Contract Summary

This Task Assignment Notification Form (Task Assignment 47) documents a professional services contract between the Florida Department of Environmental Protection (FDEP) and Michael Baker International (MBI) under Statewide Contract CN202. The task assignment is for the Bridge and Abutment Rehabilitation project for Bridge #170401 (Main Drive River Bridge) located in Myakka River State Park, Sarasota County, Florida. The project is under the oversight of FDEP's Bureau of Design and Construction, with Garland Sandel serving as the project manager and Ralph Perkins as the FDEP Contract Manager. Jeff Roberts of Michael Baker International serves as the consultant representative.

The scope of services consists of nine subtasks totaling $37,642.05, comprising $37,392.05 in fixed-price costs and $250.00 in reimbursable costs. The services include environmental data collection and field surveys ($4,747.86); environmental permitting for Sarasota County, SWFWMD, and USACE ($12,327.87 plus $250.00 reimbursable); a limited bat roost survey ($4,258.84, subcontracted to Bat Conservation and Management, Inc.); preparation of 100% repair design plans and specifications ($5,531.44); pre-bid meeting attendance ($1,435.48); RFI responses during bid phase ($2,571.80); preconstruction meeting attendance ($1,435.48); RFI and shop drawing review during construction ($2,212.32); and two site inspections at 60% and 90% completion ($2,870.96). The contract execution date is October 31, 2023, with a completion date of June 30, 2025. Payment is made upon FDEP approval of deliverables for each subtask. The project schedule allocates one day for environmental data collection, 60 days for permitting, 30 days for the bat survey, and 60 days for design plans, with remaining subtasks to be scheduled as determined.

View the file

Other files

File Type Posted
CN-370000-CN202-CMC4.pdf PDF
CN-370000-CN202-T10.pdf PDF
CN-370000-CN202-T12.pdf PDF
CN-370000-CN202-T13CO2.pdf PDF
CN-370000-CN202-T15.pdf PDF
CN-370000-CN202-T16.pdf PDF
CN-370000-CN202-T24.pdf PDF
CN-370000-CN202-T25.pdf PDF
CN-370000-CN202-T2CO2.pdf PDF
CN-370000-CN202-T30.pdf PDF
CN-370000-CN202-T31.pdf PDF
CN-370000-CN202-T32CO3.pdf PDF
CN-370000-CN202-T33CO2.pdf PDF
CN-370000-CN202-T36CO2.pdf PDF
CN-370000-CN202-T38.pdf PDF
CN-370000-CN202-T38CO2.pdf PDF
CN-370000-CN202-T40.pdf PDF
CN-370000-CN202-T44CO1.pdf PDF
CN-370000-CN202-T45CO4.pdf PDF
CN-370000-CN202-T8CO4.pdf PDF
CN-370000-CN202-T8CO6.pdf PDF
CN-370000-CN202-TA14CO3.pdf PDF
CN-370000-CN202-TA17CO2.pdf PDF
CN-370000-CN202-TA2.pdf PDF
CN-370000-CN202-TA20CO1.pdf PDF
CN-370000-CN202-TA21.pdf PDF
CN-370000-CN202-TA22.pdf PDF
CN-370000-CN202-TA28 CO3.pdf PDF
CN-370000-CN202-TA7.pdf PDF
CN-370000-CN202-CMC2.pdf PDF
CN-370000-CN202-T10CO1.pdf PDF
CN-370000-CN202-T11.pdf PDF
CN-370000-CN202-T11.pdf.crdownload CRDOWNLOAD file
CN-370000-CN202-T13.pdf PDF
CN-370000-CN202-T14.pdf PDF
CN-370000-CN202-T14CO1.pdf PDF
CN-370000-CN202-T14CO2.pdf PDF
CN-370000-CN202-T17CO1.pdf PDF
CN-370000-CN202-T19.pdf PDF
CN-370000-CN202-T1CO1.pdf PDF
CN-370000-CN202-T20.pdf PDF
CN-370000-CN202-T20CO2.pdf PDF
CN-370000-CN202-T20CO4.pdf PDF
CN-370000-CN202-T26.pdf PDF
CN-370000-CN202-T28CO1.pdf PDF
CN-370000-CN202-T31CO1.pdf PDF
CN-370000-CN202-T32CO4.pdf PDF
CN-370000-CN202-T33.pdf PDF
CN-370000-CN202-T34.pdf PDF
CN-370000-CN202-T34CO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT NOTIFICATION FORM

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description of Task:

Project Manager:

Schedule Start Date: Fixed Price Cost:

Completion Date: Cost Reimbursement not to exceed:

Total Task Amount:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 digit FLAIR Code: Total:

CN202 47 FDEP-DRP 61371C

Myakka River State Park Main Drive River Bridge

Michael Baker International

Jeff Roberts 850-766-8992 Jeff.Roberts@mbakerintl.com

Raplph Perkins 850-245-2560 ralph.perkins@floridadep.gov

The task is to complete 100% design, permit (bat survey and construction service ... per the attached proposal dated 10.24.23.

Garland Sandel

Execution Date $ 37,392.05

6.30.25 $ 250.00

$ 37,642.05

Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.10.31 11:24:43 -04'00'

Garland Sandel Garland Sandel Digitally signed by Garland Sandel Date: 2023.10.31 13:15:16 -04'00'

Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.10.31 14:00:55 -04'00'

Jeff Roberts Jeff Roberts Digitally signed by Jeff Roberts Date: 2023.10.31 15:52:22 -04'00'

Michael W. Foster Jr., PE Michael W. Foster Jr., P.E.

Digitally signed by Michael W.

Foster Jr., P.E.

Date: 2023.11.02 11:21:08 -04'00'

61371C 37504000056 080039/22 423001 U3200 131500 QK $ 37,642.05

$ 37,642.05

October 24, 2023

Garland Sandel Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, FL 32399

RE: Statewide Contract: CN202, Task Assignment _47_

Myakka River State Park Bridge Rehabilitation (Bridge # 170401), Sarasota County, FL

Dear Mr. Sandel:

For your review, Michael Baker International, Inc., is attaching a proposal summary and man-hour documentation for providing final design services for Bridge and Abutment Repair Plans for the main vehicle bridge within Myakka River State Park (Bridge # 170401).

Please review the attached Proposal Summary and deliverables and let me know if there are any questions or comments.

Sincerely, Jeff K. Roberts, PE, RSP1 Vice President

Bridge and Abutment Rehabilitation for Bridge # 170401

Myakka State Park, Sarasota County, FL

Statewide Contract CN202, Task Assignment _47__

Project Objective: The purpose of this scope of services is to provide professional services to address the critical findings in the bridge inspection report for Bridge 170401, as well as other recommended repairs to the structure. This includes repair of concrete areas and preparation of design plans and a repair solution for the failing sand-cement riprap at the west abutment of the Main Park Drive bridge in Myakka

River State Park. The intent is to fully repair the deficient areas in accordance with best practices to extend the bridge service life as long as possible using properly designed materials and analysis techniques.

Bridge 170401 carries Main park drive over Myakka river and records show it was built in 1940. The length of the bridge is 200ft with 10 equal spans of 20ft and is 25.6 ft wide. The Bridge is supported on reinforced concrete piles and is not posted for any loadings. General Project understandings, guidelines, and coordination was provided by Myakka River State Park Services representatives and the FDEP project manager. Survey and Geotechnical data collected under a separate Task Assignment will be utilized for this project. Project objectives will be accomplished with the subtasks outlined and detailed below:

Subtask 1: Environmental Data Collection/Field Surveys

Environmental Data Collection

The following available Geographical Information System (GIS) maps and data will be collected prior to conducting the environmental field surveys for the project:

• National Resource Conservation Service soils data;

• Southwest Florida Water Management District (SWFWMD) land use, cover, and forms classification system (FLUCFCS) data;

• U.S. Fish and Wildlife Service National Wetlands Inventory (NWI) data;

• U.S. Fish and Wildlife Service Information for Planning and Consultation (IPaC) list of species for project area;

• Florida Natural Areas Inventory (FNAI) tracking list for Sarasota County and biodiversity matrix data;

• Available lidar elevation data; and,

• U. S. Geological Survey contour maps.

Prior to performing the environmental field surveys, the aforementioned data will be reviewed. A list of animals and plant species that have been documented to occur or that may occur within the site will be compiled for use in conducting the environmental surveys. The project site limits will be incorporated into the maps.

General Protected Species Survey

The CONSULTANT will perform a general protected species survey within the limits of the project to look for evidence of use of the project area by protected species and to determine whether suitable habitat for protected species occurs in the project limits. The survey will be limited to the area of the slope stabilization improvements on the east bank of the Myakka River, directly beneath and adjacent to the sides of the bridge (project area). If gopher tortoise burrows are found during the general protected species survey, the location of the burrows will be flagged so that the burrow locations can be recorded as part of the land survey services for the project.

Field Wetland Delineation

The CONSULTANT will flag/stake wetland jurisdictional limits in the field within the project area in accordance with the State of Florida’s wetland delineation methodology contained in Chapter 62-330.201 of the Florida Statutes (FS). Wetland delineation boundary flag locations will be recorded as part of the surveying tasks for the project. The surveyed wetland limits will be depicted in plans that will be developed under the design tasks for the project. The wetland boundary will be used to minimize/avoid wetland impact in the project design.

Deliverable:

• Wetland limits depicted in the survey sheets.

• Copies of written correspondence.

Performance Measure: Final deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Company Position Classification Rate Hours Total Cost

MBI Sr. Environmental Scientist $172.27 4 $689.08

MBI Environmental Scientist $106.81 38 $4,058.78

Totals (Subtask 1) $4,747.86

Subtask 2: Environmental Permitting

Description: The CONSULTANT will prepare the permit application and coordinate with the regulatory agencies that have jurisdiction over the project, specifically SWFWMD and USACE.

2.A – Sarasota County Permitting Exemption

The CONSULTANT will coordinate with Sarasota County Water Navigation Authority and Sarasota County

Planning and Development Services to confirm that this project is exempt from County permitting.

2.B – SWFWMD Environmental Resource Permit (ERP) Application

SWFWMD Pre-application Meeting The CONSULTANT will coordinate, schedule, and attend a pre-application meeting with SWFWMD. A representative of the CLIENT will be invited to attend the meeting. SWFWMD pre-application meeting materials, supporting documentation and graphics for the meeting will be prepared. Meeting minutes will be developed to record and summarize the details of the meeting.

SWFWMD ERP Application Preparation The CONSULTANT will prepare the ERP application. This will include the design plans and permit drawings/dredge and fill sketches that will be prepared under the design services task for the project as well as additional graphics as required by the permit application. The application will include an environmental narrative that will provide the justification for the proposed improvements and describe the avoidance and minimization efforts and the environmental impacts. If necessary, the CONSULTANT will prepare the Uniform Mitigation Assessment Method worksheets for the project impacts.

SWFWMD Wetland Limits Field Verification Meeting The SWFWMD Wetland Limits Field Verification meeting will be scheduled after the ERP application is submitted. SWFWMD personnel will be contacted in order to arrange an on-site field meeting to review the jurisdictional lines.

SWFWMD RAI Response The CONSULTANT will respond to SWFWMD Requests for Additional Information for issues related to our scope of services. If SWFWMD requires additional services or tasks to obtain the permit which are not included in the scope of services, then an amendment to our contract will be required.

2.C – U.S. Army Corps of Engineers (USACE) Section 404 Permit Application

USACE Section 404 Permit Application Preparation The CONSULTANT will prepare USACE Form 4345 Application for Department of the Army Permit. The CONSULTANT will submit the application to USACE with necessary supporting documentation such as the permit drawings depicting the dredge and fill impacts, a location map, and an environmental narrative addressing 404 permit requirements.

USACE RAI Response The CONSULTANT will respond to USACE Requests for Additional Information for issues related to our scope of services. If the USACE requires additional services or tasks to obtain the permit which are not included in our scope of services, then an amendment to our contract will be required.

2.A – Record of communication with Sarasota County

2.B – SWFWMD Permit application in Adobe Portable Document Format (pdf) for approval prior to submittal along with copies of any RAI’s.

2.C – USACE Permit application in Adobe Portable Document Format (pdf) for approval prior to submittal along with copies of any RAI’s.

Assumptions:

• Protected species permitting and special purpose protected species surveys are not included.

• Endangered Species Act Section 7 formal consultation with the U.S. Fish and Wildlife Service is not included.

• If it is determined that Sarasota County permitting is required, this will be provided under a separate agreement.

• The project is located in an area that is retained for Section 404 jurisdiction by the USACE. The project qualifies for a USACE Section 404 Nationwide Permit.

• The project qualifies for an ERP General Permit.

• Location of wetland boundary flags will be recorded as part of the land survey tasks for the project.

• If wetland mitigation is required, this requirement will be met by purchase of mitigation credits from a SWFWMD and USACE approved wetland mitigation bank.

• Mitigation credits are available from a mitigation bank with a service area that includes the area of the project.

• Purchase price of any required wetland mitigation bank credits would be paid for by the FDEP.

• If development of a wetland mitigation plan is required, this will be provided under a separate agreement.

Fixed Price Cost:

Company Position Classification Rate Hours Total Cost

Subtask 2A – Sarasota County Permit Exemption

MBI Sr. Environmental Scientist $172.27 1 $172.27

MBI Environmental Scientist $106.81 2 $213.62

Task 2A Labor Cost $385.89

Subtask 2B – SWFWMD ERP General Permit Application

MBI Sr. Environmental Scientist $172.27 10 $1,722.70

MBI Environmental Scientist $106.81 56 $5,981.36

Task 2B Labor Cost $7,704.06

Task 4B Reimbursable Costs (SWFWMD Permit Application) $250.00

Subtask 2C – USACE Section 404 Permit Application

MBI Sr. Environmental Scientist $172.27 6 $1,033.62

MBI Environmental Scientist $106.81 30 $3,204.30

Task 2C Labor Cost $4,237.92

Totals (Subtask 2) $12,327.87

Subtask 3: Limited Bat Roost Survey Michael Baker will contract with Bat Conservation and Management, Inc. (BCM) to perform a Florida bonneted bat roost survey, in accordance with USACE requirements. This effort focuses on attempting to locate a physical roost tree or structure in the Project Area. Limited Roost Surveys consist of the following tasks:

A. Analysis of previously recorded acoustic data and/or a visual survey of snags, crevices and other “bat friendly” features will predict where roosts likely are located. Within that zone, all structures greater than 20’ high will be visually inspected for evidence of cavities or crevices that may be bat shelter. Individual trees are located on a map of the project area and assessed for suitability, DBH, height, condition, and notable bat friendly features.

B. Trees or structures determined to be potential roosts will be investigated in one or more methods:

a. Roosts will be confirmed by a visual emergence survey, with an observer stationed when weather conditions are suitable. Surveyors should be quietly stationed 30 minutes prior to sunset and remain1-1⁄2 hours after sunset, observing both visual and humanly audible evidence of FBB.

b. To eliminate the potential of mis-identifying a roost of other common bat species, a bat acoustic detector (a Pettersson D500x, and/or SonobatLIVE+Pettersson M500/384) will be used to make permanent recordings of any bat activity that occurs during the survey. This data will confirm FBB if present.

c. In lieu of an observer physically viewing a potential roost, a bat acoustic recorder, thermal video camera, or infrared video camera trap may be used at potential roosts or potential clusters of roosts. Analysis of this data will suggest if any additional survey is necessary. The image size and frame speed of any animals emerging potential roosts must able to confidently discriminate between bats and birds.

d. The structure will be systematically surveyed for bat-friendly crevices. A reasonable attempt will be made to inspect the crevices for bats using a realtime, recordable borescope camera.

C. Technical Report. A report will follow fieldwork and consist of a structure or tree summary table (tree number, suitability, DBH, height, condition, and notes/description) as applicable. A representative photo of each tree/ structure surveyed will be included and located on a project area map. A summary of visual and electronic monitoring methods will be included. Based on the observations, a conclusion will be established if FBB were present in the project area during the survey period, and if possible, an exact roost area identified with numbers present. Typically, a draft report on a small project is ready 3-7 business days after fieldwork is complete.

Deliverables:

Technical report summarizing findings of bat roost survey, prepared in PDF format. The report will be submitted to FDEP and to USACE for 404 permit approval.

Subtask 3

Company Classification Rate Hours Cost

MBI Project Manager $238.84 1 $238.84

BCM Project Principal $255.00 7 $1,785.00

BCM Biologist 1 $210.00 5 $1,050.00

BCM Biologist 2 $165.00 5 $825.00

BCM Clerical $60.00 6 $360.00

Totals (Subtask 3) 24 $4,258.84

Subtask 4: 100% Repair Plans and Specifications Michael Baker International (MBI) will review the bridge Inspection report, geotechnical data, hydraulics analysis results and develop rehabilitation plans for Bridge carrying Main road over Myakka River addressing the deficiencies in the bridge inspection report dated on 10/21/2020. The following deficiencies were noted in the Bridge Inspection report:

1. The West slope protection is fractured, settled intermittently and undermined.

2. The slab in spans 2, 3, 4, 5, 6, 8, 9 & 10 have multiple areas of map cracking on the top.

3. The deck underside and the edge fascia on the north side have spalls with exposed rebar.

4. Joint Sealants has heavy deterioration, adhesion loss and vegetation.

5. The Anchor bolts attaching the bridge rail posts are missing nuts and washers and the anchor zones are spalled.

6. All the concrete piles have corner spalls.

Not all deficiencies noted above will be shown in the plans, provided other details, plan notes and instruction can be conveyed to a qualified contractor to perform the repairs. The plans, specifications and the preliminary engineer cost estimate will be developed to address the following major items of work:

1. Cleaning and sealing the concrete bridge deck surface and both approach slabs.

2. All the spalls will be repaired, and the joint seals will be replaced.

3. The West slope protection will be replaced based on Subtask 5: Hydraulics/Scour Analysis.

4. Replace/tighten the missing bolts connecting the rail posts to the deck and the spalled zones. The scope repairs the existing condition to perform per original design. It does not upgrade existing barriers to current FDOT standards.

5. Construction drawings to assist in the replacement of the existing slope protection.

6. Technical special provisions as required for concrete repair material.

Bridge Plans will include: Cover Sheet, Project Location Map, Scope of Work, General Notes, Summary of

Pay Items and Pay Item Notes, and any details necessary to produce a workable set of plans.

The repairs in the considered pile are minor and the repairs will not be addressed in the plans. The existing bridge does not have design plans and has unknown foundations.

• 100% (Final) design level signed/sealed structural repair documents, 100% EOPC, CADD files, and

.pdf form (hardcopy upon request).

• A record copy of coordination for the State Fire Marshal’s office courtesy review will also be provided.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Company Position Classification Rate Hours Total Cost

MBI Project Manager/QC $238.84 4 $955.36

MBI Senior Engineer $149.58 12 $1,794.96

MBI Designer $115.88 24 $2,781.12

Totals (Subtask 4) $5,531.44

Subtask 5: Pre-Bid Meeting

One MBI representative will attend this meeting at the project site. MBI staff will remote assist as needed with any necessary issues or concerns.

1. FDEP will schedule the meeting and provide site for meeting location.

Meeting minutes in .pdf format will be provided to FDEP in electronic format post meetings.

Fixed Price Cost:

Company Position Classification Rate Hours Total Cost

MBI Project Manager $238.84 1 $238.84

MBI Senior Engineer $149.58 8 $1,196.64

Totals (Subtask 5) 9 $1,435.48

Subtask 6: RFI’s during Bid Phase

MBI will provide RFI and shop drawing review and responses throughout the post design phase of the project (from pre-bid/advertisement to award).

Deliverables:

A written RFI response and/or drawing markup supplied in .pdf electronic format will be provided to the contractor and FDEP within 5 business days of RFI receipt.

Company Position Classification Rate Hours Total Cost

MBI Project Manager $238.84 2 $477.68

MBI Senior Engineer $149.58 14 $2,094.12

Totals (Subtask 6) 16 $2,571.80

Subtask 7: Preconstruction Meeting One MBI representative will attend this meeting at the project site. MBI staff will remote assist as needed with any necessary issues or concerns.

Assumptions:

1. FDEP will schedule the meeting and provide site for meeting location.

Meeting minutes in .pdf format will be provided to FDEP in electronic format post meetings

Fixed Price Cost:

Company Position Classification Rate Hours Total Cost

MBI Project Manager $238.84 1 $238.84

MBI Senior Engineer $149.58 8 $1,196.64

Totals (Subtask 7) 9 $1,435.48

Subtask 8: RFI’s, Shop Drawing Review during Construction Phase

MBI will provide RFI and shop drawing review and responses throughout the construction phase of the project (from construction Notice-to-Proceed to closeout).

Deliverables:

A written RFI response and/or drawing markup supplied in .pdf electronic format will be provided to the contractor and FDEP within 5 business days of RFI/shop drawing receipt.

Company Classification Rate Hours Cost

MBI Project Manager $238.84 3 $716.52

MBI Senior Engineer $149.58 10 $1,495.80

Totals (Subtask 8) 13 $2,212.32

Subtask 9: Site Inspections

MBI will provide two site inspections, at approximately 60% and 90% completion (or as requested by FDEP), to verify installations conform to plan intent.

Deliverables:

A written punch list supplied in .pdf electronic format will be provided to the contractor and FDEP, highlighting any concerns or deficiencies noted.

Company Classification Rate Hours Cost

MBI Project Manager $238.84 2 $477.68

MBI Senior Engineer $149.58 16 $2,393.28

Totals (Subtask 9) 18 $2,870.96

Summary of Fees:

Subtask Subtask Fixed

Price Cost Subtask

Reimbursable

Subtask 1: Environmental Data Collection $4,747.86 --

Subtask 2: Environmental Permitting $12,327.87 $250.00

Subtask 3: Bat Roost Survey $4,258.84

Subtask 4: 100% Repair Plans $5,531.44

Subtask 5: Pre-Bid Meeting $1,435.48

Subtask 6: RFI during bid phase $2,571.80

Subtask 7: Pre-Construction Meeting $1,435.48

Subtask 8: RFI & Shop Drawings – Construction $2,212.32

Subtask 9: Construction Site Visits $2,870.96

Total Fixed Price Cost $37,392.05 --

Total Reimbursable Cost -- $250.00

Overall Total Cost $37,642.05

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.

Project Schedule:

Project Schedule is based on estimated duration of calendar days to complete each subtask. Schedule dates will be established after approved and executed contract has been received. Where most practical, subtasks will be worked on concurrently.

Subtask Duration (Calendar Days)

Subtask 1: Environmental Data Collection 1

Subtask 2: Environmental Permitting 60

Subtask 3: Bat Roost Survey 30

Subtask 4: 100% Repair Plans 60

Subtask 5: Pre-Bid Meeting TBD

Subtask 6: RFI during bid phase TBD

Subtask 7: Pre-Construction Meeting TBD

Subtask Duration (Calendar Days)

Subtask 8: RFI & Shop Drawings – Construction TBD

Subtask 9: Construction Site Visits TBD