Robins AFB Facility Communications Standards, 30 Sept 2007, Page 1 of 14
Robins AFB Facility Communication Standards September 30, 2007
Table of Contents Robins AFB Facility Communication Standards Table of Contents
Acronyms
1.1. Purpose
1.1.1. Request for Proposal (RFP)/Construction Projects
1.1.2. Conflicts
1.2. Standards
2. MILCON Communications
2.1. General
2.1.1. Certification and Qualification
2.2. Outside Cabling
2.2.1. Local Area Network
2.2.2. Telephone Dial Tone
2.2.3. Entrance Conduits
2.3. Facility Communication Space Requirements
2.3.1. Communications Equipment Room (CER)
2.3.1.1. CER Location, Sizing, and Details
Table 1. CER and Entrance Conduit Sizing
2.3.1.2. CER Power Requirements
2.3.1.3. CER Environmental Requirements
2.3.1.4. CER Ground Connections
2.3.2. Telecommunications Closet (TC)
2.3.2.1. TC Location, Sizing, and Details
2.3.2.2. TC Power Requirements
2.3.2.3. TC Environmental Requirements
2.3.2.4. TC Grounding
2.4 Inside Premise
2.4.1. Equipment Racks
2.4.2. Cable Raceways
2.4.3. Premise Wiring
2.4.3.1. Telecommunications Outlet
2.4.3.1.1. Telecommunications Outlet Density
2.4.3.2. Station Cables
2.4.3.3. Riser Cables
2.4.3.3.1. Telephone Riser Cable
2.4.3.3.2. LAN Riser Cable
2.4.4. Cable TV
2.4.4.1. CATV Inside Wiring
2.4.5. Systems Furniture Wiring
2.4.6. Public Address Systems (PA)
2.5. Acceptance Documentation and Records
Robins AFB Facility Communications Standards, 30 Sept 2007, Page 2 of 14
2.5.1. Testing AND Test Results
2.5.2. Telecommunications System Management Records
2.5.3. Outlets and Patch Panel Labeling
2.5.4. Distribution System Labeling
2.5.5. Acceptance Inspection
2.6. Facility Occupation
3. Construction, Additions and Renovations Projects
3.1. General
3.2. Communications Spaces
3.3. Telecommunications Distributions Systems
3.3.1. Interior Raceways
3.3.2. Entrance Conduits
3.3.3. Communications Wiring
3.4. Telecommunications Cabling
3.5. Acceptance Inspection
Robins AFB Facility Communications Standards, 30 Sept 2007, Page 3 of 14
Acronyms AFI - Air Force Instruction ANSI - American National Standards Institute ATM - asynchronous transfer mode AWG - American Wire Gauge BCE - base civil engineer BCSO - base communications systems officer BET - building entrance terminal BICSI - Building Industry Consulting Services International C4ISR - Command, Control, Communications, Intelligence, Surveillance, and Reconnaissance CAT - category CATV - community access (cable) television CER - communications equipment room CITS - Combat Information Transport System CSIR - Communications and Information System Installation Records E&I - Engineering and Installation EIA - Electronic Industries Alliance EIG - Engineering Installation Group EMCS - energy monitoring and control system ETL - Engineering Technical Letter FOC - fiber optic cable ISDN - Integrated Services Digital Network ITN - information transfer node LAN - local area network MILCON - military construction NAF - non-appropriated funds NCC - network control center NEC - National Electrical Code NFPA - National Fire Protection Association PA – Public Address STEM - system telecommunications engineering manager TC - telecommunications closet TGB - telecommunications grounding busbar TIA - Telecommunications Industry Association TMGB - telecommunications main ground busbar TX - transmit UL - Underwriters Laboratories UPS - uninterruptible power supply USOC - Universal Service Ordering Code UTP - unshielded twisted pair VAC - volt alternating current
Robins AFB Facility Communications Standards, 30 Sept 2007, Page 4 of 14
1.1. Purpose. This standard contains the communications requirements for military construction (MILCON) projects, minor Construction Projects, building renovations and Simplified Acquisition of Base Engineer Requirements (Saber projects). It supersedes the Communications Section of the Base Facility Standard. Plans for construction and renovations projects that require communications must be approved by the Base Communications and Information Systems Officer (BCSO) or his representative. The Communications organization’s Plans and Implementation Flight is the focal point for this approval. Be sure to include this office in all planning and review meetings.
1.1.1. Request for Proposal (RFP)/Construction Projects. The
information provided in this document will be incorporated in all RFP Scope of works and contracts for construction and renovations projects.
1.1.2. Conflicts. The Base Communications and Information Systems Officer is responsible for all base communications and is the final authority on any communications issues and conflicts.
1.1.3
1.2. Standards. All designs, plans and work product will be in accordance with the below standards unless otherwise stated in the document.
• Engineering Technical Letter (ETL) 02-12: Communications and Information System Criteria for Air Force Facilities
• AFI 33-104, Base Level Planning and Implementation
• AFI 33-111, Telephone Systems Management
• AFI 33-115, Network Management, Volume 1
• TIA/EIA-568-B, Commercial Building Telecommunications Cabling Standard − TIA/EIA-568-B.1, Part 1: General Requirements − TIA/EIA-568-B.2, Part 2: Balanced Twisted-Pair Cabling Components − TIA/EIA-568-B.3, Part 3: Optical Fiber Cabling Components Standard
• TIA/EIA-569-B, Commercial Building Standards for Telecommunications Pathways and Spaces
• TIA/EIA-570-A, Residential Telecommunications Cabling Standard
• TIA/EIA-606, Administration Standard for the Telecommunications Infrastructure of Commercial Buildings
• TIA/EIA-607, Commercial Building Grounding and Bonding Requirements for Telecommunications
• TIA/EIA-758, Customer-Owned Outside Plant Telecommunications Cabling Standard
Robins AFB Facility Communications Standards, 30 Sept 2007, Page 5 of 14
2. MILCON Communications.
2.1. General. Plans for MILCON projects must be approved by the Base Communications and Information Systems Officer (BCSO) or his representative.
The communications organization’s Plans and Implementation Flight is the focal point for this approval. Be sure to include this office in all planning and review meetings. MILCON contractors will provide all wiring, cabling, fiber optic cables (FOC), conduits, ducts, manholes, and pathways from the customer’s jacks to the point where the new facility will receive dial tone and Internet protocol access. To include:
1. All termination devices (cross-connects, patch panels, distribution frames, network protectors).
2. Communications equipment rooms (CER) and telecommunications closets (TC) as required.
3. Pathways such as cable trays and stubbed up and conduits.
2.1.1. Certification and Qualification. All communication design, installation, termination and testing must be preformed by certified telecommunications professionals and technicians.
2.2. Outside Cabling.
2.2.1. Local Area Network. For Local Area Network (LAN) connectivity the MILCON contractor will provide twelve (12) strands of individual 9/125 micron single mode fiber optic cable (FOC) to the nearest Information Transfer Node (ITN) identified by the BCSO’s representative. Install the fiber in an orange flexible inter-duct. The MILCON contractor will terminate both ends of the FOC in a rack mounted fiber distribution panels using ST connectors to TIA/EIA-568-B standards. The occupying organization will provide funding to the BCSO for all equipment, patch cables and jumpers, identified by the BCSO representative as required to establish LAN connectivity for users in the new facility.
2.2.2. Telephone Dial Tone. For telephone dial tone the MILCON contractor will provide a copper outside plant cable to the nearest Expansion Port Network (EPN) identified by the BCSO’s representative. The cable will be sized to support the building circuit requirements (telephone lines, trunks, alarm and sensor circuits, and point-to-point communications circuits) plus a minimum of 20% spare capacity (50% is recommended). The MILCON contractor will provide gas protector modules in the CER and terminate the cable on a cat 6 110 punch down block to TIA/EIA-568-B termination configuration. The occupying organization will provide funding to the BCSO for all telephone equipment, cables, cross connects and programming, identified by the BCSO representative as required to establish dial tone for users in the new facility.
Robins AFB Facility Communications Standards, 30 Sept 2007, Page 6 of 14
2.2.3. Entrance Conduits. Provide the appropriate numbers of four inch conduits to the nearest existing or MILCON provided manhole. See Table 1 for the number of entrance conduits required.
2.3. Facility Communication Space Requirements.
2.3.1. Communications Equipment Room (CER). The CER serves as the entrance facility for all incoming communications ducts and service and as the location for communication and information infrastructure such as the building PABX, RST, and LAN switches. Unoccupied and/or small facilities such as guardhouses, utility control buildings, and storage bunkers will typically not require a CER. CER design will be in accordance with ETL-02-12 and TIA/EIA- 569-B.
2.3.1.1. CER Location, Sizing, and Details. The CER will be located on the first floor along an exterior wall. If agreed to by the BCSO representative The CER can be located up to 30 feet from the exterior wall. It must be a dedicated space not shared with other functions (e.g., building electrical or mechanical utilities) or used for storage. The CER will have 0.75-inch fire retardant coated plywood backboards on all walls except the entry door wall, from 1 foot above the finished floor level to no less than 7 feet above the finished floor level. Provide outward opening 36-inch wide by 80-inch long double-leaf no center support doors, fitted with a room 17 lock to control access to the CER from inside the building. For ease of access doors will open into a main hallway or other such area and must be accessible to maintainers at all times. Floors, walls, and ceilings must be treated to eliminate dust. Finishes must be light in color to enhance room lighting. Provide telephone outlets for a wall-mounted telephone.
Do not locate the CER near other building utility rooms or generators that may cause electromagnetic interference with CER equipment or where moisture, gases, dust, or other contaminants may enter. The size of the CER, including space for equipment and service entrance facilities, must not be less than set out in Table 1. For more specific design guidance refer to TIA/EIA-569-A. Minimum CER size is 9’x12’, 108 sq ft.
Table 1. CER and Entrance Conduit Sizing Building Usable Area Square Meters (Square Feet)
CER Size Square Meters (Square Feet)
Number of 102-millimeter (4-inch) Entrance Conduits
1858 (<20,000 37 (400)* 3 1858 to 9290 (20,000 to 100,000) 46 (500) 4 9290 to 18,580 (100,000 to 200,000)
84 (900) 5
Every additional 18,580 (200,000) +56 (+600) +1 Note: Not less than 2:1 ratio length to width. * Adjustments may be made for small buildings.
Robins AFB Facility Communications Standards, 30 Sept 2007, Page 7 of 14
2.3.1.2. CER Power Requirements. Provide a minimum of two dedicated un-switched 20 amp NEMA 5-20 duplex receptacle power outlets or equivalent on each CER wall, each on a separate branch circuit for communication equipment.
Provide additional 120-VAC convenience outlets for maintenance and housekeeping. Backup all electrical loads in the CER with standby generator power where available.
2.3.1.3. CER Environmental Requirements. Provide heating, cooling, and fresh air appropriate for the equipment housed. Maintain a positive pressure inside the room to reduce the entry of dust. Normal operating ranges should be as locally established for employee comfort (typically between 20 to 26 °C [68 to 78 °F]). There are no special relative humidity requirements. Provide a minimum of 538 lux (50 foot-candles) of illumination measured 1 meter (39 inches) above the finished floor.
2.3.1.4. CER Ground Connections. Ground connections in the CER must meet National Fire Protection Association (NFPA) 70, National Electrical Code (NEC), and TIA/EIA-607 requirements. Provide a single-point ground for all communications/electronics equipment for the building within the CER. Provide a telecommunications main ground bus bar (TMGB) 6 inches high by 24 inches long installed 7 feet above the floor on a wall (preferably an outside wall) within the CER. The ground riser from the ground plate to the single main electrical service entrance ground must be a No. 1 American Wire Gauge (AWG) or larger copper conductor directly connected to the ground plate with no taps. The resistance of the ground riser must be 5 ohms or less measured from the main building ground point. All connections of wire-to-wire and/or wire-to-ground rod must be exothermic-welded. Extend No. 6 AWG or larger copper ground wires from the CER ground plate to each TC within the building and connect a telecommunications grounding bus bar (TGB) in the TC. Bond each TMGB and TGB to non-current-carrying metal building parts, such as metal framing, in the CER and TC as required by the NEC.
2.3.2. Telecommunications Closet (TC). Provide a TC for each 10,000 square feet of building area on each floor. The TC supports the functions outlined in TIA/EIA-568-B and serves to house the interface between the CER and client telephone and data outlets. It houses LAN networking equipment (e.g., Ethernet switches and patch panels) for client outlets served from the TC. A TC may serve as the CER for buildings less than 929 square meters in area. TC design will be in accordance with ETL-02-12 and TIA/EIA- 569-B.
2.3.2.1. TC Location, Sizing, and Details. TCs must be dedicated spaces not shared with other functions (i.e., storage, building electrical or mechanical utilities). TCs must be located centrally in the area they serve and sized in accordance with TIA/EIA-569-A. Generally, the TC must be sized to approximately 1.1% of the area it serves. For example, 10,000-square-foot area
Robins AFB Facility Communications Standards, 30 Sept 2007, Page 8 of 14 must be served by a minimum of one 110-square-foot TC. Under no circumstances will a TC be smaller than 70 square feet (7 by 10 feet). TCs on successive floors must be vertically stacked. A minimum of three 4-inch rigid steel conduits must be installed between stacked closets on successive floors in accordance with TIA/EIA-569-A. All conduit and other penetrations through fire-rated walls, ceilings, and floors must be fire-stopped in accordance with the NEC.
As a minimum, the TC will have 0.75-inch fire retardant coated plywood backboards on all walls, except the entry door wall, from 1 foot above the finished floor level to no less 7 feet above the finished floor level. Floors, walls, and ceilings must be treated to eliminate dust. Finishes must be light in color to enhance room lighting. Provide a 36-inch wide by 80-inch long single-leaf door hinged to open outward and fitted with a room 17 lock to control access to the room. For ease of access doors will open into a main hallway or other such area and must be accessible to maintainers at all times. Provide an outlet for a wall-mounted telephone installed near the entry door. Do not locate the TC near other building utility rooms or generators that may cause electromagnetic interference with TC equipment or where moisture, gases, dust, or other contaminants may enter.
2.3.2.2. TC Power Requirements. Provide a minimum of one dedicated un-switched 20 amp NEMA 5-20 duplex receptacle power outlets or equivalent on each wall, each on a separate branch circuit for communication equipment.
Increase these minimum requirements as necessary to meet equipment loads.
Provide additional 120-VAC convenience outlets for maintenance and housekeeping. Backup all electrical loads in the TC with standby generator power where available.
2.3.2.3. TC Environmental Requirements. Provide heating, cooling, and fresh air appropriate for the equipment housed. Normal operating ranges should be as locally established for employee comfort (typically between 20 to 26 °C [68 to 78 °F]). There are no special relative humidity requirements. Provide a minimum of 538 lux (50 foot-candles) of illumination measured 1 meter (39 inches) above the finished floor.
2.3.2.4. TC Grounding. All TCs must be connected to a single-point ground in the CER in accordance with TIA/EIA-607 (see paragraph 2.3.1.4).
2.4 Inside Premise
2.4.1. Equipment Racks. Equipment racks must be 19 inches wide and mounted on the floor (unless otherwise specified by the BCSO representative).
Locate 2 racks side by side near the point where outside plant cable enters the building in CERs and center of the room in TCs (unless otherwise specified by the BCSO representative). In narrow or crowded closets, equipment racks may
Robins AFB Facility Communications Standards, 30 Sept 2007, Page 9 of 14 be mounted adjacent to a wall but must provide a minimum of 36 inches of space both in front and behind the rack. Ground all racks and cabinets.
2.4.2. Cable Raceways. Channel-type cable rack must be used in TCs and CERs to provide distribution raceway between telephone backboards, equipment racks, riser conduits, and distribution cable trays. Install a complete raceway between each TC and the CER. In administration areas with tile ceilings distribution cable trays and one inch wall stub ups will be used to manage station cables between the wall outlet and the CER/TC. Cable trays will not be installed above fixed ceilings. Where cable trays cannot be used, one inch conduit will be extended from the outlet stubbed up conduit to the CER or TC. Install one spare four inch conduit and two spare flexible inter-ducts between each TC and the
CER.
2.4.3. Premise Wiring.
2.4.3.1. Telecommunications Outlet. Standard telecommunications outlet will use 8-pin/8-position CAT 6 or better modular USOC RJ-45 jacks mounted in a single faceplate. Provide one green colored jack for telephone and two yellow colored jacks for data in each outlet.
2.4.3.1.1. Telecommunications Outlet Density. Administrative facilities and administrative spaces must be equipped with one standard telecommunications outlet for each 4.5 square meters (48 square feet) of net office space or every eight feet. Individual offices should have outlets on three walls. In conference rooms provide outlets every 8 ft. In warehouses and storage areas provide one outlet every 40 feet around all perimeter walls. In shop areas provide 1 outlet at every 16 feet around all perimeter walls. No outlets will be in hangar bays unless requested by user or specified elsewhere. Provide one outlet in lobby areas, mechanical rooms, electrical rooms, at the main DCC control panel and near any other equipment requiring remote monitoring. Outlet densities and locations for all special-purpose spaces and non-administrative facilities must be determined by the user and the BCSO representative and must follow the guidelines in TIA/EIA-569-B. Provide single data jack outlets in the ceiling for wireless LAN access points as needed and identified by the BCSO representative.
2.4.3.2. Station Cables. Use cat 6, 4-pair (UTP) unshielded twisted pair, 24 AWG copper, plenum rated cables in return air spaces, (green for telephones and yellow for LAN) for all inside station cable between the telecommunications outlet and the CER/TC. Terminate all LAN cat 6 station cables on rack mounted cat 6 patch panel(s) in the CER/TC. LAN cables combined horizontal and vertical length will not exceed 295 feet from the outlet jack to the patch panel.
Terminate all telephone cat 6 station cables on a cat 6 wall mounted 110 blocks in the CER/TC. Terminations must be in accordance with TIA/EIA-568-B. Group telephone cables together and separate them from data cable groupings.
Robins AFB Facility Communications Standards, 30 Sept 2007, Page 10 of 14
2.4.3.3. Riser Cables. Riser cables provide connections between the TC and CER. Install in a complete raceway system from each TC to the CER. Riser cable shall not be installed in the overhead cable tray system used for voice/data wiring. Install one spare four inch conduit and two spare flexible inter-ducts between each TC and the CER.
2.4.3.3.1. Telephone Riser Cable. For telephones provide a multi-pair copper cable, sized to support all station cables terminated in the TC plus 50% spare pairs between each TC and the CER. Terminate the copper cable in the TC and CER on wall mounted 110-type punch down blocks rated for CAT 6 mounted on stand off blocks.
2.4.3.3.2. LAN Riser Cable. For LAN provide twelve (12) strands of individual 9/125 micron single mode fiber optic cable between each TC and the CER.
Terminate the FOC in the TC and CER in rack mounted fiber distribution panels using ST connectors. Install the fiber in an orange flexible inter-duct.
