B.3.0 - 01020 - Construction Design Performance Requirements.doc

DOC document 105 KB Posted

Attached to
A&E DESIGN/BUILD FIRST ARTICLE TESTING STORAGE FACILITY
Solicitation number
F3QCCL1025A008
Issued by

About this file

(Design-build) Construction Design Performance Requirements (8 Jan 2010)

View the file

Other files

File Type Posted
Site Visit Attendees.pdf PDF
First Article Testing Storage Facility questions 06APR11.docx DOCX document
BFS Part 7 - Communications 2007.pdf PDF
BFS Part 4 - Architectural General and Compatibility.pdf PDF
K - 01560 - Environmental Requirements - Jun 10.doc DOC document
O - UHHZ 100138 Appendix C Safety Plan.docx DOCX document
BFS Part 3 - Civil-Structural.pdf PDF
J.1 - 01540 - Green Procurement ATTACHMENT 2.doc DOC document
F - 01310 - CADD As-Built Drawings.doc DOC document
BFS Part 5 - Mechanical.pdf PDF
E.1 - 01300A - AF Form 66_Example.pdf PDF
N.0 - 133419 - Pre-engineered Metal Building.doc DOC document
BFS Part 6 - Electrical.pdf PDF
BFS Part 2 - Environmental .pdf PDF
J.2 - 01540 - Green Procurement ATTACHMENT 3.doc DOC document
001 Index of Drawings.pdf PDF
L - 01580 - Safety Requirements.doc DOC document
301 Bldg Section.pdf PDF
J.3 - 01540 - Green Procurement ATTACHMENT 7.doc DOC document
Wage Determination.pdf PDF
I.1 - 01503 - Contract Administration.doc DOC document
E.0 - 01300 - Submittals Contractor-Furnished Items.doc DOC document
BFS Part 1 - Intro and General .pdf PDF
101 Floor Plan.pdf PDF
B.3.3 - 01020C - Appendix C GEC Soils Report - First Art TestStor Fa.pdf PDF
B.3.1 - 01020A - Appendix A References.doc DOC document
M - 01730 - Operations and Maintenance Data.doc DOC document
J.0 - 01540 - Green Procurement.doc DOC document
B.2 - 01005 - Statement Of Work.doc DOC document
B.3.2 - 01020B - Appendix B Fire Protection Life Safety.doc DOC document
201 Elevations.pdf PDF
101 Site Demolition Plan.pdf PDF
B.3.5 - 01020E - Appendix D NFPA 780 LP Requirement Determination.xls XLS spreadsheet
FA8501-11-R-0018 solicitation.doc DOC document
D - 01040 - Site Requirements.doc DOC document
G - 01501 - Temporary Services - Contractor.doc DOC document
102 Site Plan.pdf PDF
B.3.4 - 01020D - Appendix D NFPA 780 LP Determination Explanation.doc DOC document
C - 01030 - Design-Build Design After Award.doc DOC document
H - 01502 - Temporary Services - Cont Occupancy.doc DOC document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01020 – (DESIGN-BUILD) CONSTRUCTION PERFORMANCE REQUIREMENTS

UHHZ 100138,_Construct First Article Testing Storage Facility, Near Building 323

INDEX

1. GENERAL

2. PROJECT DESCRIPTION

3. DESIGN REQUIREMENTS

4. SPACE REQUIREMENTS

5. CIVIL DESIGN

6. GEOTECHNICAL DESIGN

7. ARCHITECTURAL DESIGN

8. STRUCTURAL DESIGN

9. MECHANICAL DESIGN

10. ELECTRICAL DESIGN

1. GENERAL

1.1 Commencement of Work

See schedule requirements detailed in Section 01005 (paragraph 3.01), Section 01030 (paragraph 7), and Time Schedule Spreadsheet. No design (and thus no construction) shall commence until the Government has reapproved the Preaward schedule at the Kickoff Meeting after Award.

1.2 Not Used

1.3 Regulatory, Reference Requirements, and Standards: See Appendix A to Section 01020.

1.4 Technical Criteria and Standards

ROBINS ARCHITECTURAL COMPATIBILITY STANDARDS

ROBINS AIR FORCE BASE FACILITY STANDARD

INTERNATIONAL BUILDING CODE (IBC) 2006

LIFE SAFETY CODE (NFPA 101) 2006

UNDERWRITERS LABORATORIES STANDARDS (UL)

Aba accessibility standard for department of defense facilities – 31 oct 2008

INTERNATIONAL BUILDING CODE – 2006.

UFC 3-120-10

Interior Design, with Change 1

UFC 1-200-01

General building Requirements, with Change 2

UFC3-120-01

Air Force Sign Standard

UFC 3-110-03

Roofing

2. PROJECT DESCRIPTION

2.1. See Section 01005, Paragraph 1.01.

2.2. If additional land survey data is required beyond what the Government has provided, it will be the responsibility of the Contractor to obtain that survey data.

3. DESIGN REQUIREMENTS

Design submittals will be as indicated in SECTION 01030, DESIGN AFTER AWARD. Initial submittals establish the design and construction schedule.

All Design Drawings, specifications and calculations shall be prepared and stamped by a registered Architect/professional engineer in the State of GA.

4. SPACE REQUIREMENTS

4.1. This will be a 50’ x 90’ (4500SF) Storage Facility in support of Bldg 323. Size requested is 4500sf, but this should be verified and consideration given to maximizing the vertical storage and minimizing the footprint of the building. This facility is going to be unoccupied.

5. CIVIL DESIGN

AFI 32-7041

WATER QUALITY COMPLIANCE

AFI 32-7080

POLLUTION PREVENTION PROGRAMS

ETL 00-7

EPA GUIDELINE ITEMS IN CONSTRUCTION AND OTHER CIVIL ENGINEERING

SPECIFICATIONS

ETL 02-9

CONSTRUCTION SIGNS FOR MILITARY CONSTRUCTION (MILCON)

PROJECTS

ETL 08-6

DESIGN OF SURFACE DRAINAGE FACILITIES

5.1.1. All referenced material under this title in Paragraph 1.

5.2. Site Development

5.2.1. Site Survey

A topographic survey of the existing facility and site is included in Appendix B of Section 1020. The Contractor shall verify all topographic information prior to design. This would include verification of all underground and aboveground utilities, all surface features, and horizontal and vertical control datum. Verification shall include, but is not limited to, coordination with the base utility shop through obtaining a digging permit and verifying utilities on-site.

5.2.2. Demolition

5.2.2.1. Demolish and remove from the site the existing concrete pavement within limits of disturbance as directed on the Site Plan, included in Appendix B of Section 1020.

5.2.3. Erosion Control

The design shall include an Erosion Control Plan in accordance with the State of Georgia "Manual for Erosion and Sediment Control", latest revision at time of contract award. Prior to construction, the Contractor shall provide an Erosion Control Package, which meets all state and local requirements. In addition, all necessary permits shall be obtained by the Contractor and complied with throughout all phases of construction. Any violation to such permits will result in the immediate shutdown of work until corrective measures have been taken at the Contractor's expense.

5.2.4. Concrete Pavement

The existing concrete pavement shall be demolished and replaced as directed on the Site Plan, included in Appendix C of Section 1020.

5.3. Pavement Design

No new roads are required. Existing paved roads and parking areas will be utilized for this project and will be repaired and/or replaced as required if damaged during construction.

5.4. Removal and Disposal

There are no approved waste areas within the limits of Robins Air Force Base. All waste shall be disposed of off-base at the Contractor’s expense.

5.4.1. Disposal Sites

Off-base disposal of dry debris (nonhazardous waste) may be at any approved local site. Hazardous waste must be disposed of at sites that meet EPA landfill requirements, and are approved by the Contracting Officer.

5.5. Borrow Area

Borrow material shall be obtained from off-base sources and non-Government controlled areas. Approved materials shall be those classified in ASTM D 2487 as GC, GM, SW, SP, SM, SC, ML, and CL and shall be free of trash, debris, roots or other organic matter or stones larger than 3" in any dimension. These requirements shall be addressed in the specifications developed by the Contractor.

5.6. Contractor's Storage Yard

The Contractor's storage yard shall be located adjacent to the project boundaries but shall not interfere with the day to day operation of Buildings 323 and 324 occupants. A temporary chain-link security fence shall be provided around the perimeter of the yard. The fence shall be minimum 6' high with screening materials. Contractor shall provide all labor and materials to connect to electricity, water, and sewage. Electrical, power and water will be provided at no cost to the Contractor.

5.7. Haul Route

See cover sheet of reference drawings in appendix B.

5.8. Grading

A digging permit from the Base is required prior to any excavation operations. Finished floor elevations for the new storage facility shall match the existing finished floor elevation of Building 324. Drainage shall be diverted away from buildings at a minimum one percent slope away from the building. Ponding anywhere on the site will not be permitted. A topographic survey of the area is provided and shall be used as part of the original proposal submittal. Any additional survey, testing or mapping required for the design or construction of the project shall be the responsibility of the Contractor.

5.9. Storm Runoff and Drainage System

The design shall include a Storm Runoff and Drainage System Plan in accordance with Section 438 of the Energy Independence and Security Act (EISA 438) which states “The sponsor of any development or redevelopment project involving a Federal facility with a footprint that exceeds 5,000 square feet shall use site planning, design, construction, and maintenance strategies for the property to maintain or restore, to the maximum extent technically feasible, the predevelopment hydrology of the property with regard to temperature, rate, volume and duration of flow.”

Reference Section 01560 for permitting requirements.

5.9.1. Existing System

All existing storm drainage inlets which are to remain as part of the new storm drainage system as shown on the plans shall be inspected and, if necessary, thoroughly cleaned of leaves and debris to facilitate drainage. All components of the existing drainage system utilized shall be analyzed for flow capacity in order to protect surrounding areas from flooding. New roof drains shall be 6 inches minimum PVC pipe.

5.9.2. Storm Runoff

Storm runoff shall be calculated with consideration for the following:

a. Select design values to be used in the storm drainage design calculations, including: rainfall intensity, surface runoff, and retardance coefficients.

b. Develop storm drainage plan with respect to planned connections to the existing storm drainage system, when applicable.

c. Alternate schemes considered in arriving at selected storm drainage plan.

d. Considerations for future expansion and change in land use within the watershed, particularly above the project site.

e. Principal means of collection and disposal of storm water in the new storm drainage system. Include calculations for runoff and estimated sizing of pipe and drainage structures.

f. Method proposed for handling roof runoff from gutter downspouts (roof drain collector system).

g. Connections of building's mechanical drain to outside drainage system, where applicable, and cross-referencing to the appropriate section and design discipline, when required.

h. Types of materials to be specified for storm drains, culverts, and drainage structures, allowing full range of options of suitable materials for each installation.

The design frequency for the collection systems and surface drainage shall be 10 years. The Contractor shall provide a certified storm drainage plan with the final Civil design submittal, verifying that the design will handle runoff as specified, and that the design has analyzed for impact on outfall stream banks and drainage structures on and off the site to water shed basin. The storm drainage system will utilize as its final depositor the existing storm drainage system on site and/or the existing ditching system on site.

5.9.3 Storm Drainage System

This project involves construction of a new roof drain system to collect runoff from the new storage facility. The roof drainage is to be collected in gutters and directed through downspouts to a new roof drain collection pipe that shall tie in to the existing system. The new roof drain collection system is to be designed to discharge the 25 yr/ 24hr storm with the resulting hydraulic grade line a minimum 1’ below finished floor grade and maintain a minimum velocity of 2 feet per second through the system.

5.9.3.1. Drainage of Roads and Pavements

Provide positive sheet drainage away from the new storage facility.

5.9.3.2. Specific Storm Drainage Criteria

5.9.3.2.1. Design Criteria

The drainage system will be designed in accordance with specific requirements of FAA AC 150/5320-5C “Surface Drainage Design” dated 20-Sep-06. In addition, design shall also conform to the “Stormwater Local Design Manual For Houston County, Georgia”, latest edition.

The following values will be used to determine rainfall runoff for a 10-year storm frequency.

a. Minimum Time of Concentration =

20 minutes - turf areas

10 minutes - paved areas

5 minutes - roof areas

b. Intensity - Frequency Curve:

Refer to Houston County manual above.

c. Runoff Coefficients:

1.00 - paved areas

0.40 - turf areas

d. Rational (CIA) Method will be used.

5.9.3.2.2. Drainage Structures

Formulas for calculating hydraulic capacities will be as follows:

Weir Formula:

Q = CLB 3/2, for grade inlets where:

Q = capacity of grate or grates

C = constant = 3.0

L = length of throat opening

H = depth of water opening (a value of 0.4' will be used)

Minimum Factor of Safety (FS) = 2.0 in grassed areas, 1.5 in paved areas.

Orifice Formula:

Q = 0.7 L (A+Y) 3/2 will be used for curbed inlets on slopes where:

Q = capacity of inlet, in CFS

L = length of clear opening in feet

A = depth of depression of flow line at inlet, in feet

Y = depth of flow in approach gutter, in feet

5.9.3.2.3. Drainage Pipe

Min. Size:

Collectors = 12" dia.

Roof Drains = 6" dia. min. PVC

Roughness Factors:

Concrete Pipe = 0.012

C.M.P. = 0.024

Max. Inlet Capacities:

Type "A" single grate (2'x3') in grassed areas (H = 0.4', FS = 2.0): 4.0 CFS

Route roof drains to nearest storm drain manhole via 6 inch PVC with cleanouts at all "Y's" and "T's."

5.9.3.3. The minimum velocity of flow in conduits during a design storm shall be 2.0 ft/sec. Maximum flow shall not exceed 10 ft/sec.

5.10. Utilities

Show all existing utilities (size and approximate location) on the submittal drawings. Surveying required for this project is the responsibility of the Contractor. The Contractor shall obtain a digging permit, including utility verification, from the Base Civil Engineer’s office.

“ The contractor’s project designers/engineers shall schedule and meet with the Civil Engineering utility shop personnel at the project site and locate their underground utility lines and buried structures that might be affected by any digging/excavation on the site plans during the design phase”.

5.10.1. Water Distribution System

Fire Protection for the new facility will be provided by the existing fire protection line between the new facility and Building 323. See the Mechanical section of this document for additional information.

5.10.2. Sanitary Sewer System – (Omitted)

5.10.2.1. Materials

Concrete pipe is not a viable option due to the corrosive nature of the soil.

5.10.2.2. Utility Trenching and Location

All utilities shall be installed in accordance with the ROBINS AFB FACILITY STANDARD. Water and sanitary sewer lines shall not be installed in the same trench. A digging permit from the Base is required prior to beginning any excavation.

5.10.3 Chilled Water Piping - (Omitted)

5.11. Fencing

5.11.1. Contractor Yard (If Applicable)

A temporary security fence shall be provided around the Contractor's yard. Fencing shall be 5 feet high chain link with polypropylene screening.

5.12. Landscaping

Landscaping is not required.

5.13. Calculations

Provide design calculations for the following:

5.13.1. Water System

a. Fire Protection Calculations

5.13.2. Storm Drainage

a. Runoff Calculations

b. Drainage Patterns

c. Storm Drain Calculations, if necessary

5.13.3. Sanitary Sewer (Omitted)

6. GEOTECHNICAL DESIGN

Geotechnical report is provided in the Appendix C of Section 1020.

7. ARCHITECTURAL DESIGN

The Building is a 50’ x 90’ (4500SF) Pre-Engineered Metal Building with 24 gage roof panels, 26 gage wall panels, R-19 roof insulation and R-13 wall insulation. Fire protection, fire alarm, lightning protection will be required for this facility. There will be (1) 12’x10’ electric overhead coiling door on the North side and (3) 3’-0” x 7’–0” personnel doors as indicated. Provide a full rigid frame on the west end to accommodate future expansion.

7.1. Scope and Objectives

Provide a new four-thousand five-hundred (4,500) square feet pre-engineered facility in accordance with the American Institute of Steel Construction and standard industry practices.

a. Building shall be free of interior columns. No interior load bearing walls.

b. Standard bay spacing shall be 22’-6” between frame centerlines.

c.

Provide a complete design package to construct an approximately 4,500 SF (50’x 90’) pre-engineered facility near Building 324. If required by structural design, graphically indicate any portal framing required at openings or building structural bays. The manufacturer shall have AISC FCD, category MB certification.

d.

The building shall be designed with an interior clear height of 20 feet.

e.

Insulate the building with a minimum of R19 at the roof and R13 at the perimeter walls. The goal is to minimize temperature fluctuations in the facility without needing air conditioning.

f.

The building shall conform to Robins AFB color standards for this area and in a building that does not include air conditioning (cooling).

g.

The roof shall be a flat panel mechanically seamed metal with a minimum 3:12 slope.

h.

Provide (1) 10’-0” x 12’-0” electric insulated overhead coiling door on the north side to allow forklift access into the building.

i.

Provide (1) 3’-0” x 7’-0” insulated hollow metal personnel door at Mechanical/Electrical Room as indicated to provide access to the building and (2) 3’-0”x7’-0” hollow metal personnel door.

j.

Provide a minimum 6" thick floor and design for forklift traffic.

k.

Do not use the floor to resist building frame reactions. Provide isolated spread footings to resist all loads at each column.

l.

Provide storm-water runoff design.

m.

Use geotechnical services to determine soil preparation and design allowances.

n.

Provide 24ga minimum thickness roof panels and 26ga minimum thickness wall panels.

o.

Place all overhead piping, conduit, heaters, equipment, etc. above the height 20’-0”.

p.

A draft of all drawings in Microstation V8 and AutoCAD R2006 of the new approximately 4500SF facility on CD.

q.

Other pertinent information relative to the design of the new approximately 4500SF facility.

7.2. Exterior Construction

7.2.1. Exterior Wall Construction

Exterior envelope shall be preformed zinc-coated steel wall panels and have a factory polyvinylidene fluoride "Kynar 500 PVDF" color finish. Panels shall be formed or patterned to prevent waviness.

a. Panel material shall be 26 gauge zinc-coated (galvanized) steel ASTM A 755/A 755M, Coating Class G-90 or ASTM A 653/A 653M, SQ, Grade 33, Coating Class G-90.

b.

Wall liners shall be 0.023 inch thick minimum for steel with the same composition specified for panels or siding, and formed or patterned to prevent waviness and distortion, and shall extend from floor to a height of not less than 10 feet above the floor. Matching metal trim shall be provided at base of wall liner, at top of wall liner, around openings in walls and over interior and exterior corners. Wall liners shall have manufacturer's standard finishes. Colors shall be selected from manufacturer’s standard colors.

7.2.2. Windows

None required on this project.

7.2.3. Roof

Provide standing seam metal roof with a standard slope of 3:12. Insulation shall be a minimum of 2" thick and shall be tapered as required to achieve slopes indicated on drawings. Provide roof expansion joints. Roof color shall be in accordance with the ROBINS AFB BASE FACILITY STANDARD.

a.

Design basis of roof panels is American Buildings Company "Standing Seam 360". Panels shall be zinc-coated steel and have a factory polyvinylidene fluoride "Kynar 500 PVDF" finish.

7.2.4. Gutters and Downspouts

a.

Gutters: Provide complete with mitered corners, end pieces, and special pieces that may be required. Expansion-type slip joints shall be provided at the center of the runs and at intervals of not more than 32 feet for aluminum and not more than 40 feet for steel. Provide water tight seal at all other joints. Provide gutters below the slope line of the roof, to allow snow and ice to slide clear. Provide hangers and fastenings from a metal compatible with the gutters. Space hangers not more than 36 inches apart.

b.

Downspouts: Provide cross sectional area not less than the size of gutter required by manufacturer. Provide downspouts in approximately 10 foot lengths; end joints shall telescope not less than 1/2 inch, and longitudinal joints shall be locked. Provide gutter outlets with stainless steel wire ball strainers of a standard type. Position downspouts not less than 1/2 inch away from walls and fasten to the walls at top, bottom, and at not to exceed 5 foot centers intermediately between with manufacturer's standard type leader straps, or concealed type fasteners. Form straps and fasteners from a metal compatible with the downspouts.

7.2.5. Exterior Doors

New insulated and non-insulated exterior hollow metal doors and frames shall be installed. Provide door hardware and locksets.

7.2.6. Louvers

Provide louvers as required for the operation of the HVAC system and to prevent entry of water into the building. Louvers shall be finished with paint finish to meet ROBINS AFB BASE FACILITY STANDARD.

7.2.7. Expansion and Control Joints

Provide new expansion and control joints as required.

7.2.8. Termiticide

Provide termiticide treatment at new construction in contact with grade.

7.2.9. Miscellaneous Metals

Miscellaneous metals shall consist of metal fascia, gutters, downspouts, vent/louvers and flashing, etc., required for a complete facility.

7.2.10. Wood

None required on this project.

7.2.11. Painting

All exterior ferrous metal shall be painted.

7.3. Interior Construction

Not used.

7.4. Interior Finishes.

Note: Materials shown below are for design basis only to provide the contractor with a selection of materials to base the design and bid proposal. The contractor is not required to use the design basis materials. Any deviation from the design basis must be greater than or equal to materials listed. Final selection of finish material shall be made prior to final design, subject to the approval of the COTR.

