J-6 MODIFIED PRE-AWARD SURVEY (SF 1408) FORM
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP DTFT60-13-R-00003
J-6, Attachment
Modified Preaward Survey of Prospective Contractor Accounting System Checklist
FAR 16.301-3 states that a cost-reimbursement type contract may be used only when the contractor’s accounting system is adequate for determining costs applicable to the contract.
For further information, please review DCAA Manual No. 7641.90, Information for Contractor’s, dated June 26, 2012, located at http:www.dcaa.mil/DCAAm_7641.90pdf
Instructions:
1. Mark “X” in the appropriate column.
2. On Page 2, provide a narrative describing how the current accounting system supports your response to each item. Be as descriptive as necessary.
3. Answer the questions on page 3.
Contractor Name:
Point of Contact:
(Name/Ph #/email)
CAGE Code:
DUNS Code:
Yes No N/A Note
1. Is the accounting system in accord with generally accepted accounting principles?
2. ACCOUNTING SYSTEM PROVIDES FOR:
a. Proper segregation of direct costs from indirect costs. 2
b. Identification and accumulation of direct costs by contract. 3
c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)
d. Accumulation of costs under general ledger control. 5
e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.
f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.
g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.
h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.
i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.
j. Segregation of preproduction costs from production costs. 11 http://www.dcaa.mil/DCAAm_7641.90pdf
Modified Preaward Survey of Prospective Contractor Accounting System
3. Accounting system provides financial information:
a. Required by contract clauses concerning limitation of cost
(FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16).
b. Required to support requests for progress payments. 13
4. Is the accounting system designed, and are the records maintained in such a manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?
5. Is the accounting system currently in full operation? (If not, describe in Page 2 narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.)
6. Has your organization’s Accounting System ever been audited by
DCAA?
7. If the answer is yes to question 6. Above, when was the audit performed? Within the past 1 year to the closing date of this solicitation, within the past 3 years prior to the closing date of this solicitation, or greater than 3 years prior to the closing date of this solicitation.
8. If the answer is “YES” to question 6 above, did DCAA determine the
Accounting System acceptable for award of prospective contracts?
9. Has your organization’s Accounting System been audited by an outside Certified Public Accounting or other Cognizant Federal Agency other than DCAA?
10. Is your organization’s Accounting System in accord with Generally
Accepted Accounting Principles (GAAP)?
Modified Preaward Survey of Prospective Contractor Accounting System
Instruction: Use this section to explain how the current accounting system supports your response to each item. If Yes, provide an explanation that validates your answer in the box below, if NO, provide an explanation in the box below, if a response is N/A provide further explanation. Use as much space as needed. Provide references to current policies and procedures if applicable.
Note
Narrative
Modified Preaward Survey of Prospective Contractor Accounting System
PLEASE ANSWER ALL QUESTIONS BELOW:
IS YOUR ORGANIZATION’S ACCOUNTING SYSTEM READY FOR A DCAA AUDIT?
(YES/NO)
HAVE YOU READ THE REQUIREMENTS IN THE SF1408? (YES/NO)
HAVE YOU READ THE "Information for Contractors" DOCUMENT ON DCAA's WEBSITE (http://www.dcaa.mil/)? (YES/NO)
PLEASE IDENTIFY THE DCAA OFFICE THAT IS COGNIZANT OVER YOUR COMPANY -
(Found on DCAA's website (http://www.dcaa.mil/)
PLEASE IDENTIFY YOUR COMPANY’S POINT OF CONTACT REGARDING YOUR
ACCOUNTING SYSTEM (Name/ph #/ email)
If an Outside CPA/Non DoD agency has reviewed your Accounting System, please provide a copy of the Report.
[Insert name and title of individual responsible for design of the accounting system]
Name:
Title:
Contractor:
Signature:
Date: