A&E design/build first article testing storage facility

Award Notice Posted

Solicitation number
F3QCCL1025A008
Agency
Awarded
to C. Howell Contracting, Inc.
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Contract number
FA8501-11-C-0026 Federal contract award
NAICS code
236210 Industrial Building Construction
PSC
Not on record
Place of performance
Robins AFB, Georgia 31098, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

The WR-ALC/PK Contracting Squadron, Robins AFB, GA is issuing a solicitation for a Firm-Fixed Price contract to Design/build a First Article Testing Storage Facility near Bldg 323 at Robins AFB, GA. A site visit is scheduled for 31 March 2011 at 1000 AM. Participants shall notify this office with names of all individuals attending, not to exceed three representatives. See Solicitation for details.

Update #1 ·

 The WR-ALC/PK Contracting Squadron, Robins AFB, GA is issuing a solicitation for a Firm-Fixed Price contract to Design/build a First Article Testing Storage Facility near Bldg 323 at Robins AFB, GA. This announcement will only serve as a presolicitation notice. This acquisition will be set-aside 100% for Service Disabled Veteran Owned Small Businesses IAW FAR Part 19 procedures. This acquisition is subject to the North American Industry Classification System (NAICS) code 236210. This project consist of, but is not limited to, providing all tools, labor, materials, supplies, transportation and supervision necessary to design and construct a first article testing storage facility near building 323, Robins AFB. The facility shall be a metal building structure Pre-Engineered Metal Building (PEMB) type with concrete foundation, concrete floor slab, and 26 gage pre-finished metal wall panels and 24 gage pre-finished roof panels, plumbing, fire detection and suppression, electrical, lightning protection and communications equipment. The civil site development will include minor site clearing, demolition of existing site features, exterior utilities (electrical, water, and storm runoff), and a roof drainage system. Existing underground utility relocation is also required. Work shall be performed in accordance with the Drawings and Specifications. Magnitude of this project is between $500,000 and $1 Million. This range does not reflect the actual estimated cost. Any questions in regards to this notice must be submitted in writing or via email to the Primary POC. The actual solicitation will be posted on or about 1 March 2011.

Files

File Type Posted
Site Visit Attendees.pdf PDF
First Article Testing Storage Facility questions 06APR11.docx DOCX document
Wage Determination.pdf PDF
B.3.0 - 01020 - Construction Design Performance Requirements.doc DOC document
I.1 - 01503 - Contract Administration.doc DOC document
B.3.3 - 01020C - Appendix C GEC Soils Report - First Art TestStor Fa.pdf PDF
101 Floor Plan.pdf PDF
B.3.1 - 01020A - Appendix A References.doc DOC document
B.3.2 - 01020B - Appendix B Fire Protection Life Safety.doc DOC document
O - UHHZ 100138 Appendix C Safety Plan.docx DOCX document
F - 01310 - CADD As-Built Drawings.doc DOC document
BFS Part 5 - Mechanical.pdf PDF
J.3 - 01540 - Green Procurement ATTACHMENT 7.doc DOC document
E.0 - 01300 - Submittals Contractor-Furnished Items.doc DOC document
BFS Part 1 - Intro and General .pdf PDF
B.3.5 - 01020E - Appendix D NFPA 780 LP Requirement Determination.xls XLS spreadsheet
101 Site Demolition Plan.pdf PDF
BFS Part 4 - Architectural General and Compatibility.pdf PDF
K - 01560 - Environmental Requirements - Jun 10.doc DOC document
H - 01502 - Temporary Services - Cont Occupancy.doc DOC document
B.3.4 - 01020D - Appendix D NFPA 780 LP Determination Explanation.doc DOC document
G - 01501 - Temporary Services - Contractor.doc DOC document
D - 01040 - Site Requirements.doc DOC document
102 Site Plan.pdf PDF
C - 01030 - Design-Build Design After Award.doc DOC document
FA8501-11-R-0018 solicitation.doc DOC document
BFS Part 7 - Communications 2007.pdf PDF
BFS Part 3 - Civil-Structural.pdf PDF
J.1 - 01540 - Green Procurement ATTACHMENT 2.doc DOC document
BFS Part 6 - Electrical.pdf PDF
N.0 - 133419 - Pre-engineered Metal Building.doc DOC document
E.1 - 01300A - AF Form 66_Example.pdf PDF
J.2 - 01540 - Green Procurement ATTACHMENT 3.doc DOC document
BFS Part 2 - Environmental .pdf PDF
001 Index of Drawings.pdf PDF
301 Bldg Section.pdf PDF
L - 01580 - Safety Requirements.doc DOC document
M - 01730 - Operations and Maintenance Data.doc DOC document
J.0 - 01540 - Green Procurement.doc DOC document
B.2 - 01005 - Statement Of Work.doc DOC document
201 Elevations.pdf PDF
Show all 41

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors