Y1DA--552-CSI-162: Site Prep for PET CT Federal contract opportunity
Solicitation number
36C25021B0001
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This pre-solicitation notice is for site preparation services for a PET/CT replacement project at the Dayton VA Medical Center. The Department of Veterans Affairs seeks a Service-Disabled Veteran-Owned Small Business to demolish existing structures and prepare the site for building operations at a cost between $1,000,000 and $5,000,000. Interested offerors must register at SAM.gov by November 9, 2020 to receive the solicitation, which will require bid, payment and performance bonds. The selected contractor must complete all work within 245 calendar days of receiving the notice to proceed and perform a minimum of 25% of construction work. A site visit will be scheduled, and amendments will be posted at SAM.gov. Questions should be directed to the point of contact by the deadline outlined in the forthcoming solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--552-CSI-162: Site Prep for PET CT, newest first.
File Type Posted
36C25021B0001 A00007.pdf PDF
36C25021B0001 A00006.pdf PDF
JA - GOJO toilet accessories 2-18-2021_Redacted (1).pdf PDF
Bid Opening Instructions.pdf PDF
36C25021B0001 A00004.docx DOCX document
JA - Tork toilet accessories 2-18-2021_Redacted.pdf PDF
image001 (3).png PNG image
275223 - Nurse Call and Code Blue Systems - Add 2 (1).pdf PDF
G100 - Cover Sheet - Add 2 (1).pdf PDF
2019-1206_C301 (DETLS) (1).pdf PDF
2019-1206_C300 (DETLS) (1).pdf PDF
36C25021B0001 A00005 (1).pdf PDF
CBLH Addendum 1 Narrative.pdf PDF
102800ToiletAccessoriesADDNo1.pdf PDF
18111DVAMCPETCTGeotechReport.pdf PDF
18111DVAMCPETCTGeotechAddendumNo1.pdf PDF
36C25021B0001A00003.docx DOCX document
090600ScheduleofFinishesAddNo1.pdf PDF
EL2.3+Add+1.pdf PDF
EL3.4+Add+1+.pdf PDF
AS400EXTERIORELEVATIONSADDNo1.pdf PDF
230711HVACandBoilerPlantInsulationAddNo1.pdf PDF
EL4.3+Add+1.pdf PDF
EL2.0+Add+1.pdf PDF
BidOpeningInstructions.docx DOCX document
Pre-BidRFIResponsesAddNo2-19-2021.pdf PDF
Nu.+12+-+Site+Plan+Add+No+1.pdf PDF
AS522DETAILSADDNo1.pdf PDF
EL0.2+Add+1.pdf PDF
552-CSI-162 Site Visit Sign In.pdf PDF
36C25021B0001 A00002.docx DOCX document
Bid Opening Instructions.docx DOCX document
Site Visit Sign-In Sheet .xlsx XLSX spreadsheet
36C25021B0001 A00001.docx DOCX document
Valcom - ja_Redacted.pdf PDF
Masonry Veneer-JA_Redacted.pdf PDF
Fire Alarm-ja_Redacted.pdf PDF
Corbin Russwin Locksets-ja_Redacted.pdf PDF
18111 - DVAMC PETCTPart-4.pdf PDF
18111 - DVAMC PETCTPart-1.pdf PDF
Chicago Faucets-ja_Redacted.pdf PDF
18111 - DVAMC PETCTPart-2.pdf PDF
18111 - DVAMC PETCT PM VOL 1 of 2.pdf PDF
36C25021B0001_1.docx DOCX document
Wage Determination.pdf PDF
18111 - DVAMC PETCTPart-3.pdf PDF
Patient Lifts-ja_Redacted.pdf PDF
Beldon - Homestead - masonry brick-ja_Redacted.pdf PDF
18111 - DVAMC PETCTPart-5.pdf PDF
18111 - DVAMC PETCT PM VOL 2 of 2.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

552-CSI-162 DVAMC SITE PREP FOR PET/CT

# Questions Response 1 Control Room 1C137D observation window- No glass manufacturer makes a glass that is 1/2" lead that the specs call out. To achieve this, glass would need to be layered which would cause distortion.

The required lead shielding for control room 1C137D and in particular the observation window, the documents are correct.

3/4" lead shielding is required for the observation window. This can be achieved by layering the lead glass so it is equal to the required 3/4" lead shielding. We advise bidders to work with a radiation shielding company who has dealt with this in the past, as the thickness and requirements are not a common occurence. The Nuclear Medicine department is aware of the distortion and yellowish tint that will occur as you layer the lead glass panes.

2 There is lead glass called out for exterior windows which the glass company will not warrant lead glass used in an exterior application.

The exterior windows in the Toilet Rooms 1C137J and 1C137K, DO NOT have to be lead shielded. Those exterior windows can be the same insulated window system as the ones in the Equipment Room 1C137H. Even though the windows are not lead shielded, the walls around the Toilet Rooms will still require the lead shielding.

3 erosion control clarification Add 2 includes two civil drawings and a revised cover sheet G100, revised C3.0 and additional C3.1. 2019- 1206_C301(DETLS).pdf, 2019-1206_C300(DETLS).pdf and G100 - Cover Sheet- Add 2.

4 After reviewing drawing EL4.3 Add 1, is Tek tone existing and either it or Dukane acceptable as a replacement?

Dukane is existing. Tektone or Dukane is acceptable for new work. Add 2 includes revised Specification Section 275223 Nurse Call and Code Blue Systems.