Corbin Russwin Locksets-ja_Redacted.pdf

PDF 319 KB Posted

Attached to
Y1DA--552-CSI-162: Site Prep for PET CT Federal contract opportunity
Solicitation number
36C25021B0001
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document contains a sole source justification for a federal contract opportunity. The Department of Veterans Affairs is seeking to acquire Corbin Russwin locksets to maintain standardization across doors at the Dayton VAMC. Market research found this manufacturer is the only one compatible with existing locksets. The justification cites the extensive existing Corbin Russwin system and need for standardization as reasons for sole source. Approvals were provided by Electrical Engineer Joy Amundson, Contracting Officer Brian Kish, and other officials.

A related pre-solicitation notice seeks site preparation services for a PET-CT replacement project at the Dayton VAMC. The 100% set-aside opportunity for Service-Disabled Veteran-Owned Small Businesses is valued between $1-5 million. The solicitation will be issued on November 9th with proposals due 30 days later. A site visit will be scheduled and amendments posted to SAM.gov. The selected SDVOSB must perform a minimum of 25% construction work. The opportunity is issued by VA Network Contracting Office 10 for the Veterans Health Administration.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--552-CSI-162: Site Prep for PET CT, newest first.
File Type Posted
36C25021B0001 A00007.pdf PDF
36C25021B0001 A00006.pdf PDF
JA - GOJO toilet accessories 2-18-2021_Redacted (1).pdf PDF
Bid Opening Instructions.pdf PDF
36C25021B0001 A00004.docx DOCX document
JA - Tork toilet accessories 2-18-2021_Redacted.pdf PDF
Pre-Bid RFI Responses Add No 2.pdf PDF
G100 - Cover Sheet - Add 2 (1).pdf PDF
2019-1206_C301 (DETLS) (1).pdf PDF
image001 (3).png PNG image
275223 - Nurse Call and Code Blue Systems - Add 2 (1).pdf PDF
2019-1206_C300 (DETLS) (1).pdf PDF
36C25021B0001 A00005 (1).pdf PDF
CBLH Addendum 1 Narrative.pdf PDF
102800ToiletAccessoriesADDNo1.pdf PDF
18111DVAMCPETCTGeotechReport.pdf PDF
18111DVAMCPETCTGeotechAddendumNo1.pdf PDF
36C25021B0001A00003.docx DOCX document
090600ScheduleofFinishesAddNo1.pdf PDF
EL2.3+Add+1.pdf PDF
EL3.4+Add+1+.pdf PDF
AS400EXTERIORELEVATIONSADDNo1.pdf PDF
BidOpeningInstructions.docx DOCX document
Pre-BidRFIResponsesAddNo2-19-2021.pdf PDF
Nu.+12+-+Site+Plan+Add+No+1.pdf PDF
AS522DETAILSADDNo1.pdf PDF
230711HVACandBoilerPlantInsulationAddNo1.pdf PDF
EL4.3+Add+1.pdf PDF
EL2.0+Add+1.pdf PDF
EL0.2+Add+1.pdf PDF
552-CSI-162 Site Visit Sign In.pdf PDF
36C25021B0001 A00002.docx DOCX document
Bid Opening Instructions.docx DOCX document
Site Visit Sign-In Sheet .xlsx XLSX spreadsheet
36C25021B0001 A00001.docx DOCX document
Valcom - ja_Redacted.pdf PDF
Masonry Veneer-JA_Redacted.pdf PDF
Fire Alarm-ja_Redacted.pdf PDF
18111 - DVAMC PETCTPart-4.pdf PDF
18111 - DVAMC PETCTPart-1.pdf PDF
Wage Determination.pdf PDF
18111 - DVAMC PETCTPart-3.pdf PDF
Patient Lifts-ja_Redacted.pdf PDF
Chicago Faucets-ja_Redacted.pdf PDF
18111 - DVAMC PETCTPart-2.pdf PDF
18111 - DVAMC PETCT PM VOL 1 of 2.pdf PDF
36C25021B0001_1.docx DOCX document
Beldon - Homestead - masonry brick-ja_Redacted.pdf PDF
18111 - DVAMC PETCTPart-5.pdf PDF
18111 - DVAMC PETCT PM VOL 2 of 2.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAPM Part 806.3 Other Than Full and Open Competition (OFOC) SOP Attachment 2: Request for Sole Source Justification Format >SAT

OFOC SOP Revision 10 Page 2 of 3 Original Date: 03/22/11 Revision 10 Date: 09/10/2020

8. Description of the Market Research Conducted and the Results, or a Statement of the Reasons

Market Research Was Not Conducted: The Corbin Russwin lockset system have been established and maintained at the Dayton VAMC. The facility has many doors and the locksets are standardized for facility maintenance efficiency. A system of this size would be unmanageable without standardization. FAR 6.302-1 “As described in Section 6 above, market research, in accordance with FAR Part 10, was conducted by synopsis of the proposed acquisition, advising industry of the pending acquisition and soliciting inquiries from interested parties.”

9. Any Other Facts Supporting the Use of Other than Full and Open Competition: This manufacturer is the only one that will provide locksets compatible with thos already in use on our campus.

10. Listing of Sources that Expressed, in Writing, an Interest in the Acquisition: N/A

11. A Statement of the Actions, if any, the Agency May Take to Remove or Overcome any Barriers to Competition before Making subsequent acquisitions for the supplies or services required: N/A

12. Requirements Certification: I certify that the requirement outlined in this justification is a Bona Fide Need of the Department of Veterans Affairs and that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief.

Joy Amundson Date Electrical Engineer Dayton VAMC

13. Approvals in accordance with the VHAPM Part 806.3 OFOC SOP:

a. Contracting Officer or Designee’s Certification (required): I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.

Brian Kish Date Contracting Officer

NCO 10

11/16/2020

11/16/2020

Joy S. Amundson 341203

Digitally signed by Joy S.

Amundson 341203 Date: 2020.11.16 11:02:57 -05'00'

Brian S. Kish 217044

Digitally signed by Brian S. Kish 217044 Date: 2020.11.16 17:05:29 -05'00'

VHAPM Part 806.3 Other Than Full and Open Competition (OFOC) SOP Attachment 2: Request for Sole Source Justification Format >SAT

OFOC SOP Revision 10 Page 3 of 3 Original Date: 03/22/11 Revision 10 Date: 09/10/2020

b. One Level Above the Contracting Officer (Required over SAT but not exceeding $700K): I certify the justification meets requirements for other than full and open competition.

Scottie Paramoure Date Division Chief, Construction & Leasing

NCO 10

c. VHA RPO HCA Review and Approval: I have reviewed the foregoing justification and find it to be complete and accurate to the best of my knowledge and belief and recommend approval (if over $68 million) or approve ($700K to $68 million) for other than full and open competition.

Terry Spitzmiller Date VHA Head of Contracting Activity (HCA)

d. VHA Senior Procurement Executive Approval (over $68 million): I have reviewed the foregoing justification and find it to be complete and accurate to the best of my knowledge and belief and approve for other than full and open competition.

Name Date Deputy Assistant Secretary for Acquisition and Logistics Senior Procurement Executive (SPE) Department of Veterans Affairs

File details come from the government source that posted it. Updated .