This is a Task Assignment Change Order #4 issued by the Florida Department of Environmental Protection (FDEP) for Statewide Contract CN202, Task Assignment 32. The contract involves Michael Baker International, Inc., as the consultant, with Jeff Roberts, P.E., RSP1, serving as the consultant representative. The project pertains to Residence Electrical and Plumbing Repairs at Highlands Hammock State Park in Highlands County, Florida. FDEP project management is handled by Ralph Perkins, Contract Manager, and John Goss, Project Manager.
The change order is a time extension only, with no modification to the contract amount. The original task execution date was November 12, 2020, with an initial end date of June 30, 2022. The change order extends the task end date by 184 calendar days to December 31, 2022, to allow for completion of Subtask 6 (Pre-Construction Meeting), Subtask 7 (RFI and Shop Drawing Review), and Subtask 8 (Site Inspections). The total task amount remains $77,998.61, comprising a reimbursement component of $77,898.61 and a fixed fee component of $100.00. All required FDEP approvals and consultant signatures were obtained on June 7 and June 13, 2022.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
(Revised 9-26-2018) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN202 32 4 61299C
Highlands Hammock State Park Residence Electrical and Plumbing Repairs
Michael Baker International
Jeff Roberts, PE, RSP1 850-701-2303 jeff.roberts@mbakerintl.com
Ralph Perkins 850-245-2460 Ralph.Perkins@FloridaDEP.gov
Extension of time only to allow for project completion and project close-out as per attached email dated 6/6/2022 from Michael Baker International.
$ 18,308.40 $ 18,308.40 $ 100.00 $ 77,898.61 $ 77,998.61
$ 0.00 $ 100.00 $ 77,898.61 $ 77,998.61
11/12/2020
6/30/2022
6/30/2022
12/31/2022
Diane Langston Diane Langston Digitally signed by Diane Langston Date: 2022.06.07 08:32:02 -04'00'
John Goss John Goss Digitally signed by John Goss Date: 2022.06.07 08:35:45 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2022.06.07 08:50:05 -04'00'
Jeff Roberts, PE, RSP1 Jeff Roberts Digitally signed by Jeff Roberts Date: 2022.06.07 10:33:20 -04'00'
Michael Foster Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2022.06.13 09:04:45 -04'00'
$ 0.00
June 6, 2022
Stephen Pindel Assistant Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520 Tallahassee, FL 32399
RE: Statewide Contract: CN202, Task Assignment 32 – Change Order #4 (Time Extension Only)
Highlands Hammock State Park Residence Electrical and Plumbing Repairs Highlands County, FL
Dear Mr. Pindel:
To align with anticipated construction progress on the subject project, Michael Baker International, Inc., is requesting a time extension to the current expiration date of June 30, 2022.
We request the expiration of this Task Assignment be extended to 12/31/22 to allow for completion of Task 6 (Pre-Construction Meeting), Task 7 (RFI and Shop Drawing Review) and Task 8 (Site Inspections).
Please let me know if there are any questions or comments.
Sincerely, Jeff Roberts, P.E.
Associate Vice President
Change Order #4 (Time Extension Only)
Highlands Hammock State Park Electrical & Plumbing Rehab Highlands County, FL
Statewide Contract CN202, Task Assignment 32
Project Schedule:
Project Schedule is based from estimated duration of calendar days for the contractor to complete each subtask. Schedule assumes consecutive subtasks in order shown unless concurrent subtasks are noted.
Schedule dates will be established after approved and executed contract has been received.
Activity
Subtask Duration (Calendar Days)
Amended Completion Date
Subtask 6 TBD Dec. 31, 2022
Subtask 7 TBD Dec. 31, 2022
Subtask 8 TBD Dec. 31, 2022
Subtask 9 Completed under CO ‘s 2 and 3 n/a
| CN202 TA32 CO4 Highlands Hammock.pdf |
| CN202 TA32 CO4 Highlands Hammock - Electrical and Plumbing Repairs.pdf |
File details come from the government source that posted it. Updated .