Exhibit_D_Cost_Workbook_v3.0.xlsx

XLSX spreadsheet 66 KB Posted

Attached to
Pre-Solicitation -Department of Motor Vehicles (DMV), WS3A - DL/ID Mainframe Services, Data & Integration (Migration RFP)
Solicitation number
0000040415
Issued by
California

About this file

This is an Exhibit D Cost Workbook for a Request for Proposal (RFP) issued by the Department of Motor Vehicles (DMV) for DL/ID Mainframe Services, Data & Integration (RFP ISD26-3629). The workbook serves as the cost submission template for bidders responding to this solicitation. The project encompasses comprehensive digital transformation services including mainframe modernization, data conversion and migration, system integration, back-end reengineering, and organizational change management support. The contract is structured across a four-year period spanning fiscal years 2026-27 through 2029-30, with a total project budget not to exceed $35,500,000. Key deliverables include project management and sub-plans, solution architecture documentation, data cleansing and conversion implementation, phased solution delivery for back-end reengineering and integrations, training coordination, hypercare and warranty services, and transition management activities. The RFP operates in two phases, with Phase 1 submissions containing no dollar amounts and Phase 2 submissions requiring detailed cost data in prescribed formats.

The cost workbook establishes strict guidelines for bidder submissions across five primary worksheets: totals (auto-calculated), software and equipment costs (optional), unanticipated task service rates, proposed services costs, and deliverables costs. Bidders must provide hourly labor rates for 25 defined key staff positions (including project managers, architects, developers, and specialized technical roles) as well as non-key staff classifications, with separate rates for onshore and offshore/nearshore personnel. The maximum contract amounts are allocated by fiscal year: $9,500,000 for FY 2026-27, $14,000,000 for FY 2027-28, $9,000,000 for FY 2028-29, and $3,000,000 for FY 2029-30. Unanticipated tasks are budgeted at 10 percent of total contract costs and will be authorized through a formal Work Authorization process. All bidder-provided software must be non-proprietary and licensed to the State at no additional charge. Deliverables are categorized with maximum cost percentages: project management plans (4%), solution architecture (20%), data conversion and implementation (70%), training and OCM coordination (3%), and hypercare and warranty services (3%). The workbook requires that deliverables costs equal total service costs and that no more than 75 percent of hours can be allocated to non-key staff per deliverable.

View the file

Other files

File Type Posted
EXHIBIT I- DELIVERABLE EXPECTATION DOCUMENT.pdf PDF
DMV_WS3A__RFP__ROM.docx DOCX document
ATTACHMENT 11- DVBE DECLARATIONS.pdf PDF
Exhibit_C__Deliverables_and_Milestones_Table.docx DOCX document
ATTACHMENT 5- RESPONSE TO ADMINISTRATIVE REQUIREMENTS FORM.pdf PDF
EXHIBIT E- INFORMATION SECURITY AND PRIVACY PROVISIONS.pdf PDF
ATTACHMENT 7- BIDDER DECLARATION GSPD 05-105.pdf PDF
ATTACHMENT 20- GLOSSARY OF TERMS.docx DOCX document
ATTACHMENT 12- COMMERCIALLY USEFUL FUNCTION (CUF) CERTIFICATION.pdf PDF
ATTACHMENT 8- WORKERS_ COMPENSATION CERTIFICATION.pdf PDF
ATTACHMENT 14- BIDDER QUALIFICATIONS MATRIX.pdf PDF
EXHIBIT A- STATEMENT OF WORK.pdf PDF
PART 2 - BIDDER RESPONSE.pdf PDF
ATTACHMENT 1- TEMPLATE FOR QUESTION SUBMITTAL_REQUEST FOR CHANGES.pdf PDF
ATTACHMENT 6- CONFIDENTIALITY STATEMENT FORM.pdf PDF
ATTACHMENT 10- BIDDING PREFERENCES AND INCENTIVES.pdf PDF
CDT OSTP Request For Proposal_1.pdf PDF
ATTACHMENT 13- TACPA PREFERENCE REQUEST FORMS.pdf PDF
Department of Motor Vehicles (DMV) - DXP Driver License .pdf PDF
Department of Motor Vehicles (DMV) - DXP Driver License _1.pdf PDF
ATTACHMENT 15- BIDDER REFERENCE FORM.pdf PDF
DMV_WS3A_RFP_Feedback_Template.xlsx XLSX spreadsheet
EXHIBIT F- DMV ACCEPTABLE USE STATEMENT.pdf PDF
ATTACHMENT 3- FOLLOW-ON CONTRACT DISCLOSURE FORM.pdf PDF
ATTACHMENT 2- INTENT TO BID FORM.pdf PDF
Exhibit_B__Functional_and_Nonfunctional_Requirements_v4.0.xlsx XLSX spreadsheet
ATTACHMENT 9- BOND AND OTHER SECURITY DOCUMENTS.pdf PDF
CDT OSTP Request For Proposal.pdf PDF
EXHIBIT B- FUNCTIONAL AND NON-FUNCTIONAL REQUIREMENTS.pdf PDF
ATTACHMENT_16_KEY_STAFF_QUALIFICATIONS_MATRIX.xlsx XLSX spreadsheet
ATTACHMENT 16- KEY STAFF QUALIFICATIONS MATRIX.pdf PDF
Pre-solicitation_Instructions_DMV_WS3A_RFP_.docx DOCX document
ATTACHMENT 4- COVER LETTER.pdf PDF
ATTACHMENT 19- KEY STAFF REPLACEMENT FORM.pdf PDF
ATTACHMENT_14_BIDDER_QUALIFICATIONS_MATRIX.xlsx XLSX spreadsheet
EXHIBIT D- COST WORKBOOK.pdf PDF
EXHIBIT G- WORK ORDER AUTHORIZATION FORM.pdf PDF
ATTACHMENT 17- KEY STAFF REFERENCE FORM.pdf PDF
EXHIBIT C- DELIVERABLES AND MILESTONES TABLE.pdf PDF
EXHIBIT H- WORK ORDER AUTHORIZATION ACCEPTANCE FORM.pdf PDF
ATTACHMENT 18- NARRATIVE REQUIREMENTS.pdf PDF
EXHIBIT J- DELIVERABLE ACCEPTANCE DOCUMENT.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0-Instructions

DMV DXP WS3A - DL/ID Mainframe Services, Data & Integration RFP (ISD26-3629) - Exhibit D - COST WORKBOOK
Worksheet No.Worksheet Title
Worksheet No. 0Instructions
Worksheet No. 1DL-ID Cost C-1 Totals
Worksheet No. 2DL-ID Cost C-2 Software and Equipment Costs (Optional)
Worksheet No. 3DL-ID Cost C-3 Unanticipated Cost Service Rates
Worksheet No. 4DL-ID Cost C-4 Proposed Services Cost
Worksheet No. 5DL-ID Cost C-5 Deliverables
Cost Workbook Instructions
The Bidder must adhere to the instructions below when completing the Cost Workbook.

Dollar amounts are not permitted in the Bidder's Phase 1 Cost Response.

Specify the Bidder's name in the appropriate field on Worksheet No. 2.

If selected for Phase 2, Bidder is required in its Phase 2 Cost Workbook to specify all cost data in the format prescribed, even if no cost will be associated with the item indicated on the worksheet(s). When no costs are associated with an item in its Phase 2 Cost Workbook, Bidder must indicate the cost as zero (0 or $0.00).

If any character other than a numeral, dollar sign, comma, or decimal is used (e.g., a dash) in the Bidder's Phase 2 Cost Response, the State will assume the cost of the item to be zero (0 or $0.00). All other fields must not be modified. If a Cost Worksheet is modified or includes blank cells when a value is expected, the State may reject the Proposal.

The State has populated many cells with formulas, however it is the responsibility of Bidder to ensure the Cost Workbook and its calculations are correct and accurate. The State will not assume responsibility for any Cost Workbook that is not properly calculated.

The list below summarizes the worksheets within this Exhibit D: Cost Workbook.
DL-ID Cost C-1: Totals
This worksheet is automatically calculated using data from the other worksheets. Do not enter information on this auto-summarized worksheet.

NOTE: Line D must not exceed the project budget amount of $35,500,000.

DL-ID Cost C-2: One-Time and Ongoing Software and Equipment Costs (Optional - if Bidder-Provided)
This worksheet lists costs for any Bidder-provided Solution accelerator or add-on software, as well as any Bidder-provided equipment and/or software support.

Bidder must provide a narrative description in Column 1 for each item listed, and describe how the one-time costs and subscription/ongoing costs are allocated and how these costs align with the incremental Agile set of production releases planned by the Bidder. The State expects to have a clear understanding of when license costs are required to ensure all products are available to meet production release needs. All Contractor-provided software, including but not limited to product or Solution accelerators, enhancements, add-ons, and any other Contractor-provided software elements and features shall be non-proprietary in nature. Software and intellectual property the Contractor owns and does not offer on the open market for purchase or subscription is not acceptable for use in the DxP Solution. Such software must be licensed to or otherwise retained by the State for future use in a non-proprietary manner at no additional charge.

DL-ID Cost C-3: Unanticipated Task/Service Rates
This worksheet lists the rates for staff who may perform Unanticipated Tasks during the Contract period. The total Cost for Unanticipated Tasks will be entered automatically on worksheet DL Cost C-1 Totals as 10% of the sum of Rows A and C and include the average hourly rates above for 1) Key Staff, 2) Offshore Non-Key Staff, and 3) Onshore Non-Key Staff. Bidder must ensure the average rates for Non-Key Staff (offshore/nearshore and onshore average rates) include any additional Non-Key Staff rows added by the Bidder.
DL-ID Cost C-4: Proposed Services Cost
This worksheet lists the hourly rates and expected annual hours for staff proposed for the Contract period, including completion of all tasks and deliverables prior to the final Hypercare and Warranty period. There must be sufficient staffing to achieve project deliverables and milestones without exceeding the total project cost. It may be helpful to complete RFP ATTACHMENT 17.1: KEY STAFF QUALIFICATIONS MATRIX before filling in this section. The sum of the values listed on Worksheet C-4 must equal to the sum of the values listed on Worksheet C-5.
DL-ID Cost C-5: Deliverables Cost
This worksheet lists the deliverables to be provided during the Contract period, which must be priced and included in the Bidder’s Phase 2 Proposal.

Note that project plan deliverables (DEL-1 to DEL-8) will be initiated in many cases from existing DXP project plans developed through prior DXP project phases. The Bidder will enter the hours worked by Key Staff and Non-Key Staff for each deliverable; this worksheet will total the associated cost of staff to display the deliverable total cost. The DMV has indicated the maximum amount for categories of deliverables in column 2a; the Bidder must ensure that the combined total of deliverables within the category does not exceed the maximum percentage of total cost. It may be helpful to complete RFP ATTACHMENT 17.1: KEY STAFF QUALIFICATIONS MATRIX before filling in this section. The sum of the values listed on Worksheet C-5 must equal to the sum of the values listed on Worksheet C-4.

1-DL-ID Cost C-1 Totals

DMV DXP WS3A - DL/ID Mainframe Services, Data & Integration RFP (ISD26-3629) - Exhibit D - COST WORKBOOK
Bidder Name:
Table C-1: Totals
This worksheet is auto-populated using data from the other worksheets in this Cost Workbook, therefore no input from the Bidder is required. Cell addresses specified in ITEM description may change if Bidder inserts additional rows to worksheet from which the data is collected.
ROWITEMTOTAL COSTSubtotal FY 2026-27 CostSubtotal FY 2027-28 CostSubtotal FY 2028-29 CostSubtotal FY 2029-30 Cost
ACosts for One-Time and Ongoing Software for DL-ID - Bidder-Provided
from DL-ID Cost C-2 Optional(Cells V18, W18, X18, Y18)$0$0$0$0$0
BService Cost for Unanticipated Tasks
Average Hourly Rate for Key Staff$0
Average Hourly Rate for Onshore Non-Key Staff$0.00
Average Hourly Rate for Offshore Non-Key Staff$0.00
from DL-ID Cost C-3 (Cells C18, C28, and D29)

NOTE: The cost for Row B is set at 10% of the Contract Total Cost

(C-1 Row A + Row C)/10$0
CService Cost Total for Contract Period

from DL-ID Cost C-4 (Cells I25, J25, K25, L25)

MUST EQUAL DELIVERABLES COST TOTAL FOR CONTRACT PERIOD$0$0$0$0$0
DDeliverables Cost Total for Contract Period

from DL Cost C-5 (Cell C17)

MUST EQUAL SERVICE COST TOTAL FOR CONTRACT PERIOD$0
EAmount to be Awarded to Winning Bidder
Must not exceed $35,500,000$0
Total Cost by FY:$0$0$0$0
Notes
The amounts listed above are for evaluation purposes only.
The maximum contract amount for Fiscal Year (FY) 2026-27 is $9,500,000
The maximum contract amount for Fiscal Year (FY) 2027-28 is $14,000,000
The maximum contract amount for Fiscal year (FY) 2028-29 is $9,000,000
The maximum contract amount for Fiscal year (FY) 2029-30 is $3,000,000

2-DL-ID Cost C-2 Optional

DMV DXP WS3A - DL/ID Mainframe Services, Data & Integration RFP (ISD26-3629) - Exhibit D - COST WORKBOOK
Table C-2: One-Time and Ongoing Software Costs (Optional/if Bidder-Provided)
The Bidder must provide costs for any and all Bidder-provided software licenses, additional software, and technical support services listed in Column Zero (0). Each row's total is the sum of the amounts specified in Columns 2a-2d and 3a-3d. To obtain the Total Cost (Column 14), specify the number of licenses per fiscal year (FY) in Columns 4, 5, 6,and 7. Optional columns 8, 9 and any inserted columns by the Bidder are used to capture costs for additional implementation segments. Multiply the sum of Columns 4, 5, 6, 7, 8, and any inserted columns for implementation segments by the Unit Cost (Column 12). Enter the result as either a One-Time Cost incurred during a specific FY (Columns 2a, 2b, 2c, 2d) or an Ongoing Cost by FY (Columns 3a, 3b, 3c, 3d), whichever applies. For each row, please also specify the the Unit Type (Column 11), and the Number of Units (Column 13) (if applicable).
012a2b2c2d3a3b3c3d4567891011121314
Bidder-Provided Software/SupportSoftware Item Description and Purpose
- INCLUDE NARRATIVE -One-Time Costs incurred in
FY 2026-27One-Time Costs incurred in
FY 2027-28One-Time Costs incurred in
FY 2028-29One-Time Costs incurred in
FY 2029-30Ongoing Costs - ongoing costs for data cleansing/ conversion/ migration, back-end services enhancement, Hypercare and Warranty in
FY 2026-27Ongoing Costs - ongoing costs for data cleansing/ conversion/ migration, back-end services enhancement, Hypercare and Warranty in
FY 2027-28Ongoing Costs - ongoing costs for data cleansing/ conversion/ migration, back-end services enhancement, Hypercare and Warranty in
FY 2028-29Ongoing Costs - ongoing costs for data cleansing/ conversion/ migration, back-end services enhancement, Hypercare and Warranty in
FY 2029-30FY 2026-27 # of licenses neededFY 2027-28 # of licenses neededFY 2028-29 # of licenses neededFY 2029-30 # of licenses neededProduction Implementation #1 - # of additional licenses neededProduction Implementation #2 - # of additional licenses neededProduction Implementation #NN - # of additional licenses neededUnit Type (e.g., external user, internal user, CPU, hours)Unit Cost – If multiple unit types for a part, use a different line for each unit type
# of UnitsTotal Software and Support Costs
(Columns 2a through 3d)Total FY 2026-27Total FY 2027-28Total FY 2028-29Total FY 2029-30
a. Bidder-provided software accelerators/add-on licenses

List each item in its own row numbered as follows a(1), a(2), a(3)… Insert rows as needed.

