Attachment_09_Proposed_Subcontractors.docx

DOCX document 45 KB Posted

Attached to
Foreign Language Interpretation and Translation Services
Solicitation number
BPM005633
Issued by
Arizona

About this file

This is a Proposed Subcontractors attachment for a Foreign Language Interpretation and Translation solicitation (BPM005633) issued by the Arizona Department of Administration State Procurement Office. The primary contractor, Topete/Stonefield, Inc., indicated that it will subcontract portions of the work rather than performing all services with internal personnel. The contractor identified five subcontractor resources: Natalie Rivera serving as Administrative Coordinator and Bookkeeper (15% of work), Manuel Topete-Vargas as Technical Translator and Editor (10% of work), J Gerardo Meraz as Translator, Proofer, and Quality Control specialist (15% of work), Miguel Alonso as Translator (10% of work), and an additional team of translators available for rough translation work (percentage to be determined). Each subcontractor's contact information and small business status were provided.

Quality assurance and quality control measures were documented for each subcontractor, with consistent protocols requiring presidential or supervisory review of all financial and translation deliverables. The contractor's QA/QC approach includes weekly financial reviews by the president, mandatory proofreading and editing of translations before client delivery, and a tiered review process involving two proofers and final editing for all translation work. Only one of the five named subcontractors, Natalie Rivera, was designated as a small business concern. The attachment demonstrates the contractor's structured approach to managing subcontracted services while maintaining quality standards across administrative and translation functions.

View the file

Other files

File Type Posted
BPM005633 Transperfect Exceptions Determination 12.07.23.docx DOCX document
BPM005633 Bromberg Exceptions Determination Response 11.30.23.pdf PDF
BPM005633 Hurtados Exceptions Determination 12.04.23.docx DOCX document
Late Submission Determination Southstair Translation.pdf PDF
BPM005633 Language Connection Exceptions Determination 12.04.23.docx DOCX document
BPM005633 JC Wordsmith Exceptions Determination 12.04.23.docx DOCX document
BPM005633 Bromberg Exceptions Determination 11.30.23.docx DOCX document
Translation and Interpretation Confidentiality Determination Response.docx DOCX document
Translation and Interpretation Confidentiality Determination.docx DOCX document
Ad Astra_Confidentiality Determination.docx DOCX document
Transperfect Confidentiality Determination.docx DOCX document
AZ Language and Transportation_Confidentiality Determination.docx DOCX document
Bromberg Confidentiality Determination.docx DOCX document
Negotiation Letter_Language Line.docx DOCX document
Accent on Language Clarification 1-24-24.pdf PDF
Attachment_14__OVERFLOW_Languages.docx DOCX document
Attachment_01_Offer_and_Acceptance.docx DOCX document
Attachment_07_Letter_of_Insurability.docx DOCX document
Attachment_05_Conformance_Statements.docx DOCX document
Attachment_13_Pricing_Document.docx DOCX document
Supplement_9_-_Proposed_Subcontractors.pdf PDF
_Foreign_Language_Interpretation_and_Translation_Services__Attachment_09_Proposed_Subcontractors.pdf PDF
_Foreign_Language_Interpretation_and_Translation_Services__Attachment_03_Forced_Labor_of_Ethnic_Uyghurs_Ban.pdf PDF
_Foreign_Language_Interpretation_and_Translation_Services__Attachment_11_References.pdf PDF
_Foreign_Language_Interpretation_and_Translation_Services__Attachment_12_Method_of_Approach.pdf PDF
_Foreign_Language_Interpretation_and_Translation_Services__Attachment_10_Experience_and_Capacity_Response_S_-.pdf PDF
_Foreign_Language_Interpretation_and_Translation_Services__Attachment_15_Business_Associate_Agreement__HIPPA_.pdf PDF
CERTIFICATE_OF_INSURANCE__COI_.Pdf PDF
Capability_.docx DOCX document
Attachment_04_Confidential_Info_Designation__10.16.23.pdf PDF
Attachment_06_Key_Personnel__10.16.23.pdf PDF
Attachment_02_Boycott_of_Israel_Disclosure_10.16.23.pdf PDF
Attachment_15_Business_Associate_Agreement__HIPAA__Akorbi.pdf PDF
Attachment_11_References_Akorbi.pdf PDF
Attachment_05_Conformance_Statements_Akorbi_Vera_Richar.pdf PDF
HAH_-_Proof_of_Insurance_-_All_Lines__Professional_Liability.pdf PDF
CGS_FLITS_Attachment_07_Attachment_-_Supplement_Insurance_.pdf PDF
Attachment-Company_Experience.pdf PDF
Attachment_12_Method_of_Approach_ALTS.pdf PDF
Attachment_01_Offer_and_Acceptance_ALTS.pdf PDF
Attachment_13_Pricing_Document_Rev_01_ALTS.pdf PDF
Attachment_06_Key_Personnel_ALTS.pdf PDF
_Foreign_Language_Interpretation_and_Translation_Services__Attachment_04_Confidential_Info_Designation_-_signed.pdf PDF
_Foreign_Language_Interpretation_and_Translation_Services__Attachment_05_Conformance_Statements_-_signed.pdf PDF
_Foreign_Language_Interpretation_and_Translation_Services__Attachment_03_Forced_Labor_of_Ethnic_Uyghurs_Ban_-_signed.pdf PDF
[BPM005633 Attachment 06_KEY Personnel.docx DOCX document
[BPM005633 Attachment 09_Proposed Subcontractors.docx DOCX document
Southstar_COI.pdf PDF
[BPM005633 Attachment 12_Method of Approach (1).docx DOCX document
CCF_000019.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 09 – Proposed Subcontractors

Contractor Name: Topete/Stonefield, Inc.

Check “NO” if you WILL NOT subcontract any portion of the Work and will therefore be performing all of the Work with your own personnel.

☐
NO, the Offeror will not subcontract any portion of the Work.

If you WILL subcontract any portion of the Work, check “YES” below and list the name(s) of persons or companies you propose to use as Subcontractors.

1. Fill in the information for each significant Subcontractor – indicate the type of work the Subcontractor will perform under the Contract and their approximate percentage of the total Contract work;

2. Provide copies of relevant certifications each person or firm possesses attached to this form; AND

3. Provide a description of quality assurance (QA) and quality control (QC) measures that you will use to ensure that Subcontractor’s work meets the Contract requirements.

State may demand additional information about proposed Subcontractors as a precondition of Award.

X
YES, the Offeror will use the Subcontractors listed below:

Request for Proposal

Solicitation No. BPM005633

Foreign Language Interpretation and Translation Arizona Department of Administration State Procurement Office 100 North 15th Avenue Phoenix, AZ 85007

Solicitation Attachment – Proposed Subcontractors | Revision No. 1 | Revised 11-22

No.
Name and contact information
Small business
Work to be performed and QA/QC measures
%
1.
Natalie Rivera

602-882-9465 Natalie.Rivera@topstone.net Yes

Administrative Coordinator & Bookkeeper President reviews financials weekly to ensure that contracts, invoices and payments are done correctly 15%

2.
Manuel Topete-Vargas

408-439-2554 Manuel@topete.net

No
Technical Translator & Editor

President or another proofer reviews each and every translation and edits them before they are sent to the client 10%

3.
J Gerardo Meráz

602-840-2672 Genepollito@yahoo.com

No
Translator, Proofer and Quality Control

President proofs each and every translation and edits them before they are sent to the client 15%

4.
Miguel Alonso

480-983-5681 Malonso7777@gmail.com]

No
Translator

President or another proofer reviews each and every translation and edits them before they are sent to the client 10%

5.
In addition to the significant subcontractors listed above, TSI has a large team of contractors ready to serve our clients.

Yes or No Translators These translators perform rough translations that undergo a careful proofing process by two proofers and undergo a final edit before they are sent to the client

TBD

Solicitation Attachment – Method of Approach | Revision No. 1 | Revised 11-22 image1.jpg

File details come from the government source that posted it. Updated .