Addendum 02 Summary R1.pdf
PDF 192 KB Posted
- Solicitation number
- 36C24923R0030
About this file
This document contains questions and answers related to a solicitation for renovations to the James H. Quillen Veterans Affairs Medical Center in Mountain Home, Tennessee. The solicitation number is 36C24923R0030 and involves renovating Wing D2 to create an isolation ward. Key aspects of the project include demolishing and renovating rooms, corridors, and restrooms; installing new finishes, casework, and medical equipment; upgrading mechanical, electrical, and plumbing systems; and performing fire protection and alarm work. The questions and answers provide clarification on project scope details such as phasing requirements, material deliveries, structural elements, medical gas and alarm panel connections, and ceiling, flooring, and restroom accessory specifications. Relevant drawings are also referenced and will be updated through issued addenda. The solicitation is open through the Department of Veterans Affairs Veterans Health Administration.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
“RENOVATE WING D2 FOR ISOLATION WARD” PROJECT FOR THE
JAMES H. QUILLEN VETERANS AFFAIRS MEDICAL CENTER (VAMC)
MT. HOME TENNESSEEE
PROJECT NUMBER: 621-20-107
UPDATED DRAWINGS, SPECIFICATIONS, AND EXPLANATION OF REVISIONS
QUESTIONS AND ANSWERS (RFIs)
36C24923R0030
AMENDMENT NUMBER 0002
QUESTIONS AND ANSWERS
1. Per Note #29 of the Fire Alarm Systems notes on sheet FA-1.00, it states that the contractor is to provide a fire watch for all occupied areas during construction. Please provide as-builts of existing fire protection system so we can determine the level of impact, and number of fire watches that will be required.
A: As-builts are unavailable. A fire watch is only required in building areas that are affected by fire alarm outage and are occupied at that time. Fire alarm zones align with the smoke compartments and D wing is a separate smoke compartment. Minimal work is anticipated in fire alarm zone 20 (corridors and elevator lobby). The contractor is to determine the best order of operations to minimize impairments while completing the required modifications [TGS].
2. Note #20 under the Fire Protection Systems Notes on sheet FX-1.00, it states that "…Prior to connection to the above ground system, the underground fire water service shall be flushed in accordance with NFPA 13. Please confirm this requirement.
A: The following portion of Note 20 can be ignored as it is an existing system and will not require modification to the existing underground system, “Prior to connection to the above ground system, the underground fire water service shall be flushed in accordance NFPA 13.” Note will be revised as part of Addendum 2. [TGS]
3. Note H under the General Plan Notes on sheet FXD-2.02 requires an "approved" fire watch for impairments lasting longer than 10 hours. Considering the entire fire protection system is called to be demolished and renovated, the system will be down for several weeks during construction. Please advise on what an "approved" fire watch would include. Please advise if active smoke heads within the construction space can act as a fire watch during non-construction hours while during construction hours, the Project Superintendent can act as Fire Watch.
A: A continuous watch is required. Active smoke detectors would not be advisable due to the dust typically incurred during construction. Active heat detectors may be acceptable but would require coordination with the fire alarm contractor as impairments to the fire alarm zone are expected. The contractor is responsible for determining the best order of operations to minimize impairments while completing the required modifications. The Fire Watch must be conducted by the Site Safety / Health Officer (SSHO). Additionally, the threshold initiating this requirement has been reduced from 10 hours to 4 hours in Addendum #2. [TGS][PRQ]
4. Per Note #8 under Medical Gas Notes on sheet P-1.00, please advise on medical gas connection type that meets the Owner standards at this facility.
A: Amico [VA]
5. Note B under General Plan Notes on sheet PD-2.01states “Phasing - no more than 2 rooms can be out of service at a time.” Please confirm that this note refers to occupied rooms outside of the construction zone.
A: This note refers to Wing D1 below the construction area. [VA]
6. Note B under General Plan Notes on sheet PD-2.01states “Phasing - no more than 2 rooms can be out of service at a time.” Please provide all necessary as-built’s for water, sanitary and venting for all areas served by the same branch of the sanitary and water systems that serves or passes through the construction area so to properly plan the quantity and location of shutdowns that will be needed. If not available, please quantify number of shutdowns that should be assumed for plumbing scope of work.
A: As-builts are not part of bid set but record drawings will be available from the VA after bid.
[JMP]
7. Note #3 on sheet PD-2.01 and note #3 on sheet P-2.01 reference existing storm drains. On Sheet PD-2.01, there are two note #3’s (one in Toilet Room D126 shaft/chase area and one on the south side of corridor D-139) called to be demolished and offset. However, the new storm drain connection on P-2.01 only shows one note #3 for the connection point in the Toilet Room D126 chase. The location of the other note #3 as shown on sheet PD-2.01 in Corridor D-139 has an (E) existing notation next to a 0" 6" SD DN" leading us to believe that no new work is required at this location. Please clarify.
A: Note #3 on sheet P2.01 applies to the storm drain in corridor D-139. There will be new work to connect to the existing system and offset the storm drain plan west. [JMP] Note: Additional note #3 exists on P-2.01, not just the two mentioned above. An additional note will be added as a part of Addendum #2.
8. Per note #12 under Drawing Notes on sheet AD-101 implies that material deliveries should be through the existing windows. The existing windows are rather small. There would be items such as millwork, sliding doors, mechanical equipment… that would be difficult, if not impossible to receive these items through these openings. Please provide alternate routing for the larger material deliveries which would the location of a service or freight elevator.
A: The VA has decided that use of existing elevators are acceptable so long as cleanliness is maintained. This response supersedes any response given prior to this response. Coordinate with COR and refer to Specification 010000 General Requirements article 1.15 Use of Existing Elevators.
9. Per Note B under General Plan Notes on sheet P-2.01, it states that the Contractor shall X-ray floor prior to any cutting of the slab. Please advise on the structure type of the 2nd floor slab and roof slab and advise if the slab construction is post tension construction.
A: Coordinate this information with COR. Structure is 2-way slab 10” thick concrete. [CL]
10. Note B under General Plan Notes on sheet PD-2.01 states “Phasing – no more than 2 rooms can be out of service at a time.” Please provide as-built’s for all plumbing lines that feed the second floor as to coordinate the level of effort and number of mobilizations that will be required.
A: As-builts are not part of bid set but record drawings will be available from the VA after bid.
[JMP] See new tie-ins on sheet P-201 for quantities. [PRQ]
11. On sheet P-1.00, it shows a Medical Gas Alarm Panel Schedule, but there are no symbols or abbreviations for this panel. On sheet P-3.02, note #4 under the Drawing Notes, it calls for symbol "AA-1" to be installed at the Nurses Station. Please confirm that symbol “AA-1” shown on sheet P-3.02 is in fact the medical gas alarm panel from the Medical Gas Alarm Panel Schedule noted on P-1.00.
A: Confirmed. [JMP]
12. Per elevation #6 on sheet AE-4.03, it calls for a BC-1 on the casework where the sink is located.
Please confirm BC-1 is the correct cabinet selection or is it supposed to be a SB-1 instead like other sink locations at other elevations.
A: Casework below sink on 6/AE403 shall be SB-1. An update will be reflected in Addendum #2.
13. Per sheet AE-403, BC-1 on the Casework Typology Legend shows it having two drawers. On elevation #2, the elevation shows it having one drawer and on elevation #6, it is shown with a false panel. Please confirm the inconsistencies on these two elevations.
A: BC-1 shall have two drawers. Elevation #6 casework with false panel to be SB-1. Details reference section 7/AE402. This detail will be clarified in Addendum #2 to show the drawer.
14. Per detail #5 on sheet QT-4.01, it shows the headwall elevation. This elevation shows 6 vacuums, 6 oxygens but only 4 medical air outlets and no slides. On sheet P-1.00, the Medical Gas Legend depicts the symbols for determining the quantity of outlets at a given location, with the second digit representing medical air. On sheet P-3.02, it indicates the P-1.00 reference symbolism "MGH-####" at each head wall location with the number 6 indicated as the number for all medical gases and slides (including medical air). Please confirm that there should be 6 of each type (vacuums, oxygens, medical air and slides) or if the elevation on QT-4.01 would supersede in case there would be 6 vacuums, 6 oxygens, only 4 medical air outlets with no slides at each headwall location.
A: QT-401 supersedes. Addendum #2 will include revisions on plumbing drawings to match QT- 401 quantities. [PRQ]
15. Sheet P-6.01 (details #2 through #8) cannot be legibly printed and must be fully zoomed in to read. Please provide a revised sheet with bolder or darker print.
A: Lineweights will be darkened in Addendum #2 so that the text is legible.
16. Please confirm that the AHU being replaced only services the construction areas and temporary air is not required. If not, please provide as-built’s for all ductwork it will serve and for the existing AHU that is being replaced so proper pricing for temporary air and TAB services can be determined.
A: This is not correct. The existing AHU is not being replaced. The existing AHU serving areas D and E is to remain with ductwork modifications required to serve the existing areas outside of the scope of new work. Temporary duct work may be required to keep those areas ventilated by the existing unit during construction. [WLS]
17. Note E under the General Demo Notes on sheet MD-2.02 indicates that the Contractor is to bring to the attention of the VA COR if we encounter any smoke or fire dampers to be demolished. Please identify any smoke or fire dampers that will be demolished including in-wall locations as to properly price the fire damper work, and decommissioning efforts that will be required. If not, it will be assumed that only items shown on plan will require demolition A: The design team has made extensive efforts to identify existing conditions by on-site survey and as-built plan reviews, however, it is possible that a damper may have been unseen and will require demolition. Dampers discovered during construction will be handled with a Change Order. [WLS]
18. Per note C under General Plan Notes on sheet M-3.02 states that concrete coring cannot go through thickened slab areas near columns. Please confirm that this note was considered during design since there are restrooms currently oriented around columns. Please provide structural as-built’s to allow adequate pricing to consider potential offsets for mechanical and plumbing piping. We will also need structural as-built’s for the roof area to review locations of any mechanical penetrations required for the new equipment.
A: The design intentionally avoided penetrating the thickened slab areas. [WLS]
19. On the Finish Legend on sheet AI-601, it states RB-1 is used with LVT-1. The Finish Schedule on sheet AI-601 and the locates on sheet AI-101 show Storage D229 and Lounge D228 calls for LVT- 1 with RB-2. Please confirm the correct base selection.
A: Storage D229 and Lounge D228 to have RB-1. Schedule will be updated in Addendum #2.
20. On the Finish Legend on sheet AI-601, it states RB-2 is used with LVT-2. The Finish Schedule on sheet AI-601 shows Med Room D224 with LVT-2 and RB-2 while the locates on sheet AI-101 it shows Med Room D224 with LVT-2 and RB-1. Please confirm the correct base selection at this location.
A: Med Room D224 to have RB-2. Schedule will be updated in Addendum #2.
21. Specification section "23 40 00 HVAC Air Cleaning Devices" is provided in the specifications but is not in the Table of Contents. Please confirm if this section is applicable and if so, please update the Table of Contents.
A: This section is applicable. Specification Table of Contents will be updated to be included in Addendum #2. [WLS]
22. Will window shades be required for the men's locker room D232?
A: Window Shades will not be a part of the project. Specification section 12 24 00 Window Shades will be removed in Addendum #2. [PRQ]
23. Note I under the General Plan Notes on sheet E-3.02 requires you to provide and install 4 additional exit lights that are not shown on plan. Please provide the location of these exit lights to determine the level of effort for rough in requirements and accurate pricing. If locations are not available, please confirm furnishing four (4) additional exit lights only, with installation to be priced after locations are determined.
A: Reference to four additional exit signs will be removed in Addendum #2. [PRQ]
24. Sheet WP-101 does not identify and detail where wainscoting wall protection is required. Detail #2 does show wainscoting, but it is not marked as a