C27_UUpdated 621-20-107 Drawings Part 3 of 3.pdf

PDF 14 MB Posted

Attached to
Y1DZ--Project 621-20-107 Renovate Bldg. -200_Wing D2 for Isolation Ward
Solicitation number
36C24923R0030
Issued by

About this file

This document provides details for a federal contract opportunity to renovate Building 200 at the James H. Quillen VAMC Mountain Home facility in Tennessee. The solicitation number is 36C24923R0030 to renovate the D Wing of Building 200 for an Isolation Ward. The project number is 621-20-107. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The opportunity type is a solicitation to renovate the D Wing of Building 200 at the James H. Quillen VAMC Mountain Home facility in Tennessee for use as an Isolation Ward. Details provided include the solicitation number, project name and number, description of work, and the contracting federal agency.

View the file

Other files

File Type Posted
07.09_AE403 - CASEWORK ELEVATIONS.pdf PDF
P6.01 - PLUMBING DETAILS.pdf PDF
08.01_AI601 - FINISH SCHEDULE1.pdf PDF
08.00_AI101 - SECOND FLOOR FINISH PLAN-1.pdf PDF
FXD2.02 - SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN.pdf PDF
08.05_WP101 - WALL PROTECTION PLAN.pdf PDF
P2.01 - FIRST FLOOR PLUMBING NEW WORK PLAN 02.pdf PDF
P3.02 - SECOND FLOOR MEDICAL GAS NEW WORK PLAN.pdf PDF
000110 Table of Contents.pdf PDF
FX2.02 - SECOND FLOOR FIRE PROTECTION NEW WORK PLAN.pdf PDF
102600 Wall and Door Protection.pdf PDF
FX1.00 - FIRE PROTECTION LEGEND AND NOTES.pdf PDF
07.08_AE402 - CASEWORK ELEVATIONS.pdf PDF
36C24923R0030 0006.docx DOCX document
Addendum 02 Summary R1.pdf PDF
07.05_AC141 - SECOND FLOOR REFLECTED CEILING PLAN.pdf PDF
07.07_AE401 - ENLARGED RESTROOM PLANS AND ELEVATIONS.pdf PDF
087100 Door Hardware.pdf PDF
E3.02 - SECOND FLOOR LIGHTING NEW WORK PLAN.pdf PDF
36C24923R0030 0005.docx DOCX document
M2-02 - SECOND FLOOR HVAC NEW WORK PLAN.pdf PDF
36C24923R0030 0004.docx DOCX document
08.01_AI601 - FINISH SCHEDULE.pdf PDF
08.00_AI101 - SECOND FLOOR FINISH PLAN.pdf PDF
09.04_QT403 - ENLARGED EQUIPMENT PLAN.pdf PDF
36C24923R0030 0003.docx DOCX document
36C24923R0030 0002.docx DOCX document
36C24923R0030 0001.docx DOCX document
CALCULATION OF SELF PERFORMED WORK.docx DOCX document
Contractor EMR Certification Form.docx DOCX document
C27_Updated 621-20-107 Drawings Part 2 of 3.pdf PDF
C27 Updated 621-20-107 Drawings Part 1 of 3.pdf PDF
UEI _ TAX ID.docx DOCX document
36C24923R0030_1.docx DOCX document
C28_621-20-107 Specifications.pdf PDF
P07_Wage Determination_621-20-107 Renovate Bldg.-200 - Wing D2 for Isolation Ward.pdf PDF
RFI Form.docx DOCX document
PERFORMANCE QUESTIONNAIRE.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOV

SAN

SAN

V

ST

OST

IW

CD

SPD

SED

GW

SPV

SEV

SV

SV

PDR

PDR

PD

GW

GD

GD

AW

IR

NPC

ABBREVIATIONS

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AP ACCESS PANEL

BLDG BUILDING

BOP BOTTOM OF PIPE

BT BATH TUB

BLCV BALANCING VALVE

CD CONDENSATE DRAIN

CLG CEILING

CO CLEANOUT

COTG CLEANOUT TO GRADE

CONN CONNECTION

CONT CONTINUATION

CP CIRCULATING PUMP

CV CHECK VALVE

DCW COLD WATER

DF DRINKING FOUNTAIN

DFU DRAINAGE FIXTURE UNIT

DIA DIAMETER

DN DOWN

DR DRAIN

DWG DRAWING

(E) EXISTING

EL ELEVATION

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FS FLOOR SINK

FT FEET

G NATURAL GAS

GAL GALLONS

GD GARAGE DRAIN

GPM GALLONS PER MINUTE

GWH GAS WATER HEATER

GV GATE VALVE

HB HOSE BIBB

HD HUB DRAIN

HT HEAT TRACING

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

IN INCH

IW INDIRECT WASTE

L LAVATORY

MIN MINIMUM

MS MOP SINK

(N) NEW

NC NORMALLY CLOSED

NO NORMALLY OPEN

OD OVERFLOW (ROOF STORM) DRAIN

ODL OVERFLOW (STORM) DRAINAGE LEADER/PIPING

PDR PLANTER DRAIN

PD PUMP DISCHARGE

PIV POST INDICATING VALVE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH (GAUGE)

RC ROOF RECEPTOR

SA SHOCK ABSORBER

TAG LEGEND

RISER

DESIGNATION

EQUIPMENT

DESIGNATION

DETAIL

DESIGNATION

SHEET NOTE NUMBER

REVISION NUMBER

PIPING LEGEND

NATURAL GAS / FUEL OIL

FUEL OIL VENT PIPING

FUEL OIL FILL PIPING

WASTE / VENT / STORM

SANITARY (ABOVE FLOOR)

SANITARY (BELOW FLOOR)

VENT PIPING

STORM DRAIN PIPING

OVERFLOW STORM PIPING

INDIRECT WASTE PIPING

CONDENSATE DRAIN PIPING

SUMP PUMP DISCHARGE PIPING

SEWAGE EJECTOR DISCHARGE PIPING

GREASE WASTE PIPING

SUMP PUMP VENT PIPING

SEWAGE EJECTOR VENT PIPING

SOVENT PIPING (ABOVE FLOOR)

SOVENT PIPING (BELOW FLOOR)

PLANTER DRAIN PIPING (ABOVE FLOOR)

PLANTER DRAIN PIPING (BELOW FLOOR)

PUMP DISCHARGE

GREASE WASTE

GARAGE DRAIN PIPING (ABOVE FLOOR)

GARAGE DRAIN PIPING (BELOW FLOOR)

ACID WASTE

ACID WASTE (BELOW FLOOR)

POTABLE WATER

DOMESTIC COLD WATER PIPING

DOMESTIC HOT WATER PIPING

DOMESTIC HOT WATER RETURN PIPING

NON-POTABLE / INDUSTRIAL WATER

IRRIGATION PIPING

NON-POTABLE COLD WATER

P2.1

P

CP

RISER NO.

RISER SYSTEM TYPE

EQUIPMENT

EQUIPMENT NO.

DWG. SHEET NO.

DETAIL NUMBER

PLUMBING GENERAL NOTES

1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT LOCAL CODES, 2022 VA PLUMBING DESIGN

MANUAL, AND PROJECT SPECIFICATIONS.

2. PLUMBING CONTRACTOR SHALL COORDINATE ALL PIPING WITH MECHANICAL, ELECTRICAL, ARCHITECTURAL, AND

STRUCTURAL TRADES PRIOR TO CONSTRUCTION TO AVOID CONFLICTS.

3. ALL EQUIPMENT LOCATIONS SHALL BE FIELD COORDINATED WITH OTHER TRADES, DESIGN INTENT AND APPLICABLE

CODES.

4. PROVIDE ACCESS PANELS FOR ALL CONCEALED VALVES, WATER HAMMER ARRESTORS, TRAP PRIMERS, ETC.. ACCESS

DOORS OR PANELS SHALL BE NO SMALLER THAN 12"X12".

5. ROUGH-IN AND PROVIDE FINAL CONNECTION TO ALL EQUIPMENT (ICE MACHINES, COFFEE MAKERS, ETC.) FURNISHED BY OWNER AND/OR OTHERS. PROVIDE CODE APPROVED BACKFLOW PREVENTER. CONTRACTOR SHALL PROVIDE ALL ITEMS

NECESSARY TO COMPLETE THE PLUMBING INSTALLATION.

6. REFER TO ARCHITECTURAL DRAWING FOR ROUGH-IN DIMENSIONS AND MOUNTING HEIGHTS OF PLUMBING FIXTURES.

7. ALL PLUMBING FIXTURES AND EQUIPMENT SHALL BE IN COMPLIANCE WITH CURRENT APPLICABLE ENERGY

CONSERVATION CODES.

8. ALL PIPING AND EQUIPMENT IS SHOWN DIAGRAMMATICALLY ONLY. EXACT LOCATION SHALL BE DETERMINED IN FIELD.

MAINTAIN HEAD ROOM AND SPACE CONDITIONS AT ALL TIMES. ALL WORK SHALL BE COORDINATED WITH ALL TRADES BEFORE PROCEEDING WITH INSTALLATION. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL NOTIFY ARCHITECT AND ENGINEER OF ANY DISCREPANCIES. PRIOR TO EQUIPMENT SUBMITTALS, CONTRACTOR SHALL VERIFY PROPOSED

CONDITIONS TO ENSURE SPECIFIED EQUIPMENT CAN BE PROPERLY INSTALLED.

9. INSTALL PIPING CLOSE TO WALLS, PARTITIONS, CEILINGS, ETC. OFFSET ONLY WHERE NECESSARY TO FOLLOW WALLS, AS INDICATED. PROVIDE ALL NECESSARY FITTINGS, OFFSETS, VALVES AND OTHER DEVICES REQUIRED FOR A

COMPLETE INSTALLATION.

10. INSTALL PIPING IN A CONCEALED MANNER, STRAIGHT, PLUMB AND AS DIRECT AS POSSIBLE. FORM RIGHT ANGLES PARALLEL WITH BUILDING WALLS. LOCATE GROUPS OF PIPES PARALLEL TO EACH OTHER. PIPE SHALL BE LOCATED TO PERMIT ACCESS FOR SERVICE VALVES. ALL PIPING SHOWN ON THE PLANS OR INDICATED BY NOTES SHALL BE

CONCEALED ABOVE THE CEILING OR IN THE WALLS UNLESS NOTED OTHERWISE.

11. NO PIPING SHALL BE ROUTED ABOVE COMMUNICATION (IT, TR, ETC.), ELEVATOR MACHINE ROOMS, AND ELECTRICAL

ROOMS.

12. AVOID ROUTING PIPING ABOVE PHARMACY, LABORATORY, OPERATING, PROCEDURE AND IMAGING ROOMS. WHEN PIPING ABOVE THESE ROOMS CAN’T BE AVOIDED CONTRACTOR SHALL PROVIDE DRIP PANS BELOW ALL PIPING WITH MOISTURE SENSOR AND DRAINPIPE ROUTED TO MOP SINK OR FLOOR SINKS. MOISTURE SENSOR SHALL BE CONNECTED

TO BUILDING MANAGEMENT SYSTEM.

13. CONCRETE PADS, PITS, AND FLASHING FOR PLUMBING EQUIPMENT SHALL BE AS INDICATED ON THE STRUCTURAL AND ARCHITECTURAL PLANS, UNLESS NOTED OTHERWISE. COORDINATE EXACT SIZES OF REQUIRED OPENINGS AND

SUPPORTS FOR FURNISHED EQUIPMENT.

14. ALL PIPING SHALL BE REAMED TO BE FREE OF BURRS. KEEP PIPING FREE FROM SCALE AND DIRT. PROTECT OPEN PIPE ENDS WHENEVER WORK IS SUSPENDED DURING CONSTRUCTION TO PREVENT FOREIGN MATERIAL ENTERING AND CAP

ALL OPEN ENDS DURING CONSTRUCTION WITH APPROVED TEMPORARY CAPS OR MATERIALS.

15. DO NOT INSTALL JOINTS BELOW SLAB FOR DOMESTIC WATER PIPING.

16. MAINTENANCE AND IDENTIFYING LABELS SHALL BE AFFIXED TO ALL PIPING AND PLUMBING EQUIPMENT. OPERATIONS

AND MAINTENANCE MANUALS SHALL BE PROVIDED TO OWNER UPON PROJECT COMPLETION.

17. INSTALL WELDED OR THREADED PIPE IN AREAS WHERE SPACE IS CRITICAL BETWEEN FINISHED CEILING AND

STRUCTURAL SURFACE.

18. FOR NON-HEALTHCARE PROJECTS INSTALL ALL VENTS THROUGH ROOF 10'-0" MINIMUM FROM EDGE OF ROOF, FRESH AIR INTAKES, DOORS, WALKABLE AREAS OR OPERABLE WINDOWS. FOR HEALTHCARE PROJECTS INSTALL ALL VENTS THROUGH ROOF 10'-0" MINIMUM FROM EDGE OF ROOF, DOORS, WALKABLE AREAS OR OPERABLE WINDOWS AND 25’

MINIMUM FROM ANY AIR INTAKES.

19. SUBMIT APPROVED PRESSURE REDUCING VALVES & BACKFLOW PREVENTION DEVICES TO WATER AUTHORITY.

CONTRACTOR SHALL PROVIDE ALL NECESSARY DEVICES PER WATER AUTHORITY REQUIREMENTS AND MANUFACTURER

RECOMMENDATIONS.

20. ALL WALL, CEILING AND FLOOR PENETRATIONS CONVEYING PLUMBING, DRAINS, SPRINKLER PIPING, SHALL BE FULLY SEALED AND CAULKED AROUND THE PENETRATING FEATURE TO RESTORE THE REQUIRED FIRE OR SMOKE BARRIER RATING OF THE WALL, CEILING, OR FLOOR PENETRATION. AS A MINIMUM, AT ALL LOCATIONS, A TWENTY (20) MINUTE FIRE/SMOKE RESISTANCE SHALL BE MAINTAINED. USE UL LISTED FIRESTOPPING DETAILS FOR ALL RATED WALL

PENETRATIONS.

21. PLUMBING OR SPRINKLER RELATED PIPE SHALL NOT PENETRATE OR PASS THROUGH STAIRWAYS UNLESS IT IS REQUIRED FOR SERVICING THE STAIRWAY OR IT IS SEGREGATED FROM THE STAIRWAY PASSAGEWAY BY AN

ENCLOSURE SYSTEM RATED EQUAL TO OR GREATER THAN THE REQUIRED STAIRWAY RATING.

22. INSTALL WATER HAMMER ARRESTORS IN COMPLIANCE WITH ALL APPLICABLE CODES AND PER SPECIFICATIONS.

PROVIDE HAMMER ARRESTORS AT ALL EQUIPMENT OR FIXTURES WITH QUICK CLOSING VALVES, ELECTRONIC FAUCETS AND ALL FLUSH VALVES. SIZE OF WATER HAMMER ARRESTOR SHALL BE PER PDI GUIDELINES AND MANUFACTURER'S

RECOMMENDATIONS.

23. CLEANOUTS SHALL BE PROVIDED AS INDICATED ON PLANS AND AS REQUIRED BY THE LOCAL CODES. CLEANOUTS SHALL BE PROVIDED ON HORIZONTAL DRAINAGE PIPE A MAXIMUM OF EVERY 100', AS WELL AS AT EVERY FITTING GREATER THAN 45 DEGREES THAT DOES NOT HAVE AN CLEANOUT WITHIN 40'. CLEANOUTS SHALL BE PROVIDED AT THE BASE OF EVERY DRAINAGE STACK. COORDINATE EXACT LOCATION AND COVER TYPE OF CLEANOUT WITH

ARCHITECTURAL FINISHES.

24. UNLESS OTHERWISE NOTED ALL FLOOR DRAINS SHALL FITTED WITH TRAP PRIMER CONNECTION AND 1/2" TRAP PRIMER LINE FROM AN APPROVED AUTOMATIC OR MECHANICAL PRIMER DEVICE. TRAP PRIMERS MAY NOT BE SHOWN IN THE PLAN VIEW. CONTRACTOR SHALL INSTALL ALL TRAP PRIMER DEVICES IN A CONCEALED BUT FULLY ACCESSIBLE

LOCATION.

25. DRAIN VALVES ON LOWEST POINT OF DOMESTIC WATER RISERS TO BE PROVIDED AS FOLLOWS: 1-1/2" OR SMALLER

RISER PROVIDE 1/2" DRAIN VALVE. 2" OR LARGER PROVIDE 3/4" DRAIN VALVE.

26. PROVIDE FULL PORT BALL-TYPE ISOLATION VALVES ON ALL DOMESTIC WATER BRANCH LINES, AS WELL AS ON THE

INDIVIDUAL FEED LINES TO ALL FIXTURES OR EQUIPMENT.

27. PLUMBING CONTRACTOR SHALL INSTALL GAS VENTS FOR ALL GAS REGULATORS. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL REVIEW THE EXISTING CONDITIONS TO DETERMINE THE MOST ECONOMICAL ROUTE FOR

MANIFOLD VENTS BEGINNING AT EQUIPMENT AND EXTENDING THROUGH ROOF.

28. PRIOR TO INSTALLING ANY PIPING, VERIFY INVERT ELEVATIONS, LOCATIONS AND PIPE SIZES. INSTALL ALL SANITARY, WASTE, AND STORM MAINS BEGINNING AT LOW POINT OF EACH SYSTEM AND CONTINUE WITH UNBROKEN CONTINUITY OF INVERT. LOW POINT OF EACH SYSTEM SHALL BE COORDINATED WITH SITE UTILITIES CONTRACTOR. REFER TO SITE

UTILITY PLANS FOR REFERENCE.

29. ALL STORM, CONDENSATE AND SANITARY WASTE PIPING MUST SLOPE TO A MINIMUM OF 1/8" PER FOOT FOR PIPE SIZES

3" AND ABOVE, AND A MINIMUM OF 1/4" PER FOOT FOR PIPE SIZES 2-1/2" AND BELOW.

30. ALL SANITARY VENT PIPING MUST SLOPE TO A MINIMUM OF 0.5% TOWARDS THE SANITARY PIPING.

31. PLUMBING SYSTEM INSULATION COVERING PIPING INSTALLED WITHIN HVAC RETURN PLENUM AREAS SHALL HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE DEVELOPMENT INDEX OF NOT MORE THAN 50 WHEN

TESTED IN ACCORDANCE WITH ASTM E84.

32. INTERIOR HORIZONTAL ABOVE GRADE STORM AND OVERFLOW STORM PIPING, VERTICAL PIPING AT EXTERIOR WALLS, AND ROOF DRAIN BODIES SHALL BE INSULATED.

33. ALL PLUMBING PIPING LOCATED IN UNCONDITIONED SPACE SHALL BE HEAT TRACED AND INSULATED.

34. THE CONTRACTOR SHALL BE RESPONSIBLE TO AID IN THE COMMISSIONING PROCESS.

35. WHEN ADDING BALANCING VALVE INTO AN EXISTING DOMESTIC HOT WATER SYSTEM OR EXTENDING AN EXISTING DOMESTIC HOT WATER SYSTEM, IT IS THE CONTRACTOR'S RESPONSIBILITY TO RE-BALANCE THE ENTIRE DOMESTIC HOT

WATER SYSTEM.

36. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY PARAGRAPH, SUBMITTALS. CONSTRUCTION WORK SHALL NOT

START ON ANY SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY VA.

37. INSTALLER QUALIFICATIONS: INSTALLER SHALL BE LICENSED AND SHALL PROVIDE EVIDENCE OF THE SUCCESSFUL COMPLETION OF AT LEAST FIVE PROJECTS OF EQUAL OR GREATER SIZE AND COMPLEXITY. PROVIDE TRADESMEN

SKILLED IN THE APPROPRIATE TRADE.

38. WORKMANSHIP/CRAFTSMANSHIP WILL BE OF THE HIGHEST QUALITY AND STANDARDS. THE VA RESERVES THE RIGHT TO REJECT ANY WORK BASED ON POOR QUALITY OF WORKMANSHIP. THIS WORK SHALL BE REMOVED AND DONE AGAIN AT

NO ADDITIONAL COST OR TIME TO THE GOVERNMENT.

BFP BACKFLOW PREVENTER

BOB BOTTOM OF BEAM

CA COMPRESSED AIR

CFH CUBIC FEET PER HOUR

CTR COOLING TOWER RECEPTOR

CWFU COLD WATER FIXTURE UNIT

EEW EMERGENCY EYE WASH

HWFU DOMESTIC HOT WATER FIXTURE UNITS

IE INVERT ELEVATION

LDR LEADER

MAX MAXIMUM

MH MANHOLE

NIC NOT IN CONTRACT

POC POINT OF CONNECTION

RPZ REDUCED PRESSURE ZONE

RW RECLAIM STORM WATER

G

GV

NATURAL GAS PIPING

NATURAL GAS VENT PIPING

FUEL OIL SUPPLY PIPING

FUEL OIL RETURN PIPING

FOF

FOS

FOR

TDH TOTAL DYNAMIC HEAD

TMV TEMPERATURE MIXING VALVE

TOS TOP OF SLAB

TP TRAP PRIMER

TPV TRAP PRIMER VALVE

TYP TYPICAL

UP UP (PENETRATES FLOOR SLAB)

UR URINAL

V VENT

VB VACUUM BREAKER

VTR VENT THROUGH ROOF

WC WATER CLOSET

WCO WALL CLEANOUT

WH WALL HYDRANT

WF WATER FILTER

WSFU WATER SUPPLY FIXTURE UNIT

Z ZONE

UNO UNLESS NOTED OTHERWISE

ESH EMERGENCY SHOWER

GH GROUND HYDRANT

NPH NON-POTABLE HOT WATER

AW

ACID VENTAV

AFG ABOVE FINISHED GRADE

WS WASTE STACK

SD STORM (ROOF) DRAIN

SAN SANITARY

SE SEWAGE EJECTOR

SED SEWAGE EJECTOR DISCHARGE

SH SHOWER

SK SINK

SP SUMP PUMP

SPD SUMP PUMP DISCHARGE

TD TRENCH DRAIN

SF SQUARE FEET

SDL STORM DRAINAGE LEADER/PIPING

ABBREVIATIONS

DW DIALYSIS WATER

DB DIALYSIS BOX

SW SPECIAL WASTE

SW SPECIAL WASTE

WHA WATER HAMMER ARRESTOR

MEDICAL EQUIPMENT MOUNTING HEIGHTS *

O

MA

MV

WAGD

N20

IA

MEDICAL GAS NOTES

MEDICAL GAS LEGENDMEDICAL GAS SYMBOLS

MEDICAL GAS NOTES:

DEVICE

MV = MEDICAL VACUUM

S = SLIDE

ZVB = ZONE VALVE BOX

WAGD = WASTE ANESTHETIC GAS DISPOSAL

C02 = CARBON DIOXIDE GAS

AAP = AREA ALARM PANEL

N20 = NITROUS OXIDE

MA = MEDICAL COMPRESSED AIR

NCP = NITROGEN CONTROL PANEL

MGO = MEDICAL GAS WALL OUTLET

MGB = MEDICAL GAS CEILING BOOM

MGC = MEDICAL GAS CEILING COLUMN

MGP = MEDICAL GAS PEDESTAL

MGD = MEDICAL GAS DROP

MGH = MEDICAL GAS HEADWALL

O = OXYGEN

MAP = MASTER ALARM PANEL

1 SLIDE

CARBON DIOXIDE

A.

