N.0 - 133419 - Pre-engineered Metal Building.doc
DOC document 96 KB Posted
- Solicitation number
- F3QCCL1025A008
About this file
Pre Engineered Metal Buildings
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
133419 –PRE-ENGINEERED METAL BUILDINGS UHHZ 100138
UHHZ 100138 CONSTRUCT FIRST ARTICLE TESTING STORAGE NEAR BUILDING 323
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ALUMINUM ASSOCIATION (AA)
AA 30(1986)
Aluminum Structures, Construction Manual Series Section 1
AA DAF-45(2003)
Designation System for Aluminum Finishes
AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)
AAMA 101(2005)
Standard Specification for Windows, Doors, and Unit Skylights
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 303(2005)
Code of Standard Practice for Steel Buildings and Bridges
AISC 360(2005)
Specification for Structural Steel Buildings
AISC FCD(1995a)
Quality Certification Program Description
AISC S329(1985)
Allowable Stress Design Specification for Structural Joints Using ASTM A 325 or A 490 Bolts
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7(2005)
Minimum Design Loads for Buildings and Other Structures
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M(2006; Errata 2006) Structural Welding Code - Steel
ASTM INTERNATIONAL (ASTM)
ASTM A 1011/A 1011M(2006b) Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength
Low-Alloy and High-Strength Low-Alloy With Improved Formability, and Ultra-High Strength
ASTM A 252(1998; R 2002) Welded and Seamless Steel Pipe Piles
ASTM A 36/A 36M(2005)
Carbon Structural Steel
ASTM A 463/A 463M(2006) Steel Sheet, Aluminum-Coated, by the Hot-Dip Process
ASTM A 500(2003a)
Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
ASTM A 501(2001; R 2005) Hot-Formed Welded and Seamless Carbon Steel Structural Tubing
ASTM A 529/A 529M(2005) High-Strength Carbon-Manganese Steel of Structural Quality
ASTM A 53/A 53M(2006a) Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A 570/A 570M(1998) Standard Specification for Steel, Sheet and Strip, Carbon, Hot-Rolled
ASTM A 572/A 572M(2006) High-Strength Low-Alloy Columbium-Vanadium Structural Steel
ASTM A 588/A 588M(2005) High-Strength Low-Alloy Structural Steel with 50 ksi (345 MPa)
Minimum Yield Point, with Atmospheric Corrosion Resistance
ASTM A 606(2004)
Steel, Sheet and Strip, High-Strength, Low-Alloy, Hot-Rolled and Cold-
Rolled, with Improved Atmospheric Corrosion Resistance
ASTM A 618(2004)
Hot-Formed Welded and Seamless High-Strength Low-Alloy Structural
Tubing
ASTM A 653/A 653M(2006a) Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated
(Galvannealed) by the Hot-Dip Process
ASTM A 755/A 755M(2006) Steel Sheet, Metallic Coated by the Hot-Dip Process and Prepainted by the Coil-Coating Process for Exterior Exposed Building Products
ASTM A 792/A 792M(2006a) Steel Sheet, 55% Aluminum-Zinc Alloy-Coated by the Hot-Dip Process
ASTM B 209(2006)
Aluminum and Aluminum-Alloy Sheet and Plate
ASTM B 209M(2006)
Aluminum and Aluminum-Alloy Sheet and Plate (Metric)
ASTM B 221(2006)
Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
ASTM B 221M(2006)
Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)
ASTM B 241/B 241M(2002) Aluminum and Aluminum-Alloy Seamless Pipe and Seamless Extruded Tube
ASTM B 308/B 308M(2002) Aluminum-Alloy 6061-T6 Standard Structural Profiles
ASTM B 429/B 429M(2002) Aluminum-Alloy Extruded Structural Pipe and Tube
ASTM C 1289(2006)
Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board
ASTM C 1363(2005)
Standard Test Method for Thermal Performance of Building Materials and Envelope Assemblies by Means of a Hot Box Apparatus
ASTM C 518(2004)
Steady-State Thermal Transmission Properties by Means of the Heat Flow Meter Apparatus
ASTM C 553(2002)
Mineral Fiber Blanket Thermal Insulation for Commercial and Industrial Applications
ASTM C 578(2006)
Rigid, Cellular Polystyrene Thermal Insulation
ASTM C 612(2004)
Mineral Fiber Block and Board Thermal Insulation
ASTM C 991(2003)
Flexible Glass Fiber Insulation for Metal Buildings
ASTM D 1308(2002e1) Effect of Household Chemicals on Clear and Pigmented Organic Finishes
ASTM D 1654(2005)
Evaluation of Painted or Coated Specimens Subjected to Corrosive
Environments
ASTM D 2224(1978; R 1983) Standard Test Method for Mean Molecular Weight of Mineral Insulating
Oils by the Cryoscopic Method
ASTM D 2247(2002)
Testing Water Resistance of Coatings in 100% Relative Humidity
ASTM D 2794(1993; R 2004) Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)
ASTM D 3359(2002)
Measuring Adhesion by Tape Test
ASTM D 3841(1997; R 2001) Glass-Fiber-Reinforced Polyester Plastic Panels
ASTM D 4214(1998)
Evaluating the Degree of Chalking of Exterior Paint Films
ASTM D 4397(2002)
Polyethylene Sheeting for Construction, Industrial, and Agricultural
Applications
ASTM D 522(1993a; R 2001) Mandrel Bend Test of Attached Organic Coatings
ASTM D 523(1989; R 1999) Specular Gloss
ASTM D 5894(1996)
Cyclic Salt Fog/UV Exposure of Painted Metal, (Alternating Exposures in a Fog/Dry Cabinet and a UV/Condensation Cabinet)
ASTM D 610(2001)
Evaluating Degree of Rusting on Painted Steel Surfaces
ASTM D 714(2002e1) Evaluating Degree of Blistering of Paints
ASTM D 828(1997; R 2002) Tensile Properties of Paper and Paperboard Using Constant-Rate-of-
Elongation Apparatus
ASTM D 968(1993; R 2001) Abrasion Resistance of Organic Coatings by Falling Abrasive
ASTM E 84(2007)
Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E 96(2005)
Water Vapor Transmission of Materials
ASTM G 23(1996)
Operating Light-Exposure Apparatus (Carbon-Arc Type) With and
Without Water for Exposure of Nonmetallic Materials
BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)
BHMA A156.1(2006)
Butts and Hinges
BHMA A156.2(2003)
Bored and Preassembled Locks and Latches
BHMA A156.3(2001)
Exit Devices
BHMA A156.4(2000)
Door Controls - Closers
CRANE MANUFACTURERS ASSOCIATION OF AMERICA (CMAA)
CMAA 70(2004)
EnviroTop Running and Bridge and Gantry Type Multiple Girder Electric Overhead Traveling Cranes, No. 70
METAL BUILDING MANUFACTURERS ASSOCIATION (MBMA)
MBMA MBSM(2002)
Metal Building Systems Manual
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION (SMACNA)
SMACNA Arch. Manual(2003, 6th Ed) Architectural Sheet Metal Manual
STEEL DECK INSTITUTE (SDI)
SDI DDMO3(3rd Edition) Diaphragm Design Manual
STEEL DOOR INSTITUTE (SDI/DOOR)
SDI/DOOR A250.8(2003)
Recommended Specification for Standard Steel Doors and Frames
STEEL WINDOW INSTITUTE (SWI)
SWI AGSW(2002)
Architect's Guide to Steel Windows
UNDERWRITERS LABORATORIES (UL)
UL 580(2006)
Tests for Uplift Resistance of Roof Assemblies
1.2 SYSTEM DESCRIPTION
1.2.1 Design Requirements
1.2.1.1 Design Analysis
The design analysis shall be the design of a licensed Professional Engineer experienced in design of this work and shall include complete calculations for the building. Formulas and references shall be identified. Assumptions and conclusions shall be explained, and cross-referencing shall be clear. Wind forces on various parts of the structure, both positive and negative pressure, shall be calculated with the controlling pressure summarized. Lateral forces due to seismic loading shall be calculated and tabulated for the various parts and portions of the building. Computer programmed designs shall be accompanied by stress values and a letter of certification, signed by a licensed Professional Engineer, stating the design criteria and procedures used and attesting to the adequacy and accuracy of the design. A narrative of the computer program delineating the basic methodology shall be included. Computer program output shall be annotated and supplemented with sketches to verify the input and output. Critical load conditions used in the final sizing of the members shall be emphasized. The design analysis shall include the name and office phone number of the designer, who shall function as a point of contact to answer questions during the detailed drawing review.
1.2.1.2 Dimensions
Building dimensions shall be as standard with manufacturer, not less than those indicated, but exceeding the indicated dimensions only by the amount of the closest standard size thereto. Eave height shall be measured from the top of finished floor to intersection of insides of roof and sidewall sheets. The clear height between finished floor and bottom of roof steel shall be as indicated. Bay spacing shall be optimized to provide the most economical spacing that will allow use of standard 8 inch “Z” purlins and girts unless otherwise required by design.
1.2.1.3 Framing
Provide building with vertical walls and mono-slope roof. Building shall be single-span structure with the following framing system: rigid frame type construction. South End wall shall be of beam and column design. North End wall shall be full rigid frame with wind posts to allow for future expansion. Roof slope shall be as indicated. Design framed openings structurally.
1.2.1.4 Foundation Requirements
Foundations shall be redesigned with a factor of safety of 1.5 for overturning, sliding and uplift and a concrete compressive strength as specified in Section 03 30 00.00 20 CAST-IN-PLACE CONCRETE, if loads are different from indicated loads on drawings.
1.2.1.5 Expansion
Design all elements of the Building for future expansion (by Others) in the direction(s) as indicated.
1.2.2 Performance Requirements
MBMA MBSM, for loading combinations and definitions with the exceptions of wind load and special collateral loads. Design for each material shall be as specified by the Design Authority as listed in MBMA MBSM.
1.2.2.1 Roof Dead, Live and Snow Loads
As indicated.
1.2.2.2 Wind Loads
Compute and apply wind pressures, as per ASCE 7 (2005), Minimum Design Loads for Buildings and other Structures. Basic wind speed and multiplying factors are as indicated.
1.2.2.3 Impact Loads
Impact loads due to cranes where applicable shall be applied as indicated in AISC 360.
1.2.2.4 Seismic Loads
As required for ground motion acceleration indicated.
1.2.2.5 Collateral Loads
As indicated.
1.2.2.6 Deflection
a. Structural Members: The maximum deflection of main framing members shall not exceed 1/240th of their respective spans. The maximum deflection due to live load in roof panels and purlins shall not exceed 1/180th of their respective spans.
b. Roof Panels: UL 580, Class 90. The design analysis shall establish that the roof when deflected under dead plus live or snow loads, will not result in a negative gradient. Maximum deflections shall be based on sheets continuous across two or more supports with sheets unfastened and fully free to deflect. In addition, the roof decking shall be designed for a 200-pound concentrated load at midspan on a 12 inch wide section of deck. Panels thinner than 0.03 inches are not permitted for diaphragms used to resist seismic loads in Seismic Zones 2 through 4.
c. Wall Panels: The maximum deflection due to wind on wall panels and girts shall be limited to 1/120th of their respective spans except that when interior finishes are used the maximum allowable deflection shall be limited to 1/180th of their respective spans.
d. Openings: Limit deflections of steel framing above and along the side of rolling door openings to a maximum of 1/2 the allowable movement in the telescoping top roller of the doors to ensure proper operation. Frame all equipment openings over 12 by 12 inches.
1.2.2.7 Provisions for Gutters and Downspouts
Gutters and downspouts shall be designed according to the requirements of SMACNA Architectural Sheet Metal Manual for storms which should be exceeded only once in 5 years and with adequate provisions for thermal expansion and contraction. Supports for gutters and downspouts shall be designed for the anticipated loads. Roof drainage system to withstand rainfall intensity as required by the building location. Anchor downspouts to walls at 60” o.c. vertically maximum.
1.3 SUBMITTALS
a. General: Provide the following submittals in accordance with instructions found in Section 01300, Submittals and Contractor Furnished Items.
b. Material Submittals: Provide the following submittals as required by the contract or as directed by the Contracting Officer. All items in 1.3.b to be submitted as one package with 1.3.c.
Para# Description Mftr Certificate
Data of Exceptions Date Inspector Req’d Compliance Taken Required Checklist
1.3.2.a Metal Building MTS _X _ __ ____ 14 Days ANTP ____
1.3.3.a Color Finish _X _ _ __ ____ 14 Days ANTP ____ 1.3.3.b Accessories _X__ _ __ ____ 14 Days ANTP ____ 1.3.3.c Roofing and Wall _X__ _ __ ____ 14 Days ANTP ____
Panels
1.3.3.d Fasteners _X__ _ __ ____ 14 Days ANTP ____ 1.3.3.e Insulation _X__ _ __ ____ 14 Days ANTP ____ 1.3.3.f Gaskets & Insulating _X__ _ __ 14 Days ANTP ____
Compounds
1.3.3.g Sealant _X__ ____ ____ 14 Days ANTP ____ 1.3.3.h Wall Liners _X__ ____ ____ 14 Days ANTP ____ 1.3.3.i Concealed Anchor _X__ ____ ____ 14 Days ANTP ____
Clips
c. Other Submittals: Provide the following submittals as required by the contract or as directed by the Contracting Officer. All items in 1.3.c to be submitted as one package with 1.3.b.
Para# Description Date Required Inspector
Checklist
1.3.1.a Building Drawing 14 Days ANTP ____
1.3.1.b Design Anchor Bolts 14 Days ANTP ____
1.3.1.c Design Roof and
Wall Panels
1.3.4.a Building 14 Days ANTP ____
1.3.4.b Foundation Loads 14 Days ANTP ____
1.3.4.c Anchor Bolts 14 Days ANTP ____
1.3.4.d Purlins and Girts 14 Days ANTP ____
1.3.4.e Bracing 14 Days ANTP ____
1.3.4.f Roof and Wall Panels 14 Days ANTP ____
1.3.5.a Factory Test Color Finish 14 Days ANTP ____
1.3.5.b Insulation Test 14 Days ANTP ____
1.3.5.c Wind Uplift Resistance 14 Days ANTP ____
1.3.6.a Certifications
1.3.7 Sample Warranty
14 Days ANTP
1.3.1 Shop Drawings
a. Pre-engineered Building
b. Template for anchorage
c. Roof and Wall Panels
Submit details of all closures, flashing and sheet metal to indicate methods to make building water/weather tight.
1.3.2 Product Data
a. Pre-engineered metal building materials
Submit complete product data performance information and installation details for doors and frames.
1.3.3 Samples
a. Factory color finish
b. Accessories
c. Roofing and Wall Panels
d. Fasteners
e. Insulation
f. Gaskets and Insulating Compounds
g. Sealant
h. Wall Liners
i. Concealed Anchor Clips
1.3.4 Design Data
a. Building
b. Foundation loads
c. Anchor Bolts
d. Purlins and girts
e. Bracing
f. Roof and wall panels
1.3.5 Test Reports
a. Factory Color Finish
b. Insulation
c. Wind Uplift Resistance
1.3.6 Certifications
a. Manufacturer and Installer Certifications Submit information required by paragraphs 1.4.1, 1.4.1.1, and 1.4.1.2.
1.3.7 Sample Warranty
a. To show conformance to Level III warranty requirements.
1.4 QUALITY ASSURANCE
1.4.1 Qualifications
Qualifications of the manufacturer, the manufacturer's Representative when one is used, and qualifications and experience of the building erector. A brief list of locations where buildings of similar design have been used shall be included with the detail drawings and shall also include information regarding date of completion, name and address of owner, and how the structure is used.
1.4.1.1 Manufacturer
The manufacturer shall be accredited by the International Accreditation Service (IAS) Inspection Programs for Manufacturers of Metal Building Systems, AC472.
1.4.1.2 Installer
Erector shall have specialized experience in the erection of metal building systems for a period of at least 3 years, and shall comply with manufacturer’s requirements for installation of their system.
1.4.2 Regulatory Requirements
1.4.2.1 Drawings: Pre-engineered Building
Submit complete design drawings for the pre-engineered building. If the Pre-Engineered Metal Building submittal/shop drawings supplier provides drawings that indicated standard and/or typical details that do not apply, these details shall be removed or indicated as “NOT USED.”
1.4.2.2 Design Data Building
Submit design calculations for the entire pre-engineered building including foundation reactions, prepared and stamped by a professional engineer.
1.4.3 Metal Building and Pre-Roofing Conference
A coordination meeting shall be held after Government approval of Pre-Engineered Metal Building submittal and prior to Pre-Engineered Metal Building erection. This meeting shall take place at the building site and shall include representatives from the Metal building system manufacturer, Contractor, the designer, and the Contracting Officer. All items required by paragraph SUBMITTALS shall be discussed, including applicable standard manufacturer shop drawings, the approval process and roof installation. The Contractor shall coordinate time and arrangements for the meeting.
1.4.4 Instructions
1.4.4.1 Instruction Manuals
Manufacturer's literature for individual building component systems.
1.4.4.2 Erection
Manufacturer's erection instruction and erection drawings describing the preparation requirements, assembly sequence, temporary bracing, shoring, and related information necessary for erection of the metal building including its structural framework and components.
1.4.5 Samples
1.4.5.1 Factory Color Finish
Submit one sample of each color indicated for verification that the color matches the colors indicated. Where colors are not indicated, submit not less than four different samples of manufacturer's standard colors for selection by the Contracting Officer. Colors shall conform to Robins AFB Color Standards.
1.4.5.2 Accessories
One sample of each type of flashing, trim, closure, thermal spacer block, cap and similar items. Size shall be sufficient to show construction and configuration.
1.4.5.3 Roofing and Wall Panels
One piece of each type and finish (exterior and interior) to be used, 9 inches long, full width. The sample for factory color finished covering shall be accompanied by certified laboratory test reports showing that the sheets to be furnished are produced under a continuing quality control program and that a representative sample consisting of not less than 5 pieces has been tested and has met the quality standards specified for factory color finish.
1.4.5.4 Fasteners
Two samples of each type to be used, with statement regarding intended use. If so requested, random samples of bolts, nuts, and washers as delivered to the job site shall be taken in the presence of the Contracting Officer and provided to the Contracting Officer for testing to establish compliance with specified requirements.
1.4.5.5 Insulation
One piece of each type to be used, and descriptive data covering installation.
1.4.5.6 Gaskets and Insulating Compounds
Two samples of each type to be used and descriptive data.
1.4.5.7 Sealant
One sample tube, approximately 1 pound, and descriptive data.
1.4.5.8 Wall Liners
One piece, 9 inches long, full width.
1.4.5.9 Concealed Anchor Clips
Two samples of each type used.
1.5 DELIVERY, STORAGE, AND HANDLING
Deliver, store, and handle manufactured items so that materials remain dry and undamaged. Do not store in contact with materials that might cause staining.
1.6 WARRANTIES
1.6.1 Warranty
The Metal Building System, composed of framing and structural members, roof panels and wall panels, gutters and downspouts, accessories, fasteners, trim, and miscellaneous building closure items such as doors shall be warranted as described below against material and workmanship deficiencies. Any emergency temporary repairs conducted by the owner shall not negate the warranties. The SSSMR roof-panels shall be an integral part of all warranties associated with the metal building system.
1.6.2 Manufacturer's Material, Finish and System Weathertightness Warranties
The Contractor shall furnish, in writing, the following manufacturer's warranties to the Contracting Officer which cover all Metal Building System components:
a. A manufacturer's 20 year (Level III) material warranty warranting that the specified zinc-coated steel, will not rupture, structurally fail, fracture, deteriorate, or become perforated under normal design atmospheric conditions and service design loads. Design basis of warranty is American Building Company "WeatherSure L3" Manufacturer Warranty.
b. A manufacturer's 20 year (Level III) exterior material finish warranty on the factory colored finish warranting that the finish, under normal atmospheric conditions at the site, will not crack, peel, delaminate, or chalk. Design basis of warranty is American Building Company "WeatherSure L3" Manufacturer Warranty.
c. A roofing system manufacturer's 20 year non-prorated, system weather tightness warranty. Design basis of warranty is American Building Company "WeatherSure L3" Manufacturer Warranty.
PART 2 PRODUCTS
2.1 WALL AND ROOF MATERIALS
MBMA MBSM except as specified otherwise herein. Design wall and roof panels, accessories, and flashings to be completely weathertight and free of abrasions, loose fasteners, and deformations. Each piece or part of the assembly shall be clearly and legibly marked to correspond with the Drawings.
2.1.1 Minimum Thickness
As required to conform to design requirements but not less than the following:
Items
Minimum Thickness (Uncoated)
Steel Structural Members 18 Manufacturer's Standard (MFG STD)
Other Than Roof and gage, 0.0478 inch
26 MFG STD gage, 0.0179 inch Steel
Gable and Eave Trim, 24 MFG STD gage, 0.0230 inch
Fascia Closure Strips, Rake Flashings, Copings, and Liner Panels Steel
Roof Panels
24 MFG STD gage, 0.0230 inch
Eave Gutters and Downspouts
Steel
26 MFG STD gage, 0.179 inch Aluminum
0.032 inch Purlins and Girts
14 MFG STD gage, 0.078 inch
Coiling Door Opening
11 MFG STD gage, 0.125 inch
Framing Members
2.1.2 Roof Panels
Design basis of roof panels is American Buildings Company "Standing Seam 360". Panels shall be zinc-coated steel and have a factory polyvinylidene fluoride "Kynar 500 PVDF" finish. Length of sheets shall be sufficient to cover the entire length of any unbroken roof slope for slope lengths that do not exceed 50 feet. When length of run exceeds 50 feet and panel laps are provided each sheet in the run shall extend over three or more supports, and the lap joints shall be staggered a minimum of at least two purlins. Width of sheets shall not be more than 24 inches of coverage in place. SSMR system with roofing panels greater than the 12" in. width shall have standing seams rolled during installation by an electronically driven seaming machine. Roof system shall be standing-seam panels with concealed clips and fasteners and shall be nominal 3" high trapezoidal mechanically seamed standing seam roof panels
2.1.2.1 Wall Panels
Wall panels shall be preformed zinc-coated steel and have a factory polyvinylidene fluoride "Kynar 500 PVDF" color finish. Panels shall be formed or patterned to prevent waviness and distortion.
2.1.2.1 Zinc-Coated Steel Sheet
ASTM A 755/A 755M, Coating Class G-90 or ASTM A 653/A 653M, SQ, Grade 33, Coating Class G-90.
2.1.2.2 Aluminum/Zinc-Coated Steel Sheet
ASTM A 792/A 792M, AZ 55
2.1.2.3 Aluminum-coated Steel
ASTM A 463/A 463M, Type Z, coating designation T2 ES; or aluminum-coated steel conforming to ASTM A 463/A 463M, Type 2, coating designation T2 E5.
2.1.3 Wall Liners
Wall liners shall be 0.023 inch thick minimum for steel with the same composition specified for panels or siding, and formed or patterned to prevent waviness and distortion, and shall extend from floor to a height of not less than 10 feet above the floor. Matching metal trim shall be provided at base of wall liner, at top of wall liner, around openings in walls and over interior and exterior corners. Wall liners shall have manufacturer's standard finishes. Colors shall be as indicated.
2.2 FRAMING AND STRUCTURAL MEMBERS
2.2.1 Steel
ASTM A 36/A 36M.
2.2.2 Structural Tube
ASTM A 500.
2.3 ACCESSORIES
2.3.1 Caps, Closure Strips, Plates, Flashing, and Sheet Metal
Form ridge caps, closure strips, eave and edge strips, fascia strips, miscellaneous flashings, and miscellaneous sheet metal accessories from the same material and gage as the roof panels. Wall plates, base angles or base channels, and other miscellaneous framing members may be standard structural steel shapes, or may be formed from steel not lighter than 18 gage thick. Provide all items required to make building weather/water tight.
2.3.2 Sealant
Provide elastomeric type sealant containing no oil or asphalt. Exposed sealant shall cure to a rubberlike consistency. Concealed sealant may be the nonhardening type.
2.3.3 Gaskets and Insulating Compounds
Provide nonabsorptive gaskets and insulating compounds suitable for insulating contact points of incompatible materials. Insulating compounds shall be nonrunning after drying.
2.3.4 Fasteners
Fasteners for steel panels shall be zinc-coated steel, type and size specified below or as otherwise approved for the applicable requirements. Fasteners for structural connections shall provide both tensile and shear ultimate strengths of not less than 750 pounds per fastener. Fasteners for accessories shall be the manufacturer's standard. All roof fasteners shall be concealed to the greatest extent possible. Where a fastener must be exposed, the exposed roof fasteners shall be sealed or have sealed washers on the exterior side of the roof to waterproof the fastener penetration. Washer material shall be compatible with the roofing; have a minimum diameter of 3/8 inch for structural connections; and gasketed portion of fasteners or washers shall be neoprene or other equally durable elastomeric material approximately 1/8 inch thick. Exposed fasteners for factory color finished panels shall be factory finished to match the color of the panels. Fasteners shall meet requirements for warranty defined in paragraph 1.6.2.
2.3.4.1 Screws
Provide self-tapping screws not less than No. 14 diameter and not less than No. 12 diameter if self-drilling/self-tapping type. Screws shall meet requirements for warranty defined in paragraph 1.6.2.
2.3.4.2 End-Welded Studs
Provide automatic shouldered type studs with a shank diameter of not less than 3/16 inch and cap or nut for holding covering against the shoulder.
2.3.4.3 Explosive Actuated Fasteners
Fasteners for use with explosive actuated tools shall have a shank diameter of not less than 0.145 inch with a shank length of not less than 1/2 inch for fastening panels to steel and not less than one inch for fastening panels to concrete.
2.3.4.4 Blind Rivets
Provide aluminum rivets with 3/16 inch nominal diameter shank or stainless steel rivets with 1/8 inch nominal diameter shank. Rivets shall be threaded stem type if used for other than the fastening of trim. Provide hollow stem rivets with closed ends.
2.3.4.5 Bolts
Provide bolts not less than 1/4 inch diameter, shouldered or plain shank as required, with proper nuts.
2.3.5 Concealed Anchor Clips
Concealed anchor clips shall be the same as the tested roofing system. Clip bases shall have factory punched or drilled holes for attachment. Clips shall be made from multiple pieces with the allowance for the total thermal movement required to take place within the clip. Single piece clips may be acceptable when the manufacturer can substantiate that the system can accommodate the thermal cyclic movement under sustained live or snow loads.
Provide clips that allow for the thickness of insulation required to achieve the indicated R-values.
2.3.6 Gutters
Provide complete with mitered corners, end pieces, and special pieces that may be required. Expansion-type slip joints shall be provided at the center of the runs and at intervals of not more than 32 feet for aluminum and not more than 40 feet for steel. Provide water tight seal at all other joints. Provide gutters below the slope line of the roof, to allow snow and ice to slide clear. Provide hangers and fastenings from a metal compatible with the gutters. Space hangers not more than 36 inches apart.
2.3.7 Downspouts
Provide cross sectional area not less than the size of gutter required by manufacturer. Provide downspouts in approximately 10 foot lengths; end joints shall telescope not less than 1/2 inch, and longitudinal joints shall be locked. Provide gutter outlets with stainless steel wire ball strainers of a standard type. Position downspouts not less than 1/2 inch away from walls and fasten to the walls at top, bottom, and at not to exceed 5 foot centers intermediately between with manufacturer's standard type leader straps, or concealed type fasteners. Form straps and fasteners from a metal compatible with the downspouts. Provide downspout protection boots to be installed for the lower 6 feet of downspout. Downspout boots may be fabricated of cast iron, cast aluminum or heavy duty extruded aluminum.
2.3.8 Insulation
Thermal resistance of insulation shall be not less than the R-values shown on the contract drawings. R-values shall be determined at a mean temperature of 75 degrees F in accordance with ASTM C 518. Insulation shall be a standard product with the insulation manufacturer, factory marked or identified with insulation manufacturer's name or trademark and R-value. Identification shall be on individual pieces or individual packages. The stated R-value of the insulation shall be certified by an independent Registered Professional Engineer if tests are conducted in the insulation manufacturer's laboratory.
2.3.8.1 Blanket Insulation
Blanket insulation shall conform to ASTM C 991 0.6 pound fiber-glass as standard with the metal building manufacturer having a factory-applied facing on one side and a permeance rating of 0.05 or less when tested in accordance with ASTM E 96.
a. Facing on insulation (referred to as Vapor Retarder) shall consist of white polypropylene film, fiberglass reinforced scrim and kraft (PSK). Facing shall have a tensile strength of not less than 40 pounds per inch machine direction and 30 pounds per inch cross machine direction when tested in accordance with ASTM D828. Facing shall also have a permeability of 0.02 perm or less when tested in accordance with ASTM E96 and shall be factory applied.
b. The insulation, including facings, shall have a flame spread rating of 75 or less and a smoke development factor of 150 or less when tested in accordance with ASTM E 84.
c. Provide insulation containing 20 percent or greater recovered material which has been diverted from solid waste, but not including material reused in a manufacturing process. Where two materials have the same price and performance, provide the one containing the higher recovered material content.
2.3.8.2 Insulation Retainers
Retainers shall be type, size and design necessary to adequately hold the insulation and to provide a neat appearance. Metallic retaining members shall be nonferrous or have a nonferrous coating. Nonmetallic retaining members, including adhesives used in conjunction with mechanical retainers or at insulation seams, shall have a fire resistance classification not less than that permitted for the insulation.
2.3.9 Doors
Provide framing members and flashings as necessary for installation of the doors and windows.
2.3.9.1 Swinging Personnel Doors and Frames
SDI/DOOR A250.8, Grade II, Model 1, 2, 3, or 4, design as indicated, zinc-coated and shop primed, exterior mounting. Hardware shall conform to BHMA A156.1, BHMA A156.2, BHMA A156.3, and BHMA A156.4. All door hardware shall be commercial heavy-duty grade. All locks shall be "seven-pin with ‘D’ keyway" type by "Best Lock" as the basis of design to meet the Base Standard. All personnel door hardware shall be “ADA” accessible.
Provide the following hardware:
Doors: Exterior exit doors, hollow metal (total of two doors)
1 1/2 pairs Hinges
1 Standard Lever Hardware with Lockset 1 Kickplate at 10" high
1 set Silencers
1 Closer
1 Threshold
1 Weatherstrip
1 Door Bottom
1 12” x 12” Wire Glass Vision Panel in Metal Frame
2.3.9.2 Overhead Coiling Doors
Overhead coiling doors shall conform to the requirements of Section 08 33 23.00 40 OVERHEAD COILING DOORS.
2.3.10 Sealant
Sealant shall be an elastomeric type containing no oil or asphalt. Exposed sealant shall be colored to match the applicable building color and shall cure to a rubber like consistency. Provide sealant as required to make building weather/water tight.
2.3.11 Gaskets and Insulating Compounds
Gaskets and insulating compounds shall be nonabsorptive and suitable for insulating contact points of incompatible materials. Insulating compounds shall be nonrunning after drying.
2.4 FINISH
2.4.1 Shop Painting
Ferrous metal work, except factory-finished work, zinc-coated work, aluminum-coated work, and work specified to be painted herein, shall be (1) cleaned of dirt, rust, scale, loose particles, grease, oil, and other deleterious substances; (2) phosphate treated; and (3) then be given one coat of an approved rust-inhibiting primer paint of the type standard with the metal building manufacturer.
2.4.2 Factory Color Finish
Provide exterior and interior exposed surfaces of metal roof and wall panels, gutters, downspouts, and metal accessories with a thermal-cured factory applied polyvinylidene fluoride "Kynar 500 PVDF" finish. Color shall be selected from manufacturer's standard colors to match the scheduled colors to the greatest extent possible. Interior color finish shall consist of coating and dry film thickness as required to meet the manufacturer’s finish warranty. Provide exterior color finish meeting the test requirements specified below. Tests shall have been performed on the same factory finish and thickness provided.
2.4.3 Testing of Factory Color Finishes
2.4.3.1 Salt Spray Test
A sample of the sheets shall withstand a cyclic corrosion test for a minimum of 2016 hours in accordance with ASTM D 5894, including the scribe requirement in the test. Immediately upon removal of the panel from the test, the coating shall receive a rating of not less than 10, no blistering, as determined by ASTM D 714; 10, no rusting, as determined by ASTM D 610 and a rating of 6, over 1/16 to 1/8 inch failure at scribe, as determined by ASTM D 1654.
2.4.3.2 Accelerated Weathering Test
ASTM G 23, Method 2, Type D apparatus minimum 2000 hours or Type EH apparatus minimum 500 hours, no checking, blistering or loss of adhesion; color change less than 5 NBS units by ASTM D 2224 and chalking less than No. 8 rating by ASTM D 4214.
2.4.3.3 Flexibility
ASTM D 522, Method A, 1/8 inch diameter, 180 degree bend, no evidence of fracturing to the naked eye.
2.4.3.4 Adhesion
ASTM D 3359, Method B, for laboratory test and film thickness less than 5 mil and Method A for site tests. There shall be no film removed by tape applied to 11 parallel cuts spaced 1/8 inch apart plus 11 similar cuts at right angles.
2.4.3.5 Impact
ASTM D 2794, no loss of adhesion after direct and reverse impact equal to 1.5 times metal thickness in mils, expressed in inch-pounds.
2.4.3.6 Humidity Resistance
ASTM D 2247, 1000 hours, no signs of blistering, cracking, creepage or corrosion on score panel.
2.4.3.7 Specular Gloss
ASTM D 523, finished surfaces exposed to the building exterior shall have a specular gloss of 10 measured at an angle of 85 degrees.
2.4.3.8 Abrasion
ASTM D 968 Method A, falling sand shall not expose substrate when tested in quantities 7.9 - 10.6 gallons of sand per mil of thickness.
2.4.3.9 Formability Test
When subjected to testing in accordance with ASTM D 522 Method B, 1/8 inch diameter mandrel, the coating film shall show no evidence of cracking to the naked eye.
2.4.3.10 Pollution Resistance
Coating shall show no visual effects when covered spot tested in a 10 percent hydrochloric acid solution for 24 hours in accordance with ASTM D 1308.
PART 3 EXECUTION
3.1 INSPECTION
a. Check concrete dimensions, anchor bolt size and placement, and slab elevation with the metal building manufacturer's templates and drawings before setting any steel.
b. Roofing system installation shall be inspected and supervised by the manufacturer as required to meet the manufacturer's warranty requirements.
3.2 ERECTION
Erect in accordance with the manufacturer's approved erection instructions and diagrams. Correct defects and errors in the fabrication of building components in a manner approved by the Contracting Officer. If defects or errors in fabrication of components cannot be corrected, remove and provide nondefective components. When installing wall and roof systems, install closure strips, flashing, sealing material, and other accessories in accordance with building manufacturer's instructions to provide a weathertight system, free of abrasions, loose fasteners, and deformations. After erection is complete, repair and coat abraded and damaged, primed or factory-finished surfaces to match adjacent surfaces.
3.2.1 Dissimilar Materials
Prevent direct contact between aluminum surfaces, and ferrous or other incompatible metals, by one of the following methods:
a. Paint the incompatible metal with a coating of manufacturer's standard heavy-bodied paint.
b. Paint the incompatible metal with a prime coat of corrosion inhibitive primer followed by one or two coats of aluminum metal-and-masonry paint, or other suitable protective coating, excluding products containing lead and chromium pigmentation.
c. Provide an approved nonabsorptive gasket.
d. Apply an approved calking between the aluminum and the incompatible metal.
If drainage from incompatible metal passes over aluminum, paint the incompatible metal by method (a) or (b). Paint aluminum surfaces in contact with concrete or masonry materials by method (a). Paint green or wet wood, or wood treated with incompatible wood preservatives, by method (a) or use two coats of aluminum paint.
3.2.2 Rigid Frames, Bases, and Sill Members
Brace frames as necessary to ensure safety. Set accurately, using a nonshrink grout to obtain uniform bearing on the concrete and to maintain a level base line elevation. Separate leveling plates under column base plates shall not be used. Members shall be accurately spaced to assure proper fitting of panels. As erection progresses, the work shall be securely fastened to resist the dead load and wind and erection stresses. Supports for electric overhead traveling cranes shall be positioned and aligned in accordance with CMAA 70. Clean surfaces to receive the mortar and thoroughly moisten immediately before placement of mortar. Water cure exposed surfaces of mortar with wet burlap for 7 days.
3.2.2.1 Field Welding
Steel, AWS D1.1/D1.1M.
3.2.2.2 Field Bolting
AISC S329. Improper or mislocated bolt holes in structural members or other misfits caused by improper fabrication or erection, shall be repaired in accordance with AISC 303. Concrete work is specified in Section 03 30 00.00 20 CAST-IN-PLACE CONCRETE. Anchor bolts shall be accurately set by template while the concrete is in a plastic state.
3.2.3 Wall Construction
Apply panels full wall heights from base to eave with no horizontal joints except at the junctions of door frames, louver panels, and similar locations. Lay side laps away from the prevailing winds. Seal side and end laps with the joint sealing material recommended by the manufacturer. Flash or seal walls at the base, at the top, around windows, door frames, framed louvers, and other similar openings. Flashing will not be required where approved "self-flashing" panels are used. Minimum end laps for all types of panels shall be 2 1/2 inches. Minimum side laps for all types of panels shall be one corrugation, one configuration, or an interlocking joint.
3.2.4 Roof Construction
3.2.4.1 Roof Panel Installation
Roof panels shall be installed with the standing seams in the direction of the roof slope. The side seam connections for installed panels shall be completed at the end of each day's work. Method of applying joint sealant shall conform to the manufacturer's recommendation to achieve a complete weather-tight installation. End laps of panels shall be provided in accordance with the manufacturer's instructions. Closures, flashings, EPDM rubber boots, roof curbs, and related accessories shall be installed according to the manufacturer's drawings. Fasteners shall not puncture roofing sheets except as provided for in the manufacturer's instructions for erection and installation. Expansion joints for the standing seam roof system shall be installed at locations indicated on the contract drawings and other locations indicated on the manufacturer's drawings.
3.2.4.2 Concealed Anchor Clips
Concealed anchor clips shall be fastened directly to the structural framing members. The maximum distance, parallel to the seams, between clips shall be 30 inches on center at the corner, edge, and ridge zones, and 5 feet maximum on centers for the remainder of the roof.
3.2.5 Installation of Gutters and Downspouts
Gutters and downspouts shall be rigidly attached to the building. Spacing of cleats for gutters shall be 16 inches maximum. Spacing of brackets and spacers for gutters shall be 36 inches maximum. Supports for downspouts shall be spaced according to manufacturer's recommendations.
3.2.6 Louvers and Ventilators
Louvers and ventilators shall be rigidly attached to the supporting construction to assure a weather tight installation.
3.2.7 Doors
Doors, including frames and hardware, shall be securely anchored to the supporting construction, shall be installed plumb and true, and shall be adjusted as necessary to provide proper operation. Joints at doors and windows shall be sealed according to manufacturer's recommendations to provide weathertight construction.
3.2.8 Minimum Fastener Spacing
Space fasteners according to manufacturer's instructions, but not to exceed:
a. 8 inches o.c. at end laps of covering,
b. 12 inches o.c. at connection of covering to intermediate supports,
c. 12 inches o.c. side laps of roof coverings, 18 inches o.c. at side laps of wall.
3.2.9 Installation of Insulation
3.2.9.1 Roof Insulation
Install over purlins before roof coverings are applied. Hold insulation rigid until secured in place. Insulation facing shall be exposed on the interior side of the building. Fold and staple facing tabs of insulation on 6 inch centers, from exterior side of building to completely seal joints. If folding and stapling can only be accomplished from the inside, push the tabs neatly up between the edges of adjoining blankets, and cover side laps of insulation with metal strips formed for this purpose and paint to match the facing material. Install the strips spanning from purlin to purlin and in accordance with the metal building manufacturer's recommendations. Provide high clips for installation of deep blanket insulation under roof panels.
3.2.9.2 Wall Insulation
Install over girts before wall coverings are applied. Hold insulation rigid until secured in place. Expose facing toward the interior side of the building. Fold and staple facing tabs of insulation on 6 inch centers, from exterior side of building, to completely seal joints. If folding and stapling can only be accomplished from the inside, push the tabs neatly up between the edges of adjoining blankets, and cover side laps of insulation with metal strips formed for this purpose and paint to match the facing material. Install the strips spanning from girt to girt and in accordance with the metal building manufacturer's recommendations.
3.2.10 Vapor Retarder Installation
3.2.10.1 Integral Facing on Blanket Insulation
Integral facing on blanket insulation shall have the facing lapped and sealed with a compatible tape to provide a vapor tight membrane.
3.2.11 Wall Liner
Wall liner shall be securely fastened into place in accordance with the manufacturer's recommendation and in a manner to present a neat appearance.
3.3 FIELD PAINTING
Immediately upon detection, abraded or corroded spots on shop-painted surfaces shall be wire brushed and touched up with the same color and material used for the shop coat. Section 09 90 00.00 40 PAINTING AND COATING or Architectural Drawings, for painting of shop-primed ferrous surfaces, except as described in paragraph 2.4.1 for the pre-engineered metal building components. Ferrous metal work, except factory-finished work, zinc-coated work, aluminum-coated work, and work specified to be painted herein, shall be cleaned of dirt, rust, scale, loose particles, grease, oil, and other deleterious substances; and then be given (2) two coats finish paint of the type standard with the metal building manufacturer. Section 09 90 00.00 40 PAINTING AND COATING or Architectural Drawings, for painting of shop-primed ferrous surfaces. Design basis is Sherwin-Williams Universal Metal Primer (Kem Kromik) and Sherwin-Williams Industrial Enamel (B54), apply minimum (2) two coats with minimum 1.5 mil dry thickness per coat.
3.4 FIELD QUALITY CONTROL
At the discretion of the Contracting Officer, sample panels may be taken at random from each delivery or from stockpiles on the site at any time during the construction period, and tests may be made to check the conformance of the materials to the requirements specified in paragraph entitled "Factory Color Finish." Failure of the sample sheets to pass the required tests shall be cause for rejection of all sheets represented by the samples and replacement of the entire shipment.
-END OF SECTION-
133419 - 1 of 24
File details come from the government source that posted it. Updated .