First Article Testing Storage Facility, Questions
1. In section 01020 – (DESIGN/BUILD) CONSTRUCTION PERFORMANCE REQUIREMENTS, Paragraph 5.10.2.1 entitled “Materials” states that “Concrete pipe is not a viable option due to the corrosive nature of the soil.” Contrarily, on drawing sheet C102, at least three different notes state to Provide 15 inch diameter “RCP” (Reinforced Concrete Pipe).
Will the Government please clarify? The GOVT will accept reinforced concrete pipe.
2. In section 01020 – (DESIGN/BUILD) CONSTRUCTION PERFORMANCE REQUIREMENTS, Paragraph 9.3.1 states that “Heating will be provided for sprinkler riser room for freeze protection only. No other HVAC is required.” Contrarily, the drawings indicate metal louvers located on the sidewalls of the building and at the site visit last week we were informed that there would be thermostatically controlled louvers/exhaust fans in the building to provide cross ventilation.
Will the Government please clarify. Or provide a spec on cross ventilation desired, if any? The exhaust fan will have a thermostat preset to a degree when reached will open exhausting interior air out while circulating outside air from louvers on opposite side of Building. Typically, this will occur during the summer months. The General Contractor may want to consult with his Mechanical Engineer.
3. Specification Section 01005 indicates that the A/E Firm and Schedule will be submitted during non-competitive negotiations. As this is a competitive bid, will the proposal submitted need to include the design team and schedule? Yes, provide GOVT the AE Firm name and Project Schedule that outlines such items as anticipated GOVT award, anticipated GOVT NTP for Design (Phase I submittal, Phase III submittal, Corrected Final submittal.)
4. In section 133419 – PRE-ENGINEERED METAL BUILDINGS, Paragraph 3.3 entitled “FIELD PAINTING” references section 09 90 00.00 40 “PAINTING AND COATING” I did not notice this section included the documents provided on the fbo.gov website, will the Government be supplying this specification section? The successful offerer’s AE will provide Specification Section 09 90 00.00 40 Painting and Coating.
Furthermore; the same paragraph states that “ferrous metal work, except factory-finished work” … “shall be given (2) two coats of finish paint of the type standard with the metal building manufacturer.”
a. Will the Government please clarify this specification with regards to the following questions? Will factory applied standard red primer be sufficient for all primary & secondary steel? Yes, red or gray is acceptable.
b. If two coats of the specified paint are required additionally to the factory applied red primer, is it limited to the primary/hot-rolled steel? No, all steel shall receive two coats in addition to the primer coat. Contractor Option: If purlins and girts are galvanized at the PEMB manufacturer’s facility, then no additional coats of paint will be required.
c. If two coats of the specified paint are required additionally to the factory applied red primer, does the Government have a preference to application procedure, method or timing of application of paint? Yes, it shall be field applied using brush or rollers at the project site.
5. Will there be special OSHA requirements for subcontractors? Or will the OSHA -30 certifications held by the prime contractor’s project manager be sufficient? The Prime or General Contractor that holds/has the certification for this project must be onsite to provide direct supervision of their subcontractors performing tasks the subcontractor is certified to do.
6. In absence of S101 what are the load requirements for the building?
a. Wind To be determined by the successful offerer’s Structural Engineer.
b. Snow To be determined by the successful offerer’s Structural Engineer.
c. Collateral To be determined by the successful offerer’s Structural Engineer.
The above requirements are defined in Specification Section 01020 paragraph 1.4, 8.10, and 8.11.