a(1)$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00.00.00.00.00.00.0$0.000$0.00$0.00$0.00$0.00$0.00
a(2)$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00.00.00.00.00.00.0$0.000$0.00$0.00$0.00$0.00$0.00
a(3)$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00.00.00.00.00.00.0$0.000$0.00$0.00$0.00$0.00$0.00
b. Costs for bidder-provided component technical support (annual warranty/tech support/upgrade fees)

List each item in its own row numbered as follows b(1), b(2), b(3)… Insert rows as needed.

b(1)$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00.00.00.00.00.00.0$0.000$0.00$0.00$0.00$0.00$0.00
b(2)$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00.00.00.00.00.00.0$0.000$0.00$0.00$0.00$0.00$0.00
b(3)$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00.00.00.00.00.00.0$0.000$0.00$0.00$0.00$0.00$0.00
c. Other required bidder-provided components - costs

List each item in its own row numbered as follows c(1), c(2), c(3)… Insert rows as needed.

c(1)$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00.00.00.00.00.00.0$0.000$0.00$0.00$0.00$0.00$0.00
c(2)$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00.00.00.00.00.00.0$0.000$0.00$0.00$0.00$0.00$0.00
c(3)$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00.00.00.00.00.00.0$0.000$0.00$0.00$0.00$0.00$0.00
d. Contract Subtotal Cost for Software/Hardware/Technical Support$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Notes:
Unit costs must remain the same throughout the contract period. Bidders may add rows for additional software products, as required, for their solution.
Production Implementation begins upon formal written Feature Acceptance by the State.
Pre-production licenses may be a different base cost than post-production licenses (developer licenses, vs. consumer licenses, etc.).
Columns should be added to address all environments: development, testing, production, etc. Insert additional columns as needed for additional DD&I segments.
As applicable, software costs shall be based on the estimated 8,000 internal user volume. DMV anticipates that the pre-production quantities of software will be substantially lower than the post-production quantities.
Totals from this worksheet will be listed on worksheet DL Cost C-1 Totals.

3-DL-ID Cost C-3 Unanticipated

DMV DXP WS3A - DL/ID Mainframe Services, Data & Integration RFP (ISD26-3629) - Exhibit D - COST WORKBOOK
Table C-3: Unanticipated Task/Service Rates
Unanticipated Tasks represent additional work that must be performed, but not identified in the DMV's SOW. The DMV expects that during the Contract Term, legislative and/or program changes necessitate application/system modifications. Support for such modifications will result in unanticipated work at costs to be structured on the Bidder's labor costs to support change requests.

Both the DMV and the Contractor must use the Work Authorization process outlined in the SOW and agree upon the work that needs to be performed, which will result in unanticipated costs. No work can be performed in advance of DMV's approval of a Work Authorization document.

The Bidder must specify the unanticipated hourly labor rate for the required staff classifications below for their proposal to be considered responsive. During the course of the Contract, the Contractor may use other classifications to perform work; however, the unanticipated task rate charged by the Contractor will be at the lowest classification rate provided in the Contractor's Hourly Labor Rates and classifications below. Offshore work is restricted as shown in the Statement of Work.

Bidder will determine which Key Staff will be proposed for Unanticipated Tasks.

Bidder may insert additional rows if

Information from this worksheet will be included on worksheet DL Cost C-1 Totals.

1234
Consultant RoleConsultant Name*Hourly Rate for ONSHORE Staff
for Unanticipated TasksHourly Rate for OFFSHORE / NEARSHORE Staff

for Unanticipated Tasks

KEY STAFF POSITIONS
1) Billable Hourly Rate for Project Manager (Key Staff)$0.00NA
2) Billable Hourly Rate for Senior Information Architect/Lead (Key Staff)$0.00NA
3) Billable Hourly Rate for Data Conversion Lead (Key Staff)$0.00NA
4) Billable Hourly Rate for Senior Data Architect/DBA (Key Staff)$0.00NA
5) Billable Hourly Rate for ETL Developer (Key Staff)$0.00NA
6) Billable Hourly Rate for Salesforce Developer (Key Staff)$0.00NA
7) Billable Hourly Rate for Senior Salesforce Developer (Key Staff)$0.00NA
8) Billable Hourly Rate for Mulesoft Developer (Key Staff)$0.00NA
9) Billable Hourly Rate for Senior Integration Lead (Key Staff)$0.00NA
10) Billable Hourly Rate for Data Analyst (Key Staff)$0.00NA
11) Billable Hourly Rate for Business Analyst (Key Staff)$0.00NA
12) Billable Hourly Rate for Senior Program Manager/Engagement Director (Key Staff)$0.00NA
13) Billable Hourly Rate for Senior Solution Architect/Chief Architect (Key Staff)$0.00NA
14) Billable Hourly Rate for Legacy/Mainframe Modernization Lead (Key Staff)$0.00NA
15) Billable Hourly Rate for Security Lead/Contractor Security Manager (Key Staff)$0.00NA
16) Billable Hourly Rate for Release and Cutover Manager/Transition Manager (Key Staff)$0.00NA
17) Billable Hourly Rate for Quality Assurance and Test Lead (Key Staff)$0.00NA
18) Billable Hourly Rate for Data Quality and Reconciliation Lead (Key Staff)$0.00NA
19) Billable Hourly Rate for Training and Knowledge Transfer Lead (Key Staff)$0.00NA
20) Billable Hourly Rate for OCM Lead (Key Staff)$0.00NA
21) Billable Hourly Rate for Scrum Master (Key Staff)$0.00NA
22) Billable Hourly Rate for Test Automation Engineer (Key Staff)$0.00NA
23) Billable Hourly Rate for Test Analyst/Tester (Key Staff)$0.00NA
24) Billable Hourly Rate for Technical Writer/Documentation Lead (Key Staff)$0.00NA
25) Billable Hourly Rate for Rules Engine Developer (Key Staff)$0.00NA
26) Billable Hourly Rate for any additional Key staff roles proposed by bidder (List Role)$0.00NA
NON-KEY STAFF POSITIONS
27) Billable Hourly Rate for Non-Key Staff$0.00$0.00
28) Billable Hourly Rate for other Non-Key Staff (List Role)$0.00$0.00
29) Billable Hourly Rate for other Non-Key Staff (List Role)$0.00$0.00
30) Billable Hourly Rate for other Non-Key Staff (List Role)$0.00$0.00
31) Billable Hourly Rate for other Non-Key Staff (List Role)$0.00$0.00
32) Billable Hourly Rate for other Non-Key Staff (List Role)$0.00$0.00
33) Billable Hourly Rate for other Non-Key Staff (List Role)$0.00$0.00
34) Billable Hourly Rate for other Non-Key Staff (List Role)$0.00$0.00
AVERAGE RATE FOR ONSHORE NON-KEY STAFFBidder should ensure that average calculation includes any additional rows inserted by Bidder.$0.00
AVERAGE RATE FOR OFFSHORE/NEARSHORE NON-KEY STAFFBidder should ensure that average calculation includes any additional rows inserted by Bidder.$0.00
Notes:
Any work authorized under the Contract must utilize the hourly rates listed above, which are binding through the term of the Contract.
Bidder to determine which Key Staff to propose for Unanticipated Tasks, which may be fewer than for Hypercare & Warranty period.
Bidder may insert rows to list additional staff, beyond Key Staff, required to perform contracted tasks.
Totals from this worksheet will be listed on worksheet DL Cost C-1 Totals.

4-DL-ID Cost C-4 Services

DMV DXP WS3A - DL/ID Mainframe Services, Data & Integration RFP (ISD26-3629) - Exhibit D - COST WORKBOOK
Table C-4: Proposed Services Cost
The Contractor must provide sufficient staffing to achieve project deliverables and milestones and ensure the actual cost for each deliverable does not exceed the quoted cost for each deliverable as shown in Table C-5 of this Cost Workbook. Hourly rates are listed here for the purposes of developing future Work Orders.
12a2b345679
Consultant RoleProposed
Consultant NameThis staff is shown in Attachment 17.1?
(Yes/No)Hourly Rate

for Services (from tab DL-ID Cost C-3) Expected Annual Hours for Services

FY 2026-27Expected Annual Hours for Services
FY 2027-28Expected Annual Hours for Services
FY 2028-29Expected Annual Hours for Services
FY 2029-30Total Cost

per Staff

(3*(4+5+6+7))Total FY 2026-27Total FY 2027-28Total FY 2028-29Total FY 2029-30
1) Billable Hourly Rate for Project Manager (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
2) Billable Hourly Rate for Senior Information Architect/Lead (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
3) Billable Hourly Rate for Data Conversion Lead (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
4) Billable Hourly Rate for Senior Data Architect/DBA (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
5) Billable Hourly Rate for ETL Developer (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
6) Billable Hourly Rate for Salesforce Developer (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
7) Billable Hourly Rate for Senior Salesforce Developer (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
8) Billable Hourly Rate for Mulesoft Developer (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
9) Billable Hourly Rate for Senior Integration Lead (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
10) Billable Hourly Rate for Data Analyst (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
11) Billable Hourly Rate for Business Analyst (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
12) Billable Hourly Rate for Senior Program Manager/Engagement Director (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
13) Billable Hourly Rate for Senior Solution Architect/Chief Architect (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
14) Billable Hourly Rate for Legacy/Mainframe Modernization Lead (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
15) Billable Hourly Rate for Security Lead/Contractor Security Manager (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
16) Billable Hourly Rate for Release and Cutover Manager/Transition Manager (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
17) Billable Hourly Rate for Quality Assurance and Test Lead (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
18) Billable Hourly Rate for Data Quality and Reconciliation Lead (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
19) Billable Hourly Rate for Training and Knowledge Transfer Lead (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
20) Billable Hourly Rate for OCM Lead (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
21) Billable Hourly Rate for Scrum Master (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
22) Billable Hourly Rate for Test Automation Engineer (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
23) Billable Hourly Rate for Test Analyst/Tester (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
24) Billable Hourly Rate for Technical Writer/Documentation Lead (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
25) Billable Hourly Rate for Rules Engine Developer (Key Staff)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
26) Billable Hourly Rate for Other Non-Key Staff (List Role)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
(Insert additional rows as needed)$0.000.00.00.00.0$0.00$0.00$0.00$0.00$0.00
27) Total Hours per Period0.00.00.00.0
28) Total Staff Cost for all Contract Years$0.00$0.00$0.00$0.00$0.00
Notes:
Authorization for tasks shall be initiated via the Work Authorization process, utilizing the Staff Rates listed above, which are binding through the term of each contract.
Bidder to determine which Key Staff to propose for the final Hypercare and Warranty period, which may be fewer than for Years 2 and 3.
Bidder may insert rows to list additional staff, beyond Key Staff, required to perform contracted tasks.
Totals from this worksheet will be reported on worksheet DL Cost C-1 Totals.

5-DL-ID Cost C-5 Deliverables

DMV DXP WS3A - DL/ID Mainframe Services, Data & Integration RFP (ISD26-3629) - Exhibit D - COST WORKBOOK
Table C-5: Proposed Deliverables Cost
The Bidder will enter data only in the white cells, gray shaded cells are auto-calculated. The Bidder must specify the number of hours each proposed Key Staff classification and Non-Key Staff classification will work on a particular deliverable.

Enter the Hours for Staff by classification; for Key Staff, the Workbook will refer to Tab 5-DL-ID Cost C-4 to multiply the number of hours by the specified rate to calculate the Cost.

For Non-Key Staff, enter the role/classification, hours, and cost per deliverable. The Workbook will sum all staff Cost columns to populate Column 3 Deliverable Cost; if Non-Key Staff Costs have been shown for a deliverable, ensure the calculated amount in Column 3 correctly reflects the cost of all Non-Key Staff.

Indicate the Fiscal Year the deliverable cost is incurred by entering the value of column 3 in either column 6, 7, 8, or 9.

Indicate the total hours worked for Key Staff in space 10 and total hours worked for Non-Key Staff in space 11. Calculate the % of total hours worked for Key Staff in space 12 and the % of total hours worked for Non-Key Staff in space 13.

This information will be used for negotiation.

