Base Facility Standard (10 Aug 2007) Part 6- Electrical

View the file

Other files

File Type Posted
Site Visit Attendees.pdf PDF
First Article Testing Storage Facility questions 06APR11.docx DOCX document
BFS Part 7 - Communications 2007.pdf PDF
BFS Part 4 - Architectural General and Compatibility.pdf PDF
K - 01560 - Environmental Requirements - Jun 10.doc DOC document
O - UHHZ 100138 Appendix C Safety Plan.docx DOCX document
BFS Part 3 - Civil-Structural.pdf PDF
J.1 - 01540 - Green Procurement ATTACHMENT 2.doc DOC document
F - 01310 - CADD As-Built Drawings.doc DOC document
BFS Part 5 - Mechanical.pdf PDF
E.1 - 01300A - AF Form 66_Example.pdf PDF
N.0 - 133419 - Pre-engineered Metal Building.doc DOC document
BFS Part 2 - Environmental .pdf PDF
J.2 - 01540 - Green Procurement ATTACHMENT 3.doc DOC document
001 Index of Drawings.pdf PDF
L - 01580 - Safety Requirements.doc DOC document
301 Bldg Section.pdf PDF
J.3 - 01540 - Green Procurement ATTACHMENT 7.doc DOC document
B.3.0 - 01020 - Construction Design Performance Requirements.doc DOC document
Wage Determination.pdf PDF
I.1 - 01503 - Contract Administration.doc DOC document
E.0 - 01300 - Submittals Contractor-Furnished Items.doc DOC document
BFS Part 1 - Intro and General .pdf PDF
101 Floor Plan.pdf PDF
B.3.3 - 01020C - Appendix C GEC Soils Report - First Art TestStor Fa.pdf PDF
B.3.1 - 01020A - Appendix A References.doc DOC document
M - 01730 - Operations and Maintenance Data.doc DOC document
J.0 - 01540 - Green Procurement.doc DOC document
B.2 - 01005 - Statement Of Work.doc DOC document
B.3.2 - 01020B - Appendix B Fire Protection Life Safety.doc DOC document
201 Elevations.pdf PDF
101 Site Demolition Plan.pdf PDF
B.3.5 - 01020E - Appendix D NFPA 780 LP Requirement Determination.xls XLS spreadsheet
FA8501-11-R-0018 solicitation.doc DOC document
D - 01040 - Site Requirements.doc DOC document
G - 01501 - Temporary Services - Contractor.doc DOC document
102 Site Plan.pdf PDF
B.3.4 - 01020D - Appendix D NFPA 780 LP Determination Explanation.doc DOC document
C - 01030 - Design-Build Design After Award.doc DOC document
H - 01502 - Temporary Services - Cont Occupancy.doc DOC document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Robins AFB Facility Standard

BASE FACILITY STANDARD (BFS) -- ROBINS AFB, GA

(Also known as Installation Design Guide)

FOR ARCHITECT-ENGINEER FIRMS AND CONTRACTORS

PERFORMING DESIGN SERVICES AND CONSTRUCTION FOR ROBINS AFB

PART 6 - ELECTRICAL

Revised 10 August 2007

ELECTRICAL STANDARDS

INTRODUCTION

This is one part of the Robins AFB Base Facility Standards, and it shall be strictly adhered to throughout. Use the Deviation Request Form for exception requests, and note the requests and their approvals/disapprovals clearly in the design analysis.

MILCON Designs and Design/Build: Use Army Corps of Engineers (COE) Specifications for Robins AFB. These Electrical Standards take precedence over the National Electrical Code minimum requirements, COE standard design criteria (listed in the Savannah District Design Manual for Military Construction), and any other design guidance or standard.

The major sections and subsections are as follows:

1 - GENERAL

1.01 STANDARDS

1.02 DRAWINGS

1.03 MEDIUM VOLTAGE DISTRIBUTION

1.04 LOAD LEVELS

1.05 DEMAND FACTORS

1.06 POWER SYSTEM PROTECTION STUDY

1.07 MOTORS

2 - EXTERIOR

2.01 EXTERIOR POWER

2.02 EXTERIOR LIGHTING - GENERAL

2.03 EXTERIOR LIGHTING - SPORTS

2.04 LIGHTNING PROTECTION

3 - SERVICE ENTRANCE

3.01 SWITCHBOARDS, PANELBOARDS, AND MOTOR CONTROL CENTERS

3.02 GENERATORS, TRANSFER SWITCHES, AND FUEL TANKS

4 - INTERIOR

4.01 INTERIOR POWER

4.02 INTERIOR LIGHTING

4.03 EMERGENCY AND EXIT LIGHTING

5 - SPECIAL INTERIOR SYSTEMS

5.01 FIRE DETECTION AND ALARM SYSTEMS, INDIVIDUAL BUILDING MASS

NOTIFICATION SYSTEMS (FOR NEW FACILITIES)

5.02 ELEVATORS

SECTION 1 - GENERAL

1.01 STANDARDS: Follow these requirements and applicable publications. This lists requirements we expect to be covered in the design for new or altered facilities. These standards take precedent over all codes such at the National Electrical Code, ANSI C2, and NFPA.

1.02 DRAWINGS

a. General

(1) These subparagraphs are placed in the normal order of the “E” plates for a new facility.

(2) Use different site and floor plans to separate demolition from new work.

b. First Sheet

(1) Show electrical legend.

(2) List general comments for all electrical sheets.

c. Site Plan

(1) General: Show all other exterior utilities that will affect the installation of the new underground power. This points out potential interference between different utilities.

(2) Site work:

(a) Protecting the Environment: Route underground lines to avoid cutting tree roots as much as possible.

(b) Call for seeding and sodding over disturbed earth areas that are affected by construction.

(c) Provide details for patching concrete and asphalt.

(d) All lines shall be bored and jacked under road and driveway pavements. Primary voltage ductbank/line across parking lots shall be cut and patch. Secondary lines (600 volts or less) across parking lots shall be directional bore. (NOTE: Wherever possible and economically advantageous, use directional boring instead of boring and jacking.

Typical depth of directional boring is 4’, or greater when obstructions are encountered.

Directional boring is especially helpful where there is heavy underground congestion with existing utilities.)

d. Power Plan

(1) Provide separate mechanical and electrical rooms in new or altered facilities.

(a) Provide electrical rooms with exterior doublewide doors of adequate height for future removal of large electrical equipment.

(b) Ensure adequate clear space around electrical equipment in accordance with the National Electrical Code.

(2) Provide an electrical single line diagram on the drawings.

(a) Show the available symmetrical short circuit current at each bus.

(b) Show grounding of dry-type transformers.

e. Interior Lighting

(1) Show a light fixture schedule with mounting height in the table.

(2) Show a perspective view of each fixture on the drawings.

(3) Lighting plans: Show a junction box and 6 feet of flexible metal conduit to all light fixture connections above suspended ceilings, acoustical or gypsum.

f.

Lightning Protection (Either Conventional or EASE):

(1) Show roof and counterpoise (or tripod ground rod sets) design. For EASE, locate pole or roof location and ground locations.

(2) Provide details of air terminals, conductor attachments, roof penetrations, EASE mounting, etc.

(3) Show all details based upon the type of roof on the project. For example, if the project contains a standing seam roof, then all details shall be shown based on attachments to a standing seam roof.

g. Fire Alarm - Riser Diagram

(1) Show signal line circuits, notification circuits, and transceiver. Coordinate conduits with manufacturer and Contractor in design/build contracts.

(2) Show as a 2-conduit loop system.

(3) Show antenna location.

h. Telephone/Communications/CATV

: Show both plan views and riser diagrams.

1.03 MEDIUM VOLTAGE DISTRIBUTION: The Base system is owned by Robins AFB and consists of overhead and underground conductors at 12.47/7.2 KV, multi-grounded wye, 3-phase, 60 Hertz.

1.04 LOAD LEVELS: Calculate load levels for at least the following items. NOTE: Consider derating for 50 degree C ambient in uncooled spaces.

a.

Branch and feeder circuits.

b.

Panelboards and switchboards.

c. Generators and automatic transfer switches

d. Transformers

1.05 DEMAND FACTORS: Size service entrance, pad mount transformers, downstream panelboards, dry type transformers, feeders, etc., as listed below.

a. General Purpose Convenience Receptacles

(1) First 10 KVA, use 100 percent demand. PF = .95 lagging.

(2) 50 percent demand factor for remaining over 10 KVA. PF = .95 lagging

(3) Note: This does not include system furniture receptacles in office areas, individual office rooms, and large open office areas without system furniture.

b. Mechanical Equipment

: Assume 100 percent demand load, PF = .80 lagging.

c. Lighting

: Assume 100 percent demand load at PF = .95 lagging. Lighting shall be considered a continuous load with circuits serving such loads not loaded more than 80 percent of their rating.

d. System Furniture

: Assume each cubicle contains one (3 amp) 720 VA CPU computer and a (2 amp) 240 VA computer monitor. Design on each six cubicles sharing a (8 amp) 960 VA printer. Include in load calculations an additional 180 VA per cubicle for typical furniture task lighting and miscellaneous loads (such as calculators, electric pencil sharpeners, etc.) Assume 80 percent demand load at PF = 0.95.

e. Individual Office Rooms

: Assume each room contains one (3 amp) 720 VA CPU computer, one (2 amp) 240 VA computer monitor, and one (8 amp) 960 VA printer. Include in load calculations an additional 180 VA per room for typical desktop task lighting and miscellaneous loads (such as calculators, electric pencil sharpeners, etc.) Assume 100 percent demand load at PF = 0.95.

f. Large Open Offices

(250 SF and above) w/o system furniture: Design using 15 VA per SF at 80 percent diversity at PF = 0.95.

g. Busways

(and Bus Ducts):

(1) Only use busways to supply plug-in busway for shop areas with large pieces of equipment.

Do not use them to feed downstream loads from the service entrance such as panelboards and MCC's.

(2) Protective device and feeder to each busway shall have an ampacity not less than the busway ampacity.

(3) Each busway shall be fed with a separate protective device and homerun feeder.

h. Facility Transformers and Service Lateral Conductors

- No additional diversity or demand factor shall be applied to the pad mount transformers and service lateral conductors.

i. Service Entrance Rated Equipment

- Service entrance rated equipment shall be sized based on a summation of the individual demand loads. No additional diversity or demand factor shall be applied to the service entrance rated equipment.

j. Feeders

- These shall be sized to carry the anticipated current. Demand factors may be specific depending on a certain application. Demand factors not listed, or proposed that are different from this standard, must be approved by 778 CES/CECE at Robins AFB.

1.06 POWER SYSTEM PROTECTION STUDIES

a. Design

: Perform a short-circuit study during design to determine proper AIC ratings of all electrical equipment. Include calculations in the design analysis.

b. Time Current Coordination Study

: For projects that contain adjustable trip settings, a short circuit and time current coordination study will be needed to properly set the settings on the breaker trip units. The study needs to be based on the actual equipment that will be supplied on the project. Include in the study all cut sheets on the electrical equipment, breakers, and trip units being furnished on the project. The study and the equipment cut sheets shall be provided in a single 3 ring binder.

(1) For Design-Bid Build Projects

Specify in the specifications that the Contractor perform a short-circuit study and time-current coordination study prior to procurement of any equipment/material. Both the short-circuit study and the time-current coordination study shall be performed by the same company, either consulting engineering services with the equipment manufacturer or an independent Registered Professional Engineer regularly engaged in performing these studies. Specify all equipment material submittals be provided with the study in a single 3 ring binder.

(2) Design – Build Projects

After design is completed, but prior to procurement of any material, the Design Build Contractor shall obtain a short circuit and time-current coordination study. Both the short-circuit study and the time-current coordination study shall be performed by the same company, either consulting engineering services with the equipment manufacturer or an independent Registered Professional Engineer regularly engaged in performing these studies. The study will be based on the actual equipment that will be supplied on the project. The Engineering group with the Design Build Contractor shall review the study and make any recommended changes if needed to the design. Submit all equipment material submittals with the study in a single 3 ring binder.

c. MVA

: At a minimum, use 400 MVA with X/R = 15 available at the primary side of the main transformer.

d. Scope

: Include the protective system from the nearest upstream devices beyond the transformer primary fuses down to and including all adjustable or selectable low-voltage protective devices.

e. Limiters

: Do not use low voltage cable limiters to achieve short-circuit limitation for equipment.

f. Transient Voltage Surge Suppression (TVSS) is required at the main service entrance as a minimum.

Double-ended switchboards will require a TVSS on each side.

1.07 MOTORS

a. Size

: Motors of 1 HP and more shall be 3-phase.

b. Reduced Voltage Starting

: Use reduced voltage motor starting on 75 HP and up. For smaller motors, evaluate motor-starting voltage drop and provide reduced voltage starting if over 10% drop.

c. Efficiency of polyphase squirrel-cage induction motors shall be premium, design E per NEMA MG-1

- 1993, rev. 1.

SECTION 2 - EXTERIOR

2.01 EXTERIOR POWER

a. Underground

: Feed all new facilities underground.

(1) All primary underground feeders and secondary feeders from the transformer to the service entrance shall be installed in concrete-encased duct as described below.

(2) Designer shall use double-ended main switchboard on a transformer capacity of 2,000 KVA and larger. In other words, if the load requires 2,000 KVA or larger transformer capacity, the designer shall use two transformers (e.g., two 1,000 KVA) with a double-ended switchboard construction. Double-ended design shall have a main breaker on each side and a tie breaker.

(3) Air switches shall be provided and installed in order to comply with the Electrical Standards.

Each exterior transformer shall be connected to a separate air switch compartment. Transformers shall not be looped to feed downstream exterior transformers.

b. Equipment Pads

(1) Size pads to extend beyond transformer/switch 6” on all sides.

(2) Precast pads are not allowed. Equipment pads shall be poured on site with 3000 PSI and reinforcing steel.

(3) Pads shall have no openings to the dirt below. This is to keep fire ants out. Seal all openings and windows in pads with concrete.

(4) Use a counterpoise around the pad with #4/0 bare copper conductors. Add one ¾” X 10’ copper clad ground rod at all four corners. Extend a separate #4/0 bare copper conductor, in a PVC sleeve, to each equipment section (in the primary and secondary sections of padmount transformers and all four sections of padmounted switches). All connections below grade shall be exothermic type. Show detail on drawings.

c. Duct Bank

(1) For main 15 KV lines (from manhole or switch to manhole), run 4-way 5 inch PVC (Sch. 40 or Type DB) concrete-encased, as a minimum. No EB (thin wall) will be accepted.

(2) Minimum size conduit from manhole to transformer shall be 2-4” PVC (Sch. 40 or Type DB) concrete-encased. No EB (thin wall) will be accepted.

(3) For last turn up into a pad, use Sch. 80 PVC if concrete is not encasing the last piece.

(4) Provide pull wires (nylon, Greenlee #430, 210 tensile strength) in each empty conduit.

(5) Use sweeping bends if only one turn of less than 90 degrees.

(6) Turns of 90 degree or more for 500 MCM, 15 KV shall have a manhole at the turn.

Handholes are allowed for two runs (single-phase or three-phase) of #2, 15 KV only.

(7) Run neutral with phase conductors in each conduit.

(8) Use metallic backed warning tapes above all 15 KV duct banks. Show detail section for duct on drawings.

(9) Install low-voltage underground secondary conductors in RGS or PVC conduit sized and at the required depth per the NEC. Concrete-encasement is not required.

d. Cable

: Main line is defined as cable running from switch to switch or riser pole to switch.

(1) Primary cable shall be 1/C, 15 KV, copper, XLPE (MV-90), shielded with 100% insulation.

(2) Neutral conductor shall be 600 volt with THWN insulation.

(3) Main line - 500 MCM, with #4/0 neutral.

(4) Transformer feeders shall be 3 1/C #2 XLP with #2 THWN neutral, except for 2,000-2,500 KVA which shall use 4/0 conductors.

e. Manholes and Handholes

(1) Primary manholes:

(a) Use minimum size 8’ x 8’ x 7’.

(b) Place no more than 450’ apart.

(c) Provide four 5” cast-in-place inserts on each inside wall.

(d) A manhole shall be provided at each switch location. Connect to manhole with one 5” duct entering each switch section.

(2) Primary (for #2, 15 KV cable only) and secondary handholes shall be 4’ X 4’ X 4’. All sides and bottom shall be concrete.

(a) 500 MCM, 15 KV cable shall be installed in manholes only.

(b) Turns of 90 degrees or more shall use secondary handholes or runs greater than 300’.

(3) Provide sumps.

(4) Provide circular metal covers and not removable tops, since these often require power equipment to remove.

(a) Provide minimum clear opening of 32”.

(b) Provide H20 wheel loading.

(5) Core drill all existing manholes/handholes.

f. Connections

(1) Use no primary cable T-splices! This includes inside manholes and handholes.

(2) Use only padmounted air switches for primary connections.

(3) Exterior transformers shall not be looped to connect downstream transformers. Each transformer shall be connected to a dedicated air switch compartment.

g. Padmount Air Switch Features

- Design basis is S&C PMH-10

(1) 4-way, Air type.

(2) Live front, rated 600 amps with viewing window.

(3) Gang switched.

(4) No mechanical interlocks.

(5) Switches shall be factory painted Brown, Robins AFB #48.

(6) Furnish with the following options:

(a) Dual-purpose front barrier

(b) Grounding stud

(c) 18-inch carbon steel base spacer, noncompartmented to match enclosure.

(7) Furnish 6 locks and one key for each switch installed. Use locks manufactured by Best Lock Corporation, lock number 21B720L-R with core number 8A59, short shank. Keys provided shall be blank and uncut, also manufactured by Best Lock Corporation.

h. Riser Pole Connections When Specified

(1) Use 5” rigid steel for 500 MCM and 4” rigid steel for #2.

(2) Make transition from overhead riser to underground with rigid steel elbow.

(3) Use fiberglass arms only on pole.

i. Service Entrance Transformers (General Requirements

(1) Primary transformers shall not be installed indoors.

(2) Individual transformer sizes shall not exceed 2500 KVA.

(3) A separate transformer shall feed each facility or building.

(4) Designer shall use double-ended main switchboard on a transformer capacity of 2000 KVA (two 1000 KVA) and larger. Each transformer, service lateral, and side of the double ended main switchboard shall be sized for 25% spare capacity over the calculated demand, or at 20% spare capacity of the equipment rating.

(5) All new facilities shall be fed with 480/277 volts, unless special permission is granted by Civil Engineering at Robins AFB. On facilities with 480/277 volts and 208/120 volts, service into the facility shall be 480/277 volts with interior dry type step down transformers to supply the 208/120-volt system. Using separate exterior transformers to supply the 480/277-volt system and 208/120-volt system is not acceptable.

(6) Voltages: Primary - 12,470V Delta, Secondary - 480/277 volts.

(7) Pad mount transformers shall be factory painted Brown, Robins AFB #48.

(8) Furnish 1 lock and one key for each transformer installed. Use locks manufactured by Best Lock Corporation, lock number 21B720L-R with core number 8A59, short shank. Keys provided shall be blank and uncut, also manufactured by Best Lock Corporation.

(9) Unless stated elsewhere, the standard average winding temperature rise of 65 degrees, OA Class should be provided. Do not use forced air cooling to provide KVA capacity for demand load or spare capacity.

(10) Dry type primary transformers are not allowed.

(11) Transformers shall have an insulating fluid of the less flammable type, either a high fire point fluid or a silicone fluid.

j.

Service Entrance Transformers (Construction Types):

(1) Use low profile utility type in residential areas.

(2) Pad Mount Transformer Standards:

(a) Pad mount construction may be used for applications rated at 1500 KVA and less.

Due to the fusing arrangement specified herein, dead-front transformers rated 2000 – 2500 KVA are not readily available in pad mount construction. For larger transformers above 1500 KVA, use fused load interrupter switch with liquid filled substation transformer.

(b) Dead-front construction.

(c) Loop-feed construction with universal bushing wells. Install primary cable feed on one side with surge arrestors on the loop feed bushings.

(d) Load-break connectors

(e) Load-break on-off primary switch

(f) Fuses (Side-wall mounted “Bay-O-Net” oil-immersed expulsion fuses in series with coordinated oil-immersed current limiting fuses). Bay-O-Net fuses are to be externally replaceable with a hot stick without opening the transformer tank.

(g) External tap changer.

(h) 9 KV Lightning/surge arresters.

(i) Parking stands

(j) Four 2-1/2% high voltage taps, two above and two below rated voltage.

(k) Sufficient clearance for access to drain plugs.

(l) Full height isolating barriers between high voltage and secondary section.

(3) Fused Load Interrupter Switch with Substation Transformer

(a) Medium voltage fused switch and transformer shall be located on the exterior of the facility. New facilities shall be designed with the service entrance equipment located inside the main electrical room.

(b) Provide current limiting fuses in the Fused Load Interrupter Switch.

k.

Walk-In Enclosures:

(1) Use exterior walk-in enclosures for equipment when renovating an existing facility with insufficient space inside electrical rooms to install new equipment. New facilities shall be designed with adequate interior floor space inside the facility electrical rooms for the new electrical equipment.

(2) Thermally insulate the walk-in housing.

(3) Provide ventilation fans, lights receptacles, and heating and air conditioning. Provide power from a small panelboard inside the enclosure.

(4) Feeder busway (if permitted) attached to a walk-in enclosure shall have the connection to the walk-in enclosure on the upper wall sides, not the top or roof.

(5) The same manufacturer shall manufacture the housing, transformer, and switchgear.

l.

SCADA Facility Metering

(1) Provide metering and data recorders as needed for monitoring of all power, water, and gas utilities.

(2) Each transformer will require a separate meter mounted on a stand next to the transformer.

Each data recorder has capability for four metering points. Each facility transformer will use a dedicated metering point on the data recorder. Provide the quantity of data recorders as needed to meet the data collection requirements.

(3) The Electrical Contractor shall sub-contract to Georgia Power Company for the material and installation of the metering and data recorders at the transformers. Contact GA Power at 800- 205-1664 for latest cost (approximate cost $2700).

(4) The Electrical Contractor shall provide a 1 1/2-inch conduit from the bottom of the transformer to the metering cabinet provided by Georgia Power.

(5) The Electrical Contractor shall provide a 1 -inch conduit from each metering cabinet to the telephone backboard. The electrical Contractor will need to install a 4 pair cable from each data recorder (located in the metering cabinet) to the telephone backboard.

(6) Provide note on drawings to indicate that contractor shall subcontract with GA Power for procurement and installation of meter and data recorder.

(7) Other metering functions shall be connected to the data recorder, such as monitoring of data pulses from water meters and gas meters. Each meter will occupy a data point in the data recorder. Provide data recorders as needed to monitor all points in the facility.

(8) This metering shall be in addition to the multifunction metering requirements listed elsewhere for service entrance switchboards.

m.

Exterior Service Entrance Feeders

(1) Secondary Cables

(a) Run underground.

(b) Use single conductor copper with THWN insulation.

(c) Use no conductors larger than 500 MCM.

(2) Feeder busway may be used for liquid filled substation type transformers rated 2000 – 2500 KVA. However, their use is discouraged and considered only upon request.

2.02 EXTERIOR LIGHTING - GENERAL

Parking Lot Lighting

(1) General requirements:

(a) Use aluminum poles.

(b) Calculate lighting levels based upon IES (Illumination Engineering Society) for maintained levels for parking lots - design for 2.0 FC average with no point less than 1.0

FC.

(c) Fixtures shall be controlled by individual photocells on each fixture. Photocells shall activate at 3 foot-candles of ambient light.

(d) Feed at 277 V when practical. If feasible, feed by panelboards mounted adjacent to padmounted transformers. Otherwise, feed from adjacent buildings served by the parking lots.

(2) Primary standard is high mast lighting for parking lots with more than two rows of spaces or at least two driving lanes.

(a) Use 100’ poles equipped for up to 12 fixture heads, even if fewer heads are used.

Provide raceway and branch circuit wiring sufficient for all 12 fixtures. Holophane is base preference.

(b) The manufacturers do not have recommended foundation designs, so require the contractor to provide a submittal showing their proposal to withstand a 90 mph wind with

12 luminaires on the top of the pole. (NOTE: We have had some installations with a 17’ deep hole 4’ in diameter, with bolts 72 inches long, and a 14’ cage 3.5’ in diameter for concrete reinforcement. The bolts were 2” in diameter, and the rebar was sized at no. 5.

The installation included a vertical I-beam 14’ long.)

(c) Fixtures are specially made for this purpose and have 1000 W HPS lamps.

(d) Have the manufacturer provide a printout showing the FC point-to-point calculations for the lot layout.

(e) Include stainless steel hoisting cables with a mechanism that is operated by an electric drill for lowering the fixture set to ground level for maintenance.

(f) Also provide double aircraft warning lights on poles located north of Fifth Street.

(g) Voltage level is 480 V.

(3) Secondary standard is for shorter poles with cobra heads.

(a) Provide 25’ poles with screw-in bases and 6’ or 8’ arms as applicable.

(b) Foundations shall be constructed as follows: 16 inch diameter helix made from hot rolled steel per ASTM A635; base plate size 15 inch diameter bolt circle and constructed of hot rolled steel; shaft size approximately 7 ft 6 inches constructed of steel pipe per ASTM A53. Entire finish shall be hot dipped galvanized per ASTM A123. Design Basis --- Chance Cat # XT112-0284

(c) Fixtures shall be cobra head type with 250W HPS lamps. Use “wide area” lenses and fixtures. Shoebox type fixture heads are unacceptable due to difficulty in maintenance and high first cost.

(d) Voltage level is 277 V.

(4) Last preference, discouraged due to difficulty of maintenance and higher initial cost, is for shorter poles with rectangular box shaped fixtures on short horizontal arms.

(a) Only use these along paths and sidewalks near administrative facilities where a high degree of aesthetics is desirable. These must meet the balanced goals of architectural compatibility, energy budgets, and sustainability.

(b) Provide on poles no taller than 10’ due to maintenance difficulty.

(c) Poles may be colored with anodized aluminum if this better meets the architectural compatibility requirements.

(d) Foundations shall be constructed per manufacturer recommendations. If possible, use screw-in bases and foundations such as for parking lot 25’ poles, but sized smaller as required.

b

. Street Lighting

(1) General requirements:

(a) Only provide where adjacent parking lot lighting is insufficient for street level.

(b) Calculate lighting levels based upon IES (Illumination Engineering Society) for maintained levels - design for 1.0 FC with no point less than 0.5 FC.

(c) Fixtures shall be controlled by individual photocells on each fixture. Photocells shall activate at 3 foot-candles of ambient light.

(d) Feed at 277 V. If feasible, feed by panelboards mounted adjacent to padmounted transformers.

(2) Primary standard is high mast lighting as described above.

(3) Secondary standard is for shorter poles with cobra heads as described above.

c. Sidewalk Lighting

: Any sidewalk that is not adequately lighted by the parking lot lighting and branches into the entryway of the facility shall be lighted with sidewalk lighting. Design Basis -- Lithonia KBR6 series with 70-watt metal halide lamps.

d. Exterior Doors

: Provide fixtures above or next to all exterior doors. Select light fixtures at the main entrance that will accent the architecture.

e. Facility Site Lighting

: If security is a concern or parking lot is adjacent to a wall, provide wall pack metal halide fixtures spaced to provide 2.0 FC average to the area.

f. Exterior Storage Area Lighting

: Provide lights around the perimeter of the entire storage area.

(1) For most applications, consider a 30 ft tall, round, tapered aluminum pole with two-floodlight type lighting fixtures mounted on 2 tenons 180 degrees apart with 400 watt HPS with a NEMA type 6 X 5 light distribution.

(2) Install pole on a screw-in base.

(3) Poles shall withstand steady wind velocity of 80 MPH and have a 1.3 gust factor based on the effective projected area of the fixtures and brackets provided.

(4) Poles shall be one piece, spun construction, with cast aluminum base, ground lug, handhole, and sanded satin aluminum.

(5) Poles shall be spaced to provide 10 foot-candles.

2.03 EXTERIOR LIGHTING SPORTS: All lighting shall be metal halide. Calculate lighting levels based upon IES (Illumination Engineering Society) for maintained levels.

a. Baseball and Softball Fields

: Lighting levels shall be based on Class of Play Type II per IES. Layout poles shall be as recommended by the IES standard.

b. Tennis Courts

- Lighting levels shall be based on Class of Play Type II per IES. Layout of poles shall be as recommended by the IES standard.

c. Type

: All lighting shall be metal halide.

d. Poles

- All pole construction shall be concrete set in a concrete base.

2.04 LIGHTNING PROTECTION SYSTEM (LPS)

a. Mandated Need

: Provide on all facilities with explosives or hazardous materials. Ground in accordance with Chapter 7, Lightning Protection, DOD 6055.9_STD and AFI 32-1065, Grounding Systems.

b. Determined Need:

Use "NFPA 780 Risk Determination.xls" included as part of the BFS for go/no-go decision on whether to install LPS. The Excel file is based upon NFPA 780 for Lightning Protection.

Use value of Lightning Flash Density = 5.

c. Documentation

: Present all calculations in the design analysis.

d. Default Design

(especially for buildings under 4,000 square feet and all buildings containing explosives or significant quantities of hazardous materials):

(1) Design per UL and NFPA 780.

(2) Conductors:

(a) Use only copper, except on galvalume or other aluminum roof materials.

(b) All conductors on roofs shall be treated as main conductors.

(3) Install Transient Voltage Surge Suppression (TVSS) on the service entrance of each protected facility. Assume one service entrance per facility unless field checking or RAFB record drawings indicate otherwise. Our specification master is labeled 16672, Transient Voltage Surge Suppression.

(4) Installation:

(a) Methods shall conform to UL 96A.

(b) Components shall conform to UL 96.

(c) Contractor shall obtain a UL letter of findings for the facility. The UL letter of findings shall be provided to the Government directly by UL after inspection by UL personnel. The Contractor shall make all corrections listed in the UL letter of findings.

(d) Use adhesive and bolted connections on metal roofs, installed to minimize potential roof leaks due to penetrations.

(e) Thru roof penetrations are not allowed except at downlead locations at the perimeter of the facility. If possible, locate penetrations at soffits.

(f) All down conductors shall be concealed in the wall with CPVC sleeve.

(g) If the facility contains a structural steel support system, do not use the structural steel for the downlead connections. Use UL Listed Class conductors installed in PVC concealed in the walls.

(h) A counterpoise with ground rods shall be installed around the entire facility.

Counterpoise shall be minimum #1/0 bare copper and installed 2 feet below grade per NFPA 780. All below grade connections shall be exothermic type.

E. Design for all other buildings (if a waiver is currently in force after approval by HQ AFCESA and as noted in the project Statement of Work)

(1) Use the Electronically Activated Streamer Emission (EASE) system: Design basis is Prevectron IV by National Lightning Protection Corporation.

(2) Use of conventional Franklin multi-rod system is permitted instead of EASE if less expensive and acceptable to user of the facility.

(3) Design per manufacturer’s requirements.

(a) Our specification master is labeled 16671- Lightning Protection - EASE.

(b) Install Transient Voltage Surge Suppression (TVSS) on the service entrance of each facility within the protected radius if not previously installed. Assume one service entrance per facility unless field checking or RAFB record drawings indicate otherwise.

The RAFB specification master is labeled 16672, Transient Voltage Surge Suppression.

(4) Existing Facilities: Mount each EASE device on a pole or mast 15’ – 20’ horizontally to the side of the nearest building roof edge. Consider roof mounting for very tall facilities.

(5) New Facilities: Consider roof mounting first, then on a pole or mast to the side. Ensure the structural requirements for roof mounting are covered in the design package.

(6) Design Criteria: State on drawings:

(a) Soil resistivity is 25,000 Ohm-cm, unless actual values at the site are known.

(b) The highest elevation of any object on each building.

(7) Shielding Ground Bed: Provide vegetation as first choice and fencing as second choice over the top of the ground bed to prevent personnel from standing over the ground bed and being harmed by voltage gradients in the soil during a lightning strike.

SECTION 3 - SERVICE ENTRANCE

3.01 SYSTEM GROUNDING

a. Soil Resistivity b.

: The median value runs in the 25,000 ohm-cm range for soil near buildings at Robins AFB. This would normally result in a single ground rod having a resistance of nearly 100 ohms. To meet the NEC requirement of 25 ohms or less a tripod set of ground rods 20 feet apart with thermit-welded bare copper 4/0 wire between them is usually sufficient, provided the closest ground rod is at least 10 feet from the facility.

Buildings under 4,000 SF roof size and larger buildings without any admin space or office c.

: When a bldg or structure meets this description after the work of this project, the system ground may meet the NEC requirement of 25 ohms or less.

Buildings of 4,000 SF and larger roof size with any admin space or office

3.02 SWITCHBOARDS, PANELBOARDS, AND MOTOR CONTROL CENTERS

: Provide maximum of 10 ohms of resistance to hard earth ground in the system ground connected to the electrical service entrance.

a. Choice of type

(1) Use switchboard construction when 1000 Amps or larger.

(2) Use power distribution panelboard construction when equal to 800 Amps. Boxes shall be minimum 9 ½ inches deep.

(3) Use panelboards when 600 Amps or less.

b. Genera l:

(1) Use NEMA 3R outdoors. NEMA 4X may be specified in cases where the corrosion potential is high. Fiberglass is preferred over stainless steel for NEMA 4X.

(2) Use copper bus only.

(3) Size to allow for a 25% increase in power demand.

(a) A 25% spare capacity over calculated load (20% of the equipment rating) shall be provided for all electrical equipment including transformers, motor control centers, switchboards, panelboards, feeders, and associated overcurrent protective devices.

(b) Calculations shall clearly demonstrate how the spare capacity is included for each bus in the system. Include hand written calculations or a spreadsheet to demonstrate how the spare capacity is included in each bus and feeder in the system.

(4) Spare pole/space capacity shall be minimum 25% of total pole/space capacity.

(5) Panelboards, switchboards, or motor control centers shall not be tapped to feed new loads. If there is no space for protective devices in the existing piece of equipment to feed the new load, then a new panelboard, new switchboard (add section if feasible), or new motor control center (add section if feasible) shall be provided.

(6) Existing Equipment: When installing breakers in existing panels, insure the manufacturer can still supply them and at reasonable price and delivery schedule.

(7) When doing any work involving the main service entrance, install or re-install a laminated riser diagram of the electrical system on the wall near the panel.

(8) Provide typed directories in each cabinet.

(a) Clearly label each circuit as to type load and specific location. Ex.: Receptacles N.

Wall

(b) Note on the directory from where the cabinet is fed. Ex.: Fed From Panel PA in Mech Room, Ckt. 4.

(9) All service entrance equipment shall contain a main breaker. If the facility requires double ended design, as stated elsewhere in this standard, then two main breakers with a normally open tie breaker shall be provided, with Kirk key interlock.

(10) Feeders to service entrance and any panelboard within the facility shall not contain any derated neutrals. As a minimum, neutrals shall have an ampacity of the phase conductors.

Feeders to panels with 200 percent rated neutral busses shall have the neutral conductors rated 200 percent of the feeder phase conductors.

(11) New construction shall be designed with one service entrance, except as noted for transformer requirements over 5,000 KVA.

(12) Labeling of Panel Schedules and Drawings for Branch Circuits: Each homerun symbol on the drawings shall be labeled in accordance with the pole numbers instead of a circuit number.

(a) Three-phase loads shall be designated by the three-pole numbers, such as HB - 1,3,5 or HB - 8,10,12. The single pole number, such as LA-12, shall designate single-phase loads.

(b) Panel schedules shall be numbered with odd numbers on the left side, top to bottom, and even numbers on the right side top to bottom.

c. Distribution Panelboards and Switchboards:

(1) Protect by breakers. Fuses are not permitted.

(2) All switchboards and panelboards shall be 3-phase, 4-wire, with ground bus. Install a neutral conductor to all switchboards and panelboards regardless of load.

(3) If the main breaker has ground fault protection, provide it as well on the feeder breakers.

(4) Show future frame space in all service entrance rated or distribution panelboards or switchboards, with full mounting hardware provided for plugging the breakers into them.

(a) Switchboards. 1000 - 1200 Amps, provide:

1. 1-400 amp frame space.

2. 2-225 amp frame spaces.

3. 1-100 amp frame space.

(b) Switchboards. 1600 Amps and above, provide:

1. 1-800-amp frame space.

2. 2-400 amp frame spaces.

3. 2-225 amp frame spaces.

3. 1-100 amp frame space.

(c) Double-ended switchboards. Provide for each side (a) or (b) above for future frame space sizes.

(d) 800 amp panelboards. Provide:

1. 2-225 amp frame spaces.

2. 2-100 amp frame spaces.

(e) 600 amp panelboards and below. Provide:

1. 1-225 amp frame space.

2. 3-100 amp frame spaces.

(f) All frame space sizes shall be based on three pole breakers.

(5) Use an electronic multi-meter in the main panelboard or switchboard instead of ammeters,

(6) On double-ended switchboards, control switches and meters shall be connected to the side of the energized source. As soon as power is de-energized from one of the incoming sides of the double-ended switchboard, all control power shall automatically transfer to the other side of the available energized source.

(7) Switchboards

(a) Main through bus shall be fully rated and non-tapered copper bus.

(b) Distribution sections shall have the same depth as the main service section.

(c) TVSS units may be located integrally with service entrance equipment.

d. Panelboards - Other

(1) All panelboards shall be “main breaker interior” type unless the upstream circuit protective device is within sight of the downstream bus being fed.

(2) Gutter taps, sub-feed lugs, feed-thru panels, and taps of conductors inside junction boxes are unacceptable circuit feeds to panelboards.

(3) All panelboards shall be fed from a separate circuit breaker in an upstream bus. The only exception to this shall be when no more than two panelboards shall share the same feeder circuit from a dry type transformer. The second panelboard shall be connected from a feeder breaker in the first panelboard. The second panelboard shall be installed adjacent to the first panelboard or inside the same room.

(4) If multiple (three or more) 208Y/120 volt panelboards are fed from the same dry type transformer, then a 208Y/120 volt distribution panelboard shall be installed downstream from the dry type transformer. Each panelboard shall be connected to a dedicated circuit breaker in the distribution panelboard.

(5) Minimum panelboard size:

(a) Use minimum 225 Amp bus rating and main breaker, 42 poles.

(b) If the demand load is 40 Amps or less, then a 100 Amp panel, minimum 30 poles, is permitted.

(6) Mount main breakers at the top or bottom in a vertical position specifically designed for that purpose. Exceptions only apply for approved applications of 100 Amps of less and 30 poles or less.

(7) Do not use load center type panelboards except for military family housing construction and temporary lodging facility construction.

(8) Panelboards with 200 percent rated neutrals shall be used when supplying power to the following areas:

(a) Office administrative areas

(b) Cubicles or System Furniture

(c) Individual office Rooms

(d) Large open office areas

(e) Computers

(f) Electronic Equipment

(g) Electronic Test Labs

(9) When supplying panelboard feeders to panels with 200 percent rated neutrals, the neutral conductors to the panel shall have an ampacity of twice the phase conductors in the feeder.

(10) When supplying panelboard feeders to panels with 100 percent rated neutrals, the neutral conductors to the panel shall not be derated less than the phase conductors in the feeder.

(11) Column width panelboards are unacceptable.

(12) Panelboards shall not contain integral TVSS units. Any TVSS units installed at panelboards shall be separate units and installed adjacent to the panelboards.

e. Circuit Breakers

(1) Use only bolt-on type or I-Line type.

(2) Do not use ground fault breakers. Use only individual ground fault receptacles.

(3) Magnetic only switches shall not be installed in any switchboard or panelboard. All breakers shall have thermal-magnetic characteristics.

f. Main Breakers and Feeder Breakers shall be as follows

(1) Main and Tie Breakers in Main Switchboards – (Including Double-Ended)-Service Entrance Rated.

(a) Insulated-case.

(b) 100% rated.

(c) Individually mounted (drawout in 2000 amp bus and above).

(d) Solid state trips with digital integral ammeter display with the following trip functions:

Main Breakers

: Adjustable LT, Adjustable ST, Adjustable GF, with separate adjustable time delay settings for LT, ST, GF.

Tie Breaker

: Adjustable LT, Adjustable ST, Adjustable Instantaneous, Adjustable GF, with separate adjustable time delay settings for LT, ST, GF. Same long time pickup setting as main breakers.

(e) Electrical operation with backup manual operation.

(2) Feeder Circuit Breakers in Main Switchboards – (Including Double-Ended) Service Entrance Rated.

(a) Molded-case.

(b) 80% rated.

(c) Group mounted - stationary.

(d) Solid state trips with digital integral ammeter display with the following trip functions:

Adjustable LT, Adjustable ST, Adjustable Instantaneous, Adjustable GF, with separate adjustable time delay settings for LT, ST, GF.

(3) Main Circuit Breakers in Main Distribution Panels (MDP) - Service Entrance Rated ( 800 Amp Bus).

(b) 80% rated

(c) Stationary mounted.

(d) Solid state trips with integral digital ammeter display with the following trip functions:

Adjustable short time pickup with adjustable delay bands, and adjustable instantaneous pickup.

(4) Feeder Circuit Breakers in Main Distribution Panels (MDP) - Service Entrance Rated ( 800 Amp Bus).

(b) 80 % rated.

c) Use standard thermal magnetic breakers. Breakers shall contain adjustable magnetic trip on all 225 amp breakers and larger where available.

(5) Breakers Used in Service Entrance Rated Panelboards 600 Amps and below shall be standard molded-case thermal magnetic.

(6) Circuit Breakers within a Sub-distribution Panelboard and 1000 Amps or Greater.

(b) 80 % rated.

(c) RMS digital solid-state trip with adjustable short time and instantaneous pickup.

(7) Circuit Breakers within a sub-distribution panelboard and 800 Amps or less may be standard molded-case thermal magnetic.

(8) If required by the project scope, breakers shall have additional metering functions for the solid-state trips.

(a) Functions shall include the following:

1. Energy (KWH, MWH)

2. Real Power (KW, MW)

3. Total Power (KVA, MVA)

4. Frequency (HZ)

(b) Provide device monitor to serve as a central location for reading and displaying all data at each solid-state trip unit and the facility meters. Connect monitor to all devices with a RS-485 network. Device monitor shall be a separate device from the facility meter.

g. Startup

: Provide special startup along with training on setting and maintaining the breakers to CE shops. Use an independent testing firm registered with NETA or manufacturer’s service engineer to set the adjustable devices. Include:

(1) Startup in the field.

(2) CE Shop training.

(3) O&M manuals.

(4) Schematics of electronic devices.

(5) Solid state trips tested in field with a portable test kit.

(6) Specified equipment used in the startup provided to CE shops for future maintenance.

3.03 GENERATORS, TRANSFER SWITCHES, AND FUEL TANKS

a. Generators

: Base actual size on load analysis for 60-80% loading, based upon field readings when possible.

b. Fuel Tanks

(1) Provide tank large enough for generator to run 72 hours at 100% rated load. Exception: Tank may be allowed to be smaller (approx 12 hour runtime) when the generator set is used as backup source for emergency lighting only.

(2) Fuel tank shall be above ground, similar to Convault construction. The fuel tank shall be encased with secondary 3000-PSI concrete container. Concrete sub-base tanks are not acceptable.

Tank may be allowed to be skid-mounted when the generator set is used as a backup source for emergency lighting only. In this case, a weatherproof enclosure shall cover the generator set and the fuel tank

(3) A day tank is not required. The fuel shall be fed directly to the diesel fuel pump intake line.

(4) Include a high level alarm in the fuel tank to prevent overflow.

(5) Include an interstitial leak monitoring system to monitor and prevent tank leakage from the tank into the tank enclosure.

(6) Copper tubing is not allowed. Use only threaded black steel.

(7) Install a ¾” X 10’ ground rod in a ground well. Extend a #1/0 copper conductor from the ground rod to the tank.

(8) Include on all four sides of the fuel tank the following markings:

(a) Flammable

(b) No Smoking within 50 Feet

(c) Diesel Fuel

(d) Capacity of Tank

(9) If the top of the tank is greater than 42” above finished grade, include steps.

(10) A 3.0-PSI anti-siphon check valve shall control fuel feeding into the diesel fuel pump.

(11) For Above Ground Storage Tanks: Provide a ball cut-off valve on each side of the supply and return fuel line.

c. Transfer switches

(1) All new or replacement three-phase transfer switches shall be four-pole (switched neutral).

Installation of three-pole transfer switches for new installations requires MAJCOM approval.

(2) Provide maintenance capability for all transfer switches. Use bypass feature for critical facilities per design guidance.

(3) Automatic transfer switches and controls shall be installed in electrical rooms and not in areas where steam piping or other high humidity “generators” are present. Transfer switches shall not be installed outdoors unless service entrance rated and incorporating an approved NEMA outdoor classification. Service entrance rated transfer switches shall have ground fault protection installed.

(4) All transfer switches shall be of the automatic type.

d. Generator SCADA Reporting System, Radio Type

(a) Provide a Remote Transmitting Unit (RTU) at the generator set for the base SCADA System. The RTU shall be compatible and capable of interfacing with the base SCADA system manufactured and programmed by Advanced Control Systems of Atlanta, Georgia. The RTU unit shall be radio controlled, and transmit the following points to the central base monitoring system: start/stop; volts/phase; amps/phase; KW, KVAR; breaker status as open/close; water temp and oil pressure.

SECTION 4 - INTERIOR

4.01 INTERIOR POWER

General.

(1) In existing facilities fed at 208V, convert to 480V. In new facilities the service voltage shall be 480Y/277 unless the Civil-Electrical Chief in 778 CES/CECE gives approval for 208Y/120 volts.

(2) Provide small distributed dry-type transformers (delta-wye) as needed for 208Y/120V to step the voltage down from 480Y/277. In administrative areas, locate dry type transformers and branch panelboards in electrical closets distributed throughout the facility to keep the branch circuits below 200 feet.

(3) Use reduced voltage motor starting on 75 HP and up. For smaller motors, evaluate motor-starting voltage drop and provide reduced voltage starting if over 10% drop.

(4) Power Factor Correction: Install capacitors to correct power factor to 95% at full load for motors 50 HP and larger. Show every capacitor next to the motor. Install as close to the motor terminals as possible. Do not install capacitors on any motor with variable frequency drive

(VFD).

(5) The Contractor shall have an electrician with a Master’s License on site during all installations.

(6) Use generic “off the shelf” equipment. Field fabrication of panels, switches, etc., is not allowed.

(7) Equipment that is obsolete or scheduled to be obsolete is not allowed.

(8) Provide a submittal at the final inspection that lists the vendors for all equipment, so CE shops can contact them later as needed.

(9) The following wiring methods shall not be used: Armored Cable (Type AC), Flat Cable Assemblies (Type FC), Flat conductor Cable (Type FCC), Integrated Gas Spacer Cable (Type IGS), Metal-Clad Cable (Type MC), Mineral-Insulated, Metal-Sheathed Cable (Type MI), Nonmetallic-Sheathed Cable (Types NM, NMC, and NMS) {except for residential use}, Power and Control Tray Cable (Type TC) {unless specifically called for in project scope documents}, Underground Feeder and Branch-Circuit Cable (Type UF), Nonmetallic Underground conduit with Conductors (Type NUCC), Flexible Metallic Tubing (Type FMT), Electrical Nonmetallic tubing (Type ENT), and similar wiring methods with various manufacturer’s name brands.

(10) All wiring shall be rated 600 volts, single copper conductor, with Type THHN/THWN insulation.

(11) All wiring shall be installed in metallic conduit raceways above grade or PVC (schedule 40) below grade.

(12) Wireway (rectangular shells with top covers into which cables are laid) are highly discouraged and allowed by exception only.

(13) Cable tray as a raceway for power wiring is highly discouraged and is approved only by exception upon request.

(14) Raceways shall be concealed wherever practical in finished spaces.

(15) Motor Control Centers shall have disconnects, branch circuit overload protection, and controllers mounted in a single assembly. Whenever the starter is located in the MCC, use thermal magnetic or instantaneous trip circuit breaker with separate adjustable overloads. If the unit contains no starter, and the starter is located at the machine, then a thermal-magnetic circuit breaker shall be used to supply the motor feeder.

(16) Electric - Operated Projector Screens in Conference Rooms, Classrooms, and Training Rooms: Coordinate locations with user. Provide power and wall switches for control.

(17) Main electrical rooms shall be a separate room with no other trades sharing the electrical room. Main electrical room shall be located on an exterior wall with exterior double doors, and without a center support, in the opening…