CCF_000004.pdf
PDF 607 KB Posted
- Solicitation number
- BPM005633
- Issued by
- Arizona
About this file
This is a Scope of Work document for the Colorado Department of Transportation (CDOT) concerning a design project for the US 285 corridor improvements in Park County, Colorado. The project involves developing preliminary engineering and design plans for highway safety and capacity enhancements along a 12-mile segment of US 285. CDOT seeks comprehensive design services including traffic analysis, environmental assessments, geotechnical investigations, and utility coordination. The contractor must prepare a 30% design review submission, followed by a 60% design submission, and ultimately deliver a 100% final design package suitable for construction bidding. The project timeline requires the designer to complete all preliminary work and permitting coordination prior to final design completion. No specific response date, due date, or award date is explicitly stated in the document, though the work is structured in distinct design phases with intermediate milestones. The contract term extends through completion of the final design phase, with no renewal options mentioned.
Pricing terms and budget information are not detailed in this Scope of Work document. The document does not address set-asides, incumbent contractors, funding sources, or specific dollar amounts. The project appears to be funded through CDOT's capital improvement program as part of the state's transportation infrastructure development priorities. Standard contract terms and conditions would apply as established by CDOT procurement procedures, though these are not elaborated in the Scope of Work itself.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .