C27_UUpdated 621-20-107 Drawings Part 3 of 3.pdf
PDF 14 MB Posted
- Solicitation number
- 36C24923R0030
About this file
This document provides details for a federal contract opportunity to renovate Building 200 at the James H. Quillen VAMC Mountain Home facility in Tennessee. The solicitation number is 36C24923R0030 to renovate the D Wing of Building 200 for an Isolation Ward. The project number is 621-20-107. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The opportunity type is a solicitation to renovate the D Wing of Building 200 at the James H. Quillen VAMC Mountain Home facility in Tennessee for use as an Isolation Ward. Details provided include the solicitation number, project name and number, description of work, and the contracting federal agency.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOV
SAN
SAN
V
ST
OST
IW
CD
SPD
SED
GW
SPV
SEV
SV
SV
PDR
PDR
PD
GW
GD
GD
AW
IR
NPC
ABBREVIATIONS
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AP ACCESS PANEL
BLDG BUILDING
BOP BOTTOM OF PIPE
BT BATH TUB
BLCV BALANCING VALVE
CD CONDENSATE DRAIN
CLG CEILING
CO CLEANOUT
COTG CLEANOUT TO GRADE
CONN CONNECTION
CONT CONTINUATION
CP CIRCULATING PUMP
CV CHECK VALVE
DCW COLD WATER
DF DRINKING FOUNTAIN
DFU DRAINAGE FIXTURE UNIT
DIA DIAMETER
DN DOWN
DR DRAIN
DWG DRAWING
(E) EXISTING
EL ELEVATION
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FS FLOOR SINK
FT FEET
G NATURAL GAS
GAL GALLONS
GD GARAGE DRAIN
GPM GALLONS PER MINUTE
GWH GAS WATER HEATER
GV GATE VALVE
HB HOSE BIBB
HD HUB DRAIN
HT HEAT TRACING
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
IN INCH
IW INDIRECT WASTE
L LAVATORY
MIN MINIMUM
MS MOP SINK
(N) NEW
NC NORMALLY CLOSED
NO NORMALLY OPEN
OD OVERFLOW (ROOF STORM) DRAIN
ODL OVERFLOW (STORM) DRAINAGE LEADER/PIPING
PDR PLANTER DRAIN
PD PUMP DISCHARGE
PIV POST INDICATING VALVE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH (GAUGE)
RC ROOF RECEPTOR
SA SHOCK ABSORBER
TAG LEGEND
RISER
DESIGNATION
EQUIPMENT
DESIGNATION
DETAIL
DESIGNATION
SHEET NOTE NUMBER
REVISION NUMBER
PIPING LEGEND
NATURAL GAS / FUEL OIL
FUEL OIL VENT PIPING
FUEL OIL FILL PIPING
WASTE / VENT / STORM
SANITARY (ABOVE FLOOR)
SANITARY (BELOW FLOOR)
VENT PIPING
STORM DRAIN PIPING
OVERFLOW STORM PIPING
INDIRECT WASTE PIPING
CONDENSATE DRAIN PIPING
SUMP PUMP DISCHARGE PIPING
SEWAGE EJECTOR DISCHARGE PIPING
GREASE WASTE PIPING
SUMP PUMP VENT PIPING
SEWAGE EJECTOR VENT PIPING
SOVENT PIPING (ABOVE FLOOR)
SOVENT PIPING (BELOW FLOOR)
PLANTER DRAIN PIPING (ABOVE FLOOR)
PLANTER DRAIN PIPING (BELOW FLOOR)
PUMP DISCHARGE
GREASE WASTE
GARAGE DRAIN PIPING (ABOVE FLOOR)
GARAGE DRAIN PIPING (BELOW FLOOR)
ACID WASTE
ACID WASTE (BELOW FLOOR)
POTABLE WATER
DOMESTIC COLD WATER PIPING
DOMESTIC HOT WATER PIPING
DOMESTIC HOT WATER RETURN PIPING
NON-POTABLE / INDUSTRIAL WATER
IRRIGATION PIPING
NON-POTABLE COLD WATER
P2.1
P
CP
RISER NO.
RISER SYSTEM TYPE
EQUIPMENT
EQUIPMENT NO.
DWG. SHEET NO.
DETAIL NUMBER
PLUMBING GENERAL NOTES
1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT LOCAL CODES, 2022 VA PLUMBING DESIGN
MANUAL, AND PROJECT SPECIFICATIONS.
2. PLUMBING CONTRACTOR SHALL COORDINATE ALL PIPING WITH MECHANICAL, ELECTRICAL, ARCHITECTURAL, AND
STRUCTURAL TRADES PRIOR TO CONSTRUCTION TO AVOID CONFLICTS.
3. ALL EQUIPMENT LOCATIONS SHALL BE FIELD COORDINATED WITH OTHER TRADES, DESIGN INTENT AND APPLICABLE
CODES.
4. PROVIDE ACCESS PANELS FOR ALL CONCEALED VALVES, WATER HAMMER ARRESTORS, TRAP PRIMERS, ETC.. ACCESS
DOORS OR PANELS SHALL BE NO SMALLER THAN 12"X12".
5. ROUGH-IN AND PROVIDE FINAL CONNECTION TO ALL EQUIPMENT (ICE MACHINES, COFFEE MAKERS, ETC.) FURNISHED BY OWNER AND/OR OTHERS. PROVIDE CODE APPROVED BACKFLOW PREVENTER. CONTRACTOR SHALL PROVIDE ALL ITEMS
NECESSARY TO COMPLETE THE PLUMBING INSTALLATION.
6. REFER TO ARCHITECTURAL DRAWING FOR ROUGH-IN DIMENSIONS AND MOUNTING HEIGHTS OF PLUMBING FIXTURES.
7. ALL PLUMBING FIXTURES AND EQUIPMENT SHALL BE IN COMPLIANCE WITH CURRENT APPLICABLE ENERGY
CONSERVATION CODES.
8. ALL PIPING AND EQUIPMENT IS SHOWN DIAGRAMMATICALLY ONLY. EXACT LOCATION SHALL BE DETERMINED IN FIELD.
MAINTAIN HEAD ROOM AND SPACE CONDITIONS AT ALL TIMES. ALL WORK SHALL BE COORDINATED WITH ALL TRADES BEFORE PROCEEDING WITH INSTALLATION. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL NOTIFY ARCHITECT AND ENGINEER OF ANY DISCREPANCIES. PRIOR TO EQUIPMENT SUBMITTALS, CONTRACTOR SHALL VERIFY PROPOSED
CONDITIONS TO ENSURE SPECIFIED EQUIPMENT CAN BE PROPERLY INSTALLED.
9. INSTALL PIPING CLOSE TO WALLS, PARTITIONS, CEILINGS, ETC. OFFSET ONLY WHERE NECESSARY TO FOLLOW WALLS, AS INDICATED. PROVIDE ALL NECESSARY FITTINGS, OFFSETS, VALVES AND OTHER DEVICES REQUIRED FOR A
COMPLETE INSTALLATION.
10. INSTALL PIPING IN A CONCEALED MANNER, STRAIGHT, PLUMB AND AS DIRECT AS POSSIBLE. FORM RIGHT ANGLES PARALLEL WITH BUILDING WALLS. LOCATE GROUPS OF PIPES PARALLEL TO EACH OTHER. PIPE SHALL BE LOCATED TO PERMIT ACCESS FOR SERVICE VALVES. ALL PIPING SHOWN ON THE PLANS OR INDICATED BY NOTES SHALL BE
CONCEALED ABOVE THE CEILING OR IN THE WALLS UNLESS NOTED OTHERWISE.
11. NO PIPING SHALL BE ROUTED ABOVE COMMUNICATION (IT, TR, ETC.), ELEVATOR MACHINE ROOMS, AND ELECTRICAL
ROOMS.
12. AVOID ROUTING PIPING ABOVE PHARMACY, LABORATORY, OPERATING, PROCEDURE AND IMAGING ROOMS. WHEN PIPING ABOVE THESE ROOMS CAN’T BE AVOIDED CONTRACTOR SHALL PROVIDE DRIP PANS BELOW ALL PIPING WITH MOISTURE SENSOR AND DRAINPIPE ROUTED TO MOP SINK OR FLOOR SINKS. MOISTURE SENSOR SHALL BE CONNECTED
TO BUILDING MANAGEMENT SYSTEM.
13. CONCRETE PADS, PITS, AND FLASHING FOR PLUMBING EQUIPMENT SHALL BE AS INDICATED ON THE STRUCTURAL AND ARCHITECTURAL PLANS, UNLESS NOTED OTHERWISE. COORDINATE EXACT SIZES OF REQUIRED OPENINGS AND
SUPPORTS FOR FURNISHED EQUIPMENT.
14. ALL PIPING SHALL BE REAMED TO BE FREE OF BURRS. KEEP PIPING FREE FROM SCALE AND DIRT. PROTECT OPEN PIPE ENDS WHENEVER WORK IS SUSPENDED DURING CONSTRUCTION TO PREVENT FOREIGN MATERIAL ENTERING AND CAP
ALL OPEN ENDS DURING CONSTRUCTION WITH APPROVED TEMPORARY CAPS OR MATERIALS.
15. DO NOT INSTALL JOINTS BELOW SLAB FOR DOMESTIC WATER PIPING.
16. MAINTENANCE AND IDENTIFYING LABELS SHALL BE AFFIXED TO ALL PIPING AND PLUMBING EQUIPMENT. OPERATIONS
AND MAINTENANCE MANUALS SHALL BE PROVIDED TO OWNER UPON PROJECT COMPLETION.
17. INSTALL WELDED OR THREADED PIPE IN AREAS WHERE SPACE IS CRITICAL BETWEEN FINISHED CEILING AND
STRUCTURAL SURFACE.
18. FOR NON-HEALTHCARE PROJECTS INSTALL ALL VENTS THROUGH ROOF 10'-0" MINIMUM FROM EDGE OF ROOF, FRESH AIR INTAKES, DOORS, WALKABLE AREAS OR OPERABLE WINDOWS. FOR HEALTHCARE PROJECTS INSTALL ALL VENTS THROUGH ROOF 10'-0" MINIMUM FROM EDGE OF ROOF, DOORS, WALKABLE AREAS OR OPERABLE WINDOWS AND 25’
MINIMUM FROM ANY AIR INTAKES.
19. SUBMIT APPROVED PRESSURE REDUCING VALVES & BACKFLOW PREVENTION DEVICES TO WATER AUTHORITY.
CONTRACTOR SHALL PROVIDE ALL NECESSARY DEVICES PER WATER AUTHORITY REQUIREMENTS AND MANUFACTURER
RECOMMENDATIONS.
20. ALL WALL, CEILING AND FLOOR PENETRATIONS CONVEYING PLUMBING, DRAINS, SPRINKLER PIPING, SHALL BE FULLY SEALED AND CAULKED AROUND THE PENETRATING FEATURE TO RESTORE THE REQUIRED FIRE OR SMOKE BARRIER RATING OF THE WALL, CEILING, OR FLOOR PENETRATION. AS A MINIMUM, AT ALL LOCATIONS, A TWENTY (20) MINUTE FIRE/SMOKE RESISTANCE SHALL BE MAINTAINED. USE UL LISTED FIRESTOPPING DETAILS FOR ALL RATED WALL
PENETRATIONS.
21. PLUMBING OR SPRINKLER RELATED PIPE SHALL NOT PENETRATE OR PASS THROUGH STAIRWAYS UNLESS IT IS REQUIRED FOR SERVICING THE STAIRWAY OR IT IS SEGREGATED FROM THE STAIRWAY PASSAGEWAY BY AN
ENCLOSURE SYSTEM RATED EQUAL TO OR GREATER THAN THE REQUIRED STAIRWAY RATING.
22. INSTALL WATER HAMMER ARRESTORS IN COMPLIANCE WITH ALL APPLICABLE CODES AND PER SPECIFICATIONS.
PROVIDE HAMMER ARRESTORS AT ALL EQUIPMENT OR FIXTURES WITH QUICK CLOSING VALVES, ELECTRONIC FAUCETS AND ALL FLUSH VALVES. SIZE OF WATER HAMMER ARRESTOR SHALL BE PER PDI GUIDELINES AND MANUFACTURER'S
RECOMMENDATIONS.
23. CLEANOUTS SHALL BE PROVIDED AS INDICATED ON PLANS AND AS REQUIRED BY THE LOCAL CODES. CLEANOUTS SHALL BE PROVIDED ON HORIZONTAL DRAINAGE PIPE A MAXIMUM OF EVERY 100', AS WELL AS AT EVERY FITTING GREATER THAN 45 DEGREES THAT DOES NOT HAVE AN CLEANOUT WITHIN 40'. CLEANOUTS SHALL BE PROVIDED AT THE BASE OF EVERY DRAINAGE STACK. COORDINATE EXACT LOCATION AND COVER TYPE OF CLEANOUT WITH
ARCHITECTURAL FINISHES.
24. UNLESS OTHERWISE NOTED ALL FLOOR DRAINS SHALL FITTED WITH TRAP PRIMER CONNECTION AND 1/2" TRAP PRIMER LINE FROM AN APPROVED AUTOMATIC OR MECHANICAL PRIMER DEVICE. TRAP PRIMERS MAY NOT BE SHOWN IN THE PLAN VIEW. CONTRACTOR SHALL INSTALL ALL TRAP PRIMER DEVICES IN A CONCEALED BUT FULLY ACCESSIBLE
LOCATION.
25. DRAIN VALVES ON LOWEST POINT OF DOMESTIC WATER RISERS TO BE PROVIDED AS FOLLOWS: 1-1/2" OR SMALLER
RISER PROVIDE 1/2" DRAIN VALVE. 2" OR LARGER PROVIDE 3/4" DRAIN VALVE.
26. PROVIDE FULL PORT BALL-TYPE ISOLATION VALVES ON ALL DOMESTIC WATER BRANCH LINES, AS WELL AS ON THE
INDIVIDUAL FEED LINES TO ALL FIXTURES OR EQUIPMENT.
27. PLUMBING CONTRACTOR SHALL INSTALL GAS VENTS FOR ALL GAS REGULATORS. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL REVIEW THE EXISTING CONDITIONS TO DETERMINE THE MOST ECONOMICAL ROUTE FOR
MANIFOLD VENTS BEGINNING AT EQUIPMENT AND EXTENDING THROUGH ROOF.
28. PRIOR TO INSTALLING ANY PIPING, VERIFY INVERT ELEVATIONS, LOCATIONS AND PIPE SIZES. INSTALL ALL SANITARY, WASTE, AND STORM MAINS BEGINNING AT LOW POINT OF EACH SYSTEM AND CONTINUE WITH UNBROKEN CONTINUITY OF INVERT. LOW POINT OF EACH SYSTEM SHALL BE COORDINATED WITH SITE UTILITIES CONTRACTOR. REFER TO SITE
UTILITY PLANS FOR REFERENCE.
29. ALL STORM, CONDENSATE AND SANITARY WASTE PIPING MUST SLOPE TO A MINIMUM OF 1/8" PER FOOT FOR PIPE SIZES
3" AND ABOVE, AND A MINIMUM OF 1/4" PER FOOT FOR PIPE SIZES 2-1/2" AND BELOW.
30. ALL SANITARY VENT PIPING MUST SLOPE TO A MINIMUM OF 0.5% TOWARDS THE SANITARY PIPING.
31. PLUMBING SYSTEM INSULATION COVERING PIPING INSTALLED WITHIN HVAC RETURN PLENUM AREAS SHALL HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE DEVELOPMENT INDEX OF NOT MORE THAN 50 WHEN
TESTED IN ACCORDANCE WITH ASTM E84.
32. INTERIOR HORIZONTAL ABOVE GRADE STORM AND OVERFLOW STORM PIPING, VERTICAL PIPING AT EXTERIOR WALLS, AND ROOF DRAIN BODIES SHALL BE INSULATED.
33. ALL PLUMBING PIPING LOCATED IN UNCONDITIONED SPACE SHALL BE HEAT TRACED AND INSULATED.
34. THE CONTRACTOR SHALL BE RESPONSIBLE TO AID IN THE COMMISSIONING PROCESS.
35. WHEN ADDING BALANCING VALVE INTO AN EXISTING DOMESTIC HOT WATER SYSTEM OR EXTENDING AN EXISTING DOMESTIC HOT WATER SYSTEM, IT IS THE CONTRACTOR'S RESPONSIBILITY TO RE-BALANCE THE ENTIRE DOMESTIC HOT
WATER SYSTEM.
36. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY PARAGRAPH, SUBMITTALS. CONSTRUCTION WORK SHALL NOT
START ON ANY SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY VA.
37. INSTALLER QUALIFICATIONS: INSTALLER SHALL BE LICENSED AND SHALL PROVIDE EVIDENCE OF THE SUCCESSFUL COMPLETION OF AT LEAST FIVE PROJECTS OF EQUAL OR GREATER SIZE AND COMPLEXITY. PROVIDE TRADESMEN
SKILLED IN THE APPROPRIATE TRADE.
38. WORKMANSHIP/CRAFTSMANSHIP WILL BE OF THE HIGHEST QUALITY AND STANDARDS. THE VA RESERVES THE RIGHT TO REJECT ANY WORK BASED ON POOR QUALITY OF WORKMANSHIP. THIS WORK SHALL BE REMOVED AND DONE AGAIN AT
NO ADDITIONAL COST OR TIME TO THE GOVERNMENT.
BFP BACKFLOW PREVENTER
BOB BOTTOM OF BEAM
CA COMPRESSED AIR
CFH CUBIC FEET PER HOUR
CTR COOLING TOWER RECEPTOR
CWFU COLD WATER FIXTURE UNIT
EEW EMERGENCY EYE WASH
HWFU DOMESTIC HOT WATER FIXTURE UNITS
IE INVERT ELEVATION
LDR LEADER
MAX MAXIMUM
MH MANHOLE
NIC NOT IN CONTRACT
POC POINT OF CONNECTION
RPZ REDUCED PRESSURE ZONE
RW RECLAIM STORM WATER
G
GV
NATURAL GAS PIPING
NATURAL GAS VENT PIPING
FUEL OIL SUPPLY PIPING
FUEL OIL RETURN PIPING
FOF
FOS
FOR
TDH TOTAL DYNAMIC HEAD
TMV TEMPERATURE MIXING VALVE
TOS TOP OF SLAB
TP TRAP PRIMER
TPV TRAP PRIMER VALVE
TYP TYPICAL
UP UP (PENETRATES FLOOR SLAB)
UR URINAL
V VENT
VB VACUUM BREAKER
VTR VENT THROUGH ROOF
WC WATER CLOSET
WCO WALL CLEANOUT
WH WALL HYDRANT
WF WATER FILTER
WSFU WATER SUPPLY FIXTURE UNIT
Z ZONE
UNO UNLESS NOTED OTHERWISE
ESH EMERGENCY SHOWER
GH GROUND HYDRANT
NPH NON-POTABLE HOT WATER
AW
ACID VENTAV
AFG ABOVE FINISHED GRADE
WS WASTE STACK
SD STORM (ROOF) DRAIN
SAN SANITARY
SE SEWAGE EJECTOR
SED SEWAGE EJECTOR DISCHARGE
SH SHOWER
SK SINK
SP SUMP PUMP
SPD SUMP PUMP DISCHARGE
TD TRENCH DRAIN
SF SQUARE FEET
SDL STORM DRAINAGE LEADER/PIPING
ABBREVIATIONS
DW DIALYSIS WATER
DB DIALYSIS BOX
SW SPECIAL WASTE
SW SPECIAL WASTE
WHA WATER HAMMER ARRESTOR
MEDICAL EQUIPMENT MOUNTING HEIGHTS *
O
MA
MV
WAGD
N20
IA
MEDICAL GAS NOTES
MEDICAL GAS LEGENDMEDICAL GAS SYMBOLS
MEDICAL GAS NOTES:
DEVICE
MV = MEDICAL VACUUM
S = SLIDE
ZVB = ZONE VALVE BOX
WAGD = WASTE ANESTHETIC GAS DISPOSAL
C02 = CARBON DIOXIDE GAS
AAP = AREA ALARM PANEL
N20 = NITROUS OXIDE
MA = MEDICAL COMPRESSED AIR
NCP = NITROGEN CONTROL PANEL
MGO = MEDICAL GAS WALL OUTLET
MGB = MEDICAL GAS CEILING BOOM
MGC = MEDICAL GAS CEILING COLUMN
MGP = MEDICAL GAS PEDESTAL
MGD = MEDICAL GAS DROP
MGH = MEDICAL GAS HEADWALL
O = OXYGEN
MAP = MASTER ALARM PANEL
1 SLIDE
CARBON DIOXIDE
A.
OXYGEN
SLIDE
MEDICAL VACUUM
MEDICAL COMPRESSED AIR
WAGD
CARBON DIOXIDE
WASTE ANESTHETIC GAS DISPOSAL
NITROUS OXIDE
INSTRUMENT AIR
NITROGEN / INSTRUMENT AIR
NITROUS OXIDE
1 OX
1 MV
1 MA
MGO-O, A, V, S, IA, N2O, WAGD, CO2
EXAMPLE:
MAI = MEDICAL AIR INTAKE
MVE = MEDICAL VACUUM EXHAUST
DEVICE TYPE
COORDINATE WITH ARCHITECTURAL DRAWINGS FOR EXACT LOCATION
AND MOUNTING HEIGHT OF MEDICAL GAS OUTLETS, ZONE VALVE BOXES
AND ALARM PANELS.
B. NOT ALL GASES ARE TO BE USED AT EACH LOCATION. THE GAS
ORDER SHOWN IN THE EXAMPLE IS TYPICAL FOR ALL OUTLETS.
C. COORDINATE MEDICAL GAS PIPE ROUTINGS WITH ALL OTHER
TRADES BEFORE INSTALLATION.
AREA ALARM SENSOR
MASTER ALARM SENSOR
MEDICAL AIR PIPING
MEDICAL OXYGEN PIPING
AREA ALARMAA
ZONE VALVE BOXZVB
WALL OUTLETS:
ZONE VALVE BOX:
AREA ALARM:
MASTER ALARM:
NITROGEN CONTROL CABINET:
FIXED CEILING COLUMN:
RETRACTABLE CEILING COLUMN:
CEILING HOSE DROP:
ASSEMBLY
CEILING ARMS/BOOMS: CONSULT MANUFACTURERS RECOMMENDATIONS
ALL DIMENSION HEIGHTS ARE FROM FINISHED FLOOR. HEIGHTS SHALL BE COORDINATED AND
VERIFIED WITH ARCHITECTURAL ELEVATIONS, ROOM FINISHES AND FACILITY STANDARDS.
5'-0" (60 INCHES) TO THE CENTER OF THE OUTLET
5'-6" (66 INCHES) TO THE TOP OF THE ZONE VALVE BOX
5'-6" (66 INCHES) TO THE TOP OF THE ALARM
5'-6" (66 INCHES) TO THE TOP OF THE ALARM
5'-2" (62 INCHES) TO THE BOTTOM OF THE PANEL
5'-3" (63 INCHES) TO THE BOTTOM OF THE COLUMN
5'-10"(70 INCHES) TO THE BOTTOM OF THE COLUMN
6'-4" (76 INCHES) TO THE BOTTOM OF THE HOSE
OVER AND UNDER ZVB MOUNTING 6'-2" (74 INCHES) MAXIMUN TO TOP OF UPPER BOX
CA = COMPRESSED INSTRUMENT AIR
MEDICAL VACUUM
WASTE ANISTHETIC GAS DISPOSAL PIPING
NITROUS OXIDE PIPING
INSTRUMENT AIR PIPING
1. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT MEDICAL GAS OUTLET LOCATIONS AND MOUNTING
HEIGHTS.
2. NOT ALL GASES MAY BE USED. THE GAS ORDER SHOWN IN THE EXAMPLE WILL BE TYPICAL FOR ALL
OUTLETS.
3. PROVIDE BLANK COVER PLATE BETWEEN VACUUM OUTLET AND SLIDE. SEE ARCHITECTURAL FOR EXACT
CONFIGURATION.
4. MEDICAL GAS CERTIFIER SHALL REVIEW AND APPROVE ALL MEDICAL GAS DESIGN PRIOR TO INSTALLATION.
ANY ISSUES SHALL BE RESOLVED PRIOR TO INSTALLATION.
5. ALL SERVICE VALVES SHOWN ON THE FLOOR PLANS SHALL BE LOCKABLE, DUAL PURGE PORT. LOCK VALVES
IN OPEN POSITION EXCEPT THE VALVES FOR FUTURE CONNECTIONS.
6. ALL MEDICAL GAS VALVES INSTALLED FOR FUTURE SHALL BE CLOSED WITH BRAZED CAP WITH TUBING
ALLOWANCE FOR CUTTING AND RE-BRAZING.
7. ALL MEDICAL GAS SERVICE VALVES ABOVE CEILING MUST BE LOCKED OPEN.
8. PROVIDE MEDICAL GAS OUTLET CONNECTION TYPE PER OWNER STANDARDS.
SYMBOL DESCRIPTION
MGO-11111111
N NITROGEN PIPING
IA = INSRUMENT AIR
9. MEDICAL GAS SYSTEM SHALL MEET NFPA 99 CATEGORY 1 REQUIREMENTS. PIPE AND FITTING MATERIALS SHALL BE ASTM B819 (5.1.10.1.4/5.1.10.1.5). REFER TO SPECS SECTIONS FOR ALL OTHER INFORMATIONS.
MEDICAL GAS ALARM PANEL SCHEDULE
NURSE STATION (50)
LOCATION GAGESTYPE OF PANEL SERVICE INDICATOR LIGHT
AREA ALARM PANEL YES
OXIGEN LINE PRESSURE ABNORMAL
MEDICAL AIR PRESSURE ABNORMAL
MEDICAL VACUUM LINE VACUUM LW TEST BUTTON
PLUMBING EQUIPMENT SCHEDULE
EQUIPMENT DESCRIPTION SCHEDULE NOTES
REDUCED PRESSURE ZONE
BACKFLOW PREVENTER
RPZ SEE SPECIFICATIONS
FD FLOOR DRAIN SEE SPECIFICATIONS
P-812 COFFEE BOX SEE SPECIFICATIONS
P-809 DIALYSIS BOX SEE SPECIFICATIONS
P-704 SHOWER W/HOSESPRAY 2 [50] 2 [50] 0.5 [13] 0.5 [13] 2 1.5/1.5 YES NO
P-103 WATER CLOSET 4 [100] 2 [50] 1 [25] - - 4 10/0 YES NO SEE SPECIFICATION
P-105 WATER CLOSET 4 [100] 2 [50] 1 [25] - - 4 10/0 YES NO SEE SPECIFICATION
P-114 WATER CLOSET-BARIATRIC 4 [100] 2 [50] 1 [25] - - 4 6/0 YES NO SEE SPECIFICATION
P-532 SINK 2 [50] 2 [50] 0.5 [13] 0.5 [13] 1 1.5/1.5 YES NO
P-608 WATER COOLER 2 [50] 2 [50] 0.5 [13] - - 0.5 0.25/0 YES NO SEE SPECIFICATION
P-701 SHOWER 2 [50] 2 [50] 0.5 [13] 0.5 [13] 2 1.5/1.5 YES NO
P-415 LAVATORY-WALL MOUTED 2 [50] 2 [50] 0.5 [13] 0.5 [13] 1 1.5/1.5 YES NO PROVIDE WITH ASSE 1070 MIXING VALVE
P-421 LAVATORY-BARIATRIC 2 [50] 2 [50] 0.5 [13] 0.5 [13] 1 1.5/1.5 YES NO
P-531 SINK 2 [50] 2 [50] 0.5 [13] 0.5 [13] 1 1.5/1.5 NO YES
PLUMBING FIXTURE SCHEDULE
MARK DESCRIPTION
WASTE PIPE VENT PIPE COLD WATER HOT WATER WASTE
FIXTURE
UNITS
WATER
FIXTURE
UNITS
WRIST
BLADE
HANDLES
ELECTRONIC
SENSOR
REMARKS
IN [mm] IN [mm] IN [mm] IN [mm]
PROVIDE WITH ASSE 1070 MIXING VALVE
PROVIDE WITH ASSE 1070 MIXING VALVE
PROVIDE WITH ASSE 1070 MIXING VALVE
P-528 SINK 2 [50] 2 [50] 0.5 [13] 0.5 [13] 1 1.5/1.5 NO NO PROVIDE WITH ASSE 1070 MIXING VALVE
PROVIDE WITH ASSE 1070 MIXING VALVE
PROVIDE WITH ASSE 1070 MIXING VALVE
P-505 CLINICAL SERVICE SINK 4 [100] 2 [50] 1 [25] 0.5 [13] 4 10/0 NO NO SEE SPECIFICATION
P-708 WALL MTD EYEWASH - HANDS FREE 2 [50] 2 [50] 0.5 [13] 0.5 [13] 2 1.5/1.5 No NO PROVIDE WITH ANSI Z358.1 MIXING VALVE
ZONE VALVE BOX SCHEDULE
ZVB-1
DESIGNATION
TYPE OF PANEL
LOCATION
O MA MV N / IA N2O WAGD CO2
SERVICE AREA ALARM ALARM LOCATION
1-1/2" 1-1/2" 2-1/2" - - - - CORRIDOR C-1 AA-1ISO ROOMS NURSE STATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1100 Boulders Pkwy | Suite 503 Richmond, VA 23225
804.355.2067
A u to d e s k D o c s /M t H o m e
I s o la ti o n W a rd
D /W
S P
M t H o m e
D rv t
/7 /2
:1
:2
P
M
P1.00
PLUMBING LEGEND AND NOTES
11/04/2022 IGM TIP
RENOVATE D-WING FOR ISOLATION
WARD
621-20-107
MOUNTAIN HOME, TENNESSEE
BID DOCUMENTSJAMES H.
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
No. Revisions: Date:
1 BID DOCUMENTS 11/04/2022
USMM710143
Snapshot
USMM710143
Text Box 11/04/2022
29A-C
30.1
32.8
P O N M L K I H G F E D C B.5 B A.5 A
2" SAN UP
2" V UP
(E)2" V DN
(E)2" SAN DN
(E)2" V DN
2" V UP
2" SAN UP
(E)2" SAN DN
(E)2" SAN DN
(E)2" V DN
2" SAN UP
2" V UP
4" V UP
4" SAN UP
(E)4" SAN DN(E)4" V DN
2" V UP
(E)2" V DN
3" SAN UP
(E)3" SAN DN
(E)2" V DN
2" V UP
2" SAN UP
2" V UP
(E)2" V DN
(E)2" SAN DN
(E)6" SD DN
6" SD UP
(E)6" SD DN
6" SD UP
(E)6" SD DN
6" SD UP
(E)6" SD DN
(E)4" V DN (E)4" SAN DN
(E)6" SD DN
6" SD UP
4" SAN UP
4" V UP
2" SAN UP
(E)2" SAN DN
(E)4" SAN DN
(E)4" V DN
4" V UP
4" SAN UP
(E)4" SAN DN
(E)6" SD DN
6" SD UP
(E)4" SAN DN
4" SAN UP
4" V UP
(E)4" V DN
6" SD UP
2" SAN UP1
1 1
2 2
2" SAN2" SAN 2" V2" V
6" SD6" SD 6" SD6" SD
4" V4" V
(E)4" V DN
4" V4" V
4" SAN4" SAN
2" TRAPPED SAN UP
4" SAN UP
2" SAN UP
2" SAN UP
4" S
A N
4" S
A N
4" V
4" V
(E)4" SAN DN (E)4" V UP
(E)4" SAN DN
4" SAN UP
4" V UP
4" V
4" V
4" V
4" V
4" SAN4" SAN
(E)4" V DN
4" V UP
4" SAN UP
4" V UP
4" SAN UP
4" V UP
4" SAN UP
(E)4" SAN DN
(E)4" V DN(E)4" SAN DN(E)4" V DN
(E)4" SAN DN
(E)4" V DN
1 1 1
(E)4" V DN
(E)4" V DN
4" SAN UP
4" V UP
2" SAN UP
2" SAN UP
2" SAN UP4" SAN UP
4" SAN UP
2" SAN UP
4" SAN UP
3" TRAPPED SAN UP
3" TRAPPED SAN UP
2" V UP
2" V UP
1(E)4" SAN DN
2" SAN UP
2" SAN2" SAN 2" SAN UP
2" SAN UP
4" SAN UP
2" SAN UP
3" TRAPPED SAN UP
3" TRAPPED SAN UP
2" SAN UP
4" SAN UP
2" SAN UP
2" V UP2" V UP
4" V UP
4" SAN UP
(E)2"V STACK
(E)2"SAN STACK
3" TRAPPED SAN UP
3" TRAPPED SAN UP
2" SAN UP
2" SAN UP
4" SAN UP
2" SAN UP
4" SAN UP
2" SAN UP
2" SAN UP
2" V UP
4" S
A N
4" S
A N
2" SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
3" TRAPPED SAN UP
3" TRAPPED SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
3" TRAPPED SAN UP
3" TRAPPED SAN UP
2" SAN UP
4" SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
4" SAN UP
2" SAN UP
3" TRAPPED SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
4" SAN UP
(E)2" V UP
(E)4" SAN DN
(E)4" SAN DN
3" TRAPPED SAN UP
4" SAN UP
(E)4" V DN
(E)4" V DN
4" V UP
4" V UP
2" SW2" SW
2" SW UP
2" SW UP
2" SW UP
2" SW2" SW
2" SW UP
2" S
W 2"
S W
2" SW2" SW
2" SW UP
2" SW UP
2" SW UP 2" SW2" SW
2" SW UP
2" SW UP
2" SW2" SW
2" SW2" SW
2" SW UP
2" SW UP
2" SW UP 2" SW2" SW
2" SW2" SW
4" SAN UP4" SAN UP
4" SAN UP
4" SAN UP
(E)3" A.T.VTR
6" SD6" SD
2" V
2" V
4" V
4" V
2" V
2" V
4" V
4" V
4" V
4" V
2" V
2" V
4" V
4" V
2" SAN2" SAN
2" SAN UP
2" SAN2" SAN2" SAN2" SAN
4" SAN4" SAN
2" S
A N
2" S
A N
2" SAN2" SAN
4" SAN4" SAN
2"
2"
2"
4"
2"
2"
2"
2"
4"
4" SAN4" SAN
4" 4"
4" 2"
4"
4" SAN4" SAN
2"
2"
3"
4"4"
4"
2"
3"
4" 4"
2"
2" S
A N
2" S
A N
2"
2" SAN UP
3/4" DHWR UP
3/4"
(E)3/4" DHWR DN
6" SD
4" V
4" V 2
4" S
S
2" SAN UP
2" SAN2" SAN
2" SAN UP
4" SAN UP
4" 2"
2"
2"
4"
2" V UP
2" V UP
2" V UP
2" V UP
2" V UP
2" V UP
2" SAN2" SAN4"
2" V UP
2"
2"
4"
3"
2"
2" SAN2" SAN
4" SAN UP
2" SAN UP
4" S
A N
4" S
A N
3"
2" V UP
4" V UP
3"
2" SAN2" SAN
3" SAN3" SAN
2" 4"
3"
3" TRAPPED SAN UP
3" SAN UP
4" S
A N
4" S
A N
2" S
A N
2" S
A N
2" SAN UP
A. COORDINATE WITH FACILITIES ANY SHUTDOWN REQUIRED. REFER TO SPECIFICATIONS
FOR MORE DETAILS.
B. CONTRACTOR SHALL XRAY FLOOR PRIOR TO ANY CUTTING OF THE SLAB TO
COORDINATE PENETRATIONS WITH STRUCTURAL.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
G E N E R A L P L A N N O T E S
KEYPLAN
1100 Boulders Pkwy | Suite 503 Richmond, VA 23225
804.355.2067
A u to d e s k D o c s /M t H o m e
I s o la ti o n W a rd
D /W
S P
M t H o m e
D rv t
/7 /2
:1
:3
P
M
P2.01
FIRST FLOOR PLUMBING NEW
WORK PLAN
11/04/2022 IGM TIP
RENOVATE D-WING FOR ISOLATION
WARD
621-20-107
MOUNTAIN HOME, TENNESSEE
BID DOCUMENTSJAMES H.
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
N
1/8" = 1'-0"
FIRST FLOOR NEW WORK PLUMBING PLAN
D R A W I N G N O T E S :
1 CONNECT NEW VENT PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.
2 CONNECT NEW SANITARY PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.
3 CONNECT NEW STORM PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.
4 CONNECT NEW HOT WATER RETURN PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.
5 OFFSET THE EXISTING STACK IN THE NEAREST WALL.
No. Revisions: Date:
1 BID DOCUMENTS 11/04/2022
USMM710143
Snapshot
USMM710143
29A-C
30.1
32.8
P O N M L K I H G F E D C B.5 B A.5 A
P-114
P-105
P-421
P-415 P-531
P-704
P-704
P-531
P-528
P-531
P-531
P-531
P-531
P-531 P-531
P-531 P-531P-531
P-531
P-531 P-531
P-531
P-531
P-531
P-531 P-531
P-531
P-415
P-415
P-415
P-415
P-704
P-704
P-704 P-704 P-704
P-704
P-704
P-704
P-704
P-704
P-415
P-105
P-105
P-105
P-105
P-105
P-105
P-105
P-105
P-105
P-415P-415
P-415
P-531 P-531
P-415
P-105
P-105
P-415
P-415
P-103
P-415
P-532
P-528
P-701
1/2" DW1/2" DW 1/2" DW1/2" DW 1" DW1" DW
1" D
W 1"
D W
1/2" DW1/2" DW3/4" DW3/4" DW
1" D
W 1"
D W
3/4" DW3/4" DW 3/4" DW3/4" DW 1/2" DW1/2" DW
1" D
W 1"
D W
RPZ
P-809
3/ 4"
D W
3/ 4"
D W
(E )3
/4
D H
W R
(E )3
/4
D H
W R
(E )4
D
C W
(E )4
D
C W
(E )2
/2
D
H W
(E )2
/2
D
H W
(E )3
/4
1/
2"
1/
2"
1/
2"
1/
4"
1" 1"
1" D
H W
1" D
H W
1/2"
1/ 2"
1/ 2"
1/2"
P-608
RPZ
P-531
P-809 P-809 P-809
P-809P-809P-809 P-809
P-809P-809P-809P-809
P-812
3/4" DHWR
3/4" DHWR DN
P-531
1/
2" D
C W
1/
2" D
C W
2" D
H W
2" D
H W
2 1/2" DCW2 1/2" DCW
2" DHW2" DHW
2" D
H W
2" D
H W
1/
2" D
H W
1/
2" D
H W
2" D
C W
2" D
C W
2 1/2" DCW2 1/2" DCW 2 1/2" DCW2 1/2" DCW
1 1/2" DHW1 1/2" DHW
1 1/2" DCW1 1/2" DCW
1/
2" D
H W
1/
2" D
H W
1/
2" D
H W
1/
2" D
H W2"
D C
W 2"
D C
W
1/ 2"
D H
W 1/
2" D
H W
2 1/2" DCW2 1/2" DCW 2" DCW2" DCW
1 1/2" DHW1 1/2" DHW
2" DCW2" DCW
2" D
C W
2" D
C W
1/
2" D
H W
1/
2" D
H W
1/
2" D
H W
1/
2" D
H W
2" DCW2" DCW
1 1/4" DHW1 1/4" DHW
1/
4" D
H W
1/
4" D
H W
2" DCW2" DCW
3/4" DHW3/4" DHW
2" DCW2" DCW
3/ 4"
D H
W 3/
4" D
H W
1/ 2"
D C
W 1/
2" D
C W
1/
4" D
H W
1/
4" D
H W
2" D
C W
2" D
C W
1/
4" D
H W
1/
4" D
H W
1/ 2"
D C
W 1/
2" D
C W
(E )3
/4
D C
W (E
)3 /4
D
C W
1/2" DCW1/2" DCW
2" D
C W
2" D
C W
1/
4" D
H W
1/
4" D
H W
3/ 4"
D H
W 3/
4" D
H W
2" D
C W
2" D
C W
(E)2" DHW(E)2" DHW
(E)2 1/2" DCW(E)2 1/2" DCW
(E)2" DHW(E)2" DHW
(E)2 1/2" DCW(E)2 1/2" DCW
(E)2" DHW(E)2" DHW
(E)2 1/2" DCW(E)2 1/2" DCW
1" D
C W
1" D
C W
(E )2
D
H W
(E )2
D
H W
(E)3" DCW(E)3" DCW
ISO ROOM 1
D201B
ISO ROOM 2
D202B
ISO ROOM 3
D203B
ISO ROOM 4
D204B
ISO ROOM 5
D205B
ISO ROOM 6
D206B
ISO ROOM 7
D207B
ISO ROOM 8
D208B
ISO ROOM 9
D209B
ISO ROOM 10
D210B
ISO ROOM 11
D211B
ISO ROOM 12
D212B
TOILET
D201C
ANTEROOM
D201A
TOILET
D202C
ANTEROOM
D202A
TOILET
D204C
TOILET
D203C
ANTEROOM
D203A
ANTEROOM
D204A ANTEROOM
D205A
TOILET
D205C
TOILET
D-206C
ANTEROOM
D206A
ANTEROOM
D207A
TOILET
D208C
TOILET
D207C
ANTEROOM
D208A
ANTEROOM
D209A
TOILET
D210C
TOILET
D209C
ANTEROOM
D210A
ANTEROOM
D211A
TOILET
D212C
TOILET
D211C
ANTEROOM
D212A
CHART ALCOVE
D201D
CHART ALCOVE
D203D
CHART ALCOVE
D205D
CHART ALCOVE
D207D
CHART ALCOVE
D209D
CHART ALCOVE
D211D
EQUIPMENT
D214
ELECTRICAL
D233
NOURISHMENT
D215
HUDDLE
D216
CLEAN
D219
LINEN
D220
SOILED
D221
NURSE STATION
D223
OIT
D222
MED
D224
NURSE MANAGER
D227
LAB ALCOVE
D226
BIOMED
D235
MECHANICAL
H.A.C.
STAIRS
S1
STAFF TOILET
D230
LOUNGE
D228
CORRIDOR
D2C3
RESTROOM
D218
ALCOVE
D217
ALCOVE
D213
WOMEN'S LOCKER
D231
MEN'S LOCKER
D232
STORAGE
D229
X-RAY ALCOVE
D225
CORRIDOR
D2C5
CORRIDOR
C6
CORRIDOR
D2C4B
CORRIDOR
D2C2
CORRIDOR
D2C1
CONSULT
D234
CORRIDOR
D2C3B
CORRIDOR
D2C3A
VESTIBULE
D236
1/ 2"
D C
W 1/
2" D
C W
1/
2" D
H W
1/
2" D
H W
1/
2" D
H W
1/
2" D
H W
1/2" DHW1/2" DHW
P-532
1"
2 1/2" 2 1/2"
2" D
C W
2" D
C W
2"
2"
2"
2"
P-505
P-812
P-532
6 6
P-708
A. COORDINATE EXACT LOCATIONS OF PLUMBING FIXTURES WITH ARCHITECTURAL PLANS
AND ELEVATIONS. COORDINATE EXACT EQUIPMENTS WITH ARCHITECTURAL
EQUIPMENT PLANS AND ELEVATIONS.
B. USE QUARTER BENDS ON ALL SANITARY AND STORM PIPING TO LIMIT THE AMOUNT OF
CLEANOUTS REQUIRED. PROVIDE CLEANOUTS ON ALL SANITARY AND STORM PIPING
PER SPECIFICATION.
C. AVOID ROUTING ANY PLUMBING PIPING ABOVE OPERATING, PROCEDURE, CT/MRI/LINAC
(AND ASSOCIATED EQUIPMENT ROOMS), PHARMACY, LAB, ELECTRICAL, AND IT ROOMS.
WHEN THESE AREAS CANT BE AVOIDED PROVIDE DRIP PANS WITH THE MOISTURE
SENSOR CONNECTED TO BMS AND ROUTE DRAIN TO MOP SINK OR FLOOR SINK.
D. ALL FLOOR DRAINS AND FLOOR SINKS TO BE PROVIDED WITH P-TRAP PER
SPECIFICATIONS.
E. COORDINATE WITH FACILITIES ANY SHUTDOWN REQUIRED, REFER TO SPECIFICATIONS
FOR MORE DETAILS.
F. RECONNECT ALL EXISTING TO REMAIN FIXTURES/BRANCHES, DOMESTIC WATER,
SANITARY, AND VENT PIPING TO NEW MAINS. VERIFY EXACT SIZES AND LOCATIONS.
G. CONTRACTOR SHALL XRAY FLOOR PRIOR TO ANY CUTTING OF THE SLAB TO
COORDINATE PENETRATIONS WITH STRUCTURAL.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
G E N E R A L P L A N N O T E S
KEYPLAN
1100 Boulders Pkwy | Suite 503 Richmond, VA 23225
804.355.2067
A u to d e s k D o c s /M t H o m e
I s o la ti o n W a rd
D /W
S P
M t H o m e
D rv t
/7 /2
:1
:3
P
M
P2.02A
SECOND FLOOR PLUMBING NEW
WORK PLAN - WATER
11/04/2022 IGM TIP
RENOVATE D-WING FOR ISOLATION
WARD
621-20-107
MOUNTAIN HOME, TENNESSEE
BID DOCUMENTSJAMES H.
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
N
1/8" = 1'-0"
SECOND FLOOR NEW WORK PLUMBING PLAN
D R A W I N G N O T E S :
1 CONNECT NEW COLD WATER PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.
2 CONNECT NEW HOT WATER PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.
3 CONNECT 1/2" CW SUPPLY TO COFFEE MAKER (BY OTHERS). PROVIDE METAL WALL BOX AND STOP LOCATED IN WALL ABOVE COUNTER. PROVIDE DOUBLE CHECK VALVE IN SUPPLY EQUAL TO WATTS SERIES 7, LOCATED ABOVE FLOOD
LEVEL OF EQUIPMENT. COORDINATE EXACT LOCATION WITH ARCHITECT.
4 LOCATE RPZS IN THIS ROOM ON THE WALL FOR EASY ACCESS. ROUTE DRAIN TO MOP SINK WITH AIR GAP.
5 PROVIDE MANUAL VALVE, CHECK VALVE, AND CIRCUIT SETTER AT THIS LOCATION.
6 PROVIDE WATER HAMMER ARRESTOR FOR CW SUPPLY LINE TO WATER CLOSET. INSTALL WATER HAMMER ARRESTOR IN CHASE AND PROVIDE ACCESS PANEL FOR SERVICE AND MAINTENANCE. REFER TO ARCHITECTURAL DRAWINGS FOR
ACCESS PANEL LOCATIONS.
No. Revisions: Date:
1 BID DOCUMENTS 11/04/2022
USMM710143
Snapshot
USMM710143
29A-C
30.1
32.8
P O N M L K I H G F E D C B.5 B A.5 A
2" SAN DN
2" SAN DN
(E)2" VTR (E)2" VTR
2" SAN DN
2" V DN
4" SAN DN
2" V DN
(E)3" VTR
3" SAN DN(E)2" VTR
2" SAN DN
(E)4" VTR
(E)4"SAN STACK
2" SAN DN
2" SAN DN
(E)6" RD UP (E)6" SD RD UP(E)6" SD RD UP
6" SD DN
(E)4" SD RD UP(E)4" SD RD UP
(E)4" SD RD UP(E)4" SD RD UP
(E)6" SD RD UP(E)6" SD RD UP
(E)4" SD RD UP(E)4" SD RD UP
(E)4" SD RD UP(E)4" SD RD UP
6" SD DN
6" SD DN
(E)6" SD UP
(E)4" SD UP
(E )4
S
D (E
)4
S D
(E )4
S
D (E
)4
S D
(E)4" SD(E)4" SD
(E )6
S
D (E
)6
S D
(E )6
S
D (E
)6
S D
(E)6" SD RD UP(E)6" SD RD UP
(E)6" SD(E)6" SD
6" SD DN
6" SD DN
(E)4" VTR
4" SAN DN
4" V DN
(E)2"VTR
(E)2"SAN STACK
6" SD6" SD
6" SD6" SD 6" SD6" SD
1 1
2 2
(E)4" SD(E)4" SD
4" SAN DN
(E)4" VTR
2" V2" V
4" V
4" V
4" V4" V
4" S
A N
4" S
A N
4" SAN4" SAN
(E)4" VTR
4" SAN DN
4" SAN4" SAN1
4" V DN
4" SAN DN
4" SAN DN
4" SAN DN
(E)4" VTR
(E)4" VTR 1
4" V DN
4" V DN
4" SAN DN
4" SAN DN
(E)4" VTR
2" SAN2" SAN
4" SAN4" SAN
4" SAN4" SAN
4" SAN4" SAN
4" SAN4" SAN
2" SAN2" SAN
2" SAN2" SAN
4" SAN DN
4" SAN DN
RPZ
P-809
RPZ
FD-D
FD-D
FD-D
FD-D
FD-D
FD-D
FD-D
FD-D
FD-D
FD-D
FD-D
FD-D
P-809 P-809
P-809
P-809P-809P-809P-809
P-809 P-809
P-809
P-809
P-704
P-704
P-105
P-105
P-415
P-415
P-114
P-105
P-421
P-415 P-531
P-704
P-704
P-531
P-531
P-531
P-531
P-531
P-531
P-531
P-531 P-415
P-415
P-415
P-704
P-704
P-704
P-704 P-704
P-704
P-415
P-105
P-105
P-105
P-105
P-105
P-105
P-105
P-415P-415
P-415 P-415
P-105
P-105
P-528
P-704
(E)4" V STACK
/ VTR
(E)4" V STACK
/ VTR
(E)4" VTR
(E)4"SAN STACK
(E)4" V STACK
/ VTR
(E)2" VTR
(E)4"SAN STACK
(E)2"V STACK
/ VTR
(E)2" VTR
(E)2" VTR
4" V DN
(E)4" V STACK
/ VTR
P-528
P-103
P-415
P-608
P-532
P-531
P-701
P-531
P-531 P-531
P-415
P-531
4" VTR
2" V
2" V
2" VTR
(E)2"VTR
(E)2"V STACK
2" V2" V
2" V
2" V
2" V2" V
2" V
2" V
4" V
4" V
2" V2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V2" V
2" V2" V2" V2" V
2" V
2" V
2" V
2" V
(E)2" VTR
(E)4" VTR
4" VTR
4" V DN
2" VTR
2" V
2" V
2" V
2" V
2" VTR
2" V2" V
4" VTR
4" V4" V
6" SD DN
4" VTR 4" VTR
4" SAN4" SAN
6" SD6" SD
4 2" V2" V
2" V
2" V
(E)4" VTR
(E)3" VTR
(E)4" VTR
2" VTR
P-531
P-531
P-531
P-531 P-531 P-531
ISO ROOM 1
D201B
ISO ROOM 2
D202B
ISO ROOM 3
D203B
ISO ROOM 4
D204B
ISO ROOM 5
D205B
ISO ROOM 6
D206B
ISO ROOM 7
D207B
ISO ROOM 8
D208B
ISO ROOM 9
D209B
ISO ROOM 10
D210B ISO ROOM 11
D211B
ISO ROOM 12
D212B
TOILET
D201C
ANTEROOM
D201A
TOILET
D202C
ANTEROOM
D202A
TOILET
D204C
TOILET
D203C
ANTEROOM
D203A ANTEROOM
D204A
ANTEROOM
D205A
TOILET
D205C
TOILET
D-206C
ANTEROOM
D206A
ANTEROOM
D207A
TOILET
D208C
TOILET
D207C
ANTEROOM
D208A
ANTEROOM
D209A
TOILET
D210C
TOILET
D209C
ANTEROOM
D210A
ANTEROOM
D211A
TOILET
D212C
TOILET
D211C
ANTEROOM
D212A
CHART ALCOVE
D201D
CHART ALCOVE
D203D
CHART ALCOVE
D205D
CHART ALCOVE
D207D
CHART ALCOVE
D209D
CHART ALCOVE
D211D
EQUIPMENT
D214
ELECTRICAL
D233
NOURISHMENT
D215
HUDDLE
D216
CLEAN
D219
LINEN
D220
SOILED
D221
NURSE STATION
D223
OIT
D222
MED
D224
NURSE MANAGER
D227
LAB ALCOVE
D226
BIOMED
D235
MECHANICAL
H.A.C.
STAIRS
S1
STAFF TOILET
D230
LOUNGE
D228
CORRIDOR
D2C3
RESTROOM
D218
ALCOVE
D217
ALCOVE
D213
WOMEN'S LOCKER
D231
MEN'S LOCKER
D232
STORAGE
D229
X-RAY ALCOVE
D225
CORRIDOR
D2C5
CORRIDOR
C6
CORRIDOR
D2C4B
CORRIDOR
D2C2
CORRIDOR
D2C1
CONSULT
D234
CORRIDOR
D2C3B
CORRIDOR
D2C3A
VESTIBULE
D236
2" V2" V 4P-532
2"
4" V4" V
6" SD6" SD
2" V
2" V
2"
2" V
2" V
4"
2" V2" V
2" V2" V
2"
4" VTR
2" V2" V
4" V
4" V 2"
V 2"
V 2"
V 2"
V
2"
2"
3"
4" VTR
4" VTR
4" SAN4" SAN 4" SAN4" SAN
P-505
P-532
2" V
2" V
2" V
2" V
4" VTR
4" VTR
P-704
(E)4" VTR4
4" SAN4" SAN4" SAN4" SAN
FD-D
FD-D
P-708
2"
A. COORDINATE EXACT LOCATIONS OF PLUMBING FIXTURES WITH ARCHITECTURAL PLANS
AND ELEVATIONS. COORDINATE EXACT EQUIPMENTS WITH ARCHITECTURAL
EQUIPMENT PLANS AND ELEVATIONS.
B. USE QUARTER BENDS ON ALL SANITARY AND STORM PIPING TO LIMIT THE AMOUNT OF
CLEANOUTS REQUIRED. PROVIDE CLEANOUTS ON ALL SANITARY AND STORM PIPING
PER SPECIFICATION.
C. AVOID ROUTING ANY PLUMBING PIPING ABOVE OPERATING, PROCEDURE, CT/MRI/LINAC
(AND ASSOCIATED EQUIPMENT ROOMS), PHARMACY, LAB, ELECTRICAL, AND IT ROOMS.
WHEN THESE AREAS CANT BE AVOIDED PROVIDE DRIP PANS WITH THE MOISTURE
SENSOR CONNECTED TO BMS AND ROUTE DRAIN TO MOP SINK OR FLOOR SINK.
D. ALL FLOOR DRAINS AND FLOOR SINKS TO BE PROVIDED WITH P-TRAP PER
SPECIFICATIONS.
E. COORDINATE WITH FACILITIES ANY SHUTDOWN REQUIRED, REFER TO SPECIFICATIONS
FOR MORE DETAILS.
F. RECONNECT ALL EXISTING TO REMAIN FIXTURES/BRANCHES, DOMESTIC WATER,
SANITARY, AND VENT PIPING TO NEW MAINS. VERIFY EXACT SIZES AND LOCATIONS.
G. CONTRACTOR SHALL XRAY FLOOR PRIOR TO ANY CUTTING OF THE SLAB TO
COORDINATE PENETRATIONS WITH STRUCTURAL.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
G E N E R A L P L A N N O T E S
KEYPLAN
1100 Boulders Pkwy | Suite 503 Richmond, VA 23225
804.355.2067
A u to d e s k D o c s /M t H o m e
I s o la ti o n W a rd
D /W
S P
M t H o m e
D rv t
/7 /2
:1
:4
P
M
P2.02B
SECOND FLOOR PLUMBING NEW
WORK PLAN - SANITARY/STORM
11/04/2022 IGM TIP
RENOVATE D-WING FOR ISOLATION
WARD
621-20-107
MOUNTAIN HOME, TENNESSEE
BID DOCUMENTSJAMES H.
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
N
1/8" = 1'-0"
SECOND FLOOR NEW WORK PLUMBING PLAN - SANITARY AND STORM
D R A W I N G N O T E S :
1 CONNECT NEW SANITARY PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.
2 CONNECT NEW STORM PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.
3 PROVIDE DRIP PAN TO EXISTING STORM PIPING LOCATED ABOVE BIOMED UNIT.
4 CONNECT NEW VENT PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.
No. Revisions: Date:
1 BID DOCUMENTS 11/04/2022
USMM710143
Snapshot
USMM710143
29A-C
30.1
32.8
P O N M L K I H G F E D C B.5 B A.5 A
(E)2" VTR
(E)2" VTR
(E)6" RD (E)6" RD
(E)4" RD
(E)4" VTR
(E)4" VTR
(E)4" VTR
(E)4" VTR
(E)4" VTR (E)4" VTR
(E)4" VTR (E)4" VTR
(E)6" RD
(E)4" RD
(E)2" VTR
(E)4" RD
(E)4" RD
(E)3" VTR
(E)6" RD
(E)6" RD
(E)4" RD
(E)2" VTR
(E)2" VTR
2" VTR
4" VTR
(E)4" VTR
(E)2" VTR
2" VTR
2" VTR
(E)2" VTR
(E)2" VTR
(E)3" VTR
4" VTR
(E)2" VTR
(E)2" VTR
(E)4" VTR
(E)2" VTR
(E)4" VTR
(E)4" VTR
(E)4" VTR(E)4" VTR
(E)4" VTR
(E)4" VTR
2" VTR
4" VTR
4" VTR
4" VTR
4" VTR
4" VTR 4" VTR
4" VTR 4" VTR1 1
OUTSIDE AIR INTAKE
25' - 0"
A. COORDINATE WITH FACILITIES ANY SHUTDOWN REQUIRED. REFER TO SPECIFICATIONS
FOR MORE DETAILS.
B. CONTRACTOR SHALL XRAY FLOOR PRIOR TO ANY CUTTING OF THE SLAB TO
COORDINATE PENETRATIONS WITH STRUCTURAL.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
G E N E R A L P L A N N O T E S
KEYPLAN
1100 Boulders Pkwy | Suite 503 Richmond, VA 23225
804.355.2067
A u to d e s k D o c s /M t H o m e
I s o la ti o n W a rd
D /W
S P
M t H o m e
D rv t
/7 /2
:1
:4
P
M
P2.03
ROOF NEW WORK PLUMBING
PLAN
11/04/2022 IGM TIP
RENOVATE D-WING FOR ISOLATION
WARD
621-20-107
MOUNTAIN HOME, TENNESSEE
BID DOCUMENTSJAMES H.
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
N
1/8" = 1'-0"
ROOF NEW WORK PLUMBING PLAN
D R A W I N G N O T E S :
1 RELOCATED/OFFSETTED VTR, AS REQUIRED TO MAINTAIN 25' FROM ANY AIR INTAKE.
No. Revisions: Date:
1 BID DOCUMENTS 11/04/2022
USMM710143
Snapshot
USMM710143
29A-C
30.1
32.8
P O N M L K I H G F E D C B.5 B A.5 A
(E)1/2"MA
(E)1 1/2"MV
(E)3/4"O
(E )1
/2 "M
A (E
)1 /2
"O
(E )3
/4 "M
V
AA-1
ZVB-1
MGH-66660000 MGH-66660000 MGH-66660000
MGH-66660000
MGH-66660000 MGH-66660000 MGH-66660000 MGH-66660000
MGH-66660000MGH-66660000MGH-66660000
MGH-66660000
(E)3/4" O(E)3/4" O
(E)1/2" MA(E)1/2" MA
(E)1 1/2" MV(E)1 1/2" MV
2 1/2" MV2 1/2" MV
1 1/2" MA1 1/2" MA
1 1/2" O1 1/2" O
1/2"O
3/4"MV
1/2"MA
3/4" O3/4" O
1 1/4" MV1 1/4" MV
3/4" MA3/4" MA
1" O1" O
2" MV2" MV
1" MA1" MA
1" O1" O
1" MA1" MA
2" MV2" MV
1/2" O1/2" O
3/4" MV3/4" MV
1/2" MA1/2" MA
2" M
V 2"
M V
1/
4" M
A
1/ 4"
M A
1/
4" O
1/
4" O
1" MA1" MA
1" O1" O
1 1/2" MV1 1/2" MV
1" MA1" MA
1" O1" O
1 1/2" MV1 1/2" MV
1/ 2"
O 1/
2" O
1/ 2"
M A
1/ 2"
M A
3/ 4"
M V
3/ 4"
M V
3/4" O3/4" O
3/4" MA3/4" MA
1 1/4" MV1 1/4" MV
1/2" O1/2" O
3/4" MV3/4" MV
1/2" MA1/2" MA
1" O
1" O
1" M
A 1"
M A
1/
2" M
V
1/ 2"
M V
2" MV2" MV
3/4" MA3/4" MA
3/4" O3/4" O
1/ 2"
O 1/
2" O
1/ 2"
M A
1/ 2"
M A
3/ 4"
M V
3/ 4"
M V
2 2
2 2 2 2
2 2 2
ISO ROOM 1
D201B
ISO ROOM 2
D202B
ISO ROOM 3
D203B
ISO ROOM 4
D204B
ISO ROOM 5
D205B
ISO ROOM 6
D206B
ISO ROOM 7
D207B
ISO ROOM 8
D208B
ISO ROOM 9
D209B
ISO ROOM 10
D210B
ISO ROOM 11
D211B
ISO ROOM 12
D212B
TOILET
D201C
ANTEROOM
D201A
TOILET
D202C
ANTEROOM
D202A
TOILET
D204C
TOILET
D203C
ANTEROOM
D203A
ANTEROOM
D204A
ANTEROOM
D205A
TOILET
D205C
TOILET
D-206C
ANTEROOM
D206A
ANTEROOM
D207A
TOILET
D208C
TOILET
D207C
ANTEROOM
D208A
ANTEROOM
D209A
TOILET
D210C
TOILET
D209C
ANTEROOM
D210A
ANTEROOM
D211A
TOILET
D212C
TOILET
D211C
ANTEROOM
D212A
CHART ALCOVE
D201D
CHART ALCOVE
D203D
CHART ALCOVE
D205D
CHART ALCOVE
D207D
CHART ALCOVE
D209D
CHART ALCOVE
D211D
EQUIPMENT
D214
ELECTRICAL
D233
NOURISHMENT
D215
HUDDLE
D216
CLEAN
D219
LINEN
D220
SOILED
D221
NURSE STATION
D223
OIT
D222
MED
D224
NURSE MANAGER
D227
LAB ALCOVE
D226
BIOMED
D235
MECHANICAL
H.A.C.
STAIRS
S1
STAFF TOILET
D230
LOUNGE
D228
CORRIDOR
D2C3
RESTROOM
D218
ALCOVE
D217
ALCOVE
D213
WOMEN'S LOCKER
D231
MEN'S LOCKER
D232
STORAGE
D229X-RAY ALCOVE
D225
CORRIDOR
D2C5
CORRIDOR
C6
CORRIDOR
D2C4B
CORRIDOR
D2C2
CORRIDOR
D2C1
CONSULT
D234
CORRIDOR
D2C3B
CORRIDOR
D2C3A
VESTIBULE
D236
A. COORDINATE EXACT MEDICAL GAS OUTLETS, AREA ALARM AND ZONE VALVE BOX
LOCATIONS WITH ARCHITECTURAL PLANS AND ELEVATIONS.
B. PROVIDE LOCKABLE SHUT OFF VALVES ABOVE CEILING ON ALL MEDICAL GAS PIPING
UPSTREAM OF EACH ZONE VALVE BOX.
C. COORDINATE EXACT MEDICAL GAS CONNECTION POINTS TO HEAD WALLS, COLUMNS,
BOOMS, WITH MEDICAL EQUIPMENT AND ARCHITECTURAL PLANS AND ELEVATIONS.
D. COORDINATE WITH FACILITIES ANY SHUTDOWN REQUIRED. REFER TO SPECIFICATIONS
FOR MORE DETAILS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
G E N E R A L P L A N N O T E S
KEYPLAN
1100 Boulders Pkwy | Suite 503 Richmond, VA 23225
804.355.2067
A u to d e s k D o c s /M t H o m e
I s o la ti o n W a rd
D /W
S P
M t H o m e
D rv t
/7 /2
:1
:4
P
M
P3.02
SECOND FLOOR MEDICAL GAS
NEW WORK PLAN
11/04/2022 IGM TIP
RENOVATE D-WING FOR ISOLATION
WARD
621-20-107
MOUNTAIN HOME, TENNESSEE
BID DOCUMENTSJAMES H.
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
N
1/8" = 1'-0"
SECOND FLOOR NEW WORK MEDICAL GAS PLAN
D R A W I N G N O T E S :
1 CONNECT TO NEW MEDICAL GAS RISERS INSTALLED BY OTHERS. COORDINATE EXACT RISER CONNECTION POINT.
RISER TO BE SIZED TO SUPPORT (INCLUDED: O=48 SCFM; MA=48 SCFM; MV=36 SCFM).
2 CONNECT TO HEADWALL BY OTHERS. COORDINATE EXACT CONNECTION POINT AND NUMBER OF CONNECTIONS.
TYPICAL FOR ALL PATIENT ROOMS.
3 CONTRACTOR SHALL ROUTE LOW VOLTAGE CABLING TO AA-1.
4 INSTALL AA PANEL ON WALL, FACING THE NURSE STATION.
No. Revisions: Date:
1 BID DOCUMENTS 11/04/2022
USMM710143
Snapshot
USMM710143
FF:CERAMIC TILE
TOILET
D118A
TOILET
D116A
30.1
I
(E)4"VTR
(E)4"SAN STACK
(E)4"VTR
(E)4"SAN STACK2"
S A
N 2"
S A
N
2" S
A N
2" S
A N
30.1
H
(E)2"V STACK
/ VTR
(E)2"VTR
(E)2"SAN STACK
(E)P-413
TOILET
D113A
32.8
(E)4"VTR
(E)4"SAN STACK
(E)4"VTR
(E)4"V STACK
3 4
2" S
A N
2" S
A N
2" S
A N
2" S
A N
2" S
A N
2" S
A N
2" SAN2" SAN
2" S
A N
2" S
A N
30.1
I
4 4
3 3
2" V2" V
3/ 4"
D H
W 3/
4" D
H W
1/
2" D
C W
1/
2" D
C W
3/ 4"
D H
W 3/
4" D
H W
1/
2" D
C W
1/
2" D
C W
2" V2" V
1/
2" D
C W
1/
2" D
C W
3/ 4"
D H
W 3/
4" D
H W
1/
2" D
C W
1/
2" D
C W
3/ 4"
D H
W 3/
4" D
H W
30.1
H
3 4
1/ 2"
D H
W 1/
2" D
H W
1/ 2"
D C
W 1/
2" D
C W
(E)P-413
32.8
1/2" DHW1/2" DHW
1/2" DCW1/2" DCW
1/2" DCW1/2" DCW
1/2" DHW1/2" DHW
3/ 4"
D C
W 3/
4" D
C W
3/ 4"
D H
W 3/
4" D
H W
1/
2" D
C W
1/
2" D
C W
3/ 4"
D H
W 3/
4" D
H W
(E)P-401(E)P-107
(E)P-703
(E)413 (E)413
A. COORDINATE WITH FACILITIES ANY SHUTDOWN REQUIRED, REFER TO SPECIFICATIONS FOR
MORE DETAILS.
B. PHASING - NO MORE THAN 2 ROOMS OUT OF SERVICE AT ANY TIME.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
G E N E R A L P L A N N O T E S
KEYPLAN
1100 Boulders Pkwy | Suite 503 Richmond, VA 23225
804.355.2067
A u to d e s k D o c s /M t H o m e
I s o la ti o n W a rd
D /W
S P
M t H o m e
D rv t
/7 /2
:1
:5
P
M
P4.01
PLUMBING ENLARGED PLANS
11/04/2022 IGM TIP
RENOVATE D-WING FOR ISOLATION
WARD
621-20-107
MOUNTAIN HOME, TENNESSEE
BID DOCUMENTSJAMES H.
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
1/4" = 1'-0"
CALLOUT DEMOLITION - TYP.1
1/4" = 1'-0"
CALLOUT DEMOLITION - TYP.2
1/4" = 1'-0"
CALLOUT DEMOLITION - TYP.3
D R A W I N G N O T E S :
1 DEMOLISH EXISTING STORM PIPING FROM SECOND FLOOR CEILING SPACE TO FIRST FLOOR CEILING SPACE. SEE NEW
FLOOR PLAN FOR NEW STORM PIPING OFFSET.
2 REMOVE EXISTING SANITARY PIPING BACK TO SANITARY STACK. SEE NEW WORK PLAN FOR NEW CONNECTION.
3 DEMOLISH EXISTING SANITARY PIPING FROM SECOND FLOOR CEILING SPACE TO BELOW THE SLAB. SEE NEW FLOOR
PLAN FOR NEW SANITARY STACK OFFSET.
4 DEMOLISH EXISTING VENT PIPING FROM SECOND FLOOR CEILING SPACE TO FIRST FLOOR CEILING SPACE. SEE NEW
FLOOR PLAN FOR NEW VENT STACK OFFSET.
5 REMOVE EXISTING VENT PIPING BACK TO VENT STACK. SEE NEW WORK PLAN FOR NEW CONNECTION.
6 REMOVE EXISTING PLUMBING FIXTURE AND ASSOCIATED PIPING COMPLETE.
7 REMOVE EXISTING PLUMBING FIXTURES, AND ALL ASSOCIATED TRIM. REMOVE ALL EXISTING DOMESTIC WATER, VENT
AND SANITARY BACK TO ACTIVE MAINS. SEE NEW WORK PLAN FOR NEW PIPING LAYOUT.
1/4" = 1'-0"
CALLOUT DEMOLITION - TYP.4
1/4" = 1'-0"
CALLOUT DEMOLITION - TYP.5
1/4" = 1'-0"
CALLOUT DEMOLITION - TYP.6
No. Revisions: Date:
1 BID DOCUMENTS 11/04/2022
USMM710143
Snapshot
USMM710143
P-809
P-809
P-704
P-531
P-105
P-105
P-531
P-415
P-415
P-704
P-531
P-531
P-704
P-114
P-415
P-531
P-105
P-531
P-421
P-704
P-531
P-103
P-415
P-608
(E)1 1/4" DHWR(E)1 1/4" DHWR
(E)3" DHW(E)3" DHW
(E)4" DCW(E)4" DCW
(E)2 1/2"
(E)2"
(E)3"
(E)1 1/2"
(E)3"
(E)2 1/2"
(E)2 1/2"
(E)2"
(E)2 1/2"
2 1/2"CW
(E)3/4"
2"HW
1/2"HW
1/2"CW
1/2"HW
2"HW
2"CW
2 1/2"CW
1/2"HW
1/2"CW
2 1/2"CW
1 1/2"HW
1 1/2"HW
1 1/2"HW
1/2"HW
1 1/2"HW
1/2"HW
2"CW
1/2"CW
1/2"HW
1/2"CW
1/2"HW
1/2"CW
1/2"HW
1"CW
1/2"CW
1"CW
1/2"CW
1/2"HW
1/2"HW
1/2"CW
1/2"HW
1/2"CW
1/2"HW
1/2"CW
1/2"HW
1/2"CW
1/2"CW
2"CW
1/2"CW
1/2"HW
1/2"HW
1"CW
1/2"CW
1/2"CW
1/2"HW
1/2"CW
1/2"HW
1/2"CW
1/2"HW
1/2"CW
1/2"HW
1/2"CW
1/2"HW
1"CW
1/2"HW
1/2"CW
1/2"CW
3/4"CW
(E)3/4"
(E)1 1/2"
(E)1/2"
(E)1/2"
(E)1/2"
1"CW
1" DW1" DW
3/4" DW3/4" DW
1" DW1" DW
1" DW1" DW
1/2" DW1/2" DW
1/2" DW1/2" DW
1/2" DW1/2" DW
1/2" DW1/2" DW
1/2" DW1/2" DW
3/4" DW3/4" DW
1/2" DW1/2" DW
3/4"CW
2"CW
1 1/2"CW
P-812
(E)2"
(E)2"
P-528
1/2" DW1/2" DW
1/2" DW1/2" DW
1" DW1" DW
2 1/2"CW
2"HW
2"HW
2 1/2"CW 2 1/2"CW
2"HW
1 1/2"HW
1/2"HW
2 1/2"CW
2 1/2"CW
1 1/2"HW
(E)4"
SEE P5.02 FOR
CONTINUATION
1 1/2" DHW1 1/2" DHW
1 1/2" DHW1 1/2" DHW
1/2" DHW1/2" DHW
P-532
SEE P5.02 FOR
CONTINUATION
SEE P5.02 FOR
CONTINUATION
P-505
P-532
2" DCW2" DCW
1 1/2" DHW1 1/2" DHW
1 1/2"HW
2 1/2" DCW2 1/2" DCW
1/2" DCW1/2" DCW
1 1/2" DHW1 1/2" DHW
2 1/2" DCW2 1/2" DCW
1 1/2" DHW1 1/2" DHW
1 1/2" DCW1 1/2" DCW
1 1/2" DHW1 1/2" DHW
1/2" DHW1/2" DHW
1/2" DCW1/2" DCW
1/2" DCW1/2" DCW
1 1/2" DHW1 1/2" DHW
1/2" DCW1/2" DCW
1/2"HW
1"CW
2 1/2"CW
2 1/2"CW
2"CW
1/2"HW
RPZ
RPZ
1 1/2"HW
WHA
WHA
WHA
1"CW
WHA
WHA
P-708
1/2" DCW1/2" DCW
1/2" DHW1/2" DHW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1100 Boulders Pkwy | Suite 503 Richmond, VA 23225
804.355.2067
A u to d e s k D o c s /M t H o m e
I s o la ti o n W a rd
D /W
S P
M t H o m e
D rv t
/7 /2
:1
:5
P
M
P5.01
WATER RISER DIAGRAM - PART A
11/04/2022 IGM TIP
RENOVATE D-WING FOR ISOLATION
WARD
621-20-107
MOUNTAIN HOME, TENNESSEE
BID DOCUMENTSJAMES H.
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
WATER RISER DIAGRAM- PART A
No. Revisions: Date:
1 BID DOCUMENTS 11/04/2022
USMM710143
Snapshot
USMM710143
P-105
P-701
P-528 P-415
P-531
P-415P-105
P-704
P-531
P-704
P-531
P-105
P-415
P-531
P-105
P-531
P-704
P-415
P-704 P-531
P-105 P-415
P-531
P-809
P-532
P-531
P-415
P-105
P-105 P-704
P-531
P-704 P-415 P-809
P-531
P-531
P-105 P-704
P-415
P-704
P-531
P-415
P-809
2"CW
1 1/2"HW
1 1/2"HW
1/2"CW
1 1/2"HW
1/2"HW
1/2"CW
1 1/2"HW
1 1/2"HW
1"CW
1/2"CW
1/2"HW
1/2"HW
1/2"CW
1/2"HW
1/2"CW
1/2"CW
1"CW
1"CW
1/2"CW
1/2"HW
1/2"CW
1/2"CW
1/2"HW
1/2"HW
1/2"CW
2"CW
2"CW
1 1/2"CW
1/2"CW
1/2"HW
1/2"CW
1/2"HW
1/2"CW
1"CW
1/2"CW
1/2"HW
3/4"HW
1/2"HW
1 1/4"HW
1 1/4"HW
1 1/4"HW
1"HW
3/4"HW
1"HW
1/2"CW
1/2"HW
1/2"CW
1/2"CW
1/2"HW
1 1/4"HW
1 1/4"HW
2"CW
2"CW
1/2"CW
1/2"HW
1/2"HW
1/2"CW
1"CW
1/2"HW
1/2"CW
1 1/2"HW
1/2"CW
1 1/2"CW
1 1/2"HW
1/2"HW
1/2"CW
1/2"CW
1/2"CW
1"CW
1/2"HW
1/2"CW
1/2"HW
1/2"CW
1 1/4"HW
2"CW
2"CW
1/2"CW
1/2"HW
1/2"CW
1"CW
1/2"HW
1/2"HW
1/2"CW
1/2"CW
1/2"HW
1"CW
1/2"CW
1/2"HW
1"CW
1/2"CW
1/2"CW
1/2"CW
1/2"HW
1/2"CW 1/2"HW
1/2"CW
1/2"HW
1/2"CW
1"CW
1/2"HW
1 1/4"HW
1 1/4"HW
1/2"CW
1/2"HW
1/2"CW
1/2"HW
1/2"CW
1/2"HW
3/4" DW3/4" DW
3/4" DW3/4" DW
1/2" DW1/2" DW
1/2" DW1/2" DW
1/2" DW1/2" DW
3/4" DW3/4" DW
1/2" DW1/2" DW
1/2" DW1/2" DW
1/2" DW1/2" DW
1/2" DW1/2" DW
1/2" DW1/2" DW
3/4" DW3/4" DW
1 1/2"CW
2"CW 1 1/2"HW
2"CW
1 1/4"HW
2"CW
1 1/2"CW
2"CW
2"CW
1 1/2"CW
2"CW
2"CW
P-812
3/4" DHWR3/4" DHWR
1/2"CW
1 1/4"HW
1/2"CW
2"CW
2"CW
3/4"HW
1 1/2"HW
1 1/2"HW
2"CW
1 1/2"HW
1 1/2"HW
1 1/4"HW
1/2"CW
2"CW
SEE P5.01 FOR
CONTINUATION
(E)3/4" DHWR(E)3/4" DHWR
P-531
P-105
P-531
2" DCW2" DCW
2" DCW2" DCW
1/2" DW1/2" DW
SEE P5.01 FOR
CONTINUATION
SEE P5.01 FOR
CONTINUATION
1 1/4" DHW1 1/4" DHW
2"CW
3/4"HW
1 1/4"HW
1/2"HW
1/2"HW
1/2"HW
WHA
WHA
WHA
1"CW
WHA
WHA
WHA
WHA
WHA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1100 Boulders Pkwy | Suite 503 Richmond, VA 23225
804.355.2067
A u to d e s k D o c s /M t H o m e
I s o la ti o n W a rd
D /W
S P
M t H o m e
D rv t
/7 /2
:1
:5
P
M
P5.02
WATER RISER DIAGRAM - PART B
11/04/2022 IGM TIP
RENOVATE D-WING FOR ISOLATION
WARD
621-20-107
MOUNTAIN HOME, TENNESSEE
BID DOCUMENTSJAMES H.
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
WATER RISER DIAGRAM - PART B
No. Revisions: Date:
1 BID DOCUMENTS 11/04/2022
USMM710143
Snapshot
USMM710143
P-809
P-704
P-531 P-105
P-105 P-531P-415
P-415 P-704
P-531
P-531
P-704
P-114
P-415
P-531
P-105
P-531
P-421
P-704
P-531 P-103
P-415
P-608
2" V2" V
2" SAN2" SAN 2" SAN2" SAN
2" V2" V
2" V2" V
3" SAN3" SAN
2" SAN2" SAN
4" SAN4" SAN
2" V2" V
2" V2" V
2" V2" V
2" V2" V
2" V2" V
2" V2" V
2" SW2" SW
2" SW2" SW
2" V2" V
4" V4" V
2" V2" V
2" V2" V
4" V4" V
4" V4" V
2" V2" V
2" V2" V
4" V4" V
4" V4" V 2" V2" V
2" SAN2" SAN
2" V2" V
2" V2" V
2" V2" V
2" V2" V
2" V2" V
2" SAN2" SAN
4" V4" V
2" V2" V 4" V4" V
2" V2" V 2" V2" V
2" V2" V
2" V2" V
4" V4" V
2" V2" V
2" V2" V
2" V2" V
2" V2" V
(E)4" V(E)4" V
(E)3" V(E)3" V
(E)4" SAN(E)4" SAN
(E)2" SAN(E)2" SAN
(E)2" V(E)2" V
(E)2" V(E)2" V
2" SAN2" SAN
4" SAN4" SAN
2" SAN2" SAN
2" SAN2" SAN
2" SAN2" SAN
2" SAN2" SAN(E)3" SAN(E)3" SAN
(E)2" SAN(E)2" SAN
(E)2" SAN(E)2" SAN
(E)2" SAN(E)2" SAN
2" SAN2" SAN
2" SW2" SW
2" SW2" SW
(E)2" VTR
4" VTR
(E)2" VTR
2" VTR
4" VTR
(E)2" VTR
(E)2" VTR
(E)4" VTR
4" VTR
(E)2" VTR
P-528
4" V4" V
2" V2" V
2" SW2" SW
2" V2" V
4" V4" V
(E)4" SAN(E)4" SAN
4" SAN4" SAN
2" SAN2" SAN
2" SAN2" SAN
2" SAN2" SAN
3" SAN3" SAN
2" SAN2" SAN
2" SAN2" SAN
4" SAN4" SAN
2" SAN2" SAN
4" SAN4" SAN
(E)2" V(E)2" V
2" V2" V
2" V2" V
2" V2" V
2" SAN2" SAN
2" V2" V
2" V2" V
2" V2" V 4" V4" V
4" V4" V
2" V2" V
4" V4" V
2" SAN2" SAN
(E)4" SAN(E)4" SAN(E)4" V(E)4" V
(E)2" V(E)2" V
(E)2" V(E)2" V
(E)2" V(E)2" V
2" V2" V
2" V2" V
(E)2" SAN(E)2" SAN
(E)2" V(E)2" V
(E)4" V(E)4" V
(E)4" SAN(E)4" SAN
(E)2" SAN(E)2" SAN(E)3" SAN(E)3" SAN
(E)2" V(E)2" V
(E)2" V(E)2" V
(E)2" SAN(E)2" SAN
(E)4" V(E)4" V
(E)2" V(E)2" V (E)4" V(E)4" V
(E)4" SAN(E)4" SAN
(E)4" SAN(E)4" SAN
(E)4" V(E)4" V
(E)2" V(E)2" V
(E)2" SAN(E)2" SAN
(E)4" V(E)4" V
(E)2" V(E)2" V
(E)3" V(E)3" V
(E)2" V(E)2" V
2" VTR
(E)4" VTR
(E)2" VTR(E)2" VTR
SEE P5.04 FOR
CONTINUATION
2" VTR
(E)4" VTR
(E)2" VTR
(E)2" V(E)2" V
2" SW2" SW
4" V4" V
(E)2" SAN(E)2" SAN
2" SW2" SW
(E)2" VTR
(E)3" VTR
(E)4" VTR
(E)4" VTR
(E)4" V(E)4" V
(E)4" V(E)4" V
3" SAN3" SAN
(E)4" V(E)4" V
(E)2" SAN(E)2" SAN
4" VTR
4" V4" V
P-505P-532
P-532
4" VTR
FD-D
FD-D
FD-D
FD-D
(E)2" V(E)2" V
2" SAN2" SAN
4" V4" V
4" SAN4" SAN
2" V2" V
3" SAN3" SAN
4" V4" V
2" V2" V
4" V4" V
4" SAN4" SAN
4" SAN4" SAN
3" SAN3" SAN
3" SAN3" SAN
2" SAN2" SAN
2" SAN2" SAN
2" V2" V
2" V2" V
4" V4" V
2" V2" V
SEE P5.04 FOR
CONTINUATION
2" SAN2" SAN
2" SAN2" SAN
4" SAN4" SAN
2" SAN2" SAN
2" SAN2" SAN
4" SAN4" SAN
(E)4" SAN(E)4" SAN
(E)2" V(E)2" V
(E)4" V(E)4" V
4" SAN4" SAN
4" SAN4" SAN
2" SAN2" SAN
2" V2" V
4" V4" V
4" V4" V 2" V2" V
4" V4" V
4" V4" V
4" VTR
4" VTR
4" SAN4" SAN
4" SAN4" SAN
4" SAN4" SAN
2" V2" V
3" SAN3" SAN
4" V4" V
4" V4" V
2" V2" V
2" V2" V 4" V4" V
4" VTR
4" SAN4" SAN
3" SAN3" SAN
2" V2" V
2" V2" V2" V2" V2" V2" V
2" V2" V
2" V2" V
2" V2" V
(E)2" SAN(E)2" SAN
2" V2" V
(E)4" V(E)4" V
4" SAN4" SAN
3" SAN3" SAN
P-708
2" SAN2" SAN
2" V2" V
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1100 Boulders Pkwy | Suite 503 Richmond, VA 23225
804.355.2067
A u to d e s k D o c s /M t H o m e
I s o la ti o n W a rd
D /W
S P
M t H o m e
D rv t
/7 /2
:1
:0
P
M
P5.03
SANITARY RISER DIAGRAM - PART
A
11/04/2022 IGM TIP
RENOVATE D-WING FOR ISOLATION
WARD
621-20-107
MOUNTAIN HOME, TENNESSEE
BID DOCUMENTSJAMES H.
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
SANITARY RISER DIAGRAM - PART A
No. Revisions: Date:
1 BID DOCUMENTS 11/04/2022
USMM710143
Snapshot
USMM710143
P-105
P-701
P-528P-415
P-531
P-415 P-105
P-704
P-531
P-704
P-531
P-105
P-415 P-531
P-105
P-531
P-704
P-415
P-704 P-531
P-105
P-415
P-531
P-809
P-532 P-531
P-415
P-105
P-105
P-704
P-531
P-704
P-415
P-809
P-531
P-531
P-105
P-704
P-415
P-704
P-105
P-531
P-415
P-809
2" V2" V
2" V2" V
2" V2" V
4" V4" V
4" V4" V
4" V4" V
2" V2" V 2" V2" V
2" V2" V
2" V2" V 2" V2" V
2" V2" V
2" V2" V
2" V2" V
2" V2" V
2" V2" V
2" V2" V
2" V2" V
2" V2" V
2" V2" V
2" V2" V
2" V2" V
4" V4" V
4" V4" V
4" V4" V
4" V4" V
2" V2" V
2" V2" V
2" V2" V
2" V2" V
2" V2" V
2" V2" V 2" V2" V
2" V2" V
2" V2" V
2" V2" V 2" V2" V
2" V2" V
2" V2" V
4" V4" V
2" V2" V
2" V2" V
4" V4" V
2" V2" V
2" V2" V
4" V4" V
2" V2" V
2" V2" V
2" SAN2" SAN
4" SAN4" SAN
(E)4" SAN(E)4" SAN
4" SAN4" SAN
2" SAN2" SAN
2" SAN2" SAN
2" SAN2" SAN
2" SAN2" SAN
4" SAN4" SAN
4" SAN4" SAN
2" SAN2" SAN
2" SAN2" SAN
2" SAN2" SAN
4" SAN4" SAN
2" SAN2" SAN
2" SW2" SW
4" SAN4" SAN
(E)4" SAN(E)4" SAN
2" SAN2" SAN
2" SAN2" SAN
4" SAN4" SAN
2" SAN2" SAN
4" SAN4" SAN
4" SAN4" SAN
2" SAN2" SAN
(E)4" SAN(E)4" SAN
(E)4" SAN(E)4" SAN
2" SAN2" SAN
2" SAN2" SAN
2" SAN2" SAN
(E)4" SAN(E)4" SAN
(E)4" VTR
(E)4" VTR
(E)2" VTR
2" SW2" SW
4" SAN4" SAN
4" SAN4" SAN
4" SAN4" SAN
2" SAN2" SAN
3" SAN3" SAN
3" SAN3" SAN
4" V4" V
2" V2" V
2" V2" V
4" SAN4" SAN
4" SAN4" SAN
2" SAN2" SAN
2" SW2" SW
2" SW2" SW
2" SW2" SW
2" V2" V
2" SAN2" SAN
4" SAN4" SAN
2" V2" V
2" SAN2" SAN
3" SAN3" SAN
4" SAN4" SAN
2" SAN2" SAN
2" V2" V
2" V2" V 2" V2" V
2" V2" V
4" V4" V
2" V2" V
2" V2" V
4" SAN4" SAN
2" SAN2" SAN
2" SAN2" SAN
2" V2" V
2" V2" V
2" SAN2" SAN
4" V4" V
4" SAN4" SAN
(E)4" V(E)4" V
(E)4" V(E)4" V
(E)4" V(E)4" V
(E)4" V(E)4" V
(E)4" SAN(E)4" SAN
(E)4" V(E)4" V
(E)4" V(E)4" V
(E)4" V(E)4" V
(E)4" SAN(E)4" SAN
(E)4" SAN(E)4" SAN
(E)4" SAN(E)4" SAN
(E)4" V(E)4" V(E)4" SAN(E)4" SAN
(E)4" V(E)4" V
(E)4" V(E)4" V
(E)4" V(E)4" V
(E)4" V(E)4" V
(E)4" SAN(E)4" SAN
(E)4" V(E)4" V
(E)2" V(E)2" V
(E)4" V(E)4" V
4" VTR
SEE P5.03 FOR
CONTINUATION
(E)4" VTR
(E)4" SAN(E)4" SAN
2" V2" V
(E)4" V(E)4" V
(E)4" V(E)4" V
(E)4" V(E)4" V
(E)4" V(E)4" V
(E)4" V(E)4" V
2" V2" V
3" SAN3" SAN
3" SAN3" SAN
FD-D
FD-D
FD-D
FD-D
FD-D
4" SAN4" SAN
FD-D
FD-D
FD-D
FD-D
2" V2" V
(E)4" SAN(E)4" SAN
4" SAN4" SAN
3" SAN3" SAN
4" SAN4" SAN
4" SAN4" SAN
4" SAN4" SAN
2" SAN2" SAN
4" SAN4" SAN
4" SAN4" SAN
2" V2" V
2" SW2" SW
2" SW2" SW
2" SW2" SW
4" SAN4" SAN
4" SAN4" SAN
(E)4" SAN(E)4" SAN
4" SAN4" SAN
4" SAN4" SAN
2" V2" V
2" V2" V
4" V4" V
2" V2" V
2" V2" V
2" V2" V
2" V2" V
2" V2" V
4" SAN4" SAN
2" V2" V
2" V2" V
2" V2" V
2" V2" V
2" SAN2" SAN 2" SAN2" SAN
SEE P5.03 FOR
CONTINUATION
2" V2" V
2" V2" V
2" V2" V
2" SAN2" SAN
3" SAN3" SAN
FD-D
3" SAN3" SAN
4" SAN4" SAN
2" SW2" SW
2" SW2" SW
2" SW2" SW
2" SW2" SW
2" V2" V
2" V2" V
4" SAN4" SAN
2" SAN2" SAN
4" SAN4" SAN
3" SAN3" SAN
P-531
P-531
Project Number
Building Number
Draw…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .