E3.02 - SECOND FLOOR LIGHTING NEW WORK PLAN.pdf
PDF 739 KB Posted
- Solicitation number
- 36C24923R0030
About this file
This document package includes a lighting plan drawing and related federal contract opportunity notice. The lighting plan drawing depicts new lighting work for the second floor of a building renovation project. It shows fixture locations, circuiting details, and notes specifying control integration and coordination with other building systems.
The associated federal opportunity is a solicitation issued by the Department of Veterans Affairs for project number 621-20-107 to renovate building 200 at the James H. Quillen VAMC in Mountain Home, Tennessee to create an isolation ward. The work includes renovations to the D wing of the building as depicted in the lighting plan drawing. The solicitation number is 36C24923R0030 and responses were due on an unspecified date.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4 4
4 4
4 4
29A-C
30.1
32.8
P O N M L K I H G F E D C B.5 B A.5 A
2DN1
2DC1
P D D
D
V
2DN2
2DC2
NL
NL
V
V
NL
NL
V
NL
V
V
NL NL
NL
V
V
NL
NL
V
V V
NL
NL
MCC 2D
V
V
X1 X2
X1
X2
X1
X1
TYPICALL CONTROLS LAYOUT
FOR ALL PATIENT ROOMS
D4
D4
D4
D4
D4
G2 G2
D4
D4
G2
D4 D4
D4 G2
D4
G2
D4
G2 G2 G2 G2
D4 D4
D4G2 G2
D4 D4
D4
D4
G2
G2 G2
D4
D4
D4
D4
D4
G2 G2
G2 G2
D4
G2 G2 G2
D4
G2
D4
D4
D4
G2
D4
D4
D4
D4
D4 D4
G2 G2
D4
G2G2
D4
G2
D4
D4
D4 D4
G2
G2 G2 G2
D4
D4 D4
D4
D4
G2 G2
D4
G2 G2
D4
G2
G2
G2
G2 G2 G2 G2
G2G2
G2
G2
G2 G2 G2
G2
G2
G2
G2
G2 G2
G2
G2 B4
B4
G2
G2
G2
G2
G2
G2
G2
G2
G2 G2
G2
G2 G2
G2
G2 G2
G2 G2
D4 D4
G2 D4
D4D4
G2
D4
D4
D4
G2 G2 G2
D4
G2D4
D4
G2
D4
G2 G2
D4 D4
G2G2
D4 D4
D4
G2
D4
D4
G2 G2
D4 D4
D4
D4 D4
G2G2
G2 G2 G2 G2 G2 G2 G2 G2 G2 G2
G2 G2 G2 G2 G2 G2 G2 G2 G2 G2 G2
D
P
D D
D
D D
P
D D
D
P
P
D
D D
D
P P
D D
D D
P
D
D D
D
P
D D
D D
D
P
P
D D
D D
D D
D
P
B4 B4
G2
D4
D4
ISO ROOM 1
D201B
ISO ROOM 2
D202B
ISO ROOM 3
D203B
ISO ROOM 4
D204B
ISO ROOM 5
D205B
ISO ROOM 6
D206B
ISO ROOM 7
D207B
ISO ROOM 8
D208B
ISO ROOM 9
D209B
ISO ROOM 10
D210B
ISO ROOM 11
D211B
ISO ROOM 12
D212B
TOILET
D201C
ANTEROOM
D201A
TOILET
D202C
ANTEROOM
D202A
TOILET
D204C
TOILET
D203C
ANTEROOM
D203A
ANTEROOM
D204A
ANTEROOM
D205A
TOILET
D205C
TOILET
D-206C
ANTEROOM
D206A
ANTEROOM
D207A
TOILET
D208C
TOILET
D207C
ANTEROOM
D208A
ANTEROOM
D209A
TOILET
D210C
TOILET
D209C
ANTEROOM
D210A
ANTEROOM
D211A
TOILET
D212C
TOILET
D211C
ANTEROOM
D212A
CHART ALCOVE
D201D
CHART ALCOVE
D203D
CHART ALCOVE
D205D
CHART ALCOVE
D207D
CHART ALCOVE
D209D
CHART ALCOVE
D211D
EQUIPMENT
D214
ELECTRICAL
D233
NOURISHMENT
D215 HUDDLE
D216
CLEAN
D219
LINEN
D220
SOILED
D221
NURSE STATION
D223
OIT
D222
MED
D224 NURSE MANAGER
D227
LAB ALCOVE
D226
BIOMED
D235
MECHANICAL
H.A.C.
STAIRS
S1
STAFF TOILET
D230
LOUNGE
D228
CORRIDOR
D2C3
RESTROOM
D218
ALCOVE
D217
ALCOVE
D213
WOMEN'S LOCKER
D231
MEN'S LOCKER
D232
STORAGE
D229
X-RAY ALCOVE
D225
CORRIDOR
D2C5
CORRIDOR
C6
CORRIDOR
D2C4B
CORRIDOR
D2C2
CORRIDOR
D2C1
CONSULT
D234
CORRIDOR
D2C3B
CORRIDOR
D2C3A
VESTIBULE
D236
G2G2
G2 G2
G2 G2
OIT
BIO
D D
D
G2
D4 D4
D4
D4
D4
G2 G2G2
E5.00
DD D
V
D4
5 5 5
7 7 7 7 7
D
D D D
D
DDDD
A. ALL CEILING MOUNTED ITEMS SHALL BE INSTALLED IN ACCORDANCE WITH
ARCHITECTURAL REFLECTED CEILING PLANS. IF A LOCATION FOR AN ITEM IS
NOT SHOWN ON THE ARCHITECTURAL REFLECTIVE CEILING PLAN, VERIFY
THE EXACT LOCATION OF THE ITEM WITH THE ARCHITECT/ENGINEER PRIOR
TO INSTALLATION. THESE REQUIREMENTS APPLY TO ALL CEILING TYPES IN
ALL AREAS.
B. REFER TO ARCHITECTURAL, STRUCTURAL AND MECHANICAL DRAWINGS FOR
GUIDANCE AND VERIFICATION OF DIMENSIONS, CEILING HEIGHTS, CEILING
TYPES, ACCESS PANELS, DOOR SWINGS, AND LOCATIONS OF DUCTWORK,
PIPES, STRUCTURAL STEEL, EQUIPMENT, CABINET WORK AND FURNITURE.
C. INSTALL WALL LIGHTING FIXTURES, WALL SWITCHES AND OTHER WALL
MOUNTED EQUIPMENT IN STRICT COORDINATION WITH DETAIL, SECTIONS,
ELEVATIONS AND ROOM FINISHES SHOWN ON THE ARCHITECTURAL
DRAWINGS.
D. ELECTRICAL CONTRACTOR SHALL WEAR GLOVES AT ALL TIMES WHILE
HANDLING AND INSTALLING LIGHTING FIXTURES. FINGERPRINT MARKS ON
SURFACES OF FIXTURES SHALL BE UNACCEPTABLE FOR INSTALLATION.
E. LOW VOLTAGE SWITCHES SHOWN IN CONJUNCTION WITH OCCUPANCY
SENSORS SHALL ALLOW FOR OVERRIDE OF OCCUPANCY SENSOR OR ALLOW
FOR OCCUPANCY SENSOR VACANCY OPERATION. OCCUPANCY SENSORS IN
ROOMS WITH DIMMERS SHALL BE INSTALLED IN SERIES TO ALLOW SHUTOFF
OF FIXTURES IN VACANCY MODE.
F. LOW VOLTAGE SWITCH MAY BE UTILIZED BY SOME MANUFACTURERS FOR
INTEGRATION WITH OCCUPANCY SENSOR CONTROL, OTHERS MAY UTILIZE
LINE VOLTAGE. COORDINATE WITH FINAL VENDOR SELECTION.
G. COORDINATE EXACT LOCATION OF OCCUPANCY SENSOR CONTROLS WITH
MECHANICAL PLAN SO IT IS NOT IN THE PATH OF DIRECT FLOW OF AIR
VENTILATION OUTLETS, WINDOWS OR FANS.
H. LIGHTING IN MECHANICAL AND I.T. ROOMS SHALL BE COORDINATED WITH
ALL EQUIPMENT AND ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR
LOCATION LIGHTING TO NOT CONFLICT WITH EQUIPMENT INSTALLED.
I. NOT USED.
J. CONNECT EXIT SIGNS AND LIFE SAFETY FIXTURES TO
UNSWITCHED HOT WIRE UNLESS NOTED OTHERWISE.
K. JUNCTION BOXES IDENTIFIED IN TYPICAL ROOMS ARE
REPRESENTATIVE OF POWER CONNECTIONS TO LIGHT
FIXTURES. REFER TO E5 SERIES ENLARGEMENTS FOR
DETAILS.
L. LOCATE DAYLIGHT SENSORS AT A DISTANCE FROM THE
EXTERIOR WINDOW EQUAL TO TWO TIMES THE HEIGHT OF
THE EXTERIOR WINDOW, AND AT THE MIDPOINT OF THE
PERIMETER WALL IN THE ROOM.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
G E N E R A L P L A N N O T E S
KEYPLAN
1100 Boulders Pkwy | Suite 503 Richmond, VA 23225
804.355.2067
A u to d e s k D o c s /M t H o m e
I s o la ti o n W a rd
D /W
S P
M t H o m e
D rv t
/1
/2
:0
:3
P
M
E3.02
SECOND FLOOR LIGHTING NEW
WORK PLAN
11/04/2022 JPG SAH
RENOVATE D-WING FOR ISOLATION
WARD
621-20-107
MOUNTAIN HOME, TENNESSEE
BID DOCUMENTSJAMES H.
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
N
1/8" = 1'-0"
Level 2 New Work Lighting Plan
D R A W I N G N O T E S :
1 LIGHTING CONTROL DEVICE. REFERENCE SEQUENCE OF OPERATIONS ON E1.01 FOR ADDITIONAL INFORMATION
(TYPICAL)
2 IN ROOMS OR AREAS WHERE A SINGLE LIGHTING CONTROL DEVICE, THAT DEVICE SHALL CONTROL ALL NON-LIFE
SAFETY LIGHT FIXTURES WITHIN THE ROOM OR AREA. (TYPICAL)
3 CONNECT ALL NON-EMERGENCY AND NON-CRITICAL LIGHTS TO EXISTING LIGHTING CIRCUIT SERVING THIS AREA IN
PANEL 2ENH
4 CONNECT ALL CRITICAL BRANCH CIRCUITS TO EXISTING LIGHTING CIRCUIT SERVING THIS AREA IN PANEL 2ECH
5 CONNECT ALL EMERGENCY LIGHTS AHEAD OF LOCAL CONTROLS TO EXISTING CIRCUIT SERVING THIS AREA IN PANEL
2ELSH.
6 ALL LIGHTING FIXTURES IN THE STAIRS ARE EXISTING TO REMAIN.
7 REFER TO DETAIL 5 ON E5.00 FOR TYPICAL LIGHTING CONTROLS IN ALL PATIENT ROOMS.
No. Revisions: Date:
1 BID DOCUMENTS 11/04/2022
2 ADDENDUM 02 07/13/2023
07/13/2023
| Sheets |
| E3.02 - SECOND FLOOR LIGHTING NEW WORK PLAN |
File details come from the government source that posted it. Updated .