This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for Statewide Contract CN202. The document modifies Task Assignment Number 13 for the Oscar Scherer State Park Campground Bridge Replacement project. The primary parties involved are FDEP's Bureau of Design and Construction, serving as the client, and Michael Baker International, Inc. (MBI), the consulting firm providing construction administration services. The change order was executed on July 20, 2018, and extends the project timeline by 240 days to accommodate construction scheduling and campground closure operations.
The change order authorizes MBI to provide limited construction administration services including attendance at pre-bid and pre-construction meetings, review of requests for information during bidding and construction, shop drawing reviews, site inspections, and closeout documentation review. Services exclude materials testing and quality control/assurance testing. The net increase to the task amount is $26,768.10 in fixed fees, bringing the total task cost to $104,607.52. Cost breakdown includes Subtask 8 ($3,426.90), Subtask 9 ($1,495.80), Subtask 10 ($4,487.40), Subtask 11 ($2,991.60), Subtask 12 ($10,776.48), and Subtask 13 ($3,589.92). The original task end date of April 15, 2018, is extended to December 11, 2019. Payment will be made upon approval of deliverables for each subtask by FDEP in the amounts specified.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .