CALCULATION OF SELF PERFORMED WORK.docx
DOCX document 19 KB Posted
- Solicitation number
- 36C24923R0030
About this file
This document provides guidance on calculating the percentage of self-performed work for an offer on Solicitation Number 36C24923R0030 to renovate Building 200, Wing D2 at the James H. Quillen VAMC in Mountain Home, Tennessee to create an isolation ward. Offerors for general construction work (NAICS code 236220) must self-perform at least 15% of the total contract costs, with at least 25% for specialty trades, using personnel from a verified Service Disabled Veteran Owned Small Business. Offerors must provide a breakdown of personnel and material/equipment costs by specification division and calculate the percentage of self-performed personnel costs out of the total personnel costs for prime contractors and subcontractors to demonstrate compliance.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK (xxx-xx-xxx)
Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes with 237 and 238 prefix) of the cost of the contract performance incurred for personnel must be performed by the Service Disabled Veteran Owned Small Business (SDVOSB) awardee or those of a verified SDVOSB subcontractor. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.
| Specification Division |
| SDVOB Vendor (Y or N) |
| Personnel Cost |
| Material/Equipment Costs |
Division 01
| $ |
| $ |
Division 02
| $ |
| $ |
Division 03
| $ |
| $ |
(Add additional lines as necessary for each Division applicable to this project)
| $ |
| $ |
| $ |
| $ |
Sub Total (Personnel Costs, Material/Equipment Costs)
| Profit |
| $ |
| Home Office Overhead |
| $ |
| Bond |
| $ |
| Grand Total |
| $ |
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors: $
2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $
3. Remainder is ‘Total amount of work to be self-performed under the
| Contract’: | $ | |
| 4. Self-performed work = Line 3/Line 1 x 100 = | % |
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)