CN-370000-CN202-T19.pdf
PDF 2 MB Posted
- Contract number
- CN202
- Issued by
- Florida
About this file
This document is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under Statewide Contract CN202. The assignment involves the FDEP, the Town of Redington Shores, and consultant Michael Baker International, Inc., with subcontractors Volkert and Bolt performing the inspection work. The project pertains to the Redington Long Pier located in Redington Shores, Florida.
The contract encompasses three subtasks: (1) above-water structural inspection by Volkert for $3,562.26, (2) underwater Level II inspection by Bolt for $3,588.00, and (3) compilation of a conditions memorandum with recommendations and cost estimates for repair and demolition by Michael Baker International for $4,246.16. The overall contract total is $11,396.42, with costs shared equally between FDEP and the Town of Redington Shores at $5,698.21 each. All work is on a fixed-price basis with no reimbursable costs. The contract specifies deliverables as PDF reports with photographs and recommendations signed and sealed by a registered professional engineer. The project schedule commenced upon execution on November 7, 2017, with a completion date of December 31, 2018, and payment contingent upon FDEP approval of deliverables for each subtask.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN202 19 FDEP-State Lands
Redington Long Pier Redington Long Pier Inspection
Michael Baker International, Inc.
Michael Schwier, P.E. 850-205-0460 MSchwier@mbakerintl.com
Mae Roth 850-245-2781 Mae.Roth@dep.state.fl.us
Design services to include above water / under water inspection and recommendation memorandum with cost estimating for both repair and demolition per proposal dated 11/3/17. FDEP shall be responsible for payment in full ($11,396.42) should the Town of Redington Shores not provide matching payment within the terms of Contract CN202TA19.
Brian Miller, or successor
Upon execution $ 5,698.21 12/31/18 $ 0.00
$ 5,698.21
John Schrader John Schrader Digitally signed by John Schrader Date: 2017.11.07 11:03:26 -05'00' 11/07/2017
Brian Miller Brian Miller Digitally signed by Brian Miller Date: 2017.11.03 14:57:50 -04'00' 11/3/2017
Philip Madden, Asst. Bureau Chief Philip Madden Digitally signed by Philip Madden Date: 2017.11.03 16:14:34 -04'00' 11/3/2017
Michael Schwier, P.E. Michael Schwier
2017.11.03 16:19:30 -04'00' 11/03/2017
John Schrader John Schrader Digitally signed by John Schrader Date: 2017.11.07 11:03:10 -05'00' 11/07/2017
N/A N/A 37150000555 100777 000286 N/A 131500 AH $ 5,698.21
$ 5,698.21
Office: 850.205.0460 | Fax: 850.205.0461
November 03, 2017
Brian D. Miller Engineering Specialist Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520 Tallahassee, FL 32399
RE: Statewide Contract: CN202, Task Assignment 19
Redington Long Pier Inspection
Dear Mr. Miller:
For your review, Michael Baker International, Inc., has provided a proposal summary and man‐ hour documentation for the services tasks identified below:
Please review the attached Proposal Summary and deliverables.
Sincerely, Michael Schwier, P.E.
Michael Baker International, Inc.
Redington Long Pier Inspection
Statewide Contract CN202, Task Assignment 19
Subtask 1: Inspection
Description: Perform a structural inspection of the Redington Long Pier from the deck to the water line.
The inspection will involve a visual observation and general assessment of the structure to document material and structural deficiencies observed. No destructive testing will be performed. Inspection will be done by a team of two Certified Bridge Inspectors (CBIs). The inspection will be by kayak.
Compile a report of findings and submit to Michael Baker International. Report will consist of deficiency descriptions supported by photographs or sketches. Report will be drafted by the
CBI’s, compiled by a Project Administrator, and reviewed by a Senior Engineer.
Deliverable: Volkert will provide the report to BDC Project Manager in PDF format. Report will be submitted no later than two weeks of the final field date.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Subtask 1
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost
Volkert Senior CBI $ 105.57 28 $ 2,955.96
Volkert Project Engineer/Manager $ 219.99 2 $ 439.98
Volkert Project Administrator $ 83.16 2 $ 166.32
Total for Subtask 1: $ 3,562.26
Subtask 2: Inspection
Description: Perform an underwater structural inspection of the Redington Long Pier.
Bolt will perform a Level II underwater inspection on the above referenced structure’s sub‐ structure elements to include all underwater elements, shoreline to pier end. Any observed scour conditions around the underwater elements and debris buildup will be noted). No destructive testing will be performed. To abide by OSHA and ADC regulations a three (3) Person
Crew is required for SCUBA diving or surface supplied diving projects.
Compile a report of findings and submit to Michael Baker International. Report will consist of deficiency descriptions supported by photographs or sketches. Report will be drafted by the CBI
Diver, compiled by an Administrator and reviewed by a Chief Engineer.
Deliverable: Bolt will provide the report to BDC Project Manager in PDF format. Report will be submitted no later than two weeks of the final field date.
Fixed Price Cost:
Subtask 2B
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost
Bolt CBI Diver $88.50 18 $1,593.00
Bolt Inspector Diver (2 persons) $54.99 28 $1,539.72
Bolt Chief Engineer $177.39 2 $354.78
Bolt Administrator $50.25 2 $100.50
Total for Subtask 2: $3,588.00
Subtask 3: Inspection and Findings Memo
Description:
Michael Baker International will compile the inspection findings in a Conditions Memorandum with a recommendation based off the inspection on whether the pier is safe to continue operation. The memo shall also include a planning level repair cost based on the findings and demolition cost.
Structural analysis is not included in this scope of services. Should analysis be required, further documentation may be required to determine the existing structural member sizes, spacing and arrangement to facilitate a structural analysis.
Deliverable:
A conditions memorandum with recommendations summarizing the condition of pier will be provided in electronic .pdf format to the BDC Project Manager. The memo shall include photographs as necessary to convey the condition and deficiencies found. The memo shall be signed and sealed by a professional engineer registered in the state of Florida.
Fixed Price Cost:
Subtask 3
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Michael Baker Project Manager $238.85 4 $ 955.40
Michael Baker Senior Engineer $149.58 22 $3,290.76
Total $4,246.16
Total for Subtask 3: $4,246.16
Project Schedule:
Activity Duration (Calendar Days) Dates
Subtask 1 – Inspection 30 TBD – based on NTP
Subtask 2 – Underwater Insp. 30** TBD – based on NTP
Subtask 3 – Insp. & Findings Memo 14 TBD – based on NTP
** Concurrent with Subtask 1
Summary of Fees:
Per discussions with FDEP, the Town of Redington Shores and FDEP have entered into an agreement to share the cost of the Redington Long Pier Inspection and Assessment as outlined below. FDEP shall be responsible for payment in full should the Town of Redington Shores not provide payment within the terms of Contract CN202. Payment shall be based on completion of Subtasks outlined above.
Subtask Subtask Fixed Price Cost Subtask Reimbursable
Subtask 1 $3,562.26 $0.00
Subtask 2 $3,588.00 $0.00
Subtask 3 $4,246.16 $0.00
Total Fixed Price Cost: $11,396.42
Total Reimbursable Cost: $0.00
Overall Total Cost: $11,396.42
Total Cost to FDEP: $ 5,698.21
Total Cost to Town of Redington Shores $ 5,698.21
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.
Miller, Brian D.
From: ONeal, Charley Sent: Thursday, November 2, 2017 2:56 PM To: Miller, Brian D.
Cc: Stone, Philip; Loesch, Gerald Subject: FW: Redington Long Pier
Hi Brian, Below is the confirmation from the Town of Redington Shores. They are inquiring about paying via a credit card. I don’t believe that is an option but wanted to check.
Charley
From: Town Clerk Redington Shores [mailto:townclerk@townofredingtonshores.com] Sent: Thursday, November 2, 2017 2:11 PM To: ONeal, Charley <Charley.ONeal@dep.state.fl.us> Subject: Re: Redington Long Pier
Hi Charley:
All is confirmed. Can I call you and give you are credit card number for our half or do I need to send you a check. Credit card would be easier!!
Thanks Mary
Thank you
Mary Palmer, MMC
Town Clerk
Town of Redington Shores
17425 Gulf Blvd, Redington Shores, FL 33708
727‐397‐5538 www.townofredingtonshores.com
On Thu, Nov 2, 2017 at 1:57 PM, ONeal, Charley <Charley.ONeal@dep.state.fl.us> wrote:
Good afternoon Mary, It was a pleasure speaking with you this morning. We are moving forward with the pier inspection report contract and wanted to confirm the exact dollar amount for the city is agreed upon. The total cost of the contract is $11,396.42 and the city’s half would be $5,698.21.
Once confirmed, I will forward the exact information for payment processing.
I look forward to working with you.
Sincerely, Charley
Ms. Charley Oneal
Business Planning Program Administrator
Florida Department of Environmental Protection
Southwest District
13051 N Telecom Parkway, Suite 101
Temple Terrace, FL 33637 charley.oneal@FloridaDEP.gov
Office: 813.470.5716
File details come from the government source that posted it. Updated .