrared is not practical.

(4) Electric heating and heat pumps. Using this system requires approval as an exception.

(b) Existing Systems

(1) Existing steam systems. The designer shall consult with the Energy

Manager in 78 CES/CEOE for him/her to make the choice on reusing the steam central feed or convert to natural gas feed. Document the Energy Manager’s choice in the Design Analysis.

(2) Existing natural gas systems. Install natural gas fired infrared units where applicable. Provide high efficiency natural gas fired units for all situations where infrared is not practical.

(3) Existing electric heating and heat pumps. Convert to natural gas heating. We may allow retaining the electric heat system if the heat load is small and the building is a great distance from any natural gas lines. Using this system requires approval as an exception.

(2) Distribution Piping and/or Ducting: All distribution piping 3 inches and smaller shall be type K copper. Piping larger than 3 inches shall be domestic ASTM A53 or ASTM A120 sch 40 steel with all welded joints. Water velocities in distribution piping shall not exceed 3 ft/sec. Piping shall be routed to provide the greatest accessibility possible for maintenance. Pipe chases shall have removable covers, which allow access to the entire piping system. Converters, pumps, expansion tanks, and other items requiring maintenance shall be located such that they can be easily serviced from floor level.

Provide drain valves to allow complete system drainage and air vents at high points and at coils.

(3) Chilled Water/ Hot Water Pumps: Provide redundancy for the chilled water pumping station and the hot water pumping station. Provide control to alternate pump operation.

c. Ventilation/Air Conditioning/Refrigeration Systems:

(1). The designer shall utilize central plant chilled water for air conditioning, if available.

If not, an independent air conditioning system shall be provided. The designer shall consider Total Life

Cycle Cost in selecting the type of air conditioning system. All air-handling units (AHUs) shall be specified with adequate space between heating and cooling coils to allow for cleaning and repair. All mechanical rooms shall have adequate space for the service and maintenance of the AHUs. New HVAC

Equipment Minimum Seasonal Energy Efficiency Ratio shall be 13 SEER

(2) Projected cooling/heat loads: the designer in accordance with ASHRAE procedures shall calculate the design heating load requirements. Submit building heat load calculations using Trane

Trace software or as approved equal to size all the building HVAC equipment for review and approval.

The building heat load calculations shall be prepared and stamped by a registered professional HVAC engineer..

(3) Authorized Type of cooling / heating System:

(a) Central plant chilled water may be available for use for air conditioning system. If not, an independent air conditioning system shall be provided. The A-E shall consider Total

Life Cycle Cost in selecting the type of air conditioning system.

(4) Distribution Piping and Ducting: See paragraph 11.a. above.

(5) Typical space, ventilation, and temperature requirements: All administrative areas shall be designed for 75 deg F Dry Bulb (DB) and 50% Relative Humidity (RH) for summer and 70 deg

F DB and 50% RH for winter. Install humidifiers in the AHU discharge to provide rehumidification.

All classrooms shall be designed for 73 deg F Dry Bulb (DB) and 50% Relative Humidity (RH) for summer and 70 deg F DB and 50% RH for winter. Heat load calculation for the classroom shall include the heat load generated from the total number of the students in the classroom.

(6) Mechanical Rooms: Install unit heaters to keep the temperature above 55 deg F DB.

Provide forced ventilation with thermostat control.

(7) Electrical Rooms: Provide HVAC systems to maintain the space to no more than 30 degrees C, or 86 degrees F. Provide unit heaters as needed to maintain the temperature above 55 deg F

DB.

(8) Communications (Telephone, LAN, etc) Rooms: Provide conditioned air for required load.

(9) Combined Mechanical and Electrical Rooms: Provide physically separate rooms in all new construction. For existing combined rooms, physically separate the two areas, and provide cooling to the electrical area.

(10) Comply with ASHRAE Standard 62.1-2004 (Ventilation for Acceptable Indoor

Air Quality) to calculate the outside air requirement for the building HVAC equipment sizing.

d. Controls and metering: Controls shall be electronic/electric/Direct Digital control. The designer is to utilize the Corp of Engineers standard control designs as a basis to begin design. Complex

HVAC systems shall be designed as Direct Digital Control systems compatible and communicable with the existing Base DDC systems. Coordinate with the Base Project Manager for specific alterations pertaining to each project. Metering will be required for all utilities. Meters shall be non-resettable with a local numeric display. Employees of the control equipment manufacturer shall install control systems.

12. HVAC SYSTEM WATER TREATMENT:

a. General:

(1) Base the equipment installation upon specific information obtained at the construction site and upon existing Base water treatment methods. Information includes data such as current analysis of Base water.

(2) All water treatment design not by Base specialists must be performed by an NACE accredited "Corrosion Specialist" with at least five years experience in this design.

(3) Chemical pot feeders:

(a) Use at least 5-gallon capacity.

(b) Provide pressure gauge on intake side of protected system.

(c) Completely serviceable from floor level.

(4) Use interlocks to insure chemicals will not feed when main system is off; e.g., on condenser pumps.

(5) Automatic chemical feed shall use one of these methods:

(a) Water meter - timer method, where chemicals are added in relation to water make-up.

(b) Solids controller to control boiler blow down and chemical feed based upon manual setting.

(6) Inject chemicals downstream of pumps.

b. Chilled Water:

(1) Closed System:

(a) 100 tons or less: Provide chemical pot feeders.

(b) Over 100 tons: Provide automatic system.

(2) Open system (cooling towers): Provide automatic system.

c. Hot Water (Closed System):

(1) 1000 MBTU/H or less: Provide chemical pot feeders.

(2) Over 1000 MBTU/H: Provide automatic system.

d. Steam:

(1) Provide automatic system.

(2) Inject oxygen scavengers directly into the deaerator tank.

(3) Inject boiler water chemicals into feed water line right before the boiler drum.

(4) Blowdown Dumping:

(a) At main plant, dump to industrial waste.

(b) Dump elsewhere to sanitary sewer.

(5) Provide for manual blowdown of bottom drum.

13. SYSTEM COMMISSIONING OF HVAC:

a. Special Requirements:

(1) On-site training shall be provided to instruct Government personnel in each phase involved with the sequence of operation for the system. The training shall be accomplished by the manufacturer's representative, and take between two and seven days as determined by the scope of the project. This training will include the set up, operation, and balance of the system for the respective

Government shops. Specify that the training shall be conducted and completed prior to Prefinal inspection.

(2) An independent firm certified by the American Association of Balancing Contractors

(AABC) or the National Association of Balancing Contractors (NABC) shall accomplish test and balance of the system. The Government reserves the right to spot check the contract. The contractor shall be spot checked by the balancing contractor in the presence of a Government representative. If

25% of the systems checked are not within the required allowance (allowance being: 10% of what is stated on the plans) the balancing contractor will return to the site and completely redo the testing and balancing. If the system is dependent upon steam or chilled water, testing and balancing shall be accomplished during the time of year when they are available.

(3) All required test results, equipment O&M manuals, and schematics shall be turned over to the Government two weeks prior to the Prefinal inspection.

(4) Other requirements will be provided in the project description if necessary.

(5) Specifications shall require construction contractor to demonstrate the proper operation of each function described in the sequence of operation.

14. AIR CONDITIONING/HEAT LOAD ESTIMATES: The designer shall provide complete load calculations with the preliminary design. If the designer uses a computer program to compute the loads, a description of the program and copies of all input data shall be included in the design analysis.

15. PETROLEUM, OILS, AND LUBRICANTS:

a. Design of all petroleum, oils, and lubricants (POL) systems shall be IAW Military Handbook

1022 (available on the Internet at http://www.afcesa.af.mil/AFCESA/TechSupport/POL/polwww.html), American Petroleum Institute (API), and other industry standards, including all applicable NFPA regulations.

b. Welders shall be certified in accordance with API and MH 1020 and shall do all welding outside the fuels area.

c. All valves and piping accessories are required to be rated for fuels being handled.

d. All electrical equipment shall be explosion proof per Division 1, Class 1.

e. Tank refill access shall be readily available to tank trucks.

f. Surge suppressors will be used to prevent pressure build-up in the lines.

g. All above ground tanks shall be diked in accordance with EPA requirements.

h. All below ground tanks shall meet the latest editions of the EPA regulations, be double walled, and have cathodic protection.

i. Safety rails and platforms (for gauging tanks) will be provided for above ground tanks.

j. All pumps will be rated specifically for the fuel they will be handling.

k. The system will be designed such that the metals being used in the system will not react with fuel.

l. All pipes shall be painted with the proper POL color coded markings.

m. Below ground piping will be double wall, properly coated, and cathodically protected per applicable EPA regulations. The designer will evaluate the use of underground fuel pipe and submit recommendations to the Base. The Base will make the decision on the use of underground piping.

n. Design shall include emergency precautions to stop fuel flow, shut down pumps, etc., including a cutoff switch in an easily accessible location.

o. Pumps to below ground tanks shall have leak detectors for piping pressure loss.

p. WARNING signs will be properly displayed.

q. Underground tanks will be anchored properly so that flotation will not occur.

r. Pea gravel backfill will be used to fill around tanks.

s. All tanks will have manways with access ladders.

<<<<< END OF BFS PART 5 >>>>>

Revision History

24 Aug 2005 Separated from combined BFS into its own document. Added duct requirements for air compressor exhaust.

27 June 06 Revised RAFB Refrigerant Status and Standards. Add new requirement for the HVAC

SEER.