This presolicitation notice is for site preparation work for a PET-CT replacement project at the Dayton VA Medical Center in Dayton, Ohio. The Department of Veterans Affairs seeks a service-disabled veteran-owned small business to demolish existing structures and prepare the site, including furnishing labor, materials, and performing all work according to project specifications, drawings, and a statement of work. The project magnitude is between $1,000,000 and $5,000,000, work must be completed within 245 calendar days of receiving a notice to proceed, and the North American Industry Classification System code assigned is 236220 with a small business size standard of $39.5 million. At least 25% of construction work must be performed by the service-disabled veteran-owned small business or a service-disabled veteran-owned small business subcontractor. The solicitation will require bid, payment, and performance bonds and include a mandatory site visit. The solicitation and amendments will be posted on beta.sam.gov in November 2020 with proposals due approximately 30 days later.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--552-CSI-162: Site Prep for PET CT, newest first.
File Type Posted
36C25021B0001 A00007.pdf PDF
36C25021B0001 A00006.pdf PDF
JA - GOJO toilet accessories 2-18-2021_Redacted (1).pdf PDF
Bid Opening Instructions.pdf PDF
36C25021B0001 A00004.docx DOCX document
JA - Tork toilet accessories 2-18-2021_Redacted.pdf PDF
Pre-Bid RFI Responses Add No 2.pdf PDF
image001 (3).png PNG image
275223 - Nurse Call and Code Blue Systems - Add 2 (1).pdf PDF
2019-1206_C301 (DETLS) (1).pdf PDF
2019-1206_C300 (DETLS) (1).pdf PDF
36C25021B0001 A00005 (1).pdf PDF
CBLH Addendum 1 Narrative.pdf PDF
102800ToiletAccessoriesADDNo1.pdf PDF
18111DVAMCPETCTGeotechReport.pdf PDF
18111DVAMCPETCTGeotechAddendumNo1.pdf PDF
36C25021B0001A00003.docx DOCX document
090600ScheduleofFinishesAddNo1.pdf PDF
EL2.3+Add+1.pdf PDF
EL3.4+Add+1+.pdf PDF
AS400EXTERIORELEVATIONSADDNo1.pdf PDF
230711HVACandBoilerPlantInsulationAddNo1.pdf PDF
EL4.3+Add+1.pdf PDF
EL2.0+Add+1.pdf PDF
BidOpeningInstructions.docx DOCX document
Pre-BidRFIResponsesAddNo2-19-2021.pdf PDF
Nu.+12+-+Site+Plan+Add+No+1.pdf PDF
AS522DETAILSADDNo1.pdf PDF
EL0.2+Add+1.pdf PDF
552-CSI-162 Site Visit Sign In.pdf PDF
36C25021B0001 A00002.docx DOCX document
Bid Opening Instructions.docx DOCX document
Site Visit Sign-In Sheet .xlsx XLSX spreadsheet
36C25021B0001 A00001.docx DOCX document
Valcom - ja_Redacted.pdf PDF
Masonry Veneer-JA_Redacted.pdf PDF
Fire Alarm-ja_Redacted.pdf PDF
Corbin Russwin Locksets-ja_Redacted.pdf PDF
18111 - DVAMC PETCTPart-4.pdf PDF
18111 - DVAMC PETCTPart-1.pdf PDF
Chicago Faucets-ja_Redacted.pdf PDF
18111 - DVAMC PETCTPart-2.pdf PDF
18111 - DVAMC PETCT PM VOL 1 of 2.pdf PDF
36C25021B0001_1.docx DOCX document
Wage Determination.pdf PDF
18111 - DVAMC PETCTPart-3.pdf PDF
Patient Lifts-ja_Redacted.pdf PDF
Beldon - Homestead - masonry brick-ja_Redacted.pdf PDF
18111 - DVAMC PETCTPart-5.pdf PDF
18111 - DVAMC PETCT PM VOL 2 of 2.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

200 FT MAX REMOTE POINT TO EXIT

NFPA 101 LIFE SAFETY CODE (2018)

PROJECT AREA: RENOVATION - 1,465 SF

NEW CONSTRUCTION - 2,973 SF

TOTAL - 4,438 SF

FIRE SUPPRESSION: FULLY SPRINKLERED

TRAVEL DISTANCE (18.2.6):

100 FT MAX. WITHIN SUITE REMOTE POINT TO EXIT

FIRE-RESISTANCE RATINGS REQUIREMENTS - TABLE A.8.2.1.2:

CONSTRUCTION TYPE: TYPE II (222)

STRUCTURAL FRAME: 2 HOURS; 1 HOUR FOR ROOF SUPPORT ONLY

BEARING WALLS:

EXTERIOR:

INTERIOR:

NON BEARING WALLS & PARTITIONS:

EXTERIOR: 0 HOURS

INTERIOR: 0 HOURS

FLOOR CONSTRUCTION: 2 HOURS

ROOF CONSTRUCTION: 1 HOURS

2 HOURS; 1 HOUR FOR ROOF SUPPORT ONLY

2 HOURS; 1 HOUR FOR ROOF SUPPORT ONLY

INTERIOR FINISHES - TABLE A.10.2.2: CLASS A

STORAGE ROOMS (18.3.2.1.2):

LARGER THAN 100 SF STORING COMBUSTIBLE MATERIAL:

COMMON PATH OF TRAVEL (18.2.5.3): 100 FT MAX.

CORRIDOR WALLS (18.3.6.2.3): LIMIT TRANSFER OF SMOKE

SHAFT ENCLOSURES (8.6.5):

CONNECTING 4 STORIES OR MORE:

CONNECTING LESS THAN 4 STORIES:

2 HOURS

1 HOUR

SMOKE COMPARTMENTS (18.3.7.1.3c): 40,000 S.F. MAX - CONTAINING NO SLEEPING ROOMS

EXISTING SMOKE COMPARTMENT 21,595 S.F.

NEW ADDITION 2,973 S.F.

TOTAL 24,568 S.F.

EXIT ACCESS CORRIDORS (8.3.3.2.2): 1 HOUR

OCCUPANCY (6.1.5): HEALTH CARE

1 HR RATING

PATIENT CARE NON-SLEEPING SUITES (18.2.5.7.3):

MAXIMUM SIZE (18.2.5.7.3.2):

TRAVEL DISTANCE (18.2.5.7.3.3):

12,500 SF

200 FT MAX. SUITE REMOTE POINT TO AN EXIT

OCCUPANCY LOAD FACTOR - TABLE 7.3.1.2:

240 FT2 / PERSON

4,438 SF / 240 = 19 OCCUPANTS

INPATIENT TREATMENT:

SMOKE BARRIERS (18.3.7.3): 1 HOUR

EXIT ENCLOSURES (7.1.3.2.1): 1 HOUR

DEAD-END LIMIT (TABLE A7.6): 30'-0" (SPRINKLERED)

4,438 SF NEW SUITE SF

NFPA 101 LIFE SAFETY CODE 2018

NFPA 1 NATIONAL FIRE CODE 2018

NFPA 70 NATIONAL ELECTRICAL CODE 2017

PG 18-15 A/E SUBMISSION REQUIREMENTS

VOLUME C - MINOR AND NRM PROJECTS November 2008 PG 18-13 VA BARRIER FREE DESIGN STANDARD November 2018 NUCLEAR MEDICINE DESIGN GUIDE April 2008 H-18-8 SEISMIC DESIGN REQUIREMENTS November 2019 HVAC DESIGN MANUAL May 2019 PLUMBING DESIGN MANUAL May 2018 FIRE PROTECTION DESIGN MANUAL December 2015 WHOLE BUILDING COMMISSIONING PROCESS MANUAL May 2013 SITE DEVELOPMENT DESIGN MANUAL February 2013

REFER TO STATEMENT OF BID ITEMS IN SECTION 01 00 00 AND DEDUCT ALTERNATES SHEETS

FOR ADDITIONAL INFORMATION

TOTAL PROJECT DURATION 245 DAYS

DEDUCT DESCRIPTION DURATION (IN CALENDAR DAYS)

ALTERNATE #1 REMOVE WINDOW ON NORTH AND EAST ELEVATIONS 0 DAYS

ALTERNATE #2 REMOVE ROOF TOP SCREEN WALL 0 DAYS

ALTERNATE #3 SMALLER CANOPY 0 DAYS

ALTERNATE #4 REMOVE PHASE III (-28) DAYS

PROJECT NUMBER:

SUBMITTAL FOR:

DRAWING INDEX: CODE DATA:LOCATION MAP:

DAYTON VA MEDICAL CENTER

CBLH Design, Inc.

Thorson Baker Architecture & Interior Design

Structural Engineer Richfield, Ohio

Cleveland, Ohio

Scheeser Buckley Mayfield Mechanical & Electrical Engineer Uniontown, Ohio

SITE PREP FOR PET/CT REPLACEMENT

4100 WEST THIRD STREET, DAYTON, OHIO 45428

552-CSI-162

BID & CONSTRUCTION (REVISED)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

PHILIP P. KIRK

CHIEF ENGINEER

552-CSI-162

7850 Freeway Circle

440.243.2000 t

Cleveland, OH 44130

440.243.3305 f

Arch. Proj. No.:

C U s e rs

\j c h o \D o c u m e n ts

\R

S

IT

E

P R

E P

P E

T -C

T jc h o

.r v t

/2

/2

:1

:3

P

M

GI-100

COVER SITE PREP FOR PET/CT

REPLACEMENT

4100 WEST THIRD STREET,

DAYTON, OHIO 45428

09/16/2020 CE/RG DRW

BID & CONSTRUCTION

(REVISED)18111

DRAWING INDEX

SHEET NO. SHEET NAME

SS-203 FOUNDATION SECTIONS & DETAILS

SS-300 COLD FORMED SECTION & DETAILS

SS-400 ROOF FRAMING SECTIONS & DETAILS

SS-401 FRAMING SECTION & DETAILS

FIRE PROTECTION

FA0.1 FIRE SUPRESSION GENERAL NOTES, SYMBOL LEGEND AND DETAILS

FA1.1 NEW WORK - FIRST FLOOR PLAN - FIRE SUPRESSION (PHASE 1)

FA2.1 NEW WORK - FIRST FLOOR PLAN - FIRE SUPRESSION (PHASE 2)

FA3.1 NEW WORK - FIRST FLOOR PLAN - FIRE SUPRESSION (PHASE 3)

MECHANICAL

MH0.1 HVAC GENERAL NOTES AND SYMBOL LEGEND

MH1.1 NEW WORK - BASEMENT FLOOR PLAN - HVAC (PIPING) (PHASE 1)

MH1.2 NEW WORK - FIRST FLOOR PLAN - HVAC (DUCTWORK) (PHASE 1)

MH1.3 NEW WORK - FIRST FLOOR PLAN - HVAC (PIPING) (PHASE 1)

MH1.4 NEW WORK - ROOF PLAN - HVAC (PHASE 1)

MH2.1 DEMOLITION - FIRST FLOOR PLAN - HVAC (PHASE 2)

MH2.2 NEW WORK - FIRST FLOOR PLAN - HVAC (PHASE 2)

MH3.1 DEMOLITION - FIRST FLOR PLAN - HVAC (PHASE 3)

MH3.2 NEW WORK - FIRST FLOOR PLAN -HVAC (PHASE 3)

MH4.1 DETAILS - HVAC

MH4.2 DETAILS - HVAC

MH5.1 TEMPERATURE CONTROLS - HVAC

MH6.1 SCHEDULES - HVAC

PLUMBING

PL0.1 PLUMBING GENERAL NOTES, SYMBOL LEGEND, SCHEDULES AND PLBG ISOMETRIC

PL1.1 DEMOLITION - FIRST FLOOR PLAN - SANITARY/VENT (PHASE 1)

PL1.2 DEMOLITION - FIRST FLOOR PLAN - WATER AND MED GAS (PHASE 1)

PL1.3 NEW WORK - FIRST FLOOR PLAN - SANITARY/VENT (PHASE 1)

PL1.4 NEW WORK - FIRST FLOOR PLAN - WATER AND MED GAS (PHASE 1)

PL1.5 NEW WORK - ROOF PLAN - PLUMBING (PHASE 1)

PL2.1 DEMOLITION - FIRST FLOOR PLAN - SANITARY/VENT (PHASE 2)

PL2.2 DEMOLITION - FIRST FLOOR PLAN - WATER AND MED GAS (PHASE 2)

PL2.3 NEW WORK - BASEMENT FLOOR PLAN - WATER AND MED GAS (PHASE 2)

PL2.4 NEW WORK - FIRST FLOOR PLAN - SANITARY/VENT (PHASE 2)

PL2.5 NEW WORK - FIRST FLOOR PLAN - WATER AND MED GAS (PHASE 2)

PL3.1 DETAILS - PLUMBING

ELECTRICAL

EL0.1 ELECTRICAL GENERAL NOTES AND SYMBOL LEGEND

EL0.2 LIGHTING FIXTURE SCHEDULE AND DETAILS

ES.1 ELECTRICAL SITE PLAN

EL1.1 LIGHTING - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 1)

EL1.2A POWER - PARTIAL BASEMENT FLOOR PLAN - ELECTRICAL

EL1.2B POWER - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 1)

EL1.3 POWER - ROOF PLAN - ELECTRICAL (PHASE 1)

EL1.4 SYSTEMS - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 1)

EL1.4B SYSTEMS - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 1)

EL2.0 DEMOLITION - FIRST FLOOR PLAN - ELECTRICAL (PHASE 2)

EL2.1 LIGHTING - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 2)

EL2.2 POWER - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 2)

EL2.3 SYSTEMS - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 2)

EL3.1 DEMOLITION - FIRST FLOOR PLAN - ELECTRICAL (PHASE 3)

EL3.2 LIGHTING - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 3)

EL3.3 POWER - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 3)

EL3.4 SYSTEMS - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 3)

EL4.0 PANELBOARD SCHEDULE

EL4.1 ONE LINE DIAGRAM

EL4.2 ELECTRICAL DETAILS

EL4.3 ELECTRICAL DETAILS

EL5.0 DAYTON VAMC GE REFERENCE DRAWINGS

GE HEALTHCARE

GE-101 GE HEALTHCARE DRAWINGS (FOR REFERENCE ONLY)

GE-102 GE HEALTHCARE DRAWINGS (FOR REFERENCE ONLY)

GE-103 GE HEALTHCARE DRAWINGS (FOR REFERENCE ONLY)

GE-104 GE HEALTHCARE DRAWINGS (FOR REFERENCE ONLY)

GE-105 GE HEALTHCARE DRAWINGS (FOR REFERENCE ONLY)

DRAWING INDEX

SHEET NO. SHEET NAME

A-1 SITE PLAN

GENERAL

GI-100 COVER

GI-101 ABBREVIATIONS, LEGENDS AND SYMBOLS

GI-102 OVERALL FIRST FLOOR PLAN

GI-103 LIFE SAFETY PLAN

GI-110 FIRE STOPPING DETAILS

GI-111 FIRE STOPPING DETAILS

GI-112 FIRE STOPPING DETAILS

GI-113 FIRE STOPPING DETAILS

GI-114 FIRE STOPPING DETAILS

GI-115 FIRE STOPPING DETAILS

CIVIL

1 OF 2 TOPOGRAPHIC SURVEY (FOR REFERENCE ONLY)

2 OF 2 TOPOGRAPHIC SURVEY (FOR REFERENCE ONLY)

C-1.0 SITE PREPARATION & SITE PLAN

C-2.0 SITE NOTES

C-3.0 SITE DETAILS

C-3.1 SITE DETAILS

ARCHITECTURE

AD-200 FIRST FLOOR DEMOLITION PLAN - PHASE I

AD-201 FIRST FLOOR DEMOLITION PLAN - PHASE II

AD-202 FIRST FLOOR DEMOLITION SECTION - PHASE II

AD-203 FIRST FLOOR DEMOLITION PLAN - PHASE III (DEDUCT ALTERNATE #4)

AS-200 ARCHITECTURAL SITE PLAN

AS-301 FIRST FLOOR PLAN - PHASE I

AS-302 FIRST FLOOR PLAN - PHASE II

AS-303 FIRST FLOOR PLAN - PHASE III (DEDUCT ALTERNATE #4)

AS-304 FIRST FLOOR FINISH PLAN

AS-305 FIRST FLOOR PLAN - LEAD SHIELDING

AS-310 FIRST FLOOR EQUIPMENT PLAN - PHASE I

AS-311 FIRST FLOOR EQUIPMENT PLAN - PHASE II

AS-320 ROOF PLAN

AS-321 ROOF PLAN (DEDUCT ALTERNATE #2)

AS-322 ENLARGED CANOPY PLAN AND DETAILS

AS-400 EXTERIOR ELEVATIONS

AS-500 BUILDING SECTIONS

AS-510 WALL SECTIONS

AS-511 WALL SECTIONS

AS-520 DETAILS

AS-521 DETAILS

AS-522 DETAILS

AS-700 INTERIOR ELEVATIONS - PHASE I

AS-701 INTERIOR ELEVATIONS - PHASE I

AS-702 INTERIOR ELEVATIONS - PHASE I

AS-720 INTERIOR ELEVATIONS - PHASE II

AS-730 INTERIOR ELEVATIONS - PHASE III (DEDUCT ALTERNATE #4)

AS-800 MILLWORK DETAILS

AS-901 FIRST FLOOR REFLECTED CEILING PLAN - PHASE I

AS-902 FIRST FLOOR REFLECTED CEILING PLAN - PHASE II

AS-903 FIRST FLOOR REFLECTED CEILING PLAN - PHASE III (DEDUCT ALTERNATE #4)

AS-1000 PARTITION TYPES

AS-1001 DOOR & WINDOW SCHEDULES AND DETAILS

AS-1002 INTERIOR SIGNAGE

STRUCTRUAL

SS-001 GENERAL NOTES

SS-002 GENERAL NOTES

SS-003 GENERAL NOTES

SS-100 FOUNDATION PLAN

SS-100A FOUNDATION PLAN PHASE II

SS-101 ROOF FRAMING PLAN

SS-200 FOUNDATION SECTIONS & DETAILS

SS-201 FOUNDATION SECTIONS & DETAILS

SS-202 FOUNDATION SECTIONS & DETAILS

4100 WEST THIRD,

DAYTON, OHIO 45428

BUILDING CODES / PROJECT MANUALS PROJECT DURATION

Revisions: Date:

35% SUBMISSION 12-12-2019

65% SUBMISSION 02-24-2020

65% RE-SUBMISSION 03-31-2020

95% SUBMISSION 05-08-2020

BID & CONSTRUCTION 06-12-2020

BID & CONSTRUCTION (REVISED) 07-13-2020

SOLE SOURCE REVISION 09-16-2020

ADDENDUM 2 02-25-2021

Sheets
GI-100 - COVER

File details come from the government source that posted it. Updated .