36C24923R0030 0003.docx

DOCX document 39 KB Posted

Attached to
Y1DZ--Project 621-20-107 Renovate Bldg. -200_Wing D2 for Isolation Ward
Solicitation number
36C24923R0030
Issued by

About this file

This document contains an amendment to a solicitation for a construction project. The Department of Veterans Affairs is seeking proposals to renovate Building 200, Wing D2 at the James H. Quillen VAMC in Mountain Home, Tennessee to create an isolation ward. The scope of work involves demolition, new construction, and renovation of existing spaces. Proposals are due by July 12, 2023 at 1:00pm Central Time. The amendment provides answers to questions from contractors to clarify requirements. It confirms the drawings and specifications meet current guidelines, and notes coordination will be needed with other ongoing campus construction projects.

View the file

Other files

File Type Posted
07.09_AE403 - CASEWORK ELEVATIONS.pdf PDF
P6.01 - PLUMBING DETAILS.pdf PDF
08.01_AI601 - FINISH SCHEDULE1.pdf PDF
08.00_AI101 - SECOND FLOOR FINISH PLAN-1.pdf PDF
FXD2.02 - SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN.pdf PDF
08.05_WP101 - WALL PROTECTION PLAN.pdf PDF
P2.01 - FIRST FLOOR PLUMBING NEW WORK PLAN 02.pdf PDF
P3.02 - SECOND FLOOR MEDICAL GAS NEW WORK PLAN.pdf PDF
000110 Table of Contents.pdf PDF
FX2.02 - SECOND FLOOR FIRE PROTECTION NEW WORK PLAN.pdf PDF
102600 Wall and Door Protection.pdf PDF
FX1.00 - FIRE PROTECTION LEGEND AND NOTES.pdf PDF
07.08_AE402 - CASEWORK ELEVATIONS.pdf PDF
36C24923R0030 0006.docx DOCX document
Addendum 02 Summary R1.pdf PDF
07.05_AC141 - SECOND FLOOR REFLECTED CEILING PLAN.pdf PDF
07.07_AE401 - ENLARGED RESTROOM PLANS AND ELEVATIONS.pdf PDF
087100 Door Hardware.pdf PDF
E3.02 - SECOND FLOOR LIGHTING NEW WORK PLAN.pdf PDF
36C24923R0030 0005.docx DOCX document
M2-02 - SECOND FLOOR HVAC NEW WORK PLAN.pdf PDF
36C24923R0030 0004.docx DOCX document
08.01_AI601 - FINISH SCHEDULE.pdf PDF
08.00_AI101 - SECOND FLOOR FINISH PLAN.pdf PDF
09.04_QT403 - ENLARGED EQUIPMENT PLAN.pdf PDF
36C24923R0030 0002.docx DOCX document
36C24923R0030 0001.docx DOCX document
CALCULATION OF SELF PERFORMED WORK.docx DOCX document
Contractor EMR Certification Form.docx DOCX document
C27_UUpdated 621-20-107 Drawings Part 3 of 3.pdf PDF
C27_Updated 621-20-107 Drawings Part 2 of 3.pdf PDF
C27 Updated 621-20-107 Drawings Part 1 of 3.pdf PDF
UEI _ TAX ID.docx DOCX document
36C24923R0030_1.docx DOCX document
C28_621-20-107 Specifications.pdf PDF
P07_Wage Determination_621-20-107 Renovate Bldg.-200 - Wing D2 for Isolation Ward.pdf PDF
RFI Form.docx DOCX document
PERFORMANCE QUESTIONNAIRE.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project 621-20-107 Renovate Bldg.-200_Wing D2 for Isolation Ward

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 06/29/2023 621-23-3-5114-0001 621-20-107 Department of Veterans Affairs Network Contracting Office 9 (90C)

NCO 9

1639 Medical Center Parkway, Suite 400 Murfreesboro TN 37129 90C Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129 To all Offerors/Bidders

36C24923R0030 06-29-2023

X X X Proposals Due 07/12/2023 at 1300 CT

621-3630162-5114-854200-3220 23NR2JA10

X The purpose of this amendment is to provide answers to contractor questions, to support the requirements as described in the drawings, specifications, and statement of work and to extend the proposal due date.

See Answers to contractor questions on page 2.

Proposal due date is not extended. Proposals Due date is 07/12/2023 at 1300 CT.

Michael R. Brown Contracting Officer

1. Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO?

A: No

2. If no to the question above, will the SSHO need to be full-time for this project?

A: Yes

3. Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC?

A: No

4. Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC?

A: No DUPLICATE

5. If no to the question above, will the QA/QC need to be full-time for this project?

A: Yes

6. The plans are dated 11/04/2022. Is the issued drawing set the latest and complete set?

A: Yes

7. Please confirm the current design documents meet current VA TIL guidelines.

A: Confirmed

8. Please provide a hazardous materials (Asbestos) report for the space being demo’d.

A: The building was built after 1981 and ACM is presumed not to be present.

9. Are there any other projects, either ongoing or scheduled, that may impact this project?

A: There are multiple projects at various stages of construction ongoing throughout the Mountain Home campus. Coordination to deconflict will occur through COR.

10. Are all systems for building 200 up to date on their certifications?

A: What systems are they referring to?

11. Will the med gas piping be required to be recertified as part of this project?

A: Yes

12. Spec section 01 91 00 (Page 268 of the specs) references Witness Factory Testing. What equipment requires a witness factory test?

A: [WLS] AHU (see response to question 36)

13. Please describe the VA’s intent for the contractor to enter the space.

A: Coordinate with COR after award

14. For underslab sanitary work on the first floor, how many isolation rooms will be made available at one time for work?

A: Coordinate with COR. Depending on D1 patient load

15. Please provide contact information for the buildings’ Nurse Call representatives.

A: Baxter Hillrom

16. Please provide contact information for the buildings’ Access Control representatives

A: Johnson Controls

17. Please provide contact information for the buildings’ Fire Alarm representatives.

A: Johnson Controls

18. Please provide contact information for the buildings’ Building Controls representatives

A: Computrols

19. Please provide contact information for the existing roof installer as the roof is likely covered under warranty

A: Eskola Roofing, Morristown, TN

20. Will the VA allow for the use of trash shoots?

A: Yes

21. Sub Factor 1A indicates that the three similar projects should include elevator upgrades as part of their scope. Please confirm this is a requirement since there is no elevator scope on this project.

A: Yes

22. Sheet GI000 Note F indicates that if construction noise is anticipated that a written request must be made. Please identify any instances in which this would be required.

A: Coordinate with COR

23. Please provide the dimensions of the existing floor to deck.

A: {PRQ} Approximately 15’-0”.

24. Will plastic flame spread resistant temporary walls be accepted for use as an ICRA barrier?

A: Only for 24 hours or less {PRQ} I think this should be allowed if its fire resistant rated, or if the sprinkler system is active on both sides of the barrier. NFPA 241, Chapter 4.13.1.3. addresses the type of plastic film that is allowed to be used for temporary barriers during construction. See Chapter 4.13.4 for requirements of Temp Construction Barriers.

25. Sheet GI105 Note 5 of Phase 3 indicates that the contractor is to provide a code compliant path of egress along the corridor at all times. Is it safe to assume that this corridor will only be used during times of emergency egress or is the corridor expected to remain functional during this phase?

A: {PRQ} The corridors in Phase 3 (GI105) will need to remain functional during construction.

26. Is there a RCP for the first floor available for distribution?

A: No

27. Sheet M2.02 Second Floor HVAC New Work is Corrupted and will need to be redistributed.

A: See Attached

28. Will the VA confirm if there is a maximum number of files allowed for proposal submission. Is it correct that there shall be four files (Technical Proposal, Price Proposal, required licenses and forms, and a copy of the solicitation)?

A: See Solicitation

29. Is the Bid Bond to be included with offeror’s price proposals or shall they be submitted as a separate file with offeror’s other required forms and certifications?

A: See Solicitation

30. Please clarify if a Pre-T&B been conducted?

A: A Pre-T&B will need to be conducted

31. Will the contractor responsible remediate issues found during construction as it pertains to air balancing?

A: Yes

32. Please clarify if there are any requirements for temporary air.

A: [WLS] Existing spaces outside of the scope of work which are being reconnected to AHU-200-14 with new ductwork will require temporary air connections as needed to maintain ventilation. This could be temporary flex duct and not a separate cooling unit. Provide schedule to COR for review.

33. Please clarify who provides the headwalls.

A: Contractor

34. Please clarify if there will be any exceptions made to the Buy-American act.

A: No

35. Please clarify if a specific signage company should be used for the new signage

A: No specified company

36. Will the Commissioning agent and COR be required to witness the factory testing of the AHU?

A: Yes

37. Is the patient lift system to be furnished and installed by the manufacturer? Equipment schedule notes both CFCI and VFCI.

A: CFCI

38. Phasing plan notes the demolition and installation of ceilings as required to be night work and multi-phased. Phasing plan does not acknowledge the removal and replacement of flooring systems. Is the intent for all flooring systems to be replaced after ceilings are complete?

A: {PRQ} Sequence of the work is at the Contractor’s discretion. See General Phasing Notes on sheet GI105.

See attached document: 08.01_AI601 - FINISH SCHEDULE.

See attached document: 09.04_QT403 - ENLARGED EQUIPMENT PLAN.

See attached document: 08.00_AI101 - SECOND FLOOR FINISH PLAN.

Page 1 of

Page 1 of

File details come from the government source that posted it. Updated .