This document provides fire protection notes and legends for a federal contract opportunity to renovate D Wing of Building 200 at the James H. Quillen VA Medical Center in Mountain Home, Tennessee to create an isolation ward. The scope of work includes installing a fire sprinkler system and related components. Key requirements are to examine the existing site conditions before submitting a proposal, develop and submit shop drawings, obtain necessary approvals and inspections, properly install sprinkler piping and associated fittings according to NFPA 13 standards, conduct hydraulic testing, coordinate sprinkler locations with other ceiling elements, and provide manuals and certifications. The contractor must also clean debris daily and seal all wall and floor penetrations of fire-rated assemblies. Relevant details cover sprinkler types, water supply information, design criteria, and abbreviations for drawings.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE PROTECTION NOTES
1. BEFORE SUBMITTING A PROPOSAL FOR THE WORK, EACH BIDDER WILL
BE HELD RESPONSIBLE TO HAVE EXAMINED THE EXISTING SITE
CONDITIONS FOR THE WORK INCLUDED UNDER THIS CONTRACT. NO
ALLOWANCE WILL BE MADE SUBSEQUENTLY IN THIS CONNECTION ON
BEHALF OF THE CONTRACTOR FOR ANY ERROR OR NEGLIGENCE ON
THEIR PART.
2. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR THE
DEVELOPMENT AND SUBMITTING OF SHOP DRAWINGS.
3. DESIGN AND INSTALLATION SHALL BE SUBJECT TO FINAL INSPECTION
AND APPROVAL.
4. THE FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR ALL
CUTTING, SEALING, PATCHING, AND PAINTING REQUIRED FOR
INSTALLATION OF THE STANDPIPE SYSTEM. ALL PENETRATIONS OF FIRE-
RATED ASSEMBLIES SHALL BE FIRE STOPPED WITH AN
APPROVED/LISTED FIRE STOPPING METHOD AS PRESCRIBED IN THE
TENNESSEE BUILDING CODE.
5. THE FIRE PROTECTION CONTRACTOR SHALL COMPLETE AND SIGN
CONTRACTOR’S MATERIAL AND TEST CERTIFICATE FOR THE ABOVE AND
UNDERGROUND PIPING AS WELL AS ANY EQUIPMENT. THE FORMS SHALL
BE GIVEN TO THE PROJECT INSPECTOR WHO WILL FORWARD TO AHJ
FOR FILLING IN PROJECT RECORDS. A COPY OF THIS CERTIFICATE SHALL
BE PROVIDED TO THE OWNER.
6. CONTRACTOR SHALL MAINTAIN A CLEAN WORK PREMISE AT ALL TIMES
AND SHALL CLEAN CONSTRUCTION SITE OF ALL THEIR DEBRIS AT THE
END OF THE DAY AND BEFORE FINAL PAYMENT IS MADE.
7. THE BUILDING IS ASSUMED TO BE STRUCTURALLY SOUND AND FULLY
CAPABLE OF SUPPORTING THE PROPOSED SPRINKLER PIPING AND ALL
ASSOCIATED FITTINGS, HANGERS, SEISMIC BRACING AND ASSOCIATED
APPURTENANCES.
8. REFER TO FIRE PROTECTION SPECIFICATIONS FOR ADDITIONAL
INFORMATION REGARDING THE FIRE PROTECTION SYSTEM.
9. REFER TO ARCHITECTURAL DRAWINGS FOR ACTUAL BUILDING
DIMENSIONS AND DETAILS. DO NOT SCALE “FP” DRAWINGS FOR
CONSTRUCTION PURPOSES.
10. OWNER SHALL BE PROVIDED WITH ALL REQUIRED TEST CERTIFICATES,
CARE & MAINTENANCE BOOK.
11. ALL MATERIALS, EQUIPMENT, APPURTENANCE AND RELATED DEVICES
SHALL BE APPROVED FOR FIRE PROTECTION USE AND BE UL LISTED
AND/OR FM APPROVED.
12. ALL WELDING SHALL BE DONE BY CERTIFIED WELDERS.
13. INSTALL ALL EQUIPMENT AND SPECIALTY DEVICES IN ACCORDANCE WITH
MANUFACTURER’S INSTRUCTIONS.
14. ALL PIPE SHALL BE BLACK STEEL SCHEDULE 40 UNLESS NOTED IN
DESIGN DRAWINGS.
15. FLOOR/ WALL PENETRATIONS THROUGH RATED SEPARATIONS SHALL BE
SEALED WITH AN APPROVED FIRE RATED MATERIAL AND/OR APPROVED
ASSEMBLY.
16. WALL PENETRATIONS THROUGH NON-RATED PARTITIONS SHALL BE
PROVIDED WITH A NON-SHRINKING GROUT OR CAULKING MATERIAL
AND/OR APPROVED ASSEMBLY.
17. JOINING OF PIPE AND FITTINGS SHALL BE DONE WITH GROOVED
COUPLINGS WHEN LIGHTWALL PIPE IS USED OR THREADED CAST IRON
OR DUCTILE IRON FITTINGS WITH THREADABLE PIPE.
18. SIGNAGE SHALL BE PROVIDED IN ACCORDANCE WITH AHJ AND NFPA 13.
19. THE SPRINKLER SYSTEM SHALL BE SUPERVISED BY THE EXISTING FIRE
ALARM SYSTEM. ALL TAMPER AND WATER FLOW SWITCHES SHALL BE
INSTALLED BY THE FIRE PROTECTION CONTRACTOR AND WIRED TO THE
EXISTING FIRE ALARM CONTROL PANEL BY THE FIRE ALARM
CONTRACTOR.
20. THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY TESTED IN
ACCORDANCE WITH NFPA 13.
21. ALL SPRINKLER LOCATIONS SHALL BE COORDINATED WITH LIGHTING
FIXTURES, HVAC DIFFUSERS, FIRE ALARM DEVICES, SIGNS, AND OTHER
RELATED CEILING DEVICES PRIOR TO CONSTRUCTION. THE SPRINKLER
PIPE ROUTING SHALL ALSO BE COORDINATED WITH STRUCTURAL AND
OTHER DISCIPLINES PRIOR TO CONSTRUCTION TO ELIMINATE OR
MINIMIZE THE NUMBER OF LOW POINT DRAINS FOR THE SPRINKLER
SYSTEM.
22. ALL INSPECTOR’S TEST CONNECTION AND LOW POINT DRAINS SHALL BE
IN ACCORDANCE WITH NFPA 13 (UNLESS OTHERWISE NOTED) AND SHALL
BE DISPLAYED ON SHOP DRAWINGS. ALL PIPING RELATED SHALL BE
LOCATED TIGHT AGAINST THE PERIMETER WALLS. COORDINATE WITH
ARCHITECT FOR ACCEPTABLE LOCATIONS.
23. MOUNTING OF CONTROL VALVES SHALL BE AT MAXIMUM HEIGHT OF 7’-0”
A.F.F. UNLESS OTHERWISE NOTED WHICH WILL REQUIRE APPROVED
MEANS OF ACCESSIBILITY.
24. IN ACCORDANCE WITH THE PROJECTS NOTED CODES AND STANDARDS,
WHERE A WATERFLOW TEST IS USED FOR THE PURPOSE OF SYSTEM
DESIGN, THE TEST SHALL BE CONDUCTED NO MORE THAN 6 MONTHS
PRIOR TO WORKING PLAN SUBMITTAL UNLESS OTHERWISE APPROVED
BY THE AHJ.
25. WATER SUPPLY INFO USED IN DESIGN (DATED 7/13/2021):
STATIC: 115 PSI
RESIDUAL: 55 PSI
FLOW RATE: 1250 GPM
26. REMOTE AREA CALCULATION (WITH 5 PSI WATER SUPPLY DOWNGRADE)
FLOW RATE: 541 GPM
PRESSURE: 61 PSI
SAFETY MARGIN: 27 PSI
NAS NO AUTOMATIC SPRINKLERS
OFI
RN
S.F.
SPR
PSI
NTS
OFCI
NO
NC
NIC
INV
OWNER FURNISHED AND INSTALLED
POUNDS PER SQUARE INCH
RISER NIPPLE
SQUARE FEET
SPRINKLER
OWNER FURNISHED AND CONTRACTOR INSTALLED
NOT IN CONTRACT
NOT TO SCALE
NORMALLY CLOSED
NORMALLY OPEN
INVERT OF PIPE ELEVATION
GPM
GC
FLR
FFE
ELL
EL
DWG
AFF
CONT.
CONTR.
CLG
AFC
CONN
AP
FIRE PROTECTION CONTRACTOR
FINISHED FLOOR ELEVATION
GALLONS PER MINUTE
GENERAL CONTRACTOR
FLOOR
ELEVATION
ELBOW
DRAWING
ABOVE FINISHED FLOOR
ABOVE FINISHED CEILING
CONTINUATION
CONTRACTOR
CEILING
CONNECTION
ACCESS PANEL
ACOUSTICAL TILE CEILINGATC
ABBREVIATIONS
FPCR
FCC
FLOOR CONTROL VALVE ASSEMBLY
DN DOWN
TOP
WTS
TYP
TS
TOP OF PIPE ELEVATION
TAMPER / SUPERVISORY SWITCH
WATER TIGHT SLEEVE
TYPICAL
SYMBOL LEGEND
FS
PS
FSP
PRESSURE GAUGE
PRESSURE SWITCH
FLOW SWITCH
PIPING UP OR DN THROUGH FLOOR SLAB
PIPING RISE OR DROP NOT THROUGH FLOOR SLAB
SHUTOFF VALVE
CHECK VALVE WITH BALL DRIP
SHUTOFF VALVE WITH TAMPER SWITCH
FIRE STANDPIPE PIPING
EXISTING TO REMAIN (GENERAL)
EXISTING PIPING TO BE REMOVED (GENERAL)
CONNECT TO EXISTING PIPING (GENERAL)
NEW PIPING (GENERAL)
SWING CHECK VALVE
CUT AND CAP EXISTING PIPING (GENERAL)
CONTINUATION
PIPING LEGEND
SECTION DESIGNATION
DETAIL / SCHEMATIC DESIGNATION
SPRINKLER HYDRAULIC NODE TAG
UPRIGHT SPRINKLER HEAD
HORIZONTAL SIDEWALL SPRINKLER HEAD
CONCEALED PENDENT SPRINKLER HEAD
SEMI-RECESSED PENDENT SPRINKLER HEAD
PIPE CAP
DWG
EQUIPMENT TAG
FIRE HOSE VALVE
FIRE HOSE VALVE CABINET
DWG
EQ
WATER FLOW PRESSURE SWITCH
WATER FLOW SWITCH
HVAC HEATING VENTILATION AND AIR CONDITIONING CONTRACTOR
WF/PS
WF
FHV FIRE HOSE VALVE
FCVA
FIRE COMMAND CENTER
FDC FIRE DEPARTMENT CONNECTION
SP WET SPRINKLER PIPING
ETR EXISTING TO REMAIN
SPRINKLER DESIGN CRITERIA
ALL SPRINKLERS ARE TO BE QUICK RESPONSE THROUGHOUT THE SMOKE COMPARTMENT.
SPRINKLERS IN FINISHED CEILINGS SHALL BE SEMI-RECESSED PENDENTS. SPRINKLERS IN
UNFINISHED CEILING AREAS SHALL BE INSTALLED UPRIGHT. COORDINATE SPRINKLER FINISH
AND LOCATIONS WITH ARCHITECTS AND OWNER PRIOR TO INSTALLATION.
LIGHT HAZARD:
- DENSITY = 0.1 GPM/S.F. FOR MOST REMOTE 1,500 S.F. WITH 100 GPM TOTAL HOSE STREAM
- SPRINKLER COVERAGE 225 S.F. (MAX)
ORDINARY HAZARD, GROUP I:
- DENSITY = 0.15 GPM/S.F. FOR MOST REMOTE 1,500 SF WITH 250 GPM TOTAL HOSE STREAM
- SPRINKLER COVERAGE 130 S.F. (MAX)
LIGHT HAZARD CRITERIA ASSUMED FOR ALL AREAS, UNLESS NOTED OTHERWISE
ORDINARY HAZARD, GROUP I LABELED AS OH1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1100 Boulders Pkwy | Suite 503 Richmond, VA 23225
804.355.2067
A u to d e s k D o c s /M t H o m e
I s o la ti o n W a rd
D /W
S P
M t H o m e
D rv t
/1
/2
:4
:2
P
M
FX1.00
FIRE PROTECTION LEGEND AND
NOTES
11/04/2022 TGS DM
RENOVATE D-WING FOR ISOLATION
WARD
621-20-107
MOUNTAIN HOME, TENNESSEE
BID DOCUMENTSJAMES H.
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
No. Revisions: Date:
1 BID DOCUMENTS 11/04/2022
2 ADDENDUM 02 07/13/2023
File details come from the government source that posted it. Updated .