12a23456789
Deliverable NameMaximum AmountDMV total cost % maximumPercentage of Overall
Contract ValueDeliverable CostHoldback - 15%
Prior to Final Feature AcceptanceAmount Available to Invoice
Prior to Final Feature AcceptanceCost Incurred FY 2026-27Cost Incurred FY 2027-28Cost Incurred FY 2028-29Cost Incurred FY 2029-30Key Staff Assignments to DeliverableNon-Key Staff Assignments to Deliverable

(no more than 75% of hours can be allocated to Non-Key Staff)

PROJECT TOTAL$ 35,500,000.00Project ManagerSr. Info Architect / Performance LeadData Architect / DBAData Conversion LeadETL DeveloperSr. Salesforce DeveloperSalesforce DeveloperMuleSoft DeveloperSr. Integration LeadData AnalystBusiness AnalystSR PgM MGR/Eng DirSR SA/Chief ArchitectMainframe Mod LeadSecurity Lead/MgrRelease/Cutover MgrQA/Test LeadDQ Reconciliation LeadTraining/KT LeadOCM Lead
DEL-1 to DEL-8: Project Management Plan and Sub-PlansHoursCostHoursCostHoursCostHoursCostHoursCostHoursCostHoursCostHoursCostHoursCostHoursCostHoursCostHoursCostHoursCostHoursCostHoursCostHoursCostHoursCostHoursCostHoursCostHours
1. Project Management Plan - DEL-01$ 1,420,000.004%0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
2. System Security Sub-Plan - DEL-020.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3. DevSecOps Sub-Plan - DEL-030.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
4. Quality, Testing and Production Release Sub-Plan - DEL-040.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
5. End-User Training Sub-Plan - DEL-05-A0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
6. Technical Knowledge Transfer Sub-Plan - DEL-05-B0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
7. Organizational Change Management Coordination Sub-Plan - DEL-060.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
8. Transition Exit and Interaction from Contractor to DMV Sub-Plan - DEL-070.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
9. Transition Entry and Interaction and Hypercare Delivery Sub-Plan - DEL-080.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
DEL-09-A: Project Schedule0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
DEL-09-B: Hypercare and Warranty Period Project Schedule0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
DEL-10: Solution Architecture Document$ 7,100,000.0020%0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
DEL-11: Solutions & Services Design Document0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
DEL-12: Conversion, Integration, and Implementation Approach0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
DEL-13: Data Cleansing, Conversion and Implementation
1. Data Cleansing, Conversion, and Migration Plan - DEL-13-A$ 24,850,000.0070%0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
2. Data Auditing & Cleansing Report (all phases) - DEL-13-B0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3. Data Migration Report (all phases) - DEL-13-C0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
4. User Quality Assurance Testing Report (all phases) - DEL-13-D0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
DEL-14: Back-End Reengineering Phased Solution Delivery0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
DEL-15: Integrations Phased Solution Delivery0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
DEL-16: Training Coordination and OCM Coordination$ 1,065,000.003%0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
DEL-17: Pre-Production Readiness Assessment0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
DEL-18: Transition Exit and Interaction Delivery0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SUBTOTAL - Costs for all Deliverables above$0.00$0.00$0.00
DEL-19: Monthly Hypercare and Warranty Service Reports$ 1,065,000.003%0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
DEL-20: Technology Recovery Simulation Plan and Execution0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SUBTOTAL - Costs for Deliverables 19 & 20$0.00N/A$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000
Total Deliverable Cost100%0.00%$0.00$0.00$0.00$0.00$0.00$0.00$0.00
10Total Hours for Key Staff
11Total Hours for Non-Key Staff
12% of Hours for Key Staff
Notes:13% of Hours for Non-Key Staff
Authorization for tasks shall be initiated via the Work Authorization process, utilizing the Staff Rates listed in this Cost Workbook, which are binding through the term of the Contract.
Information from this worksheet will be used during DMV's review of the Bidder's ATTACHMENT 17.1: KEY STAFF QUALIFICATIONS MATRIX
No holdback applies for deliverables DEL-17 and DEL-18.
Totals from this worksheet will NOT be listed on worksheet DL Cost C-1 Totals. Deliverable costs are provided on worksheet DL Cost C-4.

This is the start of the file's text. The full file is on GovTribe.