7.4.1 Painting

All interior wall surfaces shall be painted unless noted otherwise.

a. Paint design basis is:

Manufacturer:

Sherwin-Williams

Mfg. No./Color:

Water Chestnut SW1136 LRV 68%

Finish:

Latex Eggshell Finish

Contact:

Dwight LeClair

Sherwin-Williams

11 LaVista Perimeter Office Park

Suite 107

Tucker, GA 30084

404-621-5490

8. STRUCTURAL DESIGN

8.1. General

The structural criteria established herein shall be used for structural loading, design, and installation of all structural systems and foundations, including manufacturing, erection, supervision, testing, and quality assurance of the complete installation. All structural calculations shall be checked and initialed as such by a registered structural engineer. The structural work generally consists of design, using the DESIGN LOADS AND DESIGN CRITERIA below, and of construction of, but not limited to:

a. Foundations.

b. Load Bearing and Non-loadbearing Walls.

c. Vertical Framing Members.

d. Horizontal Framing Members, including roof decks and diaphragms, roof beams and joists, floor beams and slabs.

e. Interconnection Details, including all fastening requirements.

f. Special Conditions, such as expansion, construction, and control joints, and changes in floor levels.

g. Attachment provisions for architectural, mechanical, and electrical elements.

8.2. Design Criteria

Design shall meet the following criteria and the minimum load standards presented herein. See attached specification section 13 34 19 for additional information

8.3. References

Design methods and stress allowances or load factors for the various structural materials shall be in accordance with the current editions of the codes and specifications listed above and in the ROBINS AFB FACILITY STANDARD.

8.4. Foundations

Foundations shall be reinforced concrete spread footings.

8.5. Structural Framing Systems shall be in accordance with the American Institute of Steel Construction (AISC) and applicable commercial standards for pre-engineered metal buildings.

8.6. Seismic Design

Design for seismic in accordance with ANSI/ASCE 7-05, “Minimum Design Loads for Buildings and Other Structures.”

8.7. Wind Design

Design for wind in accordance with ANSI/ASCE 7-05, "Minimum Design Loads for Buildings and Other Structures" (92 MPH).

8.8. Construction Tolerances

Allowable variations from level, or specified slopes, shall be as follows:

a. For overall length, or surface of 10 feet or less: plus or minus 1/8 inch.

b. Up to 25 feet: plus or minus 1/4 inch.

c. Up to 50 feet: plus or minus 3/8 inch.

8.9. Embedded Steel

Nonstructural steel (handrails, etc.) embedded in concrete shall be galvanized steel, with the embedded area coated with two thick coats of coal-tar epoxy to just above grade before placing them. All damaged galvanized areas shall be repaired prior to embedment.

8.10. Minimum Load Standards

Floor Live Loads

Uniform, psf

Concentrated, lbs

Storage:

Mechanical Rooms:

Roof Live Load:

20 psf (No reduction allowed)

Dead Load:

Actual

8.11. Structural System

a. All structural mill sections or welded built-up plate sections shall be designed in accordance with the AISC "Load and Resistance Factor Design (LRFD) Specification for Structural Steel Buildings," published on December 27, 1999." Allowable Stress Design and Plastic Design (June 1, 1989) may be acceptable on a case-by-case basis, but the Base Project Manager must approve use of this method. The overall structural system shall be selected based on durability, maintainability, and cost-effectiveness.

b. All cold-formed steel structural members shall be designed in accordance with the AISC “Specification for the Design of Cold-Formed Steel Structural Members, 1996 Edition.

8.11.1. Foundation System

The foundation system shall not utilize the floor slab to resist lateral thrust loads of the rigid frames and shall be determined from the following system types:

a. Continuous spread footings and stem walls with concrete slab-on-grade floor slabs.

b. Spread footings and grade beams with concrete slab-on-grade floor slabs.

c. Foundations for interior and exterior columns shall be isolated spread footings.

8.12. Design Loads

8.12.1. Dead Loads

The structural system shall be designed and constructed to safely support all dead loads, permanent or temporary, including but not limited to self weight, partitions, insulation, ceiling, floor covering, and all equipment that is fixed in position. If PEMB system is used, provide collateral loading as required per MBMA.

8.12.2. Vertical Live Loads

8.12.2.1. Roofs shall be designed to support live load, snow loads, including drifting snow, sliding snow, and rain or snow, and support wind loads including components and cladding in accordance with Minimum Design Loads for Buildings and Other Structures - ANSI/ASCE 7-02. Snow loads full or unbalanced shall govern where such loadings will result in larger members at connections. Other criteria are as follows:

Basic Wind Speed - per ASCE 7-05 (92 MPH)

Minimum Roof Live Load - 20 psf

Ground Snow Load - 5 psf

8.12.2.2. If the design roof snow loading is less than 20 psf, a minimum roof live loading for construction and maintenance of 20 psf shall be used for design of the structure. This roof live loading is in lieu of and not in addition to the snow loading. However, unbalanced snow loads, sliding and drifting snow (in particular areas), or wind loads may be the controlling load case for particular elements.

8.12.2.3. Slab-on-grade shall be minimum 6 inch thick and designed to support a loaded fork lift and live loads in accordance with Minimum Design Loads for Buildings and Other Structures - ANSI/ASCE 7-05. Finished floor elevation shall be minimum 6 inches above adjacent grade level.

8.12.3. Horizontal Loads (Acting Inward and Outward)

The structural system, including components and cladding, shall be designed to resist wind loads and seismic in accordance with the Minimum Design Loads for Buildings and Other Structures (ANSI/ASCE 7-05), basic wind load 92 MPH.

8.13. Design Criteria

8.13.1. Minimum Footing Depth

The minimum footing depth from bottom of footing to finish grade shall be as required by the Geotechnical Subsurface Investigation Report..

8.13.2. Serviceability

8.13.2.1. Foundation Settlement Strength

An adequate level of protection against structural failure due to uniform and/or differential foundation settlement or general shear shall be provided.

8.13.2.2. Vertical Deflection of Suspended Horizontal Framing Members

Building serviceability shall not be impaired by vertical deflections. Deflections of structural systems shall meet the requirements of IBC Table 1604.3. However, the sum of the instantaneous vertical deflections due to live load plus long-term sustained load deflections shall not exceed the span divided by:

a. 240 at roofs and floors

b. 600 at masonry lintels for masonry walls

Note: Gypsum board surfaces shall be considered as a brittle finish.

8.13.2.3. Horizontal deflection shall not exceed standard limits; defined within IBC Section 1604, when the structure is subjected to the required seismic or wind loads.

Note: Gypsum board surfaces shall be considered as a brittle finish.

8.13.2.4. Ultimate Strength of Structural Elements

An adequate level of protection against structural failure under extreme loads shall be provided. The Contractor shall check the usual loading conditions for normal factors of safety and the extreme loading conditions, if present, for appropriate (unusual) factors of safety to provide levels of protection appropriate for the conditions.

8.13.3. Durability/Time Reliability

8.13.3.1. Structural components shall be protected from condensed moisture that could impair their structural adequacy through deterioration.

8.13.3.2. Special attention shall be given to protection against corrosion or oxidation of metals, decay of wood and wood base materials, spilling of concrete, leaching of mortar, and deterioration of adhesives. Prevention of these hazards shall be especially important.

8.13.3.3. The materials used in structural elements, components, and assemblies shall be resistant to or protected from damage by exposure to normal climatic conditions.

8.14. General Design Criteria

8.14.1. The design drawings shall contain in the General Notes a list of the design loading criteria, a list of the strengths of the engineering materials used, the design soil values, and any other data that would be pertinent to remodeling and/or future additions.

8.14.2. Walls mostly below grade that are supported laterally by diaphragms at or near the top and bottom, shall be designed using loadings based on at rest soil pressures.

8.14.3. Diaphragms shall have continuous chord members on all edges and shall have direct positive connection for transferring load to all members of the main lateral force resisting system.

8.14.4. Metal deck shall be of the gauge and configuration to meet the loading and wind uplift requirements specified.

8.15. Concrete Design

8.15.1. General

All walls, columns, beams, and slabs shall be constructed of reinforced cast-in-place concrete with a minimum compressive strength of 4000 PSI at 28 days. Footings shall be constructed of reinforced cast-in-place concrete with a minimum compressive strength of 3000 PSI at 28 days.

8.15.2. Testing of concrete work shall be done at the Contractor's expense by an independent testing laboratory at least one a day during concrete placement. Tests shall include air, slump, and strength.

8.15.3. Forms

Provide plywood, metal, metal-framed, aluminum, reinforced fiberglass, or plywood-faced forms, to provide continuous, straight, smooth, exposed surfaces.

8.15.4. Reinforcing Materials

Reinforcing Bars: ASTM A 615, Grade 60.

8.15.5. Concrete Materials

a. Cement: ASTM C 150, Type I-II Portland cement.

b. Fine Aggregate: ASTM C 33.

c. Coarse Aggregate: ASTM C 33.

d. Air-Entraining Admixture: ASTM C 260.

e. Flowing Concrete Admixture: ASTM C 1017, Type 1 or 2.

f. Calcium Chloride shall not be permitted.

g. Fly Ash: ASTM C 618, Class "F"; fly ash content shall not exceed 20 percent of cement content or 200 lbs. of fly ash per cubic yard of concrete.

8.15.6. Vapor Barrier

Provide vapor barrier under all slab-on-grade floors. Polyethylene sheet not less than 10 mil thick. Provide a 4" thick capillary water barrier under the vapor barrier or as directed by the soils report.

8.15.7. Curing Compound

Liquid type membrane-forming curing compound complying with ASTM C 309, Type I, Class A or B.

8.15.8. Ready-Mix Concrete

ASTM C 94.

8.15.9. Slabs

8.15.9.1. Slabs supported on ground shall have a minimum 4000-PSI concrete, 28-day compressive strength, with a minimum thickness of 6 inches and shall be reinforced.

8.15.9.2. Slabs will be placed in lane fashion. Areas of sections bounded by crack control joints will not exceed 400 ft., and distance between crack control joints will not exceed 25 feet.

8.15.9.2.1. Provide contraction joints, either formed or saw cut or cut with a jointing tool, to a depth of 1/4 of the slab thickness. Sawed joints shall be completed within 4 to 12 hours after concrete placement. Reinforcement will be interrupted 2 inches (clear each side) at sawed or impressed crack control joints. Bars shall be mid-depth and starting 2 inches from edge of slab. The ends of crack control and corners of isolation joints will meet at a common point so far as practical. Floor slab isolation joint shall be 30-pound felt.

8.15.9.2.2. Provide construction joints only at approved locations. Continue reinforcement across joints, unless otherwise indicated.

8.15.9.3. Expansion Joints

Stop reinforcing at joint and provide smooth slip dowels across the joint. Dowels shall be ASTM A 36 material. Provide a bond breaker isolation joint where all concrete slabs abut a vertical surface (foundation walls).

8.15.9.4. When thickened slabs are employed under column bases or partitions, crack control joints shall be offset from the thickened areas. Re-entrant corners in slabs will be reinforced with a minimum of one No. 4 diagonal bar.

8.15.9.5. Slabs supported on ground will conform to the minimum requirements for slab-on-grade:

8.15.9.5.1. Slabs-on-Grade

Slabs shall be a minimum of 4 inches thick with 0.18 percent reinforcement.

8.15.9.5.2. Horizontal runs of conduits and pipes will not be embedded in slabs supported by ground. Vertical penetrations will conform to ACI 318-95. Aluminum conduit and pipes will not be embedded in any concrete structure.

8.16. Masonry Design

8.16.1. Joints shall be 3/8 inch, tooled concave, Type "N" mortar.

8.16.2 Concrete masonry units shall have a minimum compressive strength (f'’m) of 1500 PSI.

8.17. Structural Steel Design

8.17.1. The detailing of structural steel framing, if any, including connections, shall be complete. All weld types, weld locations, bolting layouts, bolt sizes, connection plates, member sizes and locations, and stiffener plate sizes and locations shall be shown.

8.17.2. All members, elements, and connections that are a part of the main vertical and/or lateral force resisting system must be completely detailed.

9. MECHANICAL DESIGN

9.1. General

The heating, ventilation, and air conditioning (HVAC) and plumbing systems shall be as described herein.

9.2. Criteria Reference

Design methods for the various mechanical and plumbing materials and methods shall be in accordance with the current editions of the codes and specifications listed below:

International Building Code

IBC 2006

UFC 1-200-01

General Building Requirements

UFC 3-400-10N

Design: Mechanical Engineering

UFC 3-600-01

Fire Protection

IMC 2007

International Mechanical Code

UFC 4-010-01

DoD Minimum Antiterrorism Standards for Buildings

ROBINS AFB FACILITY STANDARD.

ASHRAE Standards

9.3. Mechanical Design Criteria

Design the mechanical systems in accordance with Robins AFB Facility Standard, ASHRAE Standards, 10 CFR 435 Performance Standards, NFPA standards, UFC 3-600-01 on Fire Protection. The contractor shall obtain the service of an architect-engineering firm to perform the design for this project and provide all necessary mechanical drawings, details, schedules, construction notes, etc. to construct and provide complete, operational, and usable mechanical systems. Provide cathodic protection for all underground metal piping.

9.3.1. Heating, Ventilation, and Air Conditioning (HVAC)

Heating will be provided for sprinkler riser room for freeze protection only. No other HVAC is required.

9.3.1.1. Electrical Rooms and Communications Rooms

A new electrical room is proposed for this project.

9.4. Control System Specifics - (Omitted)

9.5. Energy Conservation – (Omitted)

9.6. HVAC Calculations – (Omitted)

9.7. Plumbing Design - (Omitted)

9.8 Life Cycle Cost Analysis – (Omitted)

9.9 Fire protection

Fire protection for the dry pipe sprinkler system in the new storage facility shall be served by a 10” water main located west of the new facility between the concrete block wall and the existing street. Fire protection system shall meet all applicable NFPA guidelines, Robins AFB requirements and UFC 3-600-01.

10. ELECTRICAL DESIGN

10.1. Codes and Standards

The design and construction of the electrical systems shall be in compliance with: (1) NFPA Codes, (2) the United Facilities Criteria design guides, (3) as required herein, and (4) Robins AFB BASE FACILITY Standard. Electrical equipment shall be UL listed wherever UL listings are available.

10.2. Specific Instructions

10.2.1. The work included in this section shall consist of furnishing all labor, materials, equipment, supervision, and services necessary to complete the design and construction of all electrical work as indicated on the drawings and described herein. The work includes but is not limited to the following principal items:

a. Power Distribution system.

b. Lighting system.

c. Fire Alarm and Detection system.

d. Voice/Data system.

e. Lightning Protection System

10.2.2. Design shall include the preparation of construction drawings and specifications clearly indicating all devices, wiring and functional requirements necessary to provide systems which comply with user needs as determined in correspondence and meetings with the users during the design phase. The RFP drawing package indicates approximate quantities of outlets, fixtures, and devices to be expected. Exact requirements regarding quantities, types and locations shall be determined during the design phase.

10.3. Electrical Design Criteria

The intent of this project is to provide power, communications, and lightning protection for the new storage facility near Building 323. The design contractor shall provide final design drawings and specifications, including all necessary details to result in a complete and usable system. Drawings and specifications shall be stamped and signed by a registered professional engineer registered in the state of Georgia.

10.3.1. Electrical Work for HVAC Systems

10.3.1.1. General

Provide power branch circuits as required by all HVAC equipment, including materials, labor, and supervision.

10.3.2. Site Electrical

Power shall be routed underground from existing Building 324 panel “PP1” to the new service rated panel at the new facility. A new two way, 4” ductbank, concrete encased with pull string and spare raceway for service lateral shall be provided from fiber optic terminal cabinet in Building 324 to a backboard in the new facility. Access to panel shall be coordinated with 402 CMXG.

10.3.3. Pad Mounted Transformer – N/A

10.3.4. Lighting

Assume 100 percent demand for all lighting loads.

10.3.4.1. Illumination Levels

The new storage facility shall have an average maintained illumination level of 30 footcandles measured at 30” above finished floor. Provide exterior building mounted lighting at each entrance. This exterior lighting shall provide an average maintained illumination level of 2.0 footcandles and a minimum 0.5 footcandles measured at ground level. Average and maintained level is defined as a calculated foot-candle level taking into consideration all depreciation light loss factors (LLF).

10.3.4.2. Fixtures

Provide 4’ fluorescent fixtures utilizing 4 foot, programmed start, T5 lamps. Lamps shall have 3500K color, and CRI of greater than 75. Fluorescent fixtures shall have electronic ballasts. Provide metal halide wall pack fixtures on the exterior of the building with a single twist lock photo control. Lighting branch circuits shall be from the new 480 volt panel and shall be 277 volt. Edit Master Specification Section 265100, INTERIOR LIGHTING as necessary for lighting design and include as a part of the project specifications.

10.3.4.3. Switching

Provide wall mounted switches near each exterior door to control lighting fixtures. Panelboard circuit breakers shall not be used for switching.

10.3.4.4. Emergency Lighting

Illuminated LED exit signs and egress lighting shall be provided for all emergency exits and passageways as required by NFPA 101 - Life Safety Code. Provide emergency wall-packs for emergency egress lighting.

10.3.5. Power

10.3.5.1. Panelboards

Provide a new surface mounted panelboard in the mechanical room to serve the new facility. The panelboard shall be fed from existing panelboard ‘PP1’ located in Building 324. Provide a new circuit breaker in panel ‘PP1’ to serve the new panelboard. The short circuit current rating of the circuit breaker in panel ‘PP1’ shall meet or exceed the short circuit rating of panel ‘PP1’. Size the new panelboard so that is has spare amperage capacity of 25 percent with 30 percent spare pole spaces.

New service panel shall supply a new dry-type transformer, 480-208/120 volt, which shall supply a new three-phase, four wire, 120/208 volt panel. The 120/208 volt panel shall supply all receptacle loads, electric coiling door, DACP, and other miscellaneous 120 volt loads. Size the new 120/208 volt panel so that it has spare amperage capacity of 25 percent and 30 percent spare poles.

During the pre-design conference, provide a sign on the panelboards to be modified. Sign shall read: “This panel is scheduled to be modified under base project UHHZ 100138. Contact Webster Holt, (Project Electrical Engineer) at (1-478-926-8849).

10.3.6. System Characteristics

The new service panelboard shall be 480/277 volt, 3 phase, 4-wire. Perform short circuit calculations to determine the short circuit current rating of the new panelboard.

10.3.7. Transient Voltage Surge Suppression (TVSS)

Provide a new, separately mounted, TVSS for the new 480-volt service panel. Supply TVSS from a circuit breaker mounted in the new service panel.

10.3.8. Electrical Disconnects

10.3.8.1. Where required, electrical disconnects shall be installed adjacent to equipment and accessible to equipment operators.

10.3.9. Wiring Devices

10.3.9.1. Mounting and Location

10.3.9.1.1. Devices located in the same approximate position on one section of wall, floor, column, etc. shall be grouped to create a functional and pleasing appearance. Similar outlet groups throughout the job shall be similarly grouped. Unless necessary otherwise, groups shall be developed as follows where applicable:

a. Devices at different levels shall be aligned vertically.

b. Devices at the same level shall, where possible, be grouped using sectional gang boxes. Devices or device groups occurring in architectural features, i.e., wall sections, etc. shall be accurately centered in the feature(s), unless functionally required otherwise. Wall switches shall be located on the strike side of a door, 6 inches from the door opening, unless otherwise functionally required.

10.3.9.2. Toggle Switches

Refer to requirements in the ROBINS AFB FACILITY STANDARD.

10.3.9.3. Standard Receptacles

Refer to requirements in the ROBINS AFB FACILITY STANDARD.

10.3.9.4. Weatherproof Receptacles

Provide one on each exterior wall.

10.3.9.5. Ground Fault Circuit Interrupter (GFCI) Outlets

a. GFCI outlets shall be provided where required by the National Electric Code or OSHA.

10.4. Outlet requirements

10.4.1. General-purpose receptacles shall be provided as indicated on sheet A-101.

10.5. Special Power Requirements – (Omitted)

10.6. Fire Alarm and Detection

10.6.1. Provide new fire alarm control panel in mechanical room per the Robins AFB Facility Standard. All wiring shall be in conduit. Raceway shall be red, factory prefinished. Provide manual pull stations at the exterior doors. Provide new smoke detector at FACP location. Connect tamper and pressure switches at FACP. Provide wall mounted visual and audible notification devices spaced as required by NFPA 72. The new fire alarm system devices shall be wired for Class A, i.e. shall be a two-conduit looped system.

10.6.2. Mass notification coverage is not required for this facility.

10.7. System Grounding

10.7.1. All raceways shall have an insulated equipment ground conductor sized in accordance with the NEC.

10.8. Lightning Protection

Provide a lightning protection system per the ROBINS AFB FACILITY STANDARD.

10.9. Voice/Data System Work

10.9.1. Provide communications ductbank, two 4”, schedule 40 PVC, concrete encased, from Building 324 to ne backboard per the Robins AFB Facility Communications Standards.

10.10. CATV System and T-Net System – NOT REQUIRED

10.11. PA System – NOT REQUIRED