2.4.4. Cable TV. CATV lines within the facility shall be provided by the MILCON contractor. CATV lines to the facility will be accomplished by the base CATV contract service provider. The MILCON contractor will provide a separate four inch conduit from the CER to the nearest communications manhole unless specified otherwise.
2.4.4.1. CATV Inside Wiring. Wiring for CATV will be installed from the CATV outlet to the CER/TC in conduit. CATV wiring shall be terminated on separate backboards from the voice/data wiring in the CER/TC. Use 75-ohm coaxial cable terminated with type “F” connectors and jacks. The MILCON Contractor will provide all terminations at the outlets and terminations at the backboard.
Amplifier shall be provided at the backboard. CATV wiring shall be installed in separate raceway from the voice/data wiring.
2.4.5. Systems Furniture Wiring. For systems furniture the MILCON contractor will provide enough cabling for each cubicle or workstation to have one voice and two data jacks. The cabling will be left coiled in the ceiling above where it will enter the system furniture with enough slack so that it can be pulled into the furniture and terminated, once the furniture is erected. The furniture installers must provide a power poll of sufficient size to accommodate the cables.
When scheduling provide a minimum of ten working days after the system furniture installation is totally completed to pull and terminate voice and data cables.
2.4.6. Public Address Systems (PA). PA Systems will not be installed in the CER or TCs unless approved by the BCSO. Under no circumstances will PA microphones be installed in CER or TCs. These must be installed in an area accessible to the occupying organization.
Robins AFB Facility Communications Standards, 30 Sept 2007, Page 11 of 14
2.5. Acceptance Documentation and Records. An “as-built” set of drawings and electronic copies in micro-station and .pdf Adobe format will be provided to the BCSO showing, but not limited to: all cable routes, outlet locations and identification markings and communication room/closet locations.
Site drawing showing the route of all manhole and duct systems installed in support of the MILCON.
2.5.1. Testing AND Test Results
All copper and fiber optic cabling installed must be tested end-to-end and certified to meet TIA/EIA performance standards. All equipment must be tested to meet contract specifications. All test results and certifications must be provided in a report upon completion of testing to the BCSO. The base BSCO will review and approve the test results before the final construction inspection. The contractor shall correct any deficiencies before the final inspection.
2.5.2. Telecommunications System Management Records.
Telecommunications system labeling, management records, and drawings must comply with TIA/EIA-606. Existing base standard numbering practices may be used as long as they incorporate the following requirements: all outlets, patch panel positions, and cables must be labeled as to their function with a unique identifier code; and as-built drawings and management records must show the location of all outlets, equipment, and cabling. These records must be provided as a deliverable item under any construction procurement contract. They will form part of the base Communications and Information Systems Installation Records (CSIR) and must be delivered to the BCSO CSIR manager upon contract completion according to AFI 33-104, Base Level Planning and Implementation, and AFI 21-404, Developing and Maintaining Communications and Computer Systems Installation Records.
2.5.3. Outlets and Patch Panel Labeling. As a minimum, outlet and patch panel labeling must show the TC number serving the outlet and the outlet circuit number. The outlet number should reflect its relative physical location in the building. Circuit numbers should not incorporate telephone extension numbers since telephone numbers can be reassigned to different outlets in telephone switching equipment and are therefore subject to frequent change. Where several patch panels are located in a single TC, the numbering and labeling scheme must also show the number of the patch panel serving the outlet. Each individual jack must be labeled to show its function; top or left jack position must be designated for and labeled “PHONE,” and bottom or right jack position must be designated for and labeled “DATA.” All patch panels terminating copper cable must be stenciled with the panel number, the cable count, and whether Terminations are wired to TIA/EIA-568-B termination configuration T568A (default) or T568B (by exception only) wiring standard. Fiber optic ports in patch panels must be labeled to show the transmit “TX” and receive “RX” port for each
Robins AFB Facility Communications Standards, 30 Sept 2007, Page 12 of 14 duplex set of fibers. Lettering on labels must be 6 millimeters (0.25 inch) high and machine-made; handwritten labels must not be used for permanent installation.
2.5.4. Distribution System Labeling. All transitions and changes in distribution system size and type must be labeled on the as-built drawings. Each cabinet must be labeled at the top with a unique designation. All cables, patch panels, and cable terminations must be labeled.
2.5.5. Acceptance Inspection. All communications systems installed by the construction contractor or their subs, must be accepted by the BCSO before telephone or LAN equipment can be installed in the new facility or the facility can be added to the base infrastructure. To schedule acceptance inspection contact the 78 CS/SCX Plans and projects office.
2.6. Facility Occupation. Occupying organizations must coordinate facility occupation dates, including partial occupations, with the BCSO. The occupying organization should ensure the MILCON design meets all their communication requirements. Any requirements not covered in the design cannot be accomplished until after the facility is accepted by the government and released by the contractor and Corps of engineers. All communications cabling must be accepted by the BCSO representatives prior to occupancy
Robins AFB Facility Communications Standards, 30 Sept 2007, Page 13 of 14
3. Construction, Additions and Renovations Projects.
3.1. General. All construction, additions and renovations designs, plans and contracts that will require communications or information systems must be approved by the BCSO or his representative. Contracts must be approved before being advertised for award. The communications organization’s Plans and Implementation Flight is the focal point for this approval. Be sure to include this office in all planning and review meetings. The occupying organization will provide funding to the BCSO for all equipment, cables, cross connects, jumpers and programming, identified by the BCSO representative as required to provide communications for users in the new facility.
3.2. Communications Spaces. All new construction, additions and renovations must provide a CER or TC as part of the project. The CER/TC will be appropriately sized to support the facility size and number of users. The CER/TC will be to the specifications outlined in the section 2.3., Facility Communications Space Requirements. Areas being converted to administrative space must include a CER/TC.
3.3. Telecommunications Distributions Systems. All new
construction, additions and renovations must include a telecommunications distribution system.
3.3.1. Interior Raceways. Install a complete raceway between each telecommunications outlet and the CER/TC. Use cable trays in administrative areas and when possible. Use conduit when it is not feasible to use cable trays or where code prohibits the use of cable trays. Provide outlet boxes and stubbed up conduits where telephone, data or cable TV connectivity is required. Provide Power polls for access to system furniture. Install two each four inch conduits with pull ropes, between TCs and the CER.
3.3.2. Entrance Conduits. Install two each four inch entry conduits with pull ropes to the nearest communications manhole for new facilities. Include hand-holes if required due to distance. Install the same for exiting facilities if required.
3.3.3. Communications Wiring. Typically premise wiring for minor construction, renovations and SABER projects is done by the 78th Communications Squadrons base telecommunications contractor. On the rare occasion any plans for projects/contracts deviates from the above, it must be approved by the BCSO. If approved the installing contractor must adhere to all criteria listed in section two of this standard.
3.4. Telecommunications Cabling. Unless otherwise approved by the BCSO, all LAN and voice cabling will be installed by the base telecommunications contractor (BTS). When planning occupancy dates provide
Robins AFB Facility Communications Standards, 30 Sept 2007, Page 14 of 14 a minimum of ten working days after the construction, renovation and system furniture installation is totally completed, for BTS to complete the communications wiring.
3.5. Acceptance Inspection. All communications systems installed by the construction contractor or their subs, must be accepted by the BCSO before telephone or LAN equipment can be installed in the new facility or the facility can be added to the base infrastructure. To schedule acceptance inspection contact the 78 CS/SCX Plans and Programs office.
End
| Robins AFB Facility Communication Standards |
| Table of Contents |
| Acronyms |
| 1.1.3 |
| 2.2. Outside Cabling. |
| 2.3. Facility Communication Space Requirements. |
| Table 1. CER and Entrance Conduit Sizing |
| 2.4 Inside Premise |
| 2.4.3. Premise Wiring. |
3. Construction, Additions and Renovations Projects.