CN-370000-CN210-T4CO1.pdf
PDF 233 KB Posted
- Contract number
- CN210
- Issued by
- Florida
About this file
This is a Task Assignment Change Order Form (Change Order No. 1) issued by the Florida Department of Environmental Protection (FDEP) under FDEP Contract No. CN210 for the St. Andrews State Park Drainage Improvements project located in St. Andrews State Park. The consultant performing the work is CPH, Inc., with Jason Toole, P.E. serving as the consultant representative. The contract manager is Mae Roth, and the FDEP project manager is Theresa Carron. The change order was approved and signed by authorized representatives on various dates in June and July 2017.
This change order authorizes additional engineering and design services comprising three subtasks: Subtask 10 (Liftstation Design), Subtask 11A (Electrical Site Investigation), Subtask 11B (Electrical Redesign/Replacement for Campground), and Subtask 11C (Construction Services). Subtask 10 is valued at $14,905.40 and includes design of three new liftstations with associated civil drawings. Subtask 11 (which replaces the original Subtask 6B) totals $58,755.92 and covers electrical site investigation, complete electrical redesign of campground infrastructure, and construction inspection services, with sub-consultant Humber-Garick providing the electrical engineering work. The overall change order increases the total project cost by $53,363.40, with combined fixed price costs of $68,633.24 and reimbursable expenses of $729.70. Payment will be made upon FDEP approval of deliverables for each subtask.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .