This presolicitation notice is for site preparation work for a PET-CT replacement project at the Dayton VA Medical Center in Dayton, Ohio. The Department of Veterans Affairs seeks a service-disabled veteran-owned small business to demolish existing structures and prepare the site, including furnishing labor, materials, and performing all work according to project specifications, drawings, and a statement of work. The project magnitude is between $1,000,000 and $5,000,000, work must be completed within 245 calendar days of receiving a notice to proceed, and the North American Industry Classification System code assigned is 236220 with a small business size standard of $39.5 million. At least 25% of construction work must be performed by the service-disabled veteran-owned small business or a service-disabled veteran-owned small business subcontractor. The solicitation will require bid, payment, and performance bonds and include a mandatory site visit. The solicitation and amendments will be posted on beta.sam.gov in November 2020 with proposals due approximately 30 days later.
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
200 FT MAX REMOTE POINT TO EXIT
NFPA 101 LIFE SAFETY CODE (2018)
PROJECT AREA: RENOVATION - 1,465 SF
NEW CONSTRUCTION - 2,973 SF
TOTAL - 4,438 SF
FIRE SUPPRESSION: FULLY SPRINKLERED
TRAVEL DISTANCE (18.2.6):
100 FT MAX. WITHIN SUITE REMOTE POINT TO EXIT
FIRE-RESISTANCE RATINGS REQUIREMENTS - TABLE A.8.2.1.2:
CONSTRUCTION TYPE: TYPE II (222)
STRUCTURAL FRAME: 2 HOURS; 1 HOUR FOR ROOF SUPPORT ONLY
BEARING WALLS:
EXTERIOR:
INTERIOR:
NON BEARING WALLS & PARTITIONS:
EXTERIOR: 0 HOURS
INTERIOR: 0 HOURS
FLOOR CONSTRUCTION: 2 HOURS
ROOF CONSTRUCTION: 1 HOURS
2 HOURS; 1 HOUR FOR ROOF SUPPORT ONLY
2 HOURS; 1 HOUR FOR ROOF SUPPORT ONLY
INTERIOR FINISHES - TABLE A.10.2.2: CLASS A
STORAGE ROOMS (18.3.2.1.2):
LARGER THAN 100 SF STORING COMBUSTIBLE MATERIAL:
COMMON PATH OF TRAVEL (18.2.5.3): 100 FT MAX.
CORRIDOR WALLS (18.3.6.2.3): LIMIT TRANSFER OF SMOKE
SHAFT ENCLOSURES (8.6.5):
CONNECTING 4 STORIES OR MORE:
CONNECTING LESS THAN 4 STORIES:
2 HOURS
1 HOUR
SMOKE COMPARTMENTS (18.3.7.1.3c): 40,000 S.F. MAX - CONTAINING NO SLEEPING ROOMS
EXISTING SMOKE COMPARTMENT 21,595 S.F.
NEW ADDITION 2,973 S.F.
TOTAL 24,568 S.F.
EXIT ACCESS CORRIDORS (8.3.3.2.2): 1 HOUR
OCCUPANCY (6.1.5): HEALTH CARE
1 HR RATING
PATIENT CARE NON-SLEEPING SUITES (18.2.5.7.3):
MAXIMUM SIZE (18.2.5.7.3.2):
TRAVEL DISTANCE (18.2.5.7.3.3):
12,500 SF
200 FT MAX. SUITE REMOTE POINT TO AN EXIT
OCCUPANCY LOAD FACTOR - TABLE 7.3.1.2:
240 FT2 / PERSON
4,438 SF / 240 = 19 OCCUPANTS
INPATIENT TREATMENT:
SMOKE BARRIERS (18.3.7.3): 1 HOUR
EXIT ENCLOSURES (7.1.3.2.1): 1 HOUR
DEAD-END LIMIT (TABLE A7.6): 30'-0" (SPRINKLERED)
4,438 SF NEW SUITE SF
NFPA 101 LIFE SAFETY CODE 2018
NFPA 1 NATIONAL FIRE CODE 2018
NFPA 70 NATIONAL ELECTRICAL CODE 2017
PG 18-15 A/E SUBMISSION REQUIREMENTS
VOLUME C - MINOR AND NRM PROJECTS November 2008 PG 18-13 VA BARRIER FREE DESIGN STANDARD November 2018 NUCLEAR MEDICINE DESIGN GUIDE April 2008 H-18-8 SEISMIC DESIGN REQUIREMENTS November 2019 HVAC DESIGN MANUAL May 2019 PLUMBING DESIGN MANUAL May 2018 FIRE PROTECTION DESIGN MANUAL December 2015 WHOLE BUILDING COMMISSIONING PROCESS MANUAL May 2013 SITE DEVELOPMENT DESIGN MANUAL February 2013
REFER TO STATEMENT OF BID ITEMS IN SECTION 01 00 00 AND DEDUCT ALTERNATES SHEETS
FOR ADDITIONAL INFORMATION
TOTAL PROJECT DURATION 245 DAYS
DEDUCT DESCRIPTION DURATION (IN CALENDAR DAYS)
ALTERNATE #1 REMOVE WINDOW ON NORTH AND EAST ELEVATIONS 0 DAYS
ALTERNATE #2 REMOVE ROOF TOP SCREEN WALL 0 DAYS
ALTERNATE #3 SMALLER CANOPY 0 DAYS
ALTERNATE #4 REMOVE PHASE III (-28) DAYS
PROJECT NUMBER:
SUBMITTAL FOR:
DRAWING INDEX: CODE DATA:LOCATION MAP:
DAYTON VA MEDICAL CENTER
CBLH Design, Inc.
Thorson Baker Architecture & Interior Design
Structural Engineer Richfield, Ohio
Cleveland, Ohio
Scheeser Buckley Mayfield Mechanical & Electrical Engineer Uniontown, Ohio
SITE PREP FOR PET/CT REPLACEMENT
4100 WEST THIRD STREET, DAYTON, OHIO 45428
552-CSI-162
BID & CONSTRUCTION (REVISED)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
PHILIP P. KIRK
CHIEF ENGINEER
552-CSI-162
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
C U s e rs
\j c h o \D o c u m e n ts
\R
S
IT
E
P R
E P
P E
T -C
T jc h o
.r v t
/2
/2
:1
:3
P
M
GI-100
COVER SITE PREP FOR PET/CT
REPLACEMENT
4100 WEST THIRD STREET,
DAYTON, OHIO 45428
09/16/2020 CE/RG DRW
BID & CONSTRUCTION
(REVISED)18111
DRAWING INDEX
SHEET NO. SHEET NAME
SS-203 FOUNDATION SECTIONS & DETAILS
SS-300 COLD FORMED SECTION & DETAILS
SS-400 ROOF FRAMING SECTIONS & DETAILS
SS-401 FRAMING SECTION & DETAILS
FIRE PROTECTION
FA0.1 FIRE SUPRESSION GENERAL NOTES, SYMBOL LEGEND AND DETAILS
FA1.1 NEW WORK - FIRST FLOOR PLAN - FIRE SUPRESSION (PHASE 1)
FA2.1 NEW WORK - FIRST FLOOR PLAN - FIRE SUPRESSION (PHASE 2)
FA3.1 NEW WORK - FIRST FLOOR PLAN - FIRE SUPRESSION (PHASE 3)
MECHANICAL
MH0.1 HVAC GENERAL NOTES AND SYMBOL LEGEND
MH1.1 NEW WORK - BASEMENT FLOOR PLAN - HVAC (PIPING) (PHASE 1)
MH1.2 NEW WORK - FIRST FLOOR PLAN - HVAC (DUCTWORK) (PHASE 1)
MH1.3 NEW WORK - FIRST FLOOR PLAN - HVAC (PIPING) (PHASE 1)
MH1.4 NEW WORK - ROOF PLAN - HVAC (PHASE 1)
MH2.1 DEMOLITION - FIRST FLOOR PLAN - HVAC (PHASE 2)
MH2.2 NEW WORK - FIRST FLOOR PLAN - HVAC (PHASE 2)
MH3.1 DEMOLITION - FIRST FLOR PLAN - HVAC (PHASE 3)
MH3.2 NEW WORK - FIRST FLOOR PLAN -HVAC (PHASE 3)
MH4.1 DETAILS - HVAC
MH4.2 DETAILS - HVAC
MH5.1 TEMPERATURE CONTROLS - HVAC
MH6.1 SCHEDULES - HVAC
PLUMBING
PL0.1 PLUMBING GENERAL NOTES, SYMBOL LEGEND, SCHEDULES AND PLBG ISOMETRIC
PL1.1 DEMOLITION - FIRST FLOOR PLAN - SANITARY/VENT (PHASE 1)
PL1.2 DEMOLITION - FIRST FLOOR PLAN - WATER AND MED GAS (PHASE 1)
PL1.3 NEW WORK - FIRST FLOOR PLAN - SANITARY/VENT (PHASE 1)
PL1.4 NEW WORK - FIRST FLOOR PLAN - WATER AND MED GAS (PHASE 1)
PL1.5 NEW WORK - ROOF PLAN - PLUMBING (PHASE 1)
PL2.1 DEMOLITION - FIRST FLOOR PLAN - SANITARY/VENT (PHASE 2)
PL2.2 DEMOLITION - FIRST FLOOR PLAN - WATER AND MED GAS (PHASE 2)
PL2.3 NEW WORK - BASEMENT FLOOR PLAN - WATER AND MED GAS (PHASE 2)
PL2.4 NEW WORK - FIRST FLOOR PLAN - SANITARY/VENT (PHASE 2)
PL2.5 NEW WORK - FIRST FLOOR PLAN - WATER AND MED GAS (PHASE 2)
PL3.1 DETAILS - PLUMBING
ELECTRICAL
EL0.1 ELECTRICAL GENERAL NOTES AND SYMBOL LEGEND
EL0.2 LIGHTING FIXTURE SCHEDULE AND DETAILS
ES.1 ELECTRICAL SITE PLAN
EL1.1 LIGHTING - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 1)
EL1.2A POWER - PARTIAL BASEMENT FLOOR PLAN - ELECTRICAL
EL1.2B POWER - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 1)
EL1.3 POWER - ROOF PLAN - ELECTRICAL (PHASE 1)
EL1.4 SYSTEMS - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 1)
EL1.4B SYSTEMS - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 1)
EL2.0 DEMOLITION - FIRST FLOOR PLAN - ELECTRICAL (PHASE 2)
EL2.1 LIGHTING - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 2)
EL2.2 POWER - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 2)
EL2.3 SYSTEMS - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 2)
EL3.1 DEMOLITION - FIRST FLOOR PLAN - ELECTRICAL (PHASE 3)
EL3.2 LIGHTING - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 3)
EL3.3 POWER - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 3)
EL3.4 SYSTEMS - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 3)
EL4.0 PANELBOARD SCHEDULE
EL4.1 ONE LINE DIAGRAM
EL4.2 ELECTRICAL DETAILS
EL4.3 ELECTRICAL DETAILS
EL5.0 DAYTON VAMC GE REFERENCE DRAWINGS
GE HEALTHCARE
GE-101 GE HEALTHCARE DRAWINGS (FOR REFERENCE ONLY)
GE-102 GE HEALTHCARE DRAWINGS (FOR REFERENCE ONLY)
GE-103 GE HEALTHCARE DRAWINGS (FOR REFERENCE ONLY)
GE-104 GE HEALTHCARE DRAWINGS (FOR REFERENCE ONLY)
GE-105 GE HEALTHCARE DRAWINGS (FOR REFERENCE ONLY)
DRAWING INDEX
SHEET NO. SHEET NAME
A-1 SITE PLAN
GENERAL
GI-100 COVER
GI-101 ABBREVIATIONS, LEGENDS AND SYMBOLS
GI-102 OVERALL FIRST FLOOR PLAN
GI-103 LIFE SAFETY PLAN
GI-110 FIRE STOPPING DETAILS
GI-111 FIRE STOPPING DETAILS
GI-112 FIRE STOPPING DETAILS
GI-113 FIRE STOPPING DETAILS
GI-114 FIRE STOPPING DETAILS
GI-115 FIRE STOPPING DETAILS
CIVIL
1 OF 2 TOPOGRAPHIC SURVEY (FOR REFERENCE ONLY)
2 OF 2 TOPOGRAPHIC SURVEY (FOR REFERENCE ONLY)
C-1.0 SITE PREPARATION & SITE PLAN
C-2.0 SITE NOTES
C-3.0 SITE DETAILS
C-3.1 SITE DETAILS
ARCHITECTURE
AD-200 FIRST FLOOR DEMOLITION PLAN - PHASE I
AD-201 FIRST FLOOR DEMOLITION PLAN - PHASE II
AD-202 FIRST FLOOR DEMOLITION SECTION - PHASE II
AD-203 FIRST FLOOR DEMOLITION PLAN - PHASE III (DEDUCT ALTERNATE #4)
AS-200 ARCHITECTURAL SITE PLAN
AS-301 FIRST FLOOR PLAN - PHASE I
AS-302 FIRST FLOOR PLAN - PHASE II
AS-303 FIRST FLOOR PLAN - PHASE III (DEDUCT ALTERNATE #4)
AS-304 FIRST FLOOR FINISH PLAN
AS-305 FIRST FLOOR PLAN - LEAD SHIELDING
AS-310 FIRST FLOOR EQUIPMENT PLAN - PHASE I
AS-311 FIRST FLOOR EQUIPMENT PLAN - PHASE II
AS-320 ROOF PLAN
AS-321 ROOF PLAN (DEDUCT ALTERNATE #2)
AS-322 ENLARGED CANOPY PLAN AND DETAILS
AS-400 EXTERIOR ELEVATIONS
AS-500 BUILDING SECTIONS
AS-510 WALL SECTIONS
AS-511 WALL SECTIONS
AS-520 DETAILS
AS-521 DETAILS
AS-522 DETAILS
AS-700 INTERIOR ELEVATIONS - PHASE I
AS-701 INTERIOR ELEVATIONS - PHASE I
AS-702 INTERIOR ELEVATIONS - PHASE I
AS-720 INTERIOR ELEVATIONS - PHASE II
AS-730 INTERIOR ELEVATIONS - PHASE III (DEDUCT ALTERNATE #4)
AS-800 MILLWORK DETAILS
AS-901 FIRST FLOOR REFLECTED CEILING PLAN - PHASE I
AS-902 FIRST FLOOR REFLECTED CEILING PLAN - PHASE II
AS-903 FIRST FLOOR REFLECTED CEILING PLAN - PHASE III (DEDUCT ALTERNATE #4)
AS-1000 PARTITION TYPES
AS-1001 DOOR & WINDOW SCHEDULES AND DETAILS
AS-1002 INTERIOR SIGNAGE
STRUCTRUAL
SS-001 GENERAL NOTES
SS-002 GENERAL NOTES
SS-003 GENERAL NOTES
SS-100 FOUNDATION PLAN
SS-100A FOUNDATION PLAN PHASE II
SS-101 ROOF FRAMING PLAN
SS-200 FOUNDATION SECTIONS & DETAILS
SS-201 FOUNDATION SECTIONS & DETAILS
SS-202 FOUNDATION SECTIONS & DETAILS
4100 WEST THIRD,
DAYTON, OHIO 45428
BUILDING CODES / PROJECT MANUALS PROJECT DURATION
Revisions: Date:
35% SUBMISSION 12-12-2019
65% SUBMISSION 02-24-2020
65% RE-SUBMISSION 03-31-2020
95% SUBMISSION 05-08-2020
BID & CONSTRUCTION 06-12-2020
BID & CONSTRUCTION (REVISED) 07-13-2020
SOLE SOURCE REVISION 09-16-2020
ADDENDUM 2 02-25-2021