This document is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under Contract No. CN214, Task Assignment No. 18. The contract involves FDEP, the consulting firm George & Associates, and the subcontractor Southern Earth Sciences, Inc. The assignment pertains to the Campground Reinvestment project at Topsail Hill Preserve State Park and is identified as Project No. 61115C. Robert George, P.E., serves as the consultant representative, with Mae Roth as the FDEP Contract Manager and Philip Stone as the project manager.
The scope of work requires Southern Earth Sciences, Inc. to conduct an asbestos demolition survey of three areas at Topsail Hill Preserve State Park: Campsites #2, Utility Pedestal #2, and the Septic Tank between campsites #3 and #5, with subsequent removal and replacement of existing concrete campsite pads and septic tank. The fixed price cost is $1,726.00, with reimbursable costs not to exceed $138.84, for a total task amount of $1,864.84. The contract period runs from execution through December 31, 2016. Funding is allocated through the Florida FLAIR system with Project #61115C, Fund 423001, and Object Code 134000. The deliverable consists of a comprehensive report identifying asbestos locations, quantities, and demolition actions in PDF format submitted to the project manager.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .