E3.02 - SECOND FLOOR LIGHTING NEW WORK PLAN.pdf

PDF 739 KB Posted

Attached to
Y1DZ--Project 621-20-107 Renovate Bldg. -200_Wing D2 for Isolation Ward
Solicitation number
36C24923R0030
Issued by

About this file

This document package includes a lighting plan drawing and related federal contract opportunity notice. The lighting plan drawing depicts new lighting work for the second floor of a building renovation project. It shows fixture locations, circuiting details, and notes specifying control integration and coordination with other building systems.

The associated federal opportunity is a solicitation issued by the Department of Veterans Affairs for project number 621-20-107 to renovate building 200 at the James H. Quillen VAMC in Mountain Home, Tennessee to create an isolation ward. The work includes renovations to the D wing of the building as depicted in the lighting plan drawing. The solicitation number is 36C24923R0030 and responses were due on an unspecified date.

View the file

Other files

File Type Posted
07.09_AE403 - CASEWORK ELEVATIONS.pdf PDF
P6.01 - PLUMBING DETAILS.pdf PDF
08.01_AI601 - FINISH SCHEDULE1.pdf PDF
08.00_AI101 - SECOND FLOOR FINISH PLAN-1.pdf PDF
FXD2.02 - SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN.pdf PDF
08.05_WP101 - WALL PROTECTION PLAN.pdf PDF
P2.01 - FIRST FLOOR PLUMBING NEW WORK PLAN 02.pdf PDF
P3.02 - SECOND FLOOR MEDICAL GAS NEW WORK PLAN.pdf PDF
000110 Table of Contents.pdf PDF
FX2.02 - SECOND FLOOR FIRE PROTECTION NEW WORK PLAN.pdf PDF
102600 Wall and Door Protection.pdf PDF
FX1.00 - FIRE PROTECTION LEGEND AND NOTES.pdf PDF
07.08_AE402 - CASEWORK ELEVATIONS.pdf PDF
36C24923R0030 0006.docx DOCX document
Addendum 02 Summary R1.pdf PDF
07.05_AC141 - SECOND FLOOR REFLECTED CEILING PLAN.pdf PDF
07.07_AE401 - ENLARGED RESTROOM PLANS AND ELEVATIONS.pdf PDF
087100 Door Hardware.pdf PDF
36C24923R0030 0005.docx DOCX document
M2-02 - SECOND FLOOR HVAC NEW WORK PLAN.pdf PDF
36C24923R0030 0004.docx DOCX document
08.01_AI601 - FINISH SCHEDULE.pdf PDF
08.00_AI101 - SECOND FLOOR FINISH PLAN.pdf PDF
09.04_QT403 - ENLARGED EQUIPMENT PLAN.pdf PDF
36C24923R0030 0003.docx DOCX document
36C24923R0030 0002.docx DOCX document
36C24923R0030 0001.docx DOCX document
CALCULATION OF SELF PERFORMED WORK.docx DOCX document
Contractor EMR Certification Form.docx DOCX document
C27_UUpdated 621-20-107 Drawings Part 3 of 3.pdf PDF
C27_Updated 621-20-107 Drawings Part 2 of 3.pdf PDF
C27 Updated 621-20-107 Drawings Part 1 of 3.pdf PDF
UEI _ TAX ID.docx DOCX document
36C24923R0030_1.docx DOCX document
C28_621-20-107 Specifications.pdf PDF
P07_Wage Determination_621-20-107 Renovate Bldg.-200 - Wing D2 for Isolation Ward.pdf PDF
RFI Form.docx DOCX document
PERFORMANCE QUESTIONNAIRE.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4 4

4 4

4 4

29A-C

30.1

32.8

P O N M L K I H G F E D C B.5 B A.5 A

2DN1

2DC1

P D D

D

V

2DN2

2DC2

NL

NL

V

V

NL

NL

V

NL

V

V

NL NL

NL

V

V

NL

NL

V

V V

NL

NL

MCC 2D

V

V

X1 X2

X1

X2

X1

X1

TYPICALL CONTROLS LAYOUT

FOR ALL PATIENT ROOMS

D4

D4

D4

D4

D4

G2 G2

D4

D4

G2

D4 D4

D4 G2

D4

G2

D4

G2 G2 G2 G2

D4 D4

D4G2 G2

D4 D4

D4

D4

G2

G2 G2

D4

D4

D4

D4

D4

G2 G2

G2 G2

D4

G2 G2 G2

D4

G2

D4

D4

D4

G2

D4

D4

D4

D4

D4 D4

G2 G2

D4

G2G2

D4

G2

D4

D4

D4 D4

G2

G2 G2 G2

D4

D4 D4

D4

D4

G2 G2

D4

G2 G2

D4

G2

G2

G2

G2 G2 G2 G2

G2G2

G2

G2

G2 G2 G2

G2

G2

G2

G2

G2 G2

G2

G2 B4

B4

G2

G2

G2

G2

G2

G2

G2

G2

G2 G2

G2

G2 G2

G2

G2 G2

G2 G2

D4 D4

G2 D4

D4D4

G2

D4

D4

D4

G2 G2 G2

D4

G2D4

D4

G2

D4

G2 G2

D4 D4

G2G2

D4 D4

D4

G2

D4

D4

G2 G2

D4 D4

D4

D4 D4

G2G2

G2 G2 G2 G2 G2 G2 G2 G2 G2 G2

G2 G2 G2 G2 G2 G2 G2 G2 G2 G2 G2

D

P

D D

D

D D

P

D D

D

P

P

D

D D

D

P P

D D

D D

P

D

D D

D

P

D D

D D

D

P

P

D D

D D

D D

D

P

B4 B4

G2

D4

D4

ISO ROOM 1

D201B

ISO ROOM 2

D202B

ISO ROOM 3

D203B

ISO ROOM 4

D204B

ISO ROOM 5

D205B

ISO ROOM 6

D206B

ISO ROOM 7

D207B

ISO ROOM 8

D208B

ISO ROOM 9

D209B

ISO ROOM 10

D210B

ISO ROOM 11

D211B

ISO ROOM 12

D212B

TOILET

D201C

ANTEROOM

D201A

TOILET

D202C

ANTEROOM

D202A

TOILET

D204C

TOILET

D203C

ANTEROOM

D203A

ANTEROOM

D204A

ANTEROOM

D205A

TOILET

D205C

TOILET

D-206C

ANTEROOM

D206A

ANTEROOM

D207A

TOILET

D208C

TOILET

D207C

ANTEROOM

D208A

ANTEROOM

D209A

TOILET

D210C

TOILET

D209C

ANTEROOM

D210A

ANTEROOM

D211A

TOILET

D212C

TOILET

D211C

ANTEROOM

D212A

CHART ALCOVE

D201D

CHART ALCOVE

D203D

CHART ALCOVE

D205D

CHART ALCOVE

D207D

CHART ALCOVE

D209D

CHART ALCOVE

D211D

EQUIPMENT

D214

ELECTRICAL

D233

NOURISHMENT

D215 HUDDLE

D216

CLEAN

D219

LINEN

D220

SOILED

D221

NURSE STATION

D223

OIT

D222

MED

D224 NURSE MANAGER

D227

LAB ALCOVE

D226

BIOMED

D235

MECHANICAL

H.A.C.

STAIRS

S1

STAFF TOILET

D230

LOUNGE

D228

CORRIDOR

D2C3

RESTROOM

D218

ALCOVE

D217

ALCOVE

D213

WOMEN'S LOCKER

D231

MEN'S LOCKER

D232

STORAGE

D229

X-RAY ALCOVE

D225

CORRIDOR

D2C5

CORRIDOR

C6

CORRIDOR

D2C4B

CORRIDOR

D2C2

CORRIDOR

D2C1

CONSULT

D234

CORRIDOR

D2C3B

CORRIDOR

D2C3A

VESTIBULE

D236

G2G2

G2 G2

G2 G2

OIT

BIO

D D

D

G2

D4 D4

D4

D4

D4

G2 G2G2

E5.00

DD D

V

D4

5 5 5

7 7 7 7 7

D

D D D

D

DDDD

A. ALL CEILING MOUNTED ITEMS SHALL BE INSTALLED IN ACCORDANCE WITH

ARCHITECTURAL REFLECTED CEILING PLANS. IF A LOCATION FOR AN ITEM IS

NOT SHOWN ON THE ARCHITECTURAL REFLECTIVE CEILING PLAN, VERIFY

THE EXACT LOCATION OF THE ITEM WITH THE ARCHITECT/ENGINEER PRIOR

TO INSTALLATION. THESE REQUIREMENTS APPLY TO ALL CEILING TYPES IN

ALL AREAS.

B. REFER TO ARCHITECTURAL, STRUCTURAL AND MECHANICAL DRAWINGS FOR

GUIDANCE AND VERIFICATION OF DIMENSIONS, CEILING HEIGHTS, CEILING

TYPES, ACCESS PANELS, DOOR SWINGS, AND LOCATIONS OF DUCTWORK,

PIPES, STRUCTURAL STEEL, EQUIPMENT, CABINET WORK AND FURNITURE.

C. INSTALL WALL LIGHTING FIXTURES, WALL SWITCHES AND OTHER WALL

MOUNTED EQUIPMENT IN STRICT COORDINATION WITH DETAIL, SECTIONS,

ELEVATIONS AND ROOM FINISHES SHOWN ON THE ARCHITECTURAL

DRAWINGS.

D. ELECTRICAL CONTRACTOR SHALL WEAR GLOVES AT ALL TIMES WHILE

HANDLING AND INSTALLING LIGHTING FIXTURES. FINGERPRINT MARKS ON

SURFACES OF FIXTURES SHALL BE UNACCEPTABLE FOR INSTALLATION.

E. LOW VOLTAGE SWITCHES SHOWN IN CONJUNCTION WITH OCCUPANCY

SENSORS SHALL ALLOW FOR OVERRIDE OF OCCUPANCY SENSOR OR ALLOW

FOR OCCUPANCY SENSOR VACANCY OPERATION. OCCUPANCY SENSORS IN

ROOMS WITH DIMMERS SHALL BE INSTALLED IN SERIES TO ALLOW SHUTOFF

OF FIXTURES IN VACANCY MODE.

F. LOW VOLTAGE SWITCH MAY BE UTILIZED BY SOME MANUFACTURERS FOR

INTEGRATION WITH OCCUPANCY SENSOR CONTROL, OTHERS MAY UTILIZE

LINE VOLTAGE. COORDINATE WITH FINAL VENDOR SELECTION.

G. COORDINATE EXACT LOCATION OF OCCUPANCY SENSOR CONTROLS WITH

MECHANICAL PLAN SO IT IS NOT IN THE PATH OF DIRECT FLOW OF AIR

VENTILATION OUTLETS, WINDOWS OR FANS.

H. LIGHTING IN MECHANICAL AND I.T. ROOMS SHALL BE COORDINATED WITH

ALL EQUIPMENT AND ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR

LOCATION LIGHTING TO NOT CONFLICT WITH EQUIPMENT INSTALLED.

I. NOT USED.

J. CONNECT EXIT SIGNS AND LIFE SAFETY FIXTURES TO

UNSWITCHED HOT WIRE UNLESS NOTED OTHERWISE.

K. JUNCTION BOXES IDENTIFIED IN TYPICAL ROOMS ARE

REPRESENTATIVE OF POWER CONNECTIONS TO LIGHT

FIXTURES. REFER TO E5 SERIES ENLARGEMENTS FOR

DETAILS.

L. LOCATE DAYLIGHT SENSORS AT A DISTANCE FROM THE

EXTERIOR WINDOW EQUAL TO TWO TIMES THE HEIGHT OF

THE EXTERIOR WINDOW, AND AT THE MIDPOINT OF THE

PERIMETER WALL IN THE ROOM.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

G E N E R A L P L A N N O T E S

KEYPLAN

1100 Boulders Pkwy | Suite 503 Richmond, VA 23225

804.355.2067

A u to d e s k D o c s /M t H o m e

I s o la ti o n W a rd

D /W

S P

M t H o m e

D rv t

/1

/2

:0

:3

P

M

E3.02

SECOND FLOOR LIGHTING NEW

WORK PLAN

11/04/2022 JPG SAH

RENOVATE D-WING FOR ISOLATION

WARD

621-20-107

MOUNTAIN HOME, TENNESSEE

BID DOCUMENTSJAMES H.

QUILLEN VA

MEDICAL

CENTER

Approved: Owner

N

1/8" = 1'-0"

Level 2 New Work Lighting Plan

D R A W I N G N O T E S :

1 LIGHTING CONTROL DEVICE. REFERENCE SEQUENCE OF OPERATIONS ON E1.01 FOR ADDITIONAL INFORMATION

(TYPICAL)

2 IN ROOMS OR AREAS WHERE A SINGLE LIGHTING CONTROL DEVICE, THAT DEVICE SHALL CONTROL ALL NON-LIFE

SAFETY LIGHT FIXTURES WITHIN THE ROOM OR AREA. (TYPICAL)

3 CONNECT ALL NON-EMERGENCY AND NON-CRITICAL LIGHTS TO EXISTING LIGHTING CIRCUIT SERVING THIS AREA IN

PANEL 2ENH

4 CONNECT ALL CRITICAL BRANCH CIRCUITS TO EXISTING LIGHTING CIRCUIT SERVING THIS AREA IN PANEL 2ECH

5 CONNECT ALL EMERGENCY LIGHTS AHEAD OF LOCAL CONTROLS TO EXISTING CIRCUIT SERVING THIS AREA IN PANEL

2ELSH.

6 ALL LIGHTING FIXTURES IN THE STAIRS ARE EXISTING TO REMAIN.

7 REFER TO DETAIL 5 ON E5.00 FOR TYPICAL LIGHTING CONTROLS IN ALL PATIENT ROOMS.

No. Revisions: Date:

1 BID DOCUMENTS 11/04/2022

2 ADDENDUM 02 07/13/2023

07/13/2023

Sheets
E3.02 - SECOND FLOOR LIGHTING NEW WORK PLAN

File details come from the government source that posted it. Updated .