Robins AFB Facility Standard
BASE FACILITY STANDARD (BFS) -- ROBINS AFB, GA
(Also known as Installation Design Guide)
FOR ARCHITECT-ENGINEER FIRMS AND CONTRACTORS
PERFORMING DESIGN SERVICES AND CONSTRUCTION FOR ROBINS AFB
PART 1 - INTRODUCTION AND GENERAL
Revised 19 December 2007
INTRODUCTION
1. FOR MILCON PROJECTS
Treat this Base Facility Standard as an officially applicable code. This is a mandatory technical guide that establishes requirements for construction projects at Robins AFB, GA. The "authority having jurisdiction" referenced in standards and codes, such as the National Electrical Code, is the office of the Base Civil Engineer, 78 CEG/CC. Each section in the guide will identify the person delegated responsibility for the standards of that section.
Deviation Request
: All deviations must be requested and approved using the form at the end of the narrative portion.
Design Submittal Checklist
: This form at the end of the narrative portion must be submitted as part of the design analysis at every submittal stage.
For projects involving Depot Maintenance facilities such as aircraft hangars and the Avionics Complex, the general oversight is by the Chief of 778 CES/CECM.
For all other projects, the general oversight is by the Chief of 778 CES/CECE.
The Design Agent offices of the Army Corps of Engineers (COE) have agreed to incorporate these standards into all designs accomplished for facilities at Robins AFB. Provide design items not addressed in these sections per the latest COE guidance and specifications.
General oversight for the Base is by the Base Project Manager identified in the Requirements and Management Plan (RAMP).
DESIGN-BUILD: When the MILCON project is design-build, incorporate these standards into the contract documents as mandatory requirements. The only time they will not apply is when a particular requirement in these is excluded with words such as “In lieu of the requirements in the Robins AFB Base Facility Standard, do (fill in).” When no such words are so stated, then these requirements overrule.
2. FOR BASE-MANAGED PROJECTS
Treat this guide as an officially applicable code. It establishes mandatory requirements for all design and construction projects at Robins AFB, GA. The authority having jurisdiction is the office of the Base Civil Engineer, 78 CEG/CC. (Under the Base Civil Engineer are two separate Squadrons, 78 CES and 778 CES. The 778 CES handles most facility design projects.) Each section in the guide will identify the person responsible for the standards of that section.
Deviation Request
: All deviations must be requested and approved using the form at the end of the narrative portion.
Design Submittal Checklist
: This form at the end of the narrative portion must be submitted as part of the design analysis at every submittal stage.
For projects involving Depot Maintenance facilities such as aircraft hangars and the Avionics Complex, the general oversight is by the Chief of 778 CES/CECM.
For all other projects, the general oversight is by the Chief of 778 CES/CECE.
3. REVISIONS
Revisions to this document are noted in dated entries at the very end.
INDEX
This Standard is divided into several parts as noted below. This document comprises Part 1.
Part 1 - Introduction and General:
Section
First Page
General Standards and Documentation 5
Special Initiatives 9 Force Protection/Antiterrorism Sustainable Design Metric Dimensions
Corrosion Control 13
Appendices:
Design Submittal Checklist 21
Deviation Request 22
Revision History of this BFS (At end)
Other Parts in Separate Documents:
Part 2 - Environmental and Landscape
Part 3 - Civil-Structural
Part 4 - Architectural Compatibility
Part 5 - Mechanical
Part 6 - Electrical
Part 7 - Communications
<<<<< END OF INDEX >>>>>
GENERAL STANDARDS AND DOCUMENTATION
1. GENERAL: This document presents mandatory requirements for all construction projects at Robins AFB, GA. (See Introduction at the beginning of this document.) We pulled several major areas out into separate documents to prevent this becoming an encyclopedia that applies in full for even the smallest projects. Treat the following documents as part of this standard to use when applicable
b. AFPAM 32-1097, Sign Standards
. Refer to the CE Sign Shop as the office that interprets and applies the Standards.
2. EXCEPTIONS:
a. In general, we seriously discourage exceptions, although we recognize each project presents unique situations that may require approved deviations. Refer questions or exceptions requests to the Chief of Engineering Design, 778 CES/CECE, unless dealing with a particular Section that lists a different responsible person.
b. Note any exceptions granted to these requirements in a clear manner in the project design analysis.
c. If they are not noted in the design analysis and subsequently approved, then the designer must comply with all mandatory requirements in this document. Failures to do so will be considered design errors. Thus, at its option, the Government through the Base Project Manager may require the A-E to correct any errors or omissions or discrepancies in its design at any time after discovery up until construction completion and acceptance. Make these changes at no additional cost to the Government.
In addition, they will be considered for AE liability.
3. DESIGN STANDARDS: Design shall conform to latest Air Force design criteria and the Base Comprehensive Plan. In general, the Air Force standards reside in AFI 32-1023 and Engineering Technical Letters. Certain types of facilities have additional requirements. Verify for each project.
4. DRAWINGS:
a. Provide design documents in MicroStation CADD format V8 version or Auto-cad 2007 version, closely conforming to the Tri-Services Standards requirements as well as mandatory Base supplements. The specific format must be IGDS. Copies of the CADD Standards are available from the Waterways Experiment Station web site and the CADD Manager in 778 CES/CEC. The paragraphs below provide information that is more specific.
b. For Base-managed projects, use the master drawing sets available, such as cover sheets, borders, title block text, and GIS (Geographic Information System) site plan data.
c. Full-size drawings shall be on size D sheets to accommodate the Robins Micrographics equipment. Size E drawings are too large and shall not be used unless facility size makes D size use impractical. Receive approval from the Base Project Manager prior to using "E" size sheets. All drawings shall have a graphic scale on them.
d. Normally provide separate demolition and installation site plans for all utilities. Include topography when applicable.
e. Electronic Files Delivered after Contract Award (MILCON projects only)
(1) Originals: Provide a complete set of CADD files to RAFB in electronic format upon completion of the design and a revised set within 30 days after construction project award if changes were made during bidding. If the contract is design-build, then provide the files within 30 days after the design is considered 100% complete.
(a) General:
1. Provide on CD-ROM all CADD generated drawings in a format fully compatible with the CECE MicroStation CADD or Autocad system. Comply with all applicable requirements of the latest Robins AFB Civil Engineering CADD Standards.
2. Transfer the electronic files with a transmittal note by certified mail or in person to the Base Project Manager.
(b) Develop project file names according to the Robins AFB Civil Engineering CADD Standards.
(c) Deliver project files to the Government in the project directory structure established by the Robins AFB Civil Engineering CADD Standards. This is currently a main directory named as the project number (such as 980213) and subdirectories as follows:
1. Directory “dgn or dwg” includes all dgn or dwg files and an index in Microsoft Word format, as described in the Robins AFB Civil Engineering CADD Standards. All dgn or dwg files must be in this one common directory, so do not place any dgn or dwg files in subdirectories under the “dgn or dwg” directory.
2. Directory “spec” includes all Specifications (fully readable in MS Word) and their index.
3. Directory “gov” includes all other required documents, such as cost estimates, bid schedules, design analysis, etc, also fully readable in MS Word or MS Excel.
(3) Mandatory CADD Files Format:
(a) Direct design in .dgn or .dwg format is strongly encouraged. Deliver all CADD graphic files to the Government in dgn or dwg format that is fully compatible with Base CADD.
(b) Ensure each drawing sheet prints out the CADD file name in the title block.
(c) If you have questions or problems occur in the submittal of diskettes, contact the project manager or CADD System Manager.
f. For Corps of Engineers MILCON projects, deliver a complete set of design documents -revised to show actual as-built conditions - to 778 CES/CECE within 30 days of the time of Base acceptance of the completed construction. The complete set shall include all changed as well as unchanged drawings. For O & M (Operations and Maintenance) projects, this issue will be addressed in the contract documents.
5. SPECIFICATIONS AND CONTRACTING DOCUMENTS:
a. All Projects with Structural Design Analysis: Provide a complete copy of the structural portion of the design analysis in MS Word format to RAFB upon completion of the design, and a revised set within 30 days after construction project award if changes were made during bidding. If the contract is design-build, then provide the files within 30 days after the design is considered 100% complete.
b. Base Managed Projects: Use the master specifications and contracting documents maintained in the 778 CES/CEC file server. These are provided in MS Word format, and all documents in the design packages must be submitted in Microsoft versions.
c. MILCON Projects: Certain Robins AFB versions of COE Guide Specifications are maintained in the 778 CES/CEC file server and will be provided as applicable. We agreed with the COE to maintain these rather than write lengthy revision requirements in this document. All needed revisions and edits have already been made to these particular Sections. The Sections maintained include these:
01040 – (Reference only) This covers site requirements at Robins such as work in Controlled Areas, digging permits, airfield construction waivers, welding permits, utility outages, and so forth.
01560 – This covers environmental requirements at Robins.
14240 – Hydraulic Elevators 16335 – Padmounted Air Switches 16375 – Exterior Electric 16415 – Electrical Work, Interior 16500 – Communication Systems 16721 – Addressable Fire Alarm Systems
d. Projects Managed by Others: For projects managed by others at MAJCOMs or by organizations such as AAFES or AFCOMS, note that critical site work requirements are also included in this RAFB master Section:
01040 – This covers site requirements at Robins such as work in Controlled Areas, digging permits, airfield construction waivers, welding permits, utility outages, and so forth.
6. VICINITY MAP: A map will be provided showing location of Robins AFB in relation to the surrounding population centers, nearby airport, and the main gate to the Base.
7. BASE MAP: For O&M projects, a map will be provided showing these locations:
a. Main Gate
b. Base Civil Engineer, Building No 1555
c. Engineering Design and Construction Management, Building No 280
c. Base Contracting Office, Building No 226
8. BASE SERVICES AND UTILITIES AVAILABLE TO THE CONTRACTOR:
a. The contractor shall collect and remove from Base all trash and construction debris for the duration of the project. Topsoil and suitable fill dirt may at the discretion of 78 CES/CETH be disposed of on Base at a site designated by them; otherwise, dirt determined by 78 CES/CETH to be unsuitable must be removed from the Base. The Houston County Landfill is located a few miles south of Warner Robins on Hwy 247.
b. No sanitary sewer dump stations are available for use by the Contractor.
c. Normal usage of potable water will be provided the contractor free of charge.
d. Electrical service shall be metered by the contractor and reimbursed to the Government at current Base rates for Military Construction Projects. Utilities are normally provided free of charge to the Contractor on O & M projects.
9. SPECIAL CONSTRUCTION CONSIDERATIONS: Mild weather throughout the year imposes negligible construction season limitations for Robins Air Force Base.
a. All necessary construction materials and labor are available within the Warner Robins/Macon/Atlanta area, which is within an approximate 120-mile radius of the project site.
b. A digging permit from the Base is required prior to beginning any excavation. A permit to weld is also required prior to welding on site. Standard specifications in MS Word for these items will be provided to the designer.
c. If the project involves work in a facility which will remain partially occupied during construction, the specifications shall require the contractor to maintain utilities (including heating and air conditioning) to the occupied portions of the facility at all times during which it is occupied.
<<<<< END OF SECTION >>>>>
SPECIAL INITIATIVES
1. GENERAL:
a. Refer questions or exceptions requests to the Chief of Engineering Design, 778 CES/CECE.
Any exceptions granted to these requirements shall be noted clearly in the project design analysis. These are mandatory requirements for all construction projects at Robins AFB
b. The Air Force and DOD often discover special situations that result in new requirements that must be incorporated into the latest facility design and construction documents. These are split out into this section to be sure these new areas are properly addressed. The current special initiatives include force protection/antiterrorism, sustainable design, and metric dimensioning.
c. Priorities: 1 Force Protection/Antiterrorism criteria overrule all other standards.
2 Sustainable Design comes next, but not in violation of the Base
Architectural Compatibility Standards. Normally incorporate this concept in all cases where there is negligible cost difference from past practice.
Discuss high cost cases with the Base Project Manager.
3 Follow the rest of the Base Facility Standard for all other items.
2. FORCE PROTECTION STANDARDS/APPLICABILITY
a. The standards in this section are governed by Department of Defense Antiterrorism Construction Standards (Draft), 30 Aug 2001. It supersedes the Interim Department of Defense Antiterrorism/Force Protection Construction Standards, 16 Dec 1999. These standards are required for new construction projects funded with all classes of funds including MILCON and O&M starting in FY
04. Until then, the interim standards of 1999 apply. However, since there is little difference between the two, designs should comply with the 2001 standards unless impractical or otherwise uneconomical.
What is given below is a short summary of the more common requirements under the new standard. See the standard itself for greater detail.
b. These standards apply to existing buildings where (a) repairs or renovations costing greater than 50% of the replacement value, (b) the building is converted to a higher classification; e.g., changing from and inhabited to primary gathering building, (c) window or door replacement projects are planned, use glazing that meets the new standard, or (d) additions of 50% or more of the size of the existing building require the existing building to be upgraded as well.
c. Franchised food operations and stand-alone shoppettes are exempt from the standoff distances to parking and roadways. All other standards apply. Family housing units of fewer than 12 units per building and gas stations and car care centers are exempt from all provisions.
d. DEFINITIONS:
Billeting. Any building where five or more unaccompanied DOD personnel are routinely housed.
Inhabited building. Buildings routinely occupied by five or more DOD personnel which also have a population density of greater than one person per 40 gross SM (430 SF). Note that portions of buildings can be considered inhabited, such as the administrative portion of shop buildings. This implies that the inhabited (or primary gathering) portion of a building has to meet the criteria herein, but the uninhabited portion does not.
Primary gathering building. Inhabited buildings that routinely house 50 or more DOD personnel. Note that it is possible for a building to be considered not inhabited, but rather to be considered as a primary gathering building. This could occur in a large hangar where the gross area per person is below the criteria, but which has 50 or more employees.
Roadways. Any surface intended for motor vehicle traffic.
Access roads. Any roadway within a controlled perimeter (the base fence constitutes a controlled perimeter) such as maintenance, delivery, service, emergency, or other special limited use road that is necessary for operation of the building. (This includes drop off driveways.)
Parking. Areas designated where vehicles may be left unattended.
e. PHILOSOPHY. The philosophy of the standards is to build greater resistance to terrorist attacks into all inhabited structures. The primary way, and least expensive way, is to maximize standoff distances. Other important goals include reducing flying debris hazards and constructing superstructures to avoid progressive collapse.
f. MINIMUM STANDOFF DISTANCES. Stand off distances are given under two categories. If sufficient space is available to provide satisfactory standoff distance as defined by the standards, then the building can be constructed using largely conventional methods. For tight sites, smaller distances are allowed if the building is hardened. However, the minimums with hardening cannot be reduced further.
See table AP 1.1. Some selected distances are given below.
Category Not analyzed Analyzed Parking and Roadways Billeting & 25 m (82 ft) 10 m (33 ft) Pri Gathering
Inhabited 10 m (33 ft) 10 m (33 ft)
Building Separation Billeting & 10 m (33 ft) No minimum Pri Gathering
Inhabited No minimum No minimum
Trash Containers Billeting & 25 m (82 ft) 10 m (33 ft) Pri Gathering
Inhabited 10 m (33 ft) 10 m (33 ft)
Note 1. Access roads must be controlled so that unauthorized vehicles are prohibited from gaining closer access than allowed for roads and parking above. For parking areas, if the parking is required to be closer than the specified standoff distances, then parking may be allowed as close as 10 m (33 SF) if the parking area has an entry control point(s) established. The standard does seem to allow some drive-up/drop-off and access roads that are not controlled (see AP 1.1.4). This is for facilities that require this such as child care centers, medical facilities, exchanges and commissaries, and schools.
Where this is required, ensure that those areas or lanes are clearly defined and marked and that their intended use is clear to prevent parking of vehicles in those areas.
Note 2. Trash containers may be located closer to the building if the container is enclosed in a hardened enclosure. See the standard for more details.
Note 3. Unobstructed space must be provided for a minimum of 10 m (33 ft) away from the building. Nothing over 150 mm (6 in) high is allowed within that distance. This is to preclude concealment of a bomb or other terrorist device.
g. MECHANICAL AND ELECTRICAL EQUIPMENT.
(1) The preferred location of mechanical and electrical equipment such as transformers, air-cooled condensers, and packaged chillers is outside the unobstructed space or on the roof.
This standard does not preclude the placement within the unobstructed space as long as the equipment does not provide an opportunity for concealment of explosive devices. If walls or other screening devices are placed around mechanical and electrical equipment within the unobstructed space, the equipment must be enclosed on all four sides and the top. Openings in the screening material will not be greater than 150 mm (6 inches).
(2) Air intakes for inhabited buildings must be at least 3 meters (10 feet) above the ground. Provide a kill switch easily accessible to the occupants that can shut down the mechanical system
(3) Route critical utilities so that they are not on the outside wall or next to the mailroom.
Do not put redundant utilities in the same chase.
(4) Brace all overhead utilities to minimize the likelihood that they will fall. Design equipment mountings to resist live load forces of 0.5 times the equipment weight in any direction and 1.5 times the equipment weight in the downward direction. Design to seismic standards also where required.
h. STRUCTURAL. There are a number of requirements for multistory buildings designed to prevent progressive collapse if one main member is damaged. Also, unreinforced masonry walls are prohibited for the exterior walls of new buildings. Provide a minimum of 0.05 % vertical reinforcement with a maximum spacing of 1200 mm (48 in). For existing buildings, implement mitigating measures to provide an equivalent level of protection.
i. GLAZING. Use a minimum of 6-mm (1/4 in) nominal laminated glass for all exterior windows and glazed doors. The glass consists of two nominal 3-mm (1/8-in) glass panes bonded together with a minimum of a 0.75-mm (0.030-inch) polyvinyl-butyric (PVB) interlayer. For insulated glass units, as a minimum the inner pane must be 6-mm laminated glass. Alternatives that meet the same performance are acceptable. Also, where minimum standoff distances are not available, provide enhanced glazing to provide the equivalent level of protection. See the standard for specific requirements for window frames (AP 1.3.1.2)
j. ENTRANCES/EXITS. Entrances and exits for new inhabited buildings must not face the installation perimeter if there will be a direct line of sight from outside the installation. For existing buildings, change the main entrance or screen the main entrance.
k. MAILROOMS. Locate mailrooms on the perimeter of the building and as far from the populated portions of the building and critical infrastructure as possible.
l. ROOF ACCESS. New buildings must have roof access from internal stairways or ladders. For existing buildings, eliminate exterior roof access where possible, or secure external ladders with safety climb devices or similar mechanisms per AFI 91-22. Ladder safety devices, cages, or wells are required on all fixed ladders 20 or more feet.
m. MASS NOTIFICATION. All new inhabited buildings must have a timely means to notify occupants of threats and instruct them in what to do in response to the threats. Any system that provides this is acceptable. For existing buildings, the requirement is mandatory for billeting and primary gathering buildings, but recommended for all inhabited buildings.
n. RECOMMENDATIONS. There are a number of recommended measures that are not mandatory. See Appendix 2 for details. One of the items to consider is to locate drive up and drop-off points away from large glazed areas. There are a number of recommendations for laying out the building interior. Also, the standard recommends minimizing the size and number of windows.
3. SUSTAINABLE DESIGN (Under Development) - Designers shall incorporate sustainable design criteria into designs for Robins AFB.
4. METRIC DIMENSIONING – Use if mandated by other Air Force or DOD directives.
<<<<< END OF SECTION >>>>>
CORROSION CONTROL
1. GENERAL:
a. Refer questions or exception requests to the Base Corrosion Control Engineer in Maintenance Engineering, 78 CES/CEA. Any exceptions granted to these requirements shall be noted clearly in the project design analysis.
2. GENERAL CRITERIA FOR EXTERIORS OF UTILITY SYSTEMS: In general, all above ground portions of utility lines and equipment shall be protected against corrosion by galvanizing or protective coatings. In general, underground lines and equipment made of metal shall be either uncoated or coated and cathodically protected. Details follow:
a. Metal Posts, Columns, and Bollards in contact with or embedded in concrete: Coal tar epoxy system for electrical insulation before placing on or in concrete. Final dry thickness of coats shall be 6 mils.
b. Metallic Parts in Concrete Pits
: When no provisions are made to prevent water in the pits, add a zinc anode (min. 3 lb.) at the lowest metallic point.
c. Water Tanks
(1) Exterior: Use an approved primer and two coat system.
(2) Internal: Provide impressed current cathodic protection with hi-silicon cast iron anodes.
d. Above Ground Tanks with Underground Lines
: Provide protection of lines based upon type of substance stored.
e. Underground Tanks
(1) Use double lined fiberglass tanks. Follow latest guidance from WR-ALC/EM on leak detection and other environmental standards.
(2) Provide protection of lines based upon type of substance stored.
f. POL Tanks shall have the bottoms coated and cathodically protected with isolation from other systems.
g. POL Lines shall be factory coated black steel with cathodic protection and isolating flanges.
Provide surge arresters across the flanges to prevent sparks.
h. Natural Gas
Lines shall be high-pressure polyethylene (PE) with PE valves and joints.
(1) Field locating (to enable path detection and to connect metal sections of the lines):
(a) Install marking tape with metal tracing wire 1 foot above pipe.
(b) Also install tracer wires placed on the lines using #14 AWG Cu with nicked TW insulation.
(2) Use metal riser assemblies at facilities (with isolating joints for metallic lines) and 1-pound hi-pot magnesium anodes connected.
i. Steam And Condensate
Lines shall be metallic meeting ETL 88-6 with exterior coatings and cathodic protection.
(1) Use isolating flanges at facilities and major above ground transitions.
(2) Locate anodes at least 15 feet from lines to prevent drying out the ground around the anodes.
(3) Do not allow anode wires to cross either set of lines.
(4) insulate the lines from the concrete in pits to prevent touching and accidentally protecting rebar.
(5) If using COE specification, modify it to require cathodic protection regardless of soil resistivity, to counter effects of anaerobic bacteria.
j. Domestic Water
Lines shall be one of these:
(1) Plastic:
(a) Field locating (to enable path detection and to connect metal sections of the lines):
1. Install marking tape with metal tracing wire 1 foot above pipe.
2. Also install tracer wires placed on the lines using #14 AWG Cu with nicked TW insulation.
(b) Use metal riser assemblies at facilities with 1-pound hi-pot magnesium anodes connected.
(2) Cast iron lines.
(a) Do not coat the cast iron.
(b) Bond the joints with No. 4 Cu AWG insulated wire. Coat both ends of the Thermit wire connections.
(3) Ductile iron.
(a) Coat ductile iron:
1. Factory applied coating with field verification and correction is first choice.
2. Coal tar epoxy system is second choice.
(b) Bond the joints with No. 4 Cu AWG insulated wire. Coat both ends of the Thermit wire connections.
(c) Provide cathodic protection.
1. Use isolating flanges at facilities and major aboveground transitions.
2. Insulate the lines from the concrete in pits to prevent touching and accidentally protecting rebar.
k. Chilled and Hot Water
Lines shall be metallic with exterior coatings and cathodic protection.
(1) Use isolating flanges at facilities and major aboveground transitions.
(2) Insulate the lines from the concrete in pits.
l. Industrial Waste
(1) PVC or other plastic is the first choice, provided the designer determines this is compatible with the waste products.
(a) Field locating (to enable path detection and to connect metal sections of the lines):
1. Install marking tape with metal tracing wire 1 foot above pipe.
2. Also install tracer wires placed on the lines using #14 AWG Cu with nicked TW insulation.
(b) Use metal riser assemblies at facilities with 1-pound hi-pot magnesium anodes connected.
(2) Cast iron.
(a) Do not coat the cast iron.
(b) Bond the joints with No. 4 Cu AWG insulated wire. Coat both ends of the Thermit wire connections.
(3) Ductile iron.
(a) Coat ductile iron:
1. Factory applied coating with field verification and correction is first choice.
2. Coal tar epoxy system is second choice.
(b) Bond the joints with No. 4 Cu AWG insulated wire. Coat both ends of the Thermit wire connections.
(c) Provide cathodic protection.
1. Use isolating flanges at facilities and major aboveground transitions.
2. Insulate the lines from the concrete in pits to prevent touching and accidentally protecting rebar.
m. Sanitary Waste
(1) Cast iron.
(a) Do not coat the cast iron.
(b) Bond the joints with No. 4 Cu AWG insulated wire. Coat both ends of the Thermit wire connections.
(2) PVC, Vitrified Clay, or Concrete. For field locating (to enable path detection and to connect metal sections of the lines):
(a) Install marking tape with metal tracing wire 1 foot above pipe.
(b) Also install tracer wires placed on the lines using #14 AWG Cu with nicked TW insulation.
n. Electrical Lines when metal shall be coated but not cathodically protected. Do not use direct buried concentric neutral cables.
3. GENERAL CRITERIA FOR INTERIORS OF UTILITY SYSTEMS:
a. Potable water shall be in accordance with MIL-HDBK 1005/7A, DATED 1 SEP 99. Our well water is very corrosive and non-scaling.
B. Hot or Chilled Water systems for heating or cooling shall have equipment and chemicals installed for chemical water treatment in accordance with AFR 91-40. This applies to both closed and open-type recirculating systems.
c. Steam systems for heating shall have equipment and chemicals installed for chemical water treatment in accordance with AFR 91-40. This applies to both closed and open-type recirculating systems.
d. Storage Tanks for liquids shall be protectively coated on the interiors with interior cathodic protection when water is the liquid stored.
e. Other Utility systems do not require interior corrosion treatments.
4. DETAILED CRITERIA FOR EACH CORROSION PROTECTION METHOD. Insure drawings and specifications address these items:
a. Material Selection
: Provide quality details to insure industry minimums are not used by installers when higher-level materials are required.
b. Protective Coatings
(1) Prepare coating specifications for above and below ground high value metallic structures per AFM 85-3, "Paints and Protective Coatings" (revised 1982), except as modified below.
(2) Prepare metal surfaces using Rust Deoxidizing Primer (RDP) by Total Rust and Corrosion Control, Inc., in Atlanta, GA. Blasting systems are substitutes and must be individually approved for use at Robins AFB.
(3) On all metallic structures where we have approved surface preparation by blasting to white or near white finish, no blasted surface will be left unprimed beyond the normal workday. Any such unprimed surface must be reblasted.
(4) Do not use thin plastic film tapes, such as electrical tape, to coat underground structures or wiring. Reference NACE Standard RP-01-69.
(5) All protective coatings shall be mildew resistant.
(6) Verify coatings on underground utilities in field with holiday detector before burial.
(7) Coal Tar Systems:
(a) When using standard coal tar mastic on buried lines, use on RDP-prepared or near white blasted surfaces a primer and two coats of the coal tar to give a final dry thickness of 125 mils.
(b) When using coal tar epoxy on buried lines, use on RDP-prepared or near white blasted surfaces a primer and two coats of the coal tar epoxy to give a final dry thickness of 6 mils.
(8) Coat major cathodic structures like brass valves and copper lines underground to minimize corrosion of adjacent structures.
(9) Insulate thrust blocks on systems that have cathodic protection.
c. Cathodic Protection
(1) Soil pH in the area generally ranges from 5.0 to 6.2.
(2) Soil resistivity on Base generally ranges from 10,000 ohm-cm to over 100,000 ohm-cm with anaerobic bacteria actively present.
(3) Base all cathodic protection design upon designer field tests made at the construction site. Tests include soil resistivity and water conductivity. We have soil resistivity grid maps of Robins for review.
(4) At Robins AFB, we now prefer deep well ground beds to conventional or distributed shallow bed designs. Obtain approval for other than deep well designs.
(5) Bury each pipeline in a separate trench with at least 2 feet separation from nearby utilities to preclude galvanic cells between different metals or new and old metals in case inadvertent metallic connections between the two ever occur.
(6) Install test stations and interference bonds for operational checks of cathodic protection systems and prevention of impressed current interferences between unprotected and protected pipeline systems.
(7) All cathodic protection designs not by Base specialists must be performed by a National Association of Corrosion Engineers (NACE) accredited "Corrosion Specialist." The Corrosion Specialist must have a minimum of five years experience in the design of cathodic protection systems.
(8) Criteria of Protection:
(a) All installed cathodic protection systems must comply with the instant off rule.
(b) Due to the presence of anaerobic bacteria at Robins, our minimum criterion is -1.0V.
(c) No other criteria are allowed.
(9) Remember to connect the rectifier "+" terminal to the anodes in the field.
d. Industrial Water Treatment
(1) General:
(a) Base the equipment installation upon specific information obtained at the construction site and upon existing Base water treatment methods. Information includes data such as current analysis of Base water.
(b) All water treatment design not by Base specialists must be performed by an NACE accredited "Corrosion Specialist" with at least five years experience in this design.
(c) Chemical pot feeders:
1. Use at least 5-gallon capacity.
2. Provide pressure gauge on intake side of protected system.
(d) Use interlocks to insure chemicals will not feed when main system is off; e.g., condenser pumps.
(e) Automatic chemical feed will use one of these methods:
1. Water meter - timer method, where chemicals are added in relation to water make-up.
2. Solids controller, to control boiler blow down and chemical feed based upon manual settings.
(f) Inject chemicals downstream of pumps.
(2) Chilled Water:
(a) Closed Systems:
1. 100 Tons or less: Use chemical pot feeders.
2. Over tons: Use automatic system.
(b) Open Systems (Cooling Towers): Use automatic system.
(3) Hot Water (Closed Systems):
(a) 1000 MBTU/H or less: Use chemical pot feeders.
(b) Over 1000 MBTU/H: Use automatic system.
(4) Steam:
(a) Use automatic system.
(b) Inject oxygen scavengers directly into the deaerator tank.
(c) Inject boiler water chemicals into the feed water line right before the boiler drum.
(d) Blowdown Dumping:
1. At main plants, dump to industrial waste.
2. Dump elsewhere to sanitary waste.
(e) Provide for manual blowdown of tank bottom.
<<<<< END OF BFS PART 1 - NARRATIVE >>>>>
Appendices:
1. Design Submittal Checklist follows.
2. Deviation Request follows.
DESIGN SUBMITTAL CHECKLIST
Project:
Submittal Stage (Circle One): Early/Concept Preliminary/Interim First Final
Enter check mark or date below. If not applicable, put "N/A." If this is a design managed by the Corps of Engineers, then put "COE" in the block if you have overriding directions from them.
Check/Date No. Item
[____] 1 Prepared this design submittal per the specs, drawings, and
Procedural Guide for AE firms (includes descriptions of what should be in the Preliminary and Final Designs).
[____] 2 Included all the attachments to all the offices listed in spec section 01030.
[____] 3 Included a Design Analysis with outline per the Procedural Guide for AE firms.
[____] 4 Included copies of all meeting records in the Design
Analysis.
[____] 5 Addressed all review comments from past submittals along with placing annotated comments in the Design Analysis.
[____] 6 Used Robins AFB master specs to develop the specs included in this package, in accordance with the outline in the contract.
[____] 7 Set up the time and date of the review conference with the Base Project Manager before sending the design package.
Date:
8 Completed internal design review of this package on date shown.
[____] 9 Applicable material submittals are included with this package.
[____] 10 A revised schedule is included.
[____] 11 Understand the contractor cannot start field/site work until notified that the corrected final drawings are signed by all applicable base personnel.
DEVIATION REQUEST
Project:
Use this form when requesting a deviation from any requirement in the Base Facility Standard (BFS) in any section of it.
If no deviation requests are requested and approved, then the contractor shall comply with all BFS statements.
Section and Paragraph
No.
Request Narrative
Approved by (Person)
Revision History (Starting Jan 2000)
30-Mar-00 Mech Section 11 - Clarified natural gas vs. electric heat, refined VAV specs, and added mech and elec room heat/cool requirements.
14-Apr-00 Added using water motor gongs in mech section.
21-Apr-00 Added more detailed CADD and word processing requirements in the General (G) section. This now requires the COE to provide us a copy of the CADD and spec files within 30 days after construction project award.
13-Jun-00 Revised CADD requirements to ensure we receive full sets of as-builts, including unchanged sheets.
16 June 00 Revised structural design references.
17 Oct 00 Strengthened mechanical requirements on emission producing equipment permitting requirements.
15 Nov 00 Added Landscape plant list.
16 Feb 01 General revision for format. Combined smaller related sections and reordered them all.
Reformatted some sections to use same paragraph numbering throughout the BFS.
22 Mar 01 We made a comprehensive revision at BCE direction. Details on revisions:
General: Updated several early paragraphs.
Environmental: Minor updates.
Civil: Expanded paragraph on irrigation.
Mech:
Para. 4 – Revised compressed air distribution requirements.
Para. 9b – Changed Mechanical Chief from Richard Eunice to Alan Whitmire.
Para. 11a – Added sub paragraph 3 for outside air requirements.
Para. 11b – Corrected spelling.
Para. 10a – Revised steam and condensate requirements.
Para. 10c – Revised gas piping requirements.
Para. 2b – Revised fire protection requirements.
Para. 7b – Changed Military Handbook 1008 to 1008c.
Para. 8a – Changed from the National Plumbing Code to the Uniform Plumbing Code.
Para. 8b – Revised copper piping requirements.
Para. 10b – Revised chilled water piping requirements.
Para. 10c – Changed requirement of # 14 AWG to # 10 AWG.
Para. 15m – Revised requirement for underground fuel piping.
(Continued)
22 Mar 01 (Cont.)
Elec: Updated lightning protection to add EASE, revised parking and street lighting
01 May 01 Environmental: Minor update to more strongly reference base spec 01560 for
Environmental Requirements, even for COE projects, since it lists so many local and state requirements
08 May 01 Civil-Structural: Added note on antennas and other user equipment mounted on roofs and sidewalls.
21 May 01 Civil-Structural: Added note on showing contractor laydown area and trailer location.
Added requirement to termite pre-treat new buildings and additions.
Mech: Added note to check structure when adding HVAC and ceiling to existing unconditioned space.
06 Jul 01 Deleted Conflicts paragraph in Electrical on Interior Lighting.
09 Aug 01 Minor updates to Standards references in Civil section.
05 Sep 01 Elec Section on Elevators - updated the fire protection criteria based upon latest codes.
8 Nov 01 Revised force protection requirements to incorporate 30 Aug 01 Department of Defense
Antiterrorism Construction Standards (Draft)
07 Jun 02 Several changes:
All - Changed office symbols to match reorganization.
General - Added requirement for MS Word copy of structural design analysis Civil - Added silt screen requirement during construction, spelled out parking lot striping, revised ladder safety devices, revised lawn sprinkler narrative, and mentioned digging permit process
Arch - Listed exterior doors required, clarified grid ceiling layout, and added interior design standards for dormitories
Mech - elaborated on life-cycle-cost analysis considerations, and clarified lavatory and urinal features
Elec - Mentioned directional boring, high mast foundations, TVSS on service entrance, lightning protection update, some system grounds to be 10 ohms or less, lighting clarifications, added occupancy sensors for lighting, and mentioned using small generators for emergency lighting.
10 Jul 02 Minor Editing.
22 Jul 02 Civil - Edited erosion control, road cuts, parking spaces, and added 15" pipe
16 Sep 03 Minor update on lightning protection
25 Feb 04 Added restrictions on various wiring methods
19 May 04 Deleted references to Mil Handbooks 1008 (now UFC 3-600-01) and 1190 Renumbered pages to make easier to find pages in future
28 May 04 Revision of Mech section to updated references to AF standards
11 Aug 2004 Deleted reference to Base AE Procedural Guide. Revised metric requirements. Revised
Intro at front. Moved this section to the rear, and simplified page numbering.
01 Oct 2004 Added reference to our master site requirements spec, Section 01040, in General
Standards and Documentation
10 Dec 2004 Communications updated and incorporated into a section of its own.
26 Jan 2005 Major update to Comm requirements. 78 CS pulled out sections from Elec area, created separate Comm area, and updated the details.
27 Jan 2005 Added info on new IntelliNet transceivers for fire alarm.
22 Feb 2005 Added note about MILCON projects running cable and conduit for Comm to base cable plant.
24 Aug 2005 Divided into 7 different documents as Parts 1-7, with 2 appendices. In the future, each
Part will have its own revision record. This became Part 1.
27 June 2006 Change from “dgn” to “dgn or dwg”
19 Dec 2007 Revised location of Base Contracting Office
| BASE FACILITY STANDARD (BFS) -- ROBINS AFB, GA |
| 2. FORCE PROTECTION STANDARDS/APPLICABILITY |
| e. PHILOSOPHY. The philosophy of the standards is to build greater resistance to terrorist attacks into all inhabited structures. The primary way, and least expensive way, is to maximize standoff distances. Other important goals include reducing flying debris hazards and constructing superstructures to avoid progressive collapse. |
| f. MINIMUM STANDOFF DISTANCES. Stand off distances are given under two categories. If sufficient space is available to provide satisfactory standoff distance as defined by the standards, then the building can be constructed using largely conventional methods. For tight sites, smaller distances are allowed if the building is hardened. However, the minimums with hardening cannot be reduced further. See table AP 1.1. Some selected distances are given below. |
| CORROSION CONTROL |
File details come from the government source that posted it. Updated .