Task Assignment Notification and Proposal Summary

This document is a Task Assignment Notification Form (TA #45) issued by the Florida Department of Environmental Protection (FDEP), Division of Recreation and Parks, under Statewide Contract CN202 with Michael Baker International, Inc. The task assignment covers erosion control and stabilization improvements at Wekiwa Springs State Park located in Orange County, Florida (Apopka). Key personnel include FDEP Project Manager Ralph Perkins and Consultant Representative Jeff Roberts, P.E., RSP1 of Michael Baker International.

The task assignment encompasses two subtasks: (1) Environmental Assessment/Data Collection and (2) Final Design Plans. Subtask 1, valued at $2,418.23 (including $150 in reimbursable exemption fees), involves collecting and reviewing environmental data from multiple agencies to confirm permit exemptions and produce an Environmental Permitting Summary Letter Report with an estimated 21-day duration. Subtask 2, valued at $14,825.86, requires finalizing design and producing comprehensive Final Construction Plans incorporating a waterline extension and irrigation system for the park's grassed areas, with an estimated 40-day duration. The overall task assignment totals $17,244.09 with a completion date of May 17, 2024. Payment is contingent upon FDEP approval of deliverables for each subtask. The project schedule indicates subtasks may be worked concurrently where practical, with a total estimated duration of 61 calendar days.

View the file

Other files

File Type Posted
CN-370000-CN202-A1.pdf PDF
CN-370000-CN202-CMC3.pdf PDF
CN-370000-CN202-CMC5.pdf PDF
CN-370000-CN202-T13CO1.pdf PDF
CN-370000-CN202-T23.pdf PDF
CN-370000-CN202-T28.pdf PDF
CN-370000-CN202-T30CO1.pdf PDF
CN-370000-CN202-T30CO2.pdf PDF
CN-370000-CN202-T32CO1.pdf PDF
CN-370000-CN202-T32CO2.pdf PDF
CN-370000-CN202-T32CO5.pdf PDF
CN-370000-CN202-T33CO1.pdf PDF
CN-370000-CN202-T34CO3.pdf PDF
CN-370000-CN202-T34CO4.pdf PDF
CN-370000-CN202-T36CO1.pdf PDF
CN-370000-CN202-T37.pdf PDF
CN-370000-CN202-T39.pdf PDF
CN-370000-CN202-T4.pdf PDF
CN-370000-CN202-T44CO2.pdf PDF
CN-370000-CN202-T45CO2.pdf PDF
CN-370000-CN202-T46.pdf PDF
CN-370000-CN202-T47.pdf PDF
CN-370000-CN202-T6CO1.pdf PDF
CN-370000-CN202-T6CO4.pdf PDF
CN-370000-CN202-T8.pdf PDF
CN-370000-CN202-T8CO2.pdf PDF
CN-370000-CN202-TA6CO3.pdf PDF
CN-370000-CN328.pdf PDF
CN-370000-CN202-CMC4.pdf PDF
CN-370000-CN202-T10.pdf PDF
CN-370000-CN202-T12.pdf PDF
CN-370000-CN202-T13CO2.pdf PDF
CN-370000-CN202-T15.pdf PDF
CN-370000-CN202-T16.pdf PDF
CN-370000-CN202-T24.pdf PDF
CN-370000-CN202-T25.pdf PDF
CN-370000-CN202-T2CO2.pdf PDF
CN-370000-CN202-T30.pdf PDF
CN-370000-CN202-T31.pdf PDF
CN-370000-CN202-T32CO3.pdf PDF
CN-370000-CN202-T33CO2.pdf PDF
CN-370000-CN202-T36CO2.pdf PDF
CN-370000-CN202-T38.pdf PDF
CN-370000-CN202-T38CO2.pdf PDF
CN-370000-CN202-T40.pdf PDF
CN-370000-CN202-T44CO1.pdf PDF
CN-370000-CN202-T45CO4.pdf PDF
CN-370000-CN202-T8CO4.pdf PDF
CN-370000-CN202-T8CO6.pdf PDF
CN-370000-CN202-TA14CO3.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT NOTIFICATION FORM

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description of Task:

