CN-370000-CN202-T1CO1.pdf
PDF 5 MB Posted
- Contract number
- CN202
- Issued by
- Florida
About this file
This is a Change Order No. 1 to Task Assignment for Continuing Professional Services issued by the Department of Environmental Protection (FDEP) to Michael Schwier/Michael Baker International for the Ellie Schiller Homosassa Springs Wildlife State Park project (Project No. 60936, Contract No. CN202). The change order amends the existing contract agreement between the contractor and FDEP, with all contract provisions applying unless specifically exempted. The document is executed by authorized representatives from FDEP, including the Budget Coordinator, Project Manager, and Contract Manager, as well as the contractor consultant.
The change order increases the contract value by $71,579.34 for Task 1, which covers dredging plans, environmental permitting tasks including data collection, field surveys, sediment sampling, analysis and reporting, Southwest Florida Water Management District (SWFWMD) permit application processing, USACE permit application preparation, and sheet pile design and geotechnical recommendations. The original task completion date was December 31, 2016, and the original task amount was $104,761.55. This change order extends the project completion date to August 28, 2017, adds 240 days to the original schedule, and increases the total task amount to $177,432.89. The net change amount is $72,671.34. Reimbursable costs total $1,092.00, not to exceed the stated amount. The work is funded through two encumbrances with respective amounts of $238.45 and $72,432.89, for a total project commitment of $72,671.34.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .