H - 01502 - Temporary Services - Cont Occupancy.doc

DOC document 27 KB Posted

Attached to
A&E DESIGN/BUILD FIRST ARTICLE TESTING STORAGE FACILITY
Solicitation number
F3QCCL1025A008
Issued by

About this file

Temporary Utilities and Services for Continued Occupancy

View the file

Other files

File Type Posted
Site Visit Attendees.pdf PDF
First Article Testing Storage Facility questions 06APR11.docx DOCX document
BFS Part 7 - Communications 2007.pdf PDF
BFS Part 4 - Architectural General and Compatibility.pdf PDF
K - 01560 - Environmental Requirements - Jun 10.doc DOC document
O - UHHZ 100138 Appendix C Safety Plan.docx DOCX document
BFS Part 3 - Civil-Structural.pdf PDF
J.1 - 01540 - Green Procurement ATTACHMENT 2.doc DOC document
F - 01310 - CADD As-Built Drawings.doc DOC document
BFS Part 5 - Mechanical.pdf PDF
E.1 - 01300A - AF Form 66_Example.pdf PDF
N.0 - 133419 - Pre-engineered Metal Building.doc DOC document
BFS Part 6 - Electrical.pdf PDF
BFS Part 2 - Environmental .pdf PDF
J.2 - 01540 - Green Procurement ATTACHMENT 3.doc DOC document
001 Index of Drawings.pdf PDF
L - 01580 - Safety Requirements.doc DOC document
301 Bldg Section.pdf PDF
J.3 - 01540 - Green Procurement ATTACHMENT 7.doc DOC document
B.3.0 - 01020 - Construction Design Performance Requirements.doc DOC document
Wage Determination.pdf PDF
I.1 - 01503 - Contract Administration.doc DOC document
E.0 - 01300 - Submittals Contractor-Furnished Items.doc DOC document
BFS Part 1 - Intro and General .pdf PDF
101 Floor Plan.pdf PDF
B.3.3 - 01020C - Appendix C GEC Soils Report - First Art TestStor Fa.pdf PDF
B.3.1 - 01020A - Appendix A References.doc DOC document
M - 01730 - Operations and Maintenance Data.doc DOC document
J.0 - 01540 - Green Procurement.doc DOC document
B.2 - 01005 - Statement Of Work.doc DOC document
B.3.2 - 01020B - Appendix B Fire Protection Life Safety.doc DOC document
201 Elevations.pdf PDF
101 Site Demolition Plan.pdf PDF
B.3.5 - 01020E - Appendix D NFPA 780 LP Requirement Determination.xls XLS spreadsheet
FA8501-11-R-0018 solicitation.doc DOC document
D - 01040 - Site Requirements.doc DOC document
G - 01501 - Temporary Services - Contractor.doc DOC document
102 Site Plan.pdf PDF
B.3.4 - 01020D - Appendix D NFPA 780 LP Determination Explanation.doc DOC document
C - 01030 - Design-Build Design After Award.doc DOC document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01502 - TEMPORARY UTILITIES AND SERVICES

FOR CONTINUED OCCUPANCY

UHHZ 100138, Construct First Article Testing Storage Facility, Near Building 323

PART 1 - GENERAL

1.01 GENERAL

A. The contractor shall provide temporary utilities and services, as required, to maintain continued occupancy in the building during construction at no additional cost to the Government.

B. Temporary utilities shall include lighting, heating, air conditioning, electrical power, domestic water, waste, and any other service normally available in the occupied area(s) that will be disconnected to allow the contractor's work to proceed.

C. Temporary utilities shall not be required where the interruptions to normal service are limited to times the building will be unoccupied.

D. Utilities: All utilities available at the site such as steam, electricity, and chilled water may be used by the contractor in conjunction with his temporary services.

PART 2 PRODUCTS - OMITTED

PART 3 EXECUTION

3.01 DOMESTIC WATER:

A. Required when service will be interrupted for over 4 hours in more than (25%) of the building.

3.02 HEATING/AIR CONDITIONING:

A. General: Temporary heating shall be provided from 1 October to 31 March. Temporary air conditioning shall be provided from 1 April to 30 September.

B. Heating shall be provided to maintain 65 degrees F in administrative areas and 55 degrees F in shop areas.

C. Air conditioning is required only within administrative areas. Temperature shall not exceed 85 degrees F in any location.

D. Shop Drawings: The contractor shall submit shop drawings for approval indicating the methods and equipment to be used to maintain the space temperature within limits, points of connection, size of pipe(s) and method of support.

E. Removal of temporary equipment: At the completion of the contract or when permanent equipment is made functional the contractor shall remove all temporary equipment. Pipe connections shall be terminated as close to tie-in as practical with a valve, six (6) inch section of pipe and cap. Show on as-builts.

3.03 ELECTRICAL SERVICES

A. Temporary service shall be required prior to the disconnection of existing service to any area occupied by Government personnel.

END OF SECTION

01502 - 1 OF 2

H - 01502 - Temporary Services - Cont Occupancy – 24 SeP-01

File details come from the government source that posted it. Updated .