Project Manager:

Schedule Start Date: Fixed Price Cost:

Completion Date: Cost Reimbursement not to exceed:

Total Task Amount:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 digit FLAIR Code: Total:

CN202 TA 45 FDEP-DRP 61378C

Wekiwa Springs State Park Wekiwa Springs Erosion Control & Access

Michael Baker International

Jeff Roberts, P.E., RSP1 (850) 701-2303 jeff.roberts@mbakerintl.com

Ralph Perkins, or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov

This TA will proceed with completion of the Environmental Assessment/Data Collection and Final Design Tasks for erosion control and stabilization improvements at the park. (See proposal dated 5/17/23).

Del Cobb, or successor

Upon Execution $ 17,094.09 5/17/2024 $ 150.00

$ 17,244.09

Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.05.18 09:27:34 -04'00'

Del Cobb Del Cobb Digitally signed by Del Cobb Date: 2023.05.18 15:52:50 -04'00'

Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.05.19 10:13:11 -04'00'

Jeff Roberts, P.E., RSP1 Jeff Roberts Digitally signed by Jeff Roberts Date: 2023.05.19 10:37:32 -04'00'

Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.

Digitally signed by Michael W.

Foster Jr., P.E.

Date: 2023.05.22 08:31:05 -04'00'

61387C 37503006080 080039/22 423001 U3200 131500 QK $ 17,244.09

$ 17,244.09

May 17, 2023

Mr. Del Cobb Project Manager Bureau of Design and Construction Division of Recreation and Parks 3900 Commonwealth Boulevard Tallahassee, FL 32399

RE: Statewide Contract: CN202, Task Assignment ___ Wekiwa Springs Final Design

Wekiwa Springs Erosion Control & Access, Orange County (Apopka), FL

Dear Mr. Cobb:

For your review, Michael Baker International, Inc., is attaching a change order proposal summary and man-hour documentation for a task assignment to include final delivery of the erosion control project, including the waterline extension and irrigation.

Please review the attached Proposal Summary and deliverables and let me know if there are any questions or comments.

Sincerely, Jeff Roberts, PE, RSP1 Associate Vice President / Sr. Project Manager

Cobb_DL Text Box

Wekiwa Springs State Park – Site Grading Improvements

Wekiwa Springs, Apopka, FL

Statewide Contract CN202, Task Assignment ___

Project Objective: Under TA #36, Michael Baker completed Conceptual and 60% Design Plans for grading improvements at the Wekiwa Springs State Park is in Orange County, Florida. Conceptual Plan

Option 1 was selected as the path forward for improvements at the park.

This TA will proceed with completion of the Environmental Assessment/Data Collection and Final Design

Tasks for erosion control and stabilization improvements at the park. Survey, Geotechnical, and

Preliminary Engineering services were delivered under TA #36. The project will be completed with the addition of 2 subtasks outlined below. It is understood with this project being improvements of areas already in use and no significant addition of impervious areas being added, Michael Baker anticipates no municipal permitting and a SJRWMD permit exemption will be issued. The subtasks outlined below will complete the design phase for the Erosion Control and Stabilization Improvements.

• Subtask 1 – Environmental Assessment/Data Collection

• Subtask 2 – Final Design Plans

General Project understandings, guidelines, and coordination was provided by Wekiwa Springs State

Park Services representatives and the FDEP project manager under TA 36.

Subtask 1: Environmental Assessment/Data Collection

Michael Baker International (MBI) will collect and review the following data prior to conducting the field surveys for the project:

• National Resource Conservation Service soils data;

• St, Johns River Water Management District (SJRWMD) land use, cover, and forms classification system (FLUCFCS) data;

• National Wetland Inventory data;

• U.S. Fish and Wildlife Service (FWS) protected species data for Highlands County;

• Florida Natural Areas Inventory (FNAI) protected species tracking list for Highlands County; and,

• United States Geological Survey contour mapping.

MBI will collect the data from the agencies listed to confirm permit exemptions. Should a permit be required based on the findings and assessment, MBI will submit for approval a change order fee proposal to obtain any permits deemed required by governing agencies.

Deliverable:

Anticipated Environmental Permitting Summary Letter Report in report in electronic (PDF) version.

Cobb_DL Text Box

Assumptions:

1. If it is determined that special purpose protected species surveys are necessary, this will be provided under a separate agreement.

2. Protected species permitting and mitigation are not included.

3. Section 7 Consultation with the U.S. Fish and Wildlife Service is not included.

4. Wekiwa Springs is a water that is retained for USACE Section 404 jurisdiction and permitting authority.

5. If it is determined that SJRWMD Environmental Resource Permitting or USACE Section 404

Permitting is required, this would be provided under a separate agreement.

6. Wetland mitigation planning, if necessary, will be provided under a separate agreement.

7. Coordination with the State Historic Preservation Office is not included.

8. Discussion of potential for County permitting will not be included in the Anticipated Permitting

Summary Letter Report.

Performance Measure: Final deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 1: Environmental Assessment/Data Collection

Company Classification Rate Hours Cost

MBI Project Manager $238.84 1 $238.84

MBI Environmental Scientist $106.81 19 $2,029.39

Subtotal (Subtask 1) 20 $2,268.23

Reimbursable Costs (Exemption Fee) $150.00

Totals (Subtask 1) 20 $2,418.23

Subtask 2: Final Construction Plans

Based on FDEP review and Comments, Michael Baker will incorporate comments and design revisions.

Finalize the design and produce Final Construction Plans. Final Construction Plans produced shall include:

• Cover Sheet

• General Notes

• Existing Conditions and Demolition Plan

• Site Improvement Plan

• Site Grading Plan

• Construction Details

• Estimated Construction Cost

The Consultant will design and implement a waterline extension and irrigation system into the approved

90% plans completed under Task 5 and prepare for final plans. The waterline extension will be placed down the center of Area 1, terminating at a hose bib connection in a locked valve box near the back of existing retaining wall.

MBI will also design an irrigation system for the grassed center portion of Area 1.

Assumptions:

• Final Construction Plans will be produced based on the original design intent and FDEP Review comments from completion of TA #36, Subtask 5: 60% Design Plans.

• FDEP will provide approximate location, type and size of existing waterline location via a marked-up site plan.

• The Consultant can assume the condition of the existing water line is acceptable for a wet tap.

• Existing water pressures are adequate to accommodate additional discharge point.

• Existing water pressures are within typical range and adequate for proposed irrigation system.

• FDEP Park staff will provide location of existing electrical panel to tap into, as well as photos of the panel and other information (verification of active circuits, Amperage ratings, etc).

• The existing electrical panel is assumed to have sufficient capacity to accommodate a new irrigation system control panel. If it is determined electrical upgrades are required to the electric panel to provide sufficient capacity for the irrigation controls, a change order will be required to provide this upgrade.

Deliverables:

• Digitally Signed and Sealed Construction Plans (PDF Format)

• Estimated Construction Cost

Performance Measure: Final deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 2: Final Construction Plans

Company Classification Rate Hours Cost

MBI Project Manager $238.84 19 $4,537.96

MBI Sr. Engineer/Planner $149.58 13 $1,944.54

MBI Designer $115.88 72 $8,343.36

Totals (Subtask 2) 104 $14,825.86

Summary of Fees:

Subtask Subtask Fixed

Price Cost Subtask

Reimbursable

Subtask 1: Environmental Assessment/Data Collection

$2,268.23 $150

Subtask 2: 100% Design Level Review $14,825.86 --

Total Fixed Price Cost $17,094.09 --

Total Reimbursable Cost -- $150

Overall Total Cost $17,244.09

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.

Project Schedule:

Project Schedule is based on estimated duration of calendar days to complete each subtask. Schedule dates will be established after approved and executed contract has been received. Where most practical, subtasks will be worked on concurrently.

Activity

Subtask Duration

(Calendar Days)

Subtask 1: Environmental Assessment 21

Subtask 2: 100% Design Level Review 40

Total Estimated Duration 61

CN202 TA45 Wekiwa Springs - Erosion Control Access.pdf
Blank TA Form.pdf

Wekiwa Springs Runoff_FinalDesign_051723.pdf