A&E design/build first article testing storage facility
Award Notice Posted
- Solicitation number
- F3QCCL1025A008
- Agency
-
AFLCMC Robins AFB
Lifecycle Management Center, Department of Defense
- Awarded
- to C. Howell Contracting, Inc.
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- Contract number
- FA8501-11-C-0026 Federal contract award
- NAICS code
- 236210 Industrial Building Construction
- PSC
- Not on record
- Place of performance
- Robins AFB, Georgia 31098, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
The WR-ALC/PK Contracting Squadron, Robins AFB, GA is issuing a solicitation for a Firm-Fixed Price contract to Design/build a First Article Testing Storage Facility near Bldg 323 at Robins AFB, GA. A site visit is scheduled for 31 March 2011 at 1000 AM. Participants shall notify this office with names of all individuals attending, not to exceed three representatives. See Solicitation for details.
Update #1 ·
The WR-ALC/PK Contracting Squadron, Robins AFB, GA is issuing a solicitation for a Firm-Fixed Price contract to Design/build a First Article Testing Storage Facility near Bldg 323 at Robins AFB, GA. This announcement will only serve as a presolicitation notice. This acquisition will be set-aside 100% for Service Disabled Veteran Owned Small Businesses IAW FAR Part 19 procedures. This acquisition is subject to the North American Industry Classification System (NAICS) code 236210. This project consist of, but is not limited to, providing all tools, labor, materials, supplies, transportation and supervision necessary to design and construct a first article testing storage facility near building 323, Robins AFB. The facility shall be a metal building structure Pre-Engineered Metal Building (PEMB) type with concrete foundation, concrete floor slab, and 26 gage pre-finished metal wall panels and 24 gage pre-finished roof panels, plumbing, fire detection and suppression, electrical, lightning protection and communications equipment. The civil site development will include minor site clearing, demolition of existing site features, exterior utilities (electrical, water, and storm runoff), and a roof drainage system. Existing underground utility relocation is also required. Work shall be performed in accordance with the Drawings and Specifications. Magnitude of this project is between $500,000 and $1 Million. This range does not reflect the actual estimated cost. Any questions in regards to this notice must be submitted in writing or via email to the Primary POC. The actual solicitation will be posted on or about 1 March 2011.