OXYGEN

SLIDE

MEDICAL VACUUM

MEDICAL COMPRESSED AIR

WAGD

CARBON DIOXIDE

WASTE ANESTHETIC GAS DISPOSAL

NITROUS OXIDE

INSTRUMENT AIR

NITROGEN / INSTRUMENT AIR

NITROUS OXIDE

1 OX

1 MV

1 MA

MGO-O, A, V, S, IA, N2O, WAGD, CO2

EXAMPLE:

MAI = MEDICAL AIR INTAKE

MVE = MEDICAL VACUUM EXHAUST

DEVICE TYPE

COORDINATE WITH ARCHITECTURAL DRAWINGS FOR EXACT LOCATION

AND MOUNTING HEIGHT OF MEDICAL GAS OUTLETS, ZONE VALVE BOXES

AND ALARM PANELS.

B. NOT ALL GASES ARE TO BE USED AT EACH LOCATION. THE GAS

ORDER SHOWN IN THE EXAMPLE IS TYPICAL FOR ALL OUTLETS.

C. COORDINATE MEDICAL GAS PIPE ROUTINGS WITH ALL OTHER

TRADES BEFORE INSTALLATION.

AREA ALARM SENSOR

MASTER ALARM SENSOR

MEDICAL AIR PIPING

MEDICAL OXYGEN PIPING

AREA ALARMAA

ZONE VALVE BOXZVB

WALL OUTLETS:

ZONE VALVE BOX:

AREA ALARM:

MASTER ALARM:

NITROGEN CONTROL CABINET:

FIXED CEILING COLUMN:

RETRACTABLE CEILING COLUMN:

CEILING HOSE DROP:

ASSEMBLY

CEILING ARMS/BOOMS: CONSULT MANUFACTURERS RECOMMENDATIONS

ALL DIMENSION HEIGHTS ARE FROM FINISHED FLOOR. HEIGHTS SHALL BE COORDINATED AND

VERIFIED WITH ARCHITECTURAL ELEVATIONS, ROOM FINISHES AND FACILITY STANDARDS.

5'-0" (60 INCHES) TO THE CENTER OF THE OUTLET

5'-6" (66 INCHES) TO THE TOP OF THE ZONE VALVE BOX

5'-6" (66 INCHES) TO THE TOP OF THE ALARM

5'-6" (66 INCHES) TO THE TOP OF THE ALARM

5'-2" (62 INCHES) TO THE BOTTOM OF THE PANEL

5'-3" (63 INCHES) TO THE BOTTOM OF THE COLUMN

5'-10"(70 INCHES) TO THE BOTTOM OF THE COLUMN

6'-4" (76 INCHES) TO THE BOTTOM OF THE HOSE

OVER AND UNDER ZVB MOUNTING 6'-2" (74 INCHES) MAXIMUN TO TOP OF UPPER BOX

CA = COMPRESSED INSTRUMENT AIR

MEDICAL VACUUM

WASTE ANISTHETIC GAS DISPOSAL PIPING

NITROUS OXIDE PIPING

INSTRUMENT AIR PIPING

1. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT MEDICAL GAS OUTLET LOCATIONS AND MOUNTING

HEIGHTS.

2. NOT ALL GASES MAY BE USED. THE GAS ORDER SHOWN IN THE EXAMPLE WILL BE TYPICAL FOR ALL

OUTLETS.

3. PROVIDE BLANK COVER PLATE BETWEEN VACUUM OUTLET AND SLIDE. SEE ARCHITECTURAL FOR EXACT

CONFIGURATION.

4. MEDICAL GAS CERTIFIER SHALL REVIEW AND APPROVE ALL MEDICAL GAS DESIGN PRIOR TO INSTALLATION.

ANY ISSUES SHALL BE RESOLVED PRIOR TO INSTALLATION.

5. ALL SERVICE VALVES SHOWN ON THE FLOOR PLANS SHALL BE LOCKABLE, DUAL PURGE PORT. LOCK VALVES

IN OPEN POSITION EXCEPT THE VALVES FOR FUTURE CONNECTIONS.

6. ALL MEDICAL GAS VALVES INSTALLED FOR FUTURE SHALL BE CLOSED WITH BRAZED CAP WITH TUBING

ALLOWANCE FOR CUTTING AND RE-BRAZING.

7. ALL MEDICAL GAS SERVICE VALVES ABOVE CEILING MUST BE LOCKED OPEN.

8. PROVIDE MEDICAL GAS OUTLET CONNECTION TYPE PER OWNER STANDARDS.

SYMBOL DESCRIPTION

MGO-11111111

N NITROGEN PIPING

IA = INSRUMENT AIR

9. MEDICAL GAS SYSTEM SHALL MEET NFPA 99 CATEGORY 1 REQUIREMENTS. PIPE AND FITTING MATERIALS SHALL BE ASTM B819 (5.1.10.1.4/5.1.10.1.5). REFER TO SPECS SECTIONS FOR ALL OTHER INFORMATIONS.

MEDICAL GAS ALARM PANEL SCHEDULE

NURSE STATION (50)

LOCATION GAGESTYPE OF PANEL SERVICE INDICATOR LIGHT

AREA ALARM PANEL YES

OXIGEN LINE PRESSURE ABNORMAL

MEDICAL AIR PRESSURE ABNORMAL

MEDICAL VACUUM LINE VACUUM LW TEST BUTTON

PLUMBING EQUIPMENT SCHEDULE

EQUIPMENT DESCRIPTION SCHEDULE NOTES

REDUCED PRESSURE ZONE

BACKFLOW PREVENTER

RPZ SEE SPECIFICATIONS

FD FLOOR DRAIN SEE SPECIFICATIONS

P-812 COFFEE BOX SEE SPECIFICATIONS

P-809 DIALYSIS BOX SEE SPECIFICATIONS

P-704 SHOWER W/HOSESPRAY 2 [50] 2 [50] 0.5 [13] 0.5 [13] 2 1.5/1.5 YES NO

P-103 WATER CLOSET 4 [100] 2 [50] 1 [25] - - 4 10/0 YES NO SEE SPECIFICATION

P-105 WATER CLOSET 4 [100] 2 [50] 1 [25] - - 4 10/0 YES NO SEE SPECIFICATION

P-114 WATER CLOSET-BARIATRIC 4 [100] 2 [50] 1 [25] - - 4 6/0 YES NO SEE SPECIFICATION

P-532 SINK 2 [50] 2 [50] 0.5 [13] 0.5 [13] 1 1.5/1.5 YES NO

P-608 WATER COOLER 2 [50] 2 [50] 0.5 [13] - - 0.5 0.25/0 YES NO SEE SPECIFICATION

P-701 SHOWER 2 [50] 2 [50] 0.5 [13] 0.5 [13] 2 1.5/1.5 YES NO

P-415 LAVATORY-WALL MOUTED 2 [50] 2 [50] 0.5 [13] 0.5 [13] 1 1.5/1.5 YES NO PROVIDE WITH ASSE 1070 MIXING VALVE

P-421 LAVATORY-BARIATRIC 2 [50] 2 [50] 0.5 [13] 0.5 [13] 1 1.5/1.5 YES NO

P-531 SINK 2 [50] 2 [50] 0.5 [13] 0.5 [13] 1 1.5/1.5 NO YES

PLUMBING FIXTURE SCHEDULE

MARK DESCRIPTION

WASTE PIPE VENT PIPE COLD WATER HOT WATER WASTE

FIXTURE

UNITS

WATER

FIXTURE

UNITS

WRIST

BLADE

HANDLES

ELECTRONIC

SENSOR

REMARKS

IN [mm] IN [mm] IN [mm] IN [mm]

PROVIDE WITH ASSE 1070 MIXING VALVE

PROVIDE WITH ASSE 1070 MIXING VALVE

PROVIDE WITH ASSE 1070 MIXING VALVE

P-528 SINK 2 [50] 2 [50] 0.5 [13] 0.5 [13] 1 1.5/1.5 NO NO PROVIDE WITH ASSE 1070 MIXING VALVE

PROVIDE WITH ASSE 1070 MIXING VALVE

PROVIDE WITH ASSE 1070 MIXING VALVE

P-505 CLINICAL SERVICE SINK 4 [100] 2 [50] 1 [25] 0.5 [13] 4 10/0 NO NO SEE SPECIFICATION

P-708 WALL MTD EYEWASH - HANDS FREE 2 [50] 2 [50] 0.5 [13] 0.5 [13] 2 1.5/1.5 No NO PROVIDE WITH ANSI Z358.1 MIXING VALVE

ZONE VALVE BOX SCHEDULE

ZVB-1

DESIGNATION

TYPE OF PANEL

LOCATION

O MA MV N / IA N2O WAGD CO2

SERVICE AREA ALARM ALARM LOCATION

1-1/2" 1-1/2" 2-1/2" - - - - CORRIDOR C-1 AA-1ISO ROOMS NURSE STATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1100 Boulders Pkwy | Suite 503 Richmond, VA 23225

804.355.2067

A u to d e s k D o c s /M t H o m e

I s o la ti o n W a rd

D /W

S P

M t H o m e

D rv t

/7 /2

:1

:2

P

M

P1.00

PLUMBING LEGEND AND NOTES

11/04/2022 IGM TIP

RENOVATE D-WING FOR ISOLATION

WARD

621-20-107

MOUNTAIN HOME, TENNESSEE

BID DOCUMENTSJAMES H.

QUILLEN VA

MEDICAL

CENTER

Approved: Owner

No. Revisions: Date:

1 BID DOCUMENTS 11/04/2022

USMM710143

Snapshot

USMM710143

Text Box 11/04/2022

29A-C

30.1

32.8

P O N M L K I H G F E D C B.5 B A.5 A

2" SAN UP

2" V UP

(E)2" V DN

(E)2" SAN DN

(E)2" V DN

2" V UP

2" SAN UP

(E)2" SAN DN

(E)2" SAN DN

(E)2" V DN

2" SAN UP

2" V UP

4" V UP

4" SAN UP

(E)4" SAN DN(E)4" V DN

2" V UP

(E)2" V DN

3" SAN UP

(E)3" SAN DN

(E)2" V DN

2" V UP

2" SAN UP

2" V UP

(E)2" V DN

(E)2" SAN DN

(E)6" SD DN

6" SD UP

(E)6" SD DN

6" SD UP

(E)6" SD DN

6" SD UP

(E)6" SD DN

(E)4" V DN (E)4" SAN DN

(E)6" SD DN

6" SD UP

4" SAN UP

4" V UP

2" SAN UP

(E)2" SAN DN

(E)4" SAN DN

(E)4" V DN

4" V UP

4" SAN UP

(E)4" SAN DN

(E)6" SD DN

6" SD UP

(E)4" SAN DN

4" SAN UP

4" V UP

(E)4" V DN

6" SD UP

2" SAN UP1

1 1

2 2

2" SAN2" SAN 2" V2" V

6" SD6" SD 6" SD6" SD

4" V4" V

(E)4" V DN

4" V4" V

4" SAN4" SAN

2" TRAPPED SAN UP

4" SAN UP

2" SAN UP

2" SAN UP

4" S

A N

4" S

A N

4" V

4" V

(E)4" SAN DN (E)4" V UP

(E)4" SAN DN

4" SAN UP

4" V UP

4" V

4" V

4" V

4" V

4" SAN4" SAN

(E)4" V DN

4" V UP

4" SAN UP

4" V UP

4" SAN UP

4" V UP

4" SAN UP

(E)4" SAN DN

(E)4" V DN(E)4" SAN DN(E)4" V DN

(E)4" SAN DN

(E)4" V DN

1 1 1

(E)4" V DN

(E)4" V DN

4" SAN UP

4" V UP

2" SAN UP

2" SAN UP

2" SAN UP4" SAN UP

4" SAN UP

2" SAN UP

4" SAN UP

3" TRAPPED SAN UP

3" TRAPPED SAN UP

2" V UP

2" V UP

1(E)4" SAN DN

2" SAN UP

2" SAN2" SAN 2" SAN UP

2" SAN UP

4" SAN UP

2" SAN UP

3" TRAPPED SAN UP

3" TRAPPED SAN UP

2" SAN UP

4" SAN UP

2" SAN UP

2" V UP2" V UP

4" V UP

4" SAN UP

(E)2"V STACK

(E)2"SAN STACK

3" TRAPPED SAN UP

3" TRAPPED SAN UP

2" SAN UP

2" SAN UP

4" SAN UP

2" SAN UP

4" SAN UP

2" SAN UP

2" SAN UP

2" V UP

4" S

A N

4" S

A N

2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

3" TRAPPED SAN UP

3" TRAPPED SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

3" TRAPPED SAN UP

3" TRAPPED SAN UP

2" SAN UP

4" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

4" SAN UP

2" SAN UP

3" TRAPPED SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

4" SAN UP

(E)2" V UP

(E)4" SAN DN

(E)4" SAN DN

3" TRAPPED SAN UP

4" SAN UP

(E)4" V DN

(E)4" V DN

4" V UP

4" V UP

2" SW2" SW

2" SW UP

2" SW UP

2" SW UP

2" SW2" SW

2" SW UP

2" S

W 2"

S W

2" SW2" SW

2" SW UP

2" SW UP

2" SW UP 2" SW2" SW

2" SW UP

2" SW UP

2" SW2" SW

2" SW2" SW

2" SW UP

2" SW UP

2" SW UP 2" SW2" SW

2" SW2" SW

4" SAN UP4" SAN UP

4" SAN UP

4" SAN UP

(E)3" A.T.VTR

6" SD6" SD

2" V

2" V

4" V

4" V

2" V

2" V

4" V

4" V

4" V

4" V

2" V

2" V

4" V

4" V

2" SAN2" SAN

2" SAN UP

2" SAN2" SAN2" SAN2" SAN

4" SAN4" SAN

2" S

A N

2" S

A N

2" SAN2" SAN

4" SAN4" SAN

2"

2"

2"

4"

2"

2"

2"

2"

4"

4" SAN4" SAN

4" 4"

4" 2"

4"

4" SAN4" SAN

2"

2"

3"

4"4"

4"

2"

3"

4" 4"

2"

2" S

A N

2" S

A N

2"

2" SAN UP

3/4" DHWR UP

3/4"

(E)3/4" DHWR DN

6" SD

4" V

4" V 2

4" S

S

2" SAN UP

2" SAN2" SAN

2" SAN UP

4" SAN UP

4" 2"

2"

2"

4"

2" V UP

2" V UP

2" V UP

2" V UP

2" V UP

2" V UP

2" SAN2" SAN4"

2" V UP

2"

2"

4"

3"

2"

2" SAN2" SAN

4" SAN UP

2" SAN UP

4" S

A N

4" S

A N

3"

2" V UP

4" V UP

3"

2" SAN2" SAN

3" SAN3" SAN

2" 4"

3"

3" TRAPPED SAN UP

3" SAN UP

4" S

A N

4" S

A N

2" S

A N

2" S

A N

2" SAN UP

A. COORDINATE WITH FACILITIES ANY SHUTDOWN REQUIRED. REFER TO SPECIFICATIONS

FOR MORE DETAILS.

B. CONTRACTOR SHALL XRAY FLOOR PRIOR TO ANY CUTTING OF THE SLAB TO

COORDINATE PENETRATIONS WITH STRUCTURAL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

G E N E R A L P L A N N O T E S

KEYPLAN

1100 Boulders Pkwy | Suite 503 Richmond, VA 23225

804.355.2067

A u to d e s k D o c s /M t H o m e

I s o la ti o n W a rd

D /W

S P

M t H o m e

D rv t

/7 /2

:1

:3

P

M

P2.01

FIRST FLOOR PLUMBING NEW

WORK PLAN

11/04/2022 IGM TIP

RENOVATE D-WING FOR ISOLATION

WARD

621-20-107

MOUNTAIN HOME, TENNESSEE

BID DOCUMENTSJAMES H.

QUILLEN VA

MEDICAL

CENTER

Approved: Owner

N

1/8" = 1'-0"

FIRST FLOOR NEW WORK PLUMBING PLAN

D R A W I N G N O T E S :

1 CONNECT NEW VENT PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.

2 CONNECT NEW SANITARY PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.

3 CONNECT NEW STORM PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.

4 CONNECT NEW HOT WATER RETURN PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.

5 OFFSET THE EXISTING STACK IN THE NEAREST WALL.

No. Revisions: Date:

1 BID DOCUMENTS 11/04/2022

USMM710143

Snapshot

USMM710143

29A-C

30.1

32.8

P O N M L K I H G F E D C B.5 B A.5 A

P-114

P-105

P-421

P-415 P-531

P-704

P-704

P-531

P-528

P-531

P-531

P-531

P-531

P-531 P-531

P-531 P-531P-531

P-531

P-531 P-531

P-531

P-531

P-531

P-531 P-531

P-531

P-415

P-415

P-415

P-415

P-704

P-704

P-704 P-704 P-704

P-704

P-704

P-704

P-704

P-704

P-415

P-105

P-105

P-105

P-105

P-105

P-105

P-105

P-105

P-105

P-415P-415

P-415

P-531 P-531

P-415

P-105

P-105

P-415

P-415

P-103

P-415

P-532

P-528

P-701

1/2" DW1/2" DW 1/2" DW1/2" DW 1" DW1" DW

1" D

W 1"

D W

1/2" DW1/2" DW3/4" DW3/4" DW

1" D

W 1"

D W

3/4" DW3/4" DW 3/4" DW3/4" DW 1/2" DW1/2" DW

1" D

W 1"

D W

RPZ

P-809

3/ 4"

D W

3/ 4"

D W

(E )3

/4

D H

W R

(E )3

/4

D H

W R

(E )4

D

C W

(E )4

D

C W

(E )2

/2

D

H W

(E )2

/2

D

H W

(E )3

/4

1/

2"

1/

2"

1/

2"

1/

4"

1" 1"

1" D

H W

1" D

H W

1/2"

1/ 2"

1/ 2"

1/2"

P-608

RPZ

P-531

P-809 P-809 P-809

P-809P-809P-809 P-809

P-809P-809P-809P-809

P-812

3/4" DHWR

3/4" DHWR DN

P-531

1/

2" D

C W

1/

2" D

C W

2" D

H W

2" D

H W

2 1/2" DCW2 1/2" DCW

2" DHW2" DHW

2" D

H W

2" D

H W

1/

2" D

H W

1/

2" D

H W

2" D

C W

2" D

C W

2 1/2" DCW2 1/2" DCW 2 1/2" DCW2 1/2" DCW

1 1/2" DHW1 1/2" DHW

1 1/2" DCW1 1/2" DCW

1/

2" D

H W

1/

2" D

H W

1/

2" D

H W

1/

2" D

H W2"

D C

W 2"

D C

W

1/ 2"

D H

W 1/

2" D

H W

2 1/2" DCW2 1/2" DCW 2" DCW2" DCW

1 1/2" DHW1 1/2" DHW

2" DCW2" DCW

2" D

C W

2" D

C W

1/

2" D

H W

1/

2" D

H W

1/

2" D

H W

1/

2" D

H W

2" DCW2" DCW

1 1/4" DHW1 1/4" DHW

1/

4" D

H W

1/

4" D

H W

2" DCW2" DCW

3/4" DHW3/4" DHW

2" DCW2" DCW

3/ 4"

D H

W 3/

4" D

H W

1/ 2"

D C

W 1/

2" D

C W

1/

4" D

H W

1/

4" D

H W

2" D

C W

2" D

C W

1/

4" D

H W

1/

4" D

H W

1/ 2"

D C

W 1/

2" D

C W

(E )3

/4

D C

W (E

)3 /4

D

C W

1/2" DCW1/2" DCW

2" D

C W

2" D

C W

1/

4" D

H W

1/

4" D

H W

3/ 4"

D H

W 3/

4" D

H W

2" D

C W

2" D

C W

(E)2" DHW(E)2" DHW

(E)2 1/2" DCW(E)2 1/2" DCW

(E)2" DHW(E)2" DHW

(E)2 1/2" DCW(E)2 1/2" DCW

(E)2" DHW(E)2" DHW

(E)2 1/2" DCW(E)2 1/2" DCW

1" D

C W

1" D

C W

(E )2

D

H W

(E )2

D

H W

(E)3" DCW(E)3" DCW

ISO ROOM 1

D201B

ISO ROOM 2

D202B

ISO ROOM 3

D203B

ISO ROOM 4

D204B

ISO ROOM 5

D205B

ISO ROOM 6

D206B

ISO ROOM 7

D207B

ISO ROOM 8

D208B

ISO ROOM 9

D209B

ISO ROOM 10

D210B

ISO ROOM 11

D211B

ISO ROOM 12

D212B

TOILET

D201C

ANTEROOM

D201A

TOILET

D202C

ANTEROOM

D202A

TOILET

D204C

TOILET

D203C

ANTEROOM

D203A

ANTEROOM

D204A ANTEROOM

D205A

TOILET

D205C

TOILET

D-206C

ANTEROOM

D206A

ANTEROOM

D207A

TOILET

D208C

TOILET

D207C

ANTEROOM

D208A

ANTEROOM

D209A

TOILET

D210C

TOILET

D209C

ANTEROOM

D210A

ANTEROOM

D211A

TOILET

D212C

TOILET

D211C

ANTEROOM

D212A

CHART ALCOVE

D201D

CHART ALCOVE

D203D

CHART ALCOVE

D205D

CHART ALCOVE

D207D

CHART ALCOVE

D209D

CHART ALCOVE

D211D

EQUIPMENT

D214

ELECTRICAL

D233

NOURISHMENT

D215

HUDDLE

D216

CLEAN

D219

LINEN

D220

SOILED

D221

NURSE STATION

D223

OIT

D222

MED

D224

NURSE MANAGER

D227

LAB ALCOVE

D226

BIOMED

D235

MECHANICAL

H.A.C.

STAIRS

S1

STAFF TOILET

D230

LOUNGE

D228

CORRIDOR

D2C3

RESTROOM

D218

ALCOVE

D217

ALCOVE

D213

WOMEN'S LOCKER

D231

MEN'S LOCKER

D232

STORAGE

D229

X-RAY ALCOVE

D225

CORRIDOR

D2C5

CORRIDOR

C6

CORRIDOR

D2C4B

CORRIDOR

D2C2

CORRIDOR

D2C1

CONSULT

D234

CORRIDOR

D2C3B

CORRIDOR

D2C3A

VESTIBULE

D236

1/ 2"

D C

W 1/

2" D

C W

1/

2" D

H W

1/

2" D

H W

1/

2" D

H W

1/

2" D

H W

1/2" DHW1/2" DHW

P-532

1"

2 1/2" 2 1/2"

2" D

C W

2" D

C W

2"

2"

2"

2"

P-505

P-812

P-532

6 6

P-708

A. COORDINATE EXACT LOCATIONS OF PLUMBING FIXTURES WITH ARCHITECTURAL PLANS

AND ELEVATIONS. COORDINATE EXACT EQUIPMENTS WITH ARCHITECTURAL

EQUIPMENT PLANS AND ELEVATIONS.

B. USE QUARTER BENDS ON ALL SANITARY AND STORM PIPING TO LIMIT THE AMOUNT OF

CLEANOUTS REQUIRED. PROVIDE CLEANOUTS ON ALL SANITARY AND STORM PIPING

PER SPECIFICATION.

C. AVOID ROUTING ANY PLUMBING PIPING ABOVE OPERATING, PROCEDURE, CT/MRI/LINAC

(AND ASSOCIATED EQUIPMENT ROOMS), PHARMACY, LAB, ELECTRICAL, AND IT ROOMS.

WHEN THESE AREAS CANT BE AVOIDED PROVIDE DRIP PANS WITH THE MOISTURE

SENSOR CONNECTED TO BMS AND ROUTE DRAIN TO MOP SINK OR FLOOR SINK.

D. ALL FLOOR DRAINS AND FLOOR SINKS TO BE PROVIDED WITH P-TRAP PER

SPECIFICATIONS.

E. COORDINATE WITH FACILITIES ANY SHUTDOWN REQUIRED, REFER TO SPECIFICATIONS

FOR MORE DETAILS.

F. RECONNECT ALL EXISTING TO REMAIN FIXTURES/BRANCHES, DOMESTIC WATER,

SANITARY, AND VENT PIPING TO NEW MAINS. VERIFY EXACT SIZES AND LOCATIONS.

G. CONTRACTOR SHALL XRAY FLOOR PRIOR TO ANY CUTTING OF THE SLAB TO

COORDINATE PENETRATIONS WITH STRUCTURAL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

G E N E R A L P L A N N O T E S

KEYPLAN

1100 Boulders Pkwy | Suite 503 Richmond, VA 23225

804.355.2067

A u to d e s k D o c s /M t H o m e

I s o la ti o n W a rd

D /W

S P

M t H o m e

D rv t

/7 /2

:1

:3

P

M

P2.02A

SECOND FLOOR PLUMBING NEW

WORK PLAN - WATER

11/04/2022 IGM TIP

RENOVATE D-WING FOR ISOLATION

WARD

621-20-107

MOUNTAIN HOME, TENNESSEE

BID DOCUMENTSJAMES H.

QUILLEN VA

MEDICAL

CENTER

Approved: Owner

N

1/8" = 1'-0"

SECOND FLOOR NEW WORK PLUMBING PLAN

D R A W I N G N O T E S :

1 CONNECT NEW COLD WATER PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.

2 CONNECT NEW HOT WATER PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.

3 CONNECT 1/2" CW SUPPLY TO COFFEE MAKER (BY OTHERS). PROVIDE METAL WALL BOX AND STOP LOCATED IN WALL ABOVE COUNTER. PROVIDE DOUBLE CHECK VALVE IN SUPPLY EQUAL TO WATTS SERIES 7, LOCATED ABOVE FLOOD

LEVEL OF EQUIPMENT. COORDINATE EXACT LOCATION WITH ARCHITECT.

4 LOCATE RPZS IN THIS ROOM ON THE WALL FOR EASY ACCESS. ROUTE DRAIN TO MOP SINK WITH AIR GAP.

5 PROVIDE MANUAL VALVE, CHECK VALVE, AND CIRCUIT SETTER AT THIS LOCATION.

6 PROVIDE WATER HAMMER ARRESTOR FOR CW SUPPLY LINE TO WATER CLOSET. INSTALL WATER HAMMER ARRESTOR IN CHASE AND PROVIDE ACCESS PANEL FOR SERVICE AND MAINTENANCE. REFER TO ARCHITECTURAL DRAWINGS FOR

ACCESS PANEL LOCATIONS.

No. Revisions: Date:

1 BID DOCUMENTS 11/04/2022

USMM710143

Snapshot

USMM710143

29A-C

30.1

32.8

P O N M L K I H G F E D C B.5 B A.5 A

2" SAN DN

2" SAN DN

(E)2" VTR (E)2" VTR

2" SAN DN

2" V DN

4" SAN DN

2" V DN

(E)3" VTR

3" SAN DN(E)2" VTR

2" SAN DN

(E)4" VTR

(E)4"SAN STACK

2" SAN DN

2" SAN DN

(E)6" RD UP (E)6" SD RD UP(E)6" SD RD UP

6" SD DN

(E)4" SD RD UP(E)4" SD RD UP

(E)4" SD RD UP(E)4" SD RD UP

(E)6" SD RD UP(E)6" SD RD UP

(E)4" SD RD UP(E)4" SD RD UP

(E)4" SD RD UP(E)4" SD RD UP

6" SD DN

6" SD DN

(E)6" SD UP

(E)4" SD UP

(E )4

S

D (E

)4

S D

(E )4

S

D (E

)4

S D

(E)4" SD(E)4" SD

(E )6

S

D (E

)6

S D

(E )6

S

D (E

)6

S D

(E)6" SD RD UP(E)6" SD RD UP

(E)6" SD(E)6" SD

6" SD DN

6" SD DN

(E)4" VTR

4" SAN DN

4" V DN

(E)2"VTR

(E)2"SAN STACK

6" SD6" SD

6" SD6" SD 6" SD6" SD

1 1

2 2

(E)4" SD(E)4" SD

4" SAN DN

(E)4" VTR

2" V2" V

4" V

4" V

4" V4" V

4" S

A N

4" S

A N

4" SAN4" SAN

(E)4" VTR

4" SAN DN

4" SAN4" SAN1

4" V DN

4" SAN DN

4" SAN DN

4" SAN DN

(E)4" VTR

(E)4" VTR 1

4" V DN

4" V DN

4" SAN DN

4" SAN DN

(E)4" VTR

2" SAN2" SAN

4" SAN4" SAN

4" SAN4" SAN

4" SAN4" SAN

4" SAN4" SAN

2" SAN2" SAN

2" SAN2" SAN

4" SAN DN

4" SAN DN

RPZ

P-809

RPZ

FD-D

FD-D

FD-D

FD-D

FD-D

FD-D

FD-D

FD-D

FD-D

FD-D

FD-D

FD-D

P-809 P-809

P-809

P-809P-809P-809P-809

P-809 P-809

P-809

P-809

P-704

P-704

P-105

P-105

P-415

P-415

P-114

P-105

P-421

P-415 P-531

P-704

P-704

P-531

P-531

P-531

P-531

P-531

P-531

P-531

P-531 P-415

P-415

P-415

P-704

P-704

P-704

P-704 P-704

P-704

P-415

P-105

P-105

P-105

P-105

P-105

P-105

P-105

P-415P-415

P-415 P-415

P-105

P-105

P-528

P-704

(E)4" V STACK

/ VTR

(E)4" V STACK

/ VTR

(E)4" VTR

(E)4"SAN STACK

(E)4" V STACK

/ VTR

(E)2" VTR

(E)4"SAN STACK

(E)2"V STACK

/ VTR

(E)2" VTR

(E)2" VTR

4" V DN

(E)4" V STACK

/ VTR

P-528

P-103

P-415

P-608

P-532

P-531

P-701

P-531

P-531 P-531

P-415

P-531

4" VTR

2" V

2" V

2" VTR

(E)2"VTR

(E)2"V STACK

2" V2" V

2" V

2" V

2" V2" V

2" V

2" V

4" V

4" V

2" V2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V2" V

2" V2" V2" V2" V

2" V

2" V

2" V

2" V

(E)2" VTR

(E)4" VTR

4" VTR

4" V DN

2" VTR

2" V

2" V

2" V

2" V

2" VTR

2" V2" V

4" VTR

4" V4" V

6" SD DN

4" VTR 4" VTR

4" SAN4" SAN

6" SD6" SD

4 2" V2" V

2" V

2" V

(E)4" VTR

(E)3" VTR

(E)4" VTR

2" VTR

P-531

P-531

P-531

P-531 P-531 P-531

ISO ROOM 1

D201B

ISO ROOM 2

D202B

ISO ROOM 3

D203B

ISO ROOM 4

D204B

ISO ROOM 5

D205B

ISO ROOM 6

D206B

ISO ROOM 7

D207B

ISO ROOM 8

D208B

ISO ROOM 9

D209B

ISO ROOM 10

D210B ISO ROOM 11

D211B

ISO ROOM 12

D212B

TOILET

D201C

ANTEROOM

D201A

TOILET

D202C

ANTEROOM

D202A

TOILET

D204C

TOILET

D203C

ANTEROOM

D203A ANTEROOM

D204A

ANTEROOM

D205A

TOILET

D205C

TOILET

D-206C

ANTEROOM

D206A

ANTEROOM

D207A

TOILET

D208C

TOILET

D207C

ANTEROOM

D208A

ANTEROOM

D209A

TOILET

D210C

TOILET

D209C

ANTEROOM

D210A

ANTEROOM

D211A

TOILET

D212C

TOILET

D211C

ANTEROOM

D212A

CHART ALCOVE

D201D

CHART ALCOVE

D203D

CHART ALCOVE

D205D

CHART ALCOVE

D207D

CHART ALCOVE

D209D

CHART ALCOVE

D211D

EQUIPMENT

D214

ELECTRICAL

D233

NOURISHMENT

D215

HUDDLE

D216

CLEAN

D219

LINEN

D220

SOILED

D221

NURSE STATION

D223

OIT

D222

MED

D224

NURSE MANAGER

D227

LAB ALCOVE

D226

BIOMED

D235

MECHANICAL

H.A.C.

STAIRS

S1

STAFF TOILET

D230

LOUNGE

D228

CORRIDOR

D2C3

RESTROOM

D218

ALCOVE

D217

ALCOVE

D213

WOMEN'S LOCKER

D231

MEN'S LOCKER

D232

STORAGE

D229

X-RAY ALCOVE

D225

CORRIDOR

D2C5

CORRIDOR

C6

CORRIDOR

D2C4B

CORRIDOR

D2C2

CORRIDOR

D2C1

CONSULT

D234

CORRIDOR

D2C3B

CORRIDOR

D2C3A

VESTIBULE

D236

2" V2" V 4P-532

2"

4" V4" V

6" SD6" SD

2" V

2" V

2"

2" V

2" V

4"

2" V2" V

2" V2" V

2"

4" VTR

2" V2" V

4" V

4" V 2"

V 2"

V 2"

V 2"

V

2"

2"

3"

4" VTR

4" VTR

4" SAN4" SAN 4" SAN4" SAN

P-505

P-532

2" V

2" V

2" V

2" V

4" VTR

4" VTR

P-704

(E)4" VTR4

4" SAN4" SAN4" SAN4" SAN

FD-D

FD-D

P-708

2"

A. COORDINATE EXACT LOCATIONS OF PLUMBING FIXTURES WITH ARCHITECTURAL PLANS

AND ELEVATIONS. COORDINATE EXACT EQUIPMENTS WITH ARCHITECTURAL

EQUIPMENT PLANS AND ELEVATIONS.

B. USE QUARTER BENDS ON ALL SANITARY AND STORM PIPING TO LIMIT THE AMOUNT OF

CLEANOUTS REQUIRED. PROVIDE CLEANOUTS ON ALL SANITARY AND STORM PIPING

PER SPECIFICATION.

C. AVOID ROUTING ANY PLUMBING PIPING ABOVE OPERATING, PROCEDURE, CT/MRI/LINAC

(AND ASSOCIATED EQUIPMENT ROOMS), PHARMACY, LAB, ELECTRICAL, AND IT ROOMS.

WHEN THESE AREAS CANT BE AVOIDED PROVIDE DRIP PANS WITH THE MOISTURE

SENSOR CONNECTED TO BMS AND ROUTE DRAIN TO MOP SINK OR FLOOR SINK.

D. ALL FLOOR DRAINS AND FLOOR SINKS TO BE PROVIDED WITH P-TRAP PER

SPECIFICATIONS.

E. COORDINATE WITH FACILITIES ANY SHUTDOWN REQUIRED, REFER TO SPECIFICATIONS

FOR MORE DETAILS.

F. RECONNECT ALL EXISTING TO REMAIN FIXTURES/BRANCHES, DOMESTIC WATER,

SANITARY, AND VENT PIPING TO NEW MAINS. VERIFY EXACT SIZES AND LOCATIONS.

G. CONTRACTOR SHALL XRAY FLOOR PRIOR TO ANY CUTTING OF THE SLAB TO

COORDINATE PENETRATIONS WITH STRUCTURAL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

G E N E R A L P L A N N O T E S

KEYPLAN

1100 Boulders Pkwy | Suite 503 Richmond, VA 23225

804.355.2067

A u to d e s k D o c s /M t H o m e

I s o la ti o n W a rd

D /W

S P

M t H o m e

D rv t

/7 /2

:1

:4

P

M

P2.02B

SECOND FLOOR PLUMBING NEW

WORK PLAN - SANITARY/STORM

11/04/2022 IGM TIP

RENOVATE D-WING FOR ISOLATION

WARD

621-20-107

MOUNTAIN HOME, TENNESSEE

BID DOCUMENTSJAMES H.

QUILLEN VA

MEDICAL

CENTER

Approved: Owner

N

1/8" = 1'-0"

SECOND FLOOR NEW WORK PLUMBING PLAN - SANITARY AND STORM

D R A W I N G N O T E S :

1 CONNECT NEW SANITARY PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.

2 CONNECT NEW STORM PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.

3 PROVIDE DRIP PAN TO EXISTING STORM PIPING LOCATED ABOVE BIOMED UNIT.

4 CONNECT NEW VENT PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.

No. Revisions: Date:

1 BID DOCUMENTS 11/04/2022

USMM710143

Snapshot

USMM710143

29A-C

30.1

32.8

P O N M L K I H G F E D C B.5 B A.5 A

(E)2" VTR

(E)2" VTR

(E)6" RD (E)6" RD

(E)4" RD

(E)4" VTR

(E)4" VTR

(E)4" VTR

(E)4" VTR

(E)4" VTR (E)4" VTR

(E)4" VTR (E)4" VTR

(E)6" RD

(E)4" RD

(E)2" VTR

(E)4" RD

(E)4" RD

(E)3" VTR

(E)6" RD

(E)6" RD

(E)4" RD

(E)2" VTR

(E)2" VTR

2" VTR

4" VTR

(E)4" VTR

(E)2" VTR

2" VTR

2" VTR

(E)2" VTR

(E)2" VTR

(E)3" VTR

4" VTR

(E)2" VTR

(E)2" VTR

(E)4" VTR

(E)2" VTR

(E)4" VTR

(E)4" VTR

(E)4" VTR(E)4" VTR

(E)4" VTR

(E)4" VTR

2" VTR

4" VTR

4" VTR

4" VTR

4" VTR

4" VTR 4" VTR

4" VTR 4" VTR1 1

OUTSIDE AIR INTAKE

25' - 0"

A. COORDINATE WITH FACILITIES ANY SHUTDOWN REQUIRED. REFER TO SPECIFICATIONS

FOR MORE DETAILS.

B. CONTRACTOR SHALL XRAY FLOOR PRIOR TO ANY CUTTING OF THE SLAB TO

COORDINATE PENETRATIONS WITH STRUCTURAL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

G E N E R A L P L A N N O T E S

KEYPLAN

1100 Boulders Pkwy | Suite 503 Richmond, VA 23225

804.355.2067

A u to d e s k D o c s /M t H o m e

I s o la ti o n W a rd

D /W

S P

M t H o m e

D rv t

/7 /2

:1

:4

P

M

P2.03

ROOF NEW WORK PLUMBING

PLAN

11/04/2022 IGM TIP

RENOVATE D-WING FOR ISOLATION

WARD

621-20-107

MOUNTAIN HOME, TENNESSEE

BID DOCUMENTSJAMES H.

QUILLEN VA

MEDICAL

CENTER

Approved: Owner

N

1/8" = 1'-0"

ROOF NEW WORK PLUMBING PLAN

D R A W I N G N O T E S :

1 RELOCATED/OFFSETTED VTR, AS REQUIRED TO MAINTAIN 25' FROM ANY AIR INTAKE.

No. Revisions: Date:

1 BID DOCUMENTS 11/04/2022

USMM710143

Snapshot

USMM710143

29A-C

30.1

32.8

P O N M L K I H G F E D C B.5 B A.5 A

(E)1/2"MA

(E)1 1/2"MV

(E)3/4"O

(E )1

/2 "M

A (E

)1 /2

"O

(E )3

/4 "M

V

AA-1

ZVB-1

MGH-66660000 MGH-66660000 MGH-66660000

MGH-66660000

MGH-66660000 MGH-66660000 MGH-66660000 MGH-66660000

MGH-66660000MGH-66660000MGH-66660000

MGH-66660000

(E)3/4" O(E)3/4" O

(E)1/2" MA(E)1/2" MA

(E)1 1/2" MV(E)1 1/2" MV

2 1/2" MV2 1/2" MV

1 1/2" MA1 1/2" MA

1 1/2" O1 1/2" O

1/2"O

3/4"MV

1/2"MA

3/4" O3/4" O

1 1/4" MV1 1/4" MV

3/4" MA3/4" MA

1" O1" O

2" MV2" MV

1" MA1" MA

1" O1" O

1" MA1" MA

2" MV2" MV

1/2" O1/2" O

3/4" MV3/4" MV

1/2" MA1/2" MA

2" M

V 2"

M V

1/

4" M

A

1/ 4"

M A

1/

4" O

1/

4" O

1" MA1" MA

1" O1" O

1 1/2" MV1 1/2" MV

1" MA1" MA

1" O1" O

1 1/2" MV1 1/2" MV

1/ 2"

O 1/

2" O

1/ 2"

M A

1/ 2"

M A

3/ 4"

M V

3/ 4"

M V

3/4" O3/4" O

3/4" MA3/4" MA

1 1/4" MV1 1/4" MV

1/2" O1/2" O

3/4" MV3/4" MV

1/2" MA1/2" MA

1" O

1" O

1" M

A 1"

M A

1/

2" M

V

1/ 2"

M V

2" MV2" MV

3/4" MA3/4" MA

3/4" O3/4" O

1/ 2"

O 1/

2" O

1/ 2"

M A

1/ 2"

M A

3/ 4"

M V

3/ 4"

M V

2 2

2 2 2 2

2 2 2

ISO ROOM 1

D201B

ISO ROOM 2

D202B

ISO ROOM 3

D203B

ISO ROOM 4

D204B

ISO ROOM 5

D205B

ISO ROOM 6

D206B

ISO ROOM 7

D207B

ISO ROOM 8

D208B

ISO ROOM 9

D209B

ISO ROOM 10

D210B

ISO ROOM 11

D211B

ISO ROOM 12

D212B

TOILET

D201C

ANTEROOM

D201A

TOILET

D202C

ANTEROOM

D202A

TOILET

D204C

TOILET

D203C

ANTEROOM

D203A

ANTEROOM

D204A

ANTEROOM

D205A

TOILET

D205C

TOILET

D-206C

ANTEROOM

D206A

ANTEROOM

D207A

TOILET

D208C

TOILET

D207C

ANTEROOM

D208A

ANTEROOM

D209A

TOILET

D210C

TOILET

D209C

ANTEROOM

D210A

ANTEROOM

D211A

TOILET

D212C

TOILET

D211C

ANTEROOM

D212A

CHART ALCOVE

D201D

CHART ALCOVE

D203D

CHART ALCOVE

D205D

CHART ALCOVE

D207D

CHART ALCOVE

D209D

CHART ALCOVE

D211D

EQUIPMENT

D214

ELECTRICAL

D233

NOURISHMENT

D215

HUDDLE

D216

CLEAN

D219

LINEN

D220

SOILED

D221

NURSE STATION

D223

OIT

D222

MED

D224

NURSE MANAGER

D227

LAB ALCOVE

D226

BIOMED

D235

MECHANICAL

H.A.C.

STAIRS

S1

STAFF TOILET

D230

LOUNGE

D228

CORRIDOR

D2C3

RESTROOM

D218

ALCOVE

D217

ALCOVE

D213

WOMEN'S LOCKER

D231

MEN'S LOCKER

D232

STORAGE

D229X-RAY ALCOVE

D225

CORRIDOR

D2C5

CORRIDOR

C6

CORRIDOR

D2C4B

CORRIDOR

D2C2

CORRIDOR

D2C1

CONSULT

D234

CORRIDOR

D2C3B

CORRIDOR

D2C3A

VESTIBULE

D236

A. COORDINATE EXACT MEDICAL GAS OUTLETS, AREA ALARM AND ZONE VALVE BOX

LOCATIONS WITH ARCHITECTURAL PLANS AND ELEVATIONS.

B. PROVIDE LOCKABLE SHUT OFF VALVES ABOVE CEILING ON ALL MEDICAL GAS PIPING

UPSTREAM OF EACH ZONE VALVE BOX.

C. COORDINATE EXACT MEDICAL GAS CONNECTION POINTS TO HEAD WALLS, COLUMNS,

BOOMS, WITH MEDICAL EQUIPMENT AND ARCHITECTURAL PLANS AND ELEVATIONS.

D. COORDINATE WITH FACILITIES ANY SHUTDOWN REQUIRED. REFER TO SPECIFICATIONS

FOR MORE DETAILS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

G E N E R A L P L A N N O T E S

KEYPLAN

1100 Boulders Pkwy | Suite 503 Richmond, VA 23225

804.355.2067

A u to d e s k D o c s /M t H o m e

I s o la ti o n W a rd

D /W

S P

M t H o m e

D rv t

/7 /2

:1

:4

P

M

P3.02

SECOND FLOOR MEDICAL GAS

NEW WORK PLAN

11/04/2022 IGM TIP

RENOVATE D-WING FOR ISOLATION

WARD

621-20-107

MOUNTAIN HOME, TENNESSEE

BID DOCUMENTSJAMES H.

QUILLEN VA

MEDICAL

CENTER

Approved: Owner

N

1/8" = 1'-0"

SECOND FLOOR NEW WORK MEDICAL GAS PLAN

D R A W I N G N O T E S :

1 CONNECT TO NEW MEDICAL GAS RISERS INSTALLED BY OTHERS. COORDINATE EXACT RISER CONNECTION POINT.

RISER TO BE SIZED TO SUPPORT (INCLUDED: O=48 SCFM; MA=48 SCFM; MV=36 SCFM).

2 CONNECT TO HEADWALL BY OTHERS. COORDINATE EXACT CONNECTION POINT AND NUMBER OF CONNECTIONS.

TYPICAL FOR ALL PATIENT ROOMS.

3 CONTRACTOR SHALL ROUTE LOW VOLTAGE CABLING TO AA-1.

4 INSTALL AA PANEL ON WALL, FACING THE NURSE STATION.

No. Revisions: Date:

1 BID DOCUMENTS 11/04/2022

USMM710143

Snapshot

USMM710143

FF:CERAMIC TILE

TOILET

D118A

TOILET

D116A

30.1

I

(E)4"VTR

(E)4"SAN STACK

(E)4"VTR

(E)4"SAN STACK2"

S A

N 2"

S A

N

2" S

A N

2" S

A N

30.1

H

(E)2"V STACK

/ VTR

(E)2"VTR

(E)2"SAN STACK

(E)P-413

TOILET

D113A

32.8

(E)4"VTR

(E)4"SAN STACK

(E)4"VTR

(E)4"V STACK

3 4

2" S

A N

2" S

A N

2" S

A N

2" S

A N

2" S

A N

2" S

A N

2" SAN2" SAN

2" S

A N

2" S

A N

30.1

I

4 4

3 3

2" V2" V

3/ 4"

D H

W 3/

4" D

H W

1/

2" D

C W

1/

2" D

C W

3/ 4"

D H

W 3/

4" D

H W

1/

2" D

C W

1/

2" D

C W

2" V2" V

1/

2" D

C W

1/

2" D

C W

3/ 4"

D H

W 3/

4" D

H W

1/

2" D

C W

1/

2" D

C W

3/ 4"

D H

W 3/

4" D

H W

30.1

H

3 4

1/ 2"

D H

W 1/

2" D

H W

1/ 2"

D C

W 1/

2" D

C W

(E)P-413

32.8

1/2" DHW1/2" DHW

1/2" DCW1/2" DCW

1/2" DCW1/2" DCW

1/2" DHW1/2" DHW

3/ 4"

D C

W 3/

4" D

C W

3/ 4"

D H

W 3/

4" D

H W

1/

2" D

C W

1/

2" D

C W

3/ 4"

D H

W 3/

4" D

H W

(E)P-401(E)P-107

(E)P-703

(E)413 (E)413

A. COORDINATE WITH FACILITIES ANY SHUTDOWN REQUIRED, REFER TO SPECIFICATIONS FOR

MORE DETAILS.

B. PHASING - NO MORE THAN 2 ROOMS OUT OF SERVICE AT ANY TIME.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

G E N E R A L P L A N N O T E S

KEYPLAN

1100 Boulders Pkwy | Suite 503 Richmond, VA 23225

804.355.2067

A u to d e s k D o c s /M t H o m e

I s o la ti o n W a rd

D /W

S P

M t H o m e

D rv t

/7 /2

:1

:5

P

M

P4.01

PLUMBING ENLARGED PLANS

11/04/2022 IGM TIP

RENOVATE D-WING FOR ISOLATION

WARD

621-20-107

MOUNTAIN HOME, TENNESSEE

BID DOCUMENTSJAMES H.

QUILLEN VA

MEDICAL

CENTER

Approved: Owner

1/4" = 1'-0"

CALLOUT DEMOLITION - TYP.1

1/4" = 1'-0"

CALLOUT DEMOLITION - TYP.2

1/4" = 1'-0"

CALLOUT DEMOLITION - TYP.3

D R A W I N G N O T E S :

1 DEMOLISH EXISTING STORM PIPING FROM SECOND FLOOR CEILING SPACE TO FIRST FLOOR CEILING SPACE. SEE NEW

FLOOR PLAN FOR NEW STORM PIPING OFFSET.

2 REMOVE EXISTING SANITARY PIPING BACK TO SANITARY STACK. SEE NEW WORK PLAN FOR NEW CONNECTION.

3 DEMOLISH EXISTING SANITARY PIPING FROM SECOND FLOOR CEILING SPACE TO BELOW THE SLAB. SEE NEW FLOOR

PLAN FOR NEW SANITARY STACK OFFSET.

4 DEMOLISH EXISTING VENT PIPING FROM SECOND FLOOR CEILING SPACE TO FIRST FLOOR CEILING SPACE. SEE NEW

FLOOR PLAN FOR NEW VENT STACK OFFSET.

5 REMOVE EXISTING VENT PIPING BACK TO VENT STACK. SEE NEW WORK PLAN FOR NEW CONNECTION.

6 REMOVE EXISTING PLUMBING FIXTURE AND ASSOCIATED PIPING COMPLETE.

7 REMOVE EXISTING PLUMBING FIXTURES, AND ALL ASSOCIATED TRIM. REMOVE ALL EXISTING DOMESTIC WATER, VENT

AND SANITARY BACK TO ACTIVE MAINS. SEE NEW WORK PLAN FOR NEW PIPING LAYOUT.

1/4" = 1'-0"

CALLOUT DEMOLITION - TYP.4

1/4" = 1'-0"

CALLOUT DEMOLITION - TYP.5

1/4" = 1'-0"

CALLOUT DEMOLITION - TYP.6

No. Revisions: Date:

1 BID DOCUMENTS 11/04/2022

USMM710143

Snapshot

USMM710143

P-809

P-809

P-704

P-531

P-105

P-105

P-531

P-415

P-415

P-704

P-531

P-531

P-704

P-114

P-415

P-531

P-105

P-531

P-421

P-704

P-531

P-103

P-415

P-608

(E)1 1/4" DHWR(E)1 1/4" DHWR

(E)3" DHW(E)3" DHW

(E)4" DCW(E)4" DCW

(E)2 1/2"

(E)2"

(E)3"

(E)1 1/2"

(E)3"

(E)2 1/2"

(E)2 1/2"

(E)2"

(E)2 1/2"

2 1/2"CW

(E)3/4"

2"HW

1/2"HW

1/2"CW

1/2"HW

2"HW

2"CW

2 1/2"CW

1/2"HW

1/2"CW

2 1/2"CW

1 1/2"HW

1 1/2"HW

1 1/2"HW

1/2"HW

1 1/2"HW

1/2"HW

2"CW

1/2"CW

1/2"HW

1/2"CW

1/2"HW

1/2"CW

1/2"HW

1"CW

1/2"CW

1"CW

1/2"CW

1/2"HW

1/2"HW

1/2"CW

1/2"HW

1/2"CW

1/2"HW

1/2"CW

1/2"HW

1/2"CW

1/2"CW

2"CW

1/2"CW

1/2"HW

1/2"HW

1"CW

1/2"CW

1/2"CW

1/2"HW

1/2"CW

1/2"HW

1/2"CW

1/2"HW

1/2"CW

1/2"HW

1/2"CW

1/2"HW

1"CW

1/2"HW

1/2"CW

1/2"CW

3/4"CW

(E)3/4"

(E)1 1/2"

(E)1/2"

(E)1/2"

(E)1/2"

1"CW

1" DW1" DW

3/4" DW3/4" DW

1" DW1" DW

1" DW1" DW

1/2" DW1/2" DW

1/2" DW1/2" DW

1/2" DW1/2" DW

1/2" DW1/2" DW

1/2" DW1/2" DW

3/4" DW3/4" DW

1/2" DW1/2" DW

3/4"CW

2"CW

1 1/2"CW

P-812

(E)2"

(E)2"

P-528

1/2" DW1/2" DW

1/2" DW1/2" DW

1" DW1" DW

2 1/2"CW

2"HW

2"HW

2 1/2"CW 2 1/2"CW

2"HW

1 1/2"HW

1/2"HW

2 1/2"CW

2 1/2"CW

1 1/2"HW

(E)4"

SEE P5.02 FOR

CONTINUATION

1 1/2" DHW1 1/2" DHW

1 1/2" DHW1 1/2" DHW

1/2" DHW1/2" DHW

P-532

SEE P5.02 FOR

CONTINUATION

SEE P5.02 FOR

CONTINUATION

P-505

P-532

2" DCW2" DCW

1 1/2" DHW1 1/2" DHW

1 1/2"HW

2 1/2" DCW2 1/2" DCW

1/2" DCW1/2" DCW

1 1/2" DHW1 1/2" DHW

2 1/2" DCW2 1/2" DCW

1 1/2" DHW1 1/2" DHW

1 1/2" DCW1 1/2" DCW

1 1/2" DHW1 1/2" DHW

1/2" DHW1/2" DHW

1/2" DCW1/2" DCW

1/2" DCW1/2" DCW

1 1/2" DHW1 1/2" DHW

1/2" DCW1/2" DCW

1/2"HW

1"CW

2 1/2"CW

2 1/2"CW

2"CW

1/2"HW

RPZ

RPZ

1 1/2"HW

WHA

WHA

WHA

1"CW

WHA

WHA

P-708

1/2" DCW1/2" DCW

1/2" DHW1/2" DHW

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1100 Boulders Pkwy | Suite 503 Richmond, VA 23225

804.355.2067

A u to d e s k D o c s /M t H o m e

I s o la ti o n W a rd

D /W

S P

M t H o m e

D rv t

/7 /2

:1

:5

P

M

P5.01

WATER RISER DIAGRAM - PART A

11/04/2022 IGM TIP

RENOVATE D-WING FOR ISOLATION

WARD

621-20-107

MOUNTAIN HOME, TENNESSEE

BID DOCUMENTSJAMES H.

QUILLEN VA

MEDICAL

CENTER

Approved: Owner

WATER RISER DIAGRAM- PART A

No. Revisions: Date:

1 BID DOCUMENTS 11/04/2022

USMM710143

Snapshot

USMM710143

P-105

P-701

P-528 P-415

P-531

P-415P-105

P-704

P-531

P-704

P-531

P-105

P-415

P-531

P-105

P-531

P-704

P-415

P-704 P-531

P-105 P-415

P-531

P-809

P-532

P-531

P-415

P-105

P-105 P-704

P-531

P-704 P-415 P-809

P-531

P-531

P-105 P-704

P-415

P-704

P-531

P-415

P-809

2"CW

1 1/2"HW

1 1/2"HW

1/2"CW

1 1/2"HW

1/2"HW

1/2"CW

1 1/2"HW

1 1/2"HW

1"CW

1/2"CW

1/2"HW

1/2"HW

1/2"CW

1/2"HW

1/2"CW

1/2"CW

1"CW

1"CW

1/2"CW

1/2"HW

1/2"CW

1/2"CW

1/2"HW

1/2"HW

1/2"CW

2"CW

2"CW

1 1/2"CW

1/2"CW

1/2"HW

1/2"CW

1/2"HW

1/2"CW

1"CW

1/2"CW

1/2"HW

3/4"HW

1/2"HW

1 1/4"HW

1 1/4"HW

1 1/4"HW

1"HW

3/4"HW

1"HW

1/2"CW

1/2"HW

1/2"CW

1/2"CW

1/2"HW

1 1/4"HW

1 1/4"HW

2"CW

2"CW

1/2"CW

1/2"HW

1/2"HW

1/2"CW

1"CW

1/2"HW

1/2"CW

1 1/2"HW

1/2"CW

1 1/2"CW

1 1/2"HW

1/2"HW

1/2"CW

1/2"CW

1/2"CW

1"CW

1/2"HW

1/2"CW

1/2"HW

1/2"CW

1 1/4"HW

2"CW

2"CW

1/2"CW

1/2"HW

1/2"CW

1"CW

1/2"HW

1/2"HW

1/2"CW

1/2"CW

1/2"HW

1"CW

1/2"CW

1/2"HW

1"CW

1/2"CW

1/2"CW

1/2"CW

1/2"HW

1/2"CW 1/2"HW

1/2"CW

1/2"HW

1/2"CW

1"CW

1/2"HW

1 1/4"HW

1 1/4"HW

1/2"CW

1/2"HW

1/2"CW

1/2"HW

1/2"CW

1/2"HW

3/4" DW3/4" DW

3/4" DW3/4" DW

1/2" DW1/2" DW

1/2" DW1/2" DW

1/2" DW1/2" DW

3/4" DW3/4" DW

1/2" DW1/2" DW

1/2" DW1/2" DW

1/2" DW1/2" DW

1/2" DW1/2" DW

1/2" DW1/2" DW

3/4" DW3/4" DW

1 1/2"CW

2"CW 1 1/2"HW

2"CW

1 1/4"HW

2"CW

1 1/2"CW

2"CW

2"CW

1 1/2"CW

2"CW

2"CW

P-812

3/4" DHWR3/4" DHWR

1/2"CW

1 1/4"HW

1/2"CW

2"CW

2"CW

3/4"HW

1 1/2"HW

1 1/2"HW

2"CW

1 1/2"HW

1 1/2"HW

1 1/4"HW

1/2"CW

2"CW

SEE P5.01 FOR

CONTINUATION

(E)3/4" DHWR(E)3/4" DHWR

P-531

P-105

P-531

2" DCW2" DCW

2" DCW2" DCW

1/2" DW1/2" DW

SEE P5.01 FOR

CONTINUATION

SEE P5.01 FOR

CONTINUATION

1 1/4" DHW1 1/4" DHW

2"CW

3/4"HW

1 1/4"HW

1/2"HW

1/2"HW

1/2"HW

WHA

WHA

WHA

1"CW

WHA

WHA

WHA

WHA

WHA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1100 Boulders Pkwy | Suite 503 Richmond, VA 23225

804.355.2067

A u to d e s k D o c s /M t H o m e

I s o la ti o n W a rd

D /W

S P

M t H o m e

D rv t

/7 /2

:1

:5

P

M

P5.02

WATER RISER DIAGRAM - PART B

11/04/2022 IGM TIP

RENOVATE D-WING FOR ISOLATION

WARD

621-20-107

MOUNTAIN HOME, TENNESSEE

BID DOCUMENTSJAMES H.

QUILLEN VA

MEDICAL

CENTER

Approved: Owner

WATER RISER DIAGRAM - PART B

No. Revisions: Date:

1 BID DOCUMENTS 11/04/2022

USMM710143

Snapshot

USMM710143

P-809

P-704

P-531 P-105

P-105 P-531P-415

P-415 P-704

P-531

P-531

P-704

P-114

P-415

P-531

P-105

P-531

P-421

P-704

P-531 P-103

P-415

P-608

2" V2" V

2" SAN2" SAN 2" SAN2" SAN

2" V2" V

2" V2" V

3" SAN3" SAN

2" SAN2" SAN

4" SAN4" SAN

2" V2" V

2" V2" V

2" V2" V

2" V2" V

2" V2" V

2" V2" V

2" SW2" SW

2" SW2" SW

2" V2" V

4" V4" V

2" V2" V

2" V2" V

4" V4" V

4" V4" V

2" V2" V

2" V2" V

4" V4" V

4" V4" V 2" V2" V

2" SAN2" SAN

2" V2" V

2" V2" V

2" V2" V

2" V2" V

2" V2" V

2" SAN2" SAN

4" V4" V

2" V2" V 4" V4" V

2" V2" V 2" V2" V

2" V2" V

2" V2" V

4" V4" V

2" V2" V

2" V2" V

2" V2" V

2" V2" V

(E)4" V(E)4" V

(E)3" V(E)3" V

(E)4" SAN(E)4" SAN

(E)2" SAN(E)2" SAN

(E)2" V(E)2" V

(E)2" V(E)2" V

2" SAN2" SAN

4" SAN4" SAN

2" SAN2" SAN

2" SAN2" SAN

2" SAN2" SAN

2" SAN2" SAN(E)3" SAN(E)3" SAN

(E)2" SAN(E)2" SAN

(E)2" SAN(E)2" SAN

(E)2" SAN(E)2" SAN

2" SAN2" SAN

2" SW2" SW

2" SW2" SW

(E)2" VTR

4" VTR

(E)2" VTR

2" VTR

4" VTR

(E)2" VTR

(E)2" VTR

(E)4" VTR

4" VTR

(E)2" VTR

P-528

4" V4" V

2" V2" V

2" SW2" SW

2" V2" V

4" V4" V

(E)4" SAN(E)4" SAN

4" SAN4" SAN

2" SAN2" SAN

2" SAN2" SAN

2" SAN2" SAN

3" SAN3" SAN

2" SAN2" SAN

2" SAN2" SAN

4" SAN4" SAN

2" SAN2" SAN

4" SAN4" SAN

(E)2" V(E)2" V

2" V2" V

2" V2" V

2" V2" V

2" SAN2" SAN

2" V2" V

2" V2" V

2" V2" V 4" V4" V

4" V4" V

2" V2" V

4" V4" V

2" SAN2" SAN

(E)4" SAN(E)4" SAN(E)4" V(E)4" V

(E)2" V(E)2" V

(E)2" V(E)2" V

(E)2" V(E)2" V

2" V2" V

2" V2" V

(E)2" SAN(E)2" SAN

(E)2" V(E)2" V

(E)4" V(E)4" V

(E)4" SAN(E)4" SAN

(E)2" SAN(E)2" SAN(E)3" SAN(E)3" SAN

(E)2" V(E)2" V

(E)2" V(E)2" V

(E)2" SAN(E)2" SAN

(E)4" V(E)4" V

(E)2" V(E)2" V (E)4" V(E)4" V

(E)4" SAN(E)4" SAN

(E)4" SAN(E)4" SAN

(E)4" V(E)4" V

(E)2" V(E)2" V

(E)2" SAN(E)2" SAN

(E)4" V(E)4" V

(E)2" V(E)2" V

(E)3" V(E)3" V

(E)2" V(E)2" V

2" VTR

(E)4" VTR

(E)2" VTR(E)2" VTR

SEE P5.04 FOR

CONTINUATION

2" VTR

(E)4" VTR

(E)2" VTR

(E)2" V(E)2" V

2" SW2" SW

4" V4" V

(E)2" SAN(E)2" SAN

2" SW2" SW

(E)2" VTR

(E)3" VTR

(E)4" VTR

(E)4" VTR

(E)4" V(E)4" V

(E)4" V(E)4" V

3" SAN3" SAN

(E)4" V(E)4" V

(E)2" SAN(E)2" SAN

4" VTR

4" V4" V

P-505P-532

P-532

4" VTR

FD-D

FD-D

FD-D

FD-D

(E)2" V(E)2" V

2" SAN2" SAN

4" V4" V

4" SAN4" SAN

2" V2" V

3" SAN3" SAN

4" V4" V

2" V2" V

4" V4" V

4" SAN4" SAN

4" SAN4" SAN

3" SAN3" SAN

3" SAN3" SAN

2" SAN2" SAN

2" SAN2" SAN

2" V2" V

2" V2" V

4" V4" V

2" V2" V

SEE P5.04 FOR

CONTINUATION

2" SAN2" SAN

2" SAN2" SAN

4" SAN4" SAN

2" SAN2" SAN

2" SAN2" SAN

4" SAN4" SAN

(E)4" SAN(E)4" SAN

(E)2" V(E)2" V

(E)4" V(E)4" V

4" SAN4" SAN

4" SAN4" SAN

2" SAN2" SAN

2" V2" V

4" V4" V

4" V4" V 2" V2" V

4" V4" V

4" V4" V

4" VTR

4" VTR

4" SAN4" SAN

4" SAN4" SAN

4" SAN4" SAN

2" V2" V

3" SAN3" SAN

4" V4" V

4" V4" V

2" V2" V

2" V2" V 4" V4" V

4" VTR

4" SAN4" SAN

3" SAN3" SAN

2" V2" V

2" V2" V2" V2" V2" V2" V

2" V2" V

2" V2" V

2" V2" V

(E)2" SAN(E)2" SAN

2" V2" V

(E)4" V(E)4" V

4" SAN4" SAN

3" SAN3" SAN

P-708

2" SAN2" SAN

2" V2" V

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1100 Boulders Pkwy | Suite 503 Richmond, VA 23225

804.355.2067

A u to d e s k D o c s /M t H o m e

I s o la ti o n W a rd

D /W

S P

M t H o m e

D rv t

/7 /2

:1

:0

P

M

P5.03

SANITARY RISER DIAGRAM - PART

A

11/04/2022 IGM TIP

RENOVATE D-WING FOR ISOLATION

WARD

621-20-107

MOUNTAIN HOME, TENNESSEE

BID DOCUMENTSJAMES H.

QUILLEN VA

MEDICAL

CENTER

Approved: Owner

SANITARY RISER DIAGRAM - PART A

No. Revisions: Date:

1 BID DOCUMENTS 11/04/2022

USMM710143

Snapshot

USMM710143

P-105

P-701

P-528P-415

P-531

P-415 P-105

P-704

P-531

P-704

P-531

P-105

P-415 P-531

P-105

P-531

P-704

P-415

P-704 P-531

P-105

P-415

P-531

P-809

P-532 P-531

P-415

P-105

P-105

P-704

P-531

P-704

P-415

P-809

P-531

P-531

P-105

P-704

P-415

P-704

P-105

P-531

P-415

P-809

2" V2" V

2" V2" V

2" V2" V

4" V4" V

4" V4" V

4" V4" V

2" V2" V 2" V2" V

2" V2" V

2" V2" V 2" V2" V

2" V2" V

2" V2" V

2" V2" V

2" V2" V

2" V2" V

2" V2" V

2" V2" V

2" V2" V

2" V2" V

2" V2" V

2" V2" V

4" V4" V

4" V4" V

4" V4" V

4" V4" V

2" V2" V

2" V2" V

2" V2" V

2" V2" V

2" V2" V

2" V2" V 2" V2" V

2" V2" V

2" V2" V

2" V2" V 2" V2" V

2" V2" V

2" V2" V

4" V4" V

2" V2" V

2" V2" V

4" V4" V

2" V2" V

2" V2" V

4" V4" V

2" V2" V

2" V2" V

2" SAN2" SAN

4" SAN4" SAN

(E)4" SAN(E)4" SAN

4" SAN4" SAN

2" SAN2" SAN

2" SAN2" SAN

2" SAN2" SAN

2" SAN2" SAN

4" SAN4" SAN

4" SAN4" SAN

2" SAN2" SAN

2" SAN2" SAN

2" SAN2" SAN

4" SAN4" SAN

2" SAN2" SAN

2" SW2" SW

4" SAN4" SAN

(E)4" SAN(E)4" SAN

2" SAN2" SAN

2" SAN2" SAN

4" SAN4" SAN

2" SAN2" SAN

4" SAN4" SAN

4" SAN4" SAN

2" SAN2" SAN

(E)4" SAN(E)4" SAN

(E)4" SAN(E)4" SAN

2" SAN2" SAN

2" SAN2" SAN

2" SAN2" SAN

(E)4" SAN(E)4" SAN

(E)4" VTR

(E)4" VTR

(E)2" VTR

2" SW2" SW

4" SAN4" SAN

4" SAN4" SAN

4" SAN4" SAN

2" SAN2" SAN

3" SAN3" SAN

3" SAN3" SAN

4" V4" V

2" V2" V

2" V2" V

4" SAN4" SAN

4" SAN4" SAN

2" SAN2" SAN

2" SW2" SW

2" SW2" SW

2" SW2" SW

2" V2" V

2" SAN2" SAN

4" SAN4" SAN

2" V2" V

2" SAN2" SAN

3" SAN3" SAN

4" SAN4" SAN

2" SAN2" SAN

2" V2" V

2" V2" V 2" V2" V

2" V2" V

4" V4" V

2" V2" V

2" V2" V

4" SAN4" SAN

2" SAN2" SAN

2" SAN2" SAN

2" V2" V

2" V2" V

2" SAN2" SAN

4" V4" V

4" SAN4" SAN

(E)4" V(E)4" V

(E)4" V(E)4" V

(E)4" V(E)4" V

(E)4" V(E)4" V

(E)4" SAN(E)4" SAN

(E)4" V(E)4" V

(E)4" V(E)4" V

(E)4" V(E)4" V

(E)4" SAN(E)4" SAN

(E)4" SAN(E)4" SAN

(E)4" SAN(E)4" SAN

(E)4" V(E)4" V(E)4" SAN(E)4" SAN

(E)4" V(E)4" V

(E)4" V(E)4" V

(E)4" V(E)4" V

(E)4" V(E)4" V

(E)4" SAN(E)4" SAN

(E)4" V(E)4" V

(E)2" V(E)2" V

(E)4" V(E)4" V

4" VTR

SEE P5.03 FOR

CONTINUATION

(E)4" VTR

(E)4" SAN(E)4" SAN

2" V2" V

(E)4" V(E)4" V

(E)4" V(E)4" V

(E)4" V(E)4" V

(E)4" V(E)4" V

(E)4" V(E)4" V

2" V2" V

3" SAN3" SAN

3" SAN3" SAN

FD-D

FD-D

FD-D

FD-D

FD-D

4" SAN4" SAN

FD-D

FD-D

FD-D

FD-D

2" V2" V

(E)4" SAN(E)4" SAN

4" SAN4" SAN

3" SAN3" SAN

4" SAN4" SAN

4" SAN4" SAN

4" SAN4" SAN

2" SAN2" SAN

4" SAN4" SAN

4" SAN4" SAN

2" V2" V

2" SW2" SW

2" SW2" SW

2" SW2" SW

4" SAN4" SAN

4" SAN4" SAN

(E)4" SAN(E)4" SAN

4" SAN4" SAN

4" SAN4" SAN

2" V2" V

2" V2" V

4" V4" V

2" V2" V

2" V2" V

2" V2" V

2" V2" V

2" V2" V

4" SAN4" SAN

2" V2" V

2" V2" V

2" V2" V

2" V2" V

2" SAN2" SAN 2" SAN2" SAN

SEE P5.03 FOR

CONTINUATION

2" V2" V

2" V2" V

2" V2" V

2" SAN2" SAN

3" SAN3" SAN

FD-D

3" SAN3" SAN

4" SAN4" SAN

2" SW2" SW

2" SW2" SW

2" SW2" SW

2" SW2" SW

2" V2" V

2" V2" V

4" SAN4" SAN

2" SAN2" SAN

4" SAN4" SAN

3" SAN3" SAN

P-531

P-531

Project Number

Building Number

Draw…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .