This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for Contract CN331, Task Assignment 22, Change Order 1. The document establishes a modification to an existing consulting agreement between FDEP and Humiston & Moore Engineers, a coastal engineering firm specializing in beach restoration and coastal systems design. The project is located at Gasparilla Island State Park in Lee County, Florida, and involves an interim beach nourishment initiative funded through ARPA (American Rescue Plan Act) resources. The contract is managed by Ralph Perkins (FDEP Contract Manager) and Brett Moore, P.E. (Consultant Representative), with oversight from FDEP's Bureau of Design and Construction and Parks Service divisions.

The change order authorizes $33,818.00 in fixed-fee services for design, bidding, and pre-construction phases of a beach nourishment project involving offshore sand dredging from Boca Grande Pass (approximately 1.3 miles offshore) and placement along the park's Gulf-facing beach. The work is divided into three subtasks: Subtask 5a ($17,656.00) covers construction plans, technical specifications, bid schedule, and opinion of probable costs; Subtask 5b ($7,422.00) encompasses pre-bid conference coordination, technical support, addenda preparation, and bid review and recommendation; and Subtask 5c ($8,740.00) addresses pre-construction regulatory requirements and agency coordination meetings. The contract execution date is August 3, 2023, with a task end date of July 27, 2026. Construction observation support (Subtask 5d) and post-construction certification services (Subtask 5e) are scoped with costs to be determined upon design completion. Payment is due upon FDEP approval of deliverables for each subtask.

View the file

Other files

File Type Posted
CN-370000-CN331-CMC3.pdf PDF
CN-370000-CN331-T13CO1.pdf PDF
CN-370000-CN331-T14.pdf PDF
CN-370000-CN331-T15.pdf PDF
CN-370000-CN331-T18.pdf PDF
CN-370000-CN331-T21CO2.pdf PDF
CN-370000-CN331-T21CO3.pdf PDF
CN-370000-CN331-T22.pdf PDF
CN-370000-CN331-T22CO2.pdf PDF
CN-370000-CN331-T8.pdf PDF
CN-370000-CN331-CMC5.pdf PDF
CN-370000-CN331-T13CO4.pdf PDF
CN-370000-CN331-T15CO1.pdf PDF
CN-370000-CN331-T16.pdf PDF
CN-370000-CN331-T17.pdf PDF
CN-370000-CN331-T17CO1.pdf PDF
CN-370000-CN331-T18CO4.pdf PDF
CN-370000-CN331-T19.pdf PDF
CN-370000-CN331-T1CO1.pdf PDF
CN-370000-CN331-T20.pdf PDF
CN-370000-CN331-T4CO2.pdf PDF
CN-370000-CN331-T4CO3.pdf PDF
CN-370000-CN331-T7.pdf PDF
CN-370000-CN331-CMC2.pdf PDF
CN-370000-CN331-R1.pdf PDF
CN-370000-CN331-T11.pdf PDF
CN-370000-CN331-T13CO2.pdf PDF
CN-370000-CN331-T16CO1.pdf PDF
CN-370000-CN331-T18CO1.pdf PDF
CN-370000-CN331-T18CO2.pdf PDF
CN-370000-CN331-T21.pdf PDF
CN-370000-CN331-T22CO3.pdf PDF
CN-370000-CN331-T23.pdf PDF
CN-370000-CN331-T23CO1.pdf PDF
CN-370000-CN331-T24.pdf PDF
CN-370000-CN331-T3C01.pdf PDF
CN-370000-CN331-T4.pdf PDF
CN-370000-CN331-TA6.pdf PDF
CN-370000-CN331.pdf PDF
CN-370000-CN331-CMC1.pdf PDF
CN-370000-CN331-CMC4.pdf PDF
CN-370000-CN331-T1.pdf PDF
CN-370000-CN331-T10.pdf PDF
CN-370000-CN331-T12.pdf PDF
CN-370000-CN331-T13.pdf PDF
CN-370000-CN331-T13CO3.pdf PDF
CN-370000-CN331-T16CO2.pdf PDF
CN-370000-CN331-T1CO2.pdf PDF
CN-370000-CN331-T1CO3.pdf PDF
CN-370000-CN331-T1CO4.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT CHANGE ORDER FORM

( ) Page 1 of 1

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description and Justification of Change:

Change in Task Amount:

Item Reimbursement Fixed Fee Total

Original Task Amount:

Task amount including all previous Change Orders:

Net increase/decrease in task amount for this Change Order:

Total Amounts with all Change Orders:

Change in Task Time:

Original Task Execution Date:

Original Task End Date:

Present Task End Date:

Net Change in Days:

New Task End Date:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 Digit FLAIR Code: Total:

CN331 TA22 C/O1 ARPLE1

Gasparilla Island State Park Coastal Resiliency Enhancement

Humiston & Moore Engineers

Brett Moore, P.E. 239.566.0649 X 102bdm@humistonandmoore.com>

Ralph Perkins 850-245-2560 Ralph.Perkins@FloridaDEP.gov

Provide bidding assistance , additional plan designs outside of scope for short term enhancements as well as long term to coastal resiliency at Gasparilla Island State Park per the attached proposal dated 02/27/2024

$ 0.00 $ 112,550.00 $ 112,550.00 $ 0.00 $ 112,550.00 $ 112,550.00 $ 0.00 $ 33,818.00 $ 33,818.00 $ 0.00 $ 146,368.00 $ 146,368.00

08/03/2023

07/27/2026

07/27/2026

0.00

07/27/2026

Lisa Yarborough

Garland Sandel

Ralph Perkins

Brett Moore, P.E.

Bryan Bradner

ARPLE1 CSFRF 37538010000 085176/000286 000286 U1671 241000 AD $ 33,818.00

$ 33,818.0037101000286375004000008517622

February 27, 2024 Garland Sandel, Design Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard, MS 520 Tallahassee, FL 32399

RE: DEP Agreement CN331 - Humiston & Moore Engineers Conceptual Alternatives Analysis for Coastal Resiliency Enhancements Gasparilla Island State Park Change Order #1 Interim Beach Nourishment Task Assignment Number 22

Dear Mr. Sandel, In reference to recent conversations regarding the use of ARPA funds toward an interim Beach Nourishment, we are preparing this Change Order to address the necessary tasks needed to develop the plans and technical specifications to support bidding and selection of a contractor in 2024. We intend to use existing data which we have collected as part of Task Assignment 22, in conjunction with existing monitoring data from previous restoration efforts on Gasparilla Island. In addition, we have included relative costs for support through the bidding phase. The scope for the construction phase and post construction certification and as-builts is provided and costs will be determined once the design is completed and accepted by your Department.

Sincerely, HUMISTON & MOORE ENGINEERS

Brett D. Moore, P.E., BC.DE.

President

Interim Beach Nourishment at Gasparilla Island State Park

CN331 - TA #22 Change Order 1

Description: Design, Bid, and Construction Phases

The following services are related to the design, bidding and construction phases for Beach Nourishment Project at Gasparilla Island State Park, in Lee County. The project involves the dredging of sand from the offshore borrow area along the north shoal of Boca Grande Pass approximately 1.3 miles offshore and placement of that sand within the authorized beach fill area along the park beach fronting the Gulf of Mexico. H&M will continue to work closely with the DEP Bureau of Design and Construction (BDC) staff and appointed representative for this project.

In general, the necessary steps will include the following.

1. Obtain existing monitoring data of the authorized offshore borrow area and prepare construction plans and specifications for the beach fill based on the offshore data and recent topographic and bathymetric data along the beach fill area collected under Contract CN331-TA22.

2. Provide Request for Information (RFI) support as needed during the bidding process and selection of a contractor. It is assumed this will include an onsite meeting pre-Bid meeting with prospective bidders and Park staff.

3. Conduct the pre-construction conferences with regulatory agencies, review pre-construction submittals from the Contractor, including Operations Plan, and obtain NTP for construction.

4. Provide construction management of observation services through construction to Final Completion.

5. Provide post construction Report and Certification for state and federal permits.

Subtask 5a: Construction Plans, Technical Specifications, Bid Schedule, Opinion of Probable Costs Using existing available data from monitoring of the authorized offshore borrow area and recent data collected as part of this contract along the gulf beaches within the park, prepare construction plans, technical specifications, a Bid Schedule, and an Opinion of Probable Costs to be used for bidding.

Deliverable 5a: Signed and sealed Construction Plans, Technical Specifications, Bid Schedule, and Opinion of Probable Costs in pdf format provided electronically.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 5a Construction Plans, Technical Specifications, Bid Schedule, Opinion of Probable Costs Firm Name Position Classification Hourly

Rate Hours Total Fixed

Price Cost Humiston & Moore Eng. Project Manager / P.E. $206.00 24 $4,944.00 Humiston & Moore Eng. Senior Engineer $172.00 4 $688.00 Humiston & Moore Eng. Engineer III $123.00 40 $4,920.00 Humiston & Moore Eng. Engineer I $94.00 20 $1,880.00 Humiston & Moore Eng. AutoCAD Technician II $85.00 60 $5,100.00 Humiston & Moore Eng. Administrative Assistant $62.00 2 $124.00

Subtotal $17,656.00 Total for Subtask 5a: $ $17,656.00

Subtask 5b: Bid Phase Pre-Bid Conference, Technical Support and Addenda to Bid Package, Review Bids: H&M will coordinate with DEP staff, review and comment on the final bid package for advertisement and compile relevant existing documents including final plans, technical specifications, and regulatory permits to support the bid package. Following advertisement of project, H&M will coordinate with DEP staff in preparation of responses to inquiries from potential bidders and coordinate and attend an on-site pre-bid conference with representatives of DEP Parks Service, BDC, and prospective bidders and suppliers. Engineer will prepare addenda to bid documents and responses to RFIs from prospective Bidders at the request of DEP on an as needed basis. H&M will review the proposed bids and provide a recommendation to DEP BDC staff.

Deliverable 5b: Provide Bid Tabulation and recommendation for award to BSC staff in pdf.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 5b Pre-Construction Services Firm Name Position Classification Hourly

Rate Hours Total Fixed

Price Cost Humiston & Moore Eng. Project Manager / P.E. $206.00 16 $3,296.00 Humiston & Moore Eng. Senior Engineer $172.00 1 $172.00 Humiston & Moore Eng. Engineer I I $123.00 20 $2,460.00 Humiston & Moore Eng. Engineer I $94.00 8 $752.00 Humiston & Moore Eng. AutoCAD Technician II $85.00 8 $680.00 Humiston & Moore Eng. Administrative Assistant $62.00 1 $62.00

Subtotal $7,422.00 Total for Subtask 5b: $ $7,422.00

Subtask 5c: Pre-Construction Services Pre-Construction Regulatory Requirements and Agency Meeting: Engineer will file the necessary subcontractor, and environmental protection plan from Contractor to address the requirements. H&M shall coordinate with Contractor and BDC staff in ensuring sufficiency of required items in Technical Specifications for fulfillment of pre-construction state and federal regulatory requirements. H&M, DEP Park staff, BDC staff, and Contractor will conduct a pre-construction meeting with the state and federal agencies and their respective resource agencies to fulfill the pre-construction meeting requirements of the regulatory permits. The selected Contractor will be present for this meeting. H&M will provide required notices of commencement to respective state and federal agencies.

Deliverable 5c: Summaries of Meetings (state and federal) provided electronically in pdf format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 5c Pre-Construction Services Firm Name Position Classification Hourly

Rate Hours Total Fixed

Price Cost Humiston & Moore Eng. Project Manager / P.E. $206.00 16 $3,296.00 Humiston & Moore Eng. Senior Engineer $172.00 2 $344.00 Humiston & Moore Eng. Engineer III $123.00 16 $1,968.00 Humiston & Moore Eng. Engineer I $94.00 20 $1,880.00 Humiston & Moore Eng. AutoCAD Technician II $85.00 14 $1,190.00 Humiston & Moore Eng. Administrative Assistant $62.00 1 $62.00 Subtotal $8,740.00

Total for Subtask 5c: $ $8,740.00

Subtask 5d: Construction Observation Support Construction Observation Support: H&M and/or BDC representatives will be on-site daily as required under the State updated approved QA/QC plan dated 2019. H&M shall coordinate with BDC staff on as-needed basis during the week and coordinate meetings with Contractor, Park staff, and BDC weekly throughout the construction project. Engineer shall review daily reports from Contractor and conduct construction observation services as necessary to assess construction performance in reference to technical specifications and regulatory compliance and provide reviews of contractor pay requests for BDC. This will include:

Review of daily dredged tracking records and beach disposal.

Review progress surveys from Contractor, monitor production rates and review Contractor Pay

Requests with BDC.

Periodic photos to document progress. Daily coordination with Park shore-bird monitor for work after

February 15, 2025.

Submit turbidity reports on weekly basis from Contractor subconsultant as required in state and federal permits.

Submit quarterly compliance reports to DEP.

Continue to update as-built drawings based on progress surveys from Contractor.

Deliverable 5d: Summaries of Weekly Site Meetings and Certification of Substantial Project Completion provided electronically in pdf format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Cost for these services under Subtask 5d to be determined.

Subtask 5e: Project Construction Closeout and Post Construction Certification Post Project Certifications: Upon nearing project completion, the Contractor, Engineer and BDC staff will conduct a walk-through of the project to determine if the Work is substantially complete and develop a punch list for the Contractor. Once the contractor addresses all of the items on the punch list and has provided sufficient post dredge and fill placement survey information and related survey certifications, Engineer can recommend to the DEP Parks and BDC that the project construction be deemed substantially complete so the contractor may demobilize, upon acceptance by the BDC.

Upon completion of the project and review of post construction survey data provided by Contractor, H&M as Engineer of Record, will provide all necessary project certifications including beach profile and post dredge as-built surveys to the BDC, DEP and USACE for project and permit compliance. In accordance with the DEP QA/QC program as part of the state DEP permit, sediment samples will be collected and analyzed on 500-foot stations and include background station. Analysis will include grain-size analysis and Munsell Color. Post construction report will include analysis of sediment, and a summary of dredge tracking data and turbidity monitoring. Project certifications would include reference to a set of record as-built construction plans.

Deliverable 5e: Copy of Project Certifications to DEP and USACE provided electronically in pdf format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Cost for these services under Subtask 5e to be determined.

Project Schedule:

Activity Duration (Max. Calendar Days from Authorization) Subtask 5a: Plans, specs, bid schedule, OPC 120 Subtask 5b: Bid Phase 120 Subtask 5c: Pre-Construction Services 90

Summary of Fees:

Subtask Subtask Fixed Price Cost Subtask Reimbursable Subtask 5a: Plans, specs, bid schedule, OPC $17,656.00 Subtask 5b: Bid Phase $7,422.00 Subtask 5c: Pre-Construction Services $8,740.00

Total Fixed Price Cost: $33,818.00 Total Reimbursable Cost: $0.00

Overall Total Cost: $33,818.00 Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.