Temporary Utilities and Services for Contractor (24 Sept 2004)

View the file

Other files

File Type Posted
Site Visit Attendees.pdf PDF
First Article Testing Storage Facility questions 06APR11.docx DOCX document
BFS Part 7 - Communications 2007.pdf PDF
BFS Part 4 - Architectural General and Compatibility.pdf PDF
K - 01560 - Environmental Requirements - Jun 10.doc DOC document
O - UHHZ 100138 Appendix C Safety Plan.docx DOCX document
BFS Part 3 - Civil-Structural.pdf PDF
J.1 - 01540 - Green Procurement ATTACHMENT 2.doc DOC document
F - 01310 - CADD As-Built Drawings.doc DOC document
BFS Part 5 - Mechanical.pdf PDF
E.1 - 01300A - AF Form 66_Example.pdf PDF
N.0 - 133419 - Pre-engineered Metal Building.doc DOC document
BFS Part 6 - Electrical.pdf PDF
BFS Part 2 - Environmental .pdf PDF
J.2 - 01540 - Green Procurement ATTACHMENT 3.doc DOC document
001 Index of Drawings.pdf PDF
L - 01580 - Safety Requirements.doc DOC document
301 Bldg Section.pdf PDF
J.3 - 01540 - Green Procurement ATTACHMENT 7.doc DOC document
B.3.0 - 01020 - Construction Design Performance Requirements.doc DOC document
Wage Determination.pdf PDF
I.1 - 01503 - Contract Administration.doc DOC document
E.0 - 01300 - Submittals Contractor-Furnished Items.doc DOC document
BFS Part 1 - Intro and General .pdf PDF
101 Floor Plan.pdf PDF
B.3.3 - 01020C - Appendix C GEC Soils Report - First Art TestStor Fa.pdf PDF
B.3.1 - 01020A - Appendix A References.doc DOC document
M - 01730 - Operations and Maintenance Data.doc DOC document
J.0 - 01540 - Green Procurement.doc DOC document
B.2 - 01005 - Statement Of Work.doc DOC document
B.3.2 - 01020B - Appendix B Fire Protection Life Safety.doc DOC document
201 Elevations.pdf PDF
101 Site Demolition Plan.pdf PDF
B.3.5 - 01020E - Appendix D NFPA 780 LP Requirement Determination.xls XLS spreadsheet
FA8501-11-R-0018 solicitation.doc DOC document
D - 01040 - Site Requirements.doc DOC document
102 Site Plan.pdf PDF
B.3.4 - 01020D - Appendix D NFPA 780 LP Determination Explanation.doc DOC document
C - 01030 - Design-Build Design After Award.doc DOC document
H - 01502 - Temporary Services - Cont Occupancy.doc DOC document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TEMPORARY SERVICES 01501

UHHZ 100138, Construct First Article Testing Storage Facility, Near Building 323

PART 1 - GENERAL

1.01 GENERAL: Electricity required for contractor convenience will be provided at no charge. Other utilities will be provided as available, also at no charge. Telephone hookups are contractor responsibility.

A. These requirements are general in nature and are not intended to override safety requirements.

B. Provide all equipment required for temporary utilities (such as transformers, poles, disconnects, etc.) hookup to base system and after final inspection remove equipment before final acceptance.

1.02 OMITTED:

1.03 SUBMITTALS:

A. General: Provide the following submittals in accordance with instructions found in Section 01300, Submittals and Contractor Furnished Items. The contractor may submit manufacturer’s data in lieu of the required certificate of compliance if he desires. The Government requires manufacturer data if an “X” appears under the “Mfg. Data Required” column.

B. Material Submittals: Omitted.

C. Other Submittals: Provide the following submittals as required by the contract or as directed by the Contracting Officer.

Inspector

Para# Description Date Required Checklist

1.04 B.2 Notification of Need before start of work ___

1.04 B.3 Notification of Installation 15 days prior ___

1.04 B.4 Notification of Removal 15 days prior ___

1.04 REQUIRED INFORMATION:

A. Heating and Ventilating: The contractor shall submit shop drawings for approval indicating the methods and equipment to be used to maintain the space temperature.

B. Electrical:

1. Shop Drawing of Temporary Service Entrance: The routing, point of connection, size of pipe(s), and method of support for the temporary service mast shall be submitted for approval before installation.

2. Notification of Need: Contractor shall submit typed letter to indicate the need for Government furnished electrical hook-up to his service before work begins.

3. Notification of Installation: Contractor shall notify the Contracting Officer fifteen (15) days before electrical hook-up of Service. The pole shall be set before notification.

4. Notification of Removal: Contractor shall notify the Contracting Officer fifteen (15) days before electrical disconnection of Service. The Service shall be removed before final inspection.

PART 2 - PRODUCTS - Omitted

PART 3 - EXECUTION

3.01 DOMESTIC WATER:

A. General: Where required for the convenience of the contractor or as required to maintain continued occupancy of the work area, the contractor shall provide temporary water service of adequate capacity. At all points of tie-in to existing lines, the contractor shall provide a cut-off valve to isolate temporary lines from existing.

B. Insulation: Where temporary water service lines are exposed to the weather, they shall be insulated to prevent freezing from 1 November through 31 March.

C. Disinfection: Where temporary lines will be used for drinking water, they shall be flushed and disinfected before being placed into service.

D. Removal: All temporary water lines shall be removed before final inspection. The shut-off valve at the point of tie-in to the existing line shall remain unless indicated otherwise. Provide a six (6) inch section of pipe on the downstream side of valve and cap.

E. Temporary Restrooms: Where construction work renders existing restrooms unusable and alternate facilities are not within a reasonable distance as determined by the Contracting Officer, the Contractor shall provide a minimum of one portable toilet for each 15 people of each sex. As a minimum, one toilet shall be provided for each sex. Temporary facilities shall be maintained by the Contractor and located where directed by the Contracting Officer.

3.02 HEATING AND VENTILATING:

A. General: Where temperature control is necessary for the contractor's comfort, the contractor may provide temporary heating and/or air conditioning

B. Utilities: All utilities available on the site such as chilled water, steam, and electricity may be used by the contractor in conjunction with temporary heating and/or air conditioning equipment.

C. Removal of Temporary Equipment: Before final acceptance, the contractor shall remove all equipment used to provide temporary heating and/or air conditioning.

3.03 ELECTRICAL SERVICE:

A. Pole: Contractor shall set a pole with rigid steel mast feeding a panelboard with a NEMA 3R or 4X enclosure. The pole and mast shall be set in accordance with Article 230 of National Electrical Code(NEC).

B. Locks: The Service panelboard provided by the contractor shall be locked at all times when work is not being accomplished at job site. In all cases when the service is locked, the main breaker shall be turned off.

C. Shut-off: The existing panelboard which is used to feed the temporary circuits may require installation of necessary breakers at no additional cost to the Government. The contractor shall turn off each breaker feeding a temporary circuit connected when he is not at the work site.

1. Label: A piece of red tape shall be placed on each of the contractor's circuits when they are turned off. A notice shall be mounted within one (1) foot of panelboard stating correct operating procedure (turn breakers off when not in use) and warnings (Government personnel should not turn on breaker no.'s with red tape on them.)

D. Clearance: All temporary branch circuits not in conduit shall be mounted at least 10' AFF.

E. Remote disconnects: In each room with some type of divider between the temporary service and location of outlets, provide a separate disconnect. This disconnect shall be visible and mounted approximately 4' AFF. Disconnect shall be of the safety switch type. Disconnects shall be lockable in the off position.

1. Shut-off: The remote disconnect shall be turned to "off" position when circuits are not in use.

2. Label: The disconnect shall be painted in stripes 1-1/2" wide running diagonally at a 30-degree angle from left lower corner to right upper corner. Stripes shall be alternate colors of red, yellow, and black.

F. Feeders shall be protected by approved overcurrent devices (fuses or circuit breakers) and originate from approved distribution centers. Overcurrent protection devices and connection shall be enclosed in approved cabinets or boxes. Provide a readily accessible, manually operated switch for each incoming supply circuit.

3.04 WIRING:

A. Rules: Wiring shall conform to NEC Article 305, and the following:

1. Wiring passing through work areas shall be covered or elevated to protect it from damage which would create a hazard to employees. Worn or frayed electric cables shall not be used. Wiring shall be fastened at ceiling height or 8-feet, whichever is higher, every 10 ft. No conductor shall be laid on the floor.

B. Branch circuits shall originate in a standard power outlet, disconnect, or panelboard. Conductors shall be permitted within multiconductor cord and cable assemblies (no open conductors may be used). All conductors shall be protected by overcurrent devices at their ampacity per NEC 310-16.

C. Extension Cords: The use of a number of short extension cords to reach the power source is not acceptable. A single extension cord should be used in all cases. Flexible extension cords shall be of the hard usage (SF, SJO, SJT, and SJTO) or extra-hard usage (S, SO, SJ and STO) types and listed by Underwriters Laboratories. The size shall not be less than #14 AWG, and length shall be 50 ft or less. Protect them against accidental damage caused by traffic, sharp corners, projections, and pinching in doors or elsewhere. They shall not be fastened with staples, hung from nails, or suspended by wire.

D. Splices do not have to be in a junction box. Splice using wire caps. The wire caps shall be offset from one another, and cables assembled compressed with a layer of plastic tape applied continuously with 30% overlap from one end of spliced area to the other.

3.05 OUTLETS:

A. 15- and 20-ampere attachment plugs and connectors shall be constructed so that there are no current-carrying parts except the prongs, blades, or pins. The cover for wire terminations shall be mechanically secured or an integral part of the attachment plug or connector. Plugs and receptacles shall have the proper NEMA configuration (such as 5-15R) for the voltage, phase, and amperage ratings for which they will be used. Receptacles should be marked to show operating voltage. Plugs and receptacles shall not be interchangeable between circuits with different voltage and current ratings. No dual voltage receptacles or attachment plugs shall be used. All receptacles shall be of an approved grounding type, grounded by connection to a separate grounding conductor.

B. Attachment plugs for use in work areas shall be so constructed that they will endure rough use and be equipped with a suitable cord grip to prevent strain on the terminal screws. Attachment plugs or other connectors supplying equipment at more than 300 volts shall be of the skirted type or otherwise so designed to confine the arcs.

3.06 LIGHTING:

A. Temporary lights shall be equipped with heavy-duty electric cords with connections and insulation maintained in safe condition. Temporary lights shall not be suspended by their electric cords unless cords and lights are so designed. Temporary festoon lighting strings shall be made with cords having lamp sockets and connections protected by insulating coverings. Handlamps of the portable type shall be of the molded composition or other type approved for the purpose. Brass-shell paper-lined lampholders shall not be used. Temporary lighting shall be connected to a ground fault interrrupter outlet. A ground wire shall be provided for all temporary lighting circuits unless there are no exposed metal parts of the lighting fixture.

B. Special: Lighting on barricades, fences, or sidewalk coverings shall be encased in metal raceway.

C. Guards: Temporary lights shall be equipped with guards to prevent accidental contact with the bulb. Guards are not required when the reflector construction has a deeply recessed bulb. Handlamps shall be equipped with a handle and a substantial guard over the bulb attached to the handholder or the handle. Do not use exposed empty light sockets and broken bulbs.

D. Lighting Levels: Temporary lighting systems which are installed to provide illumination during construction work shall furnish sufficient illumination for safe working conditions. Special attention should be given to illumination at stairways, ladders, floor openings, basements and other hazardous locations.

END OF SECTION

01501 - 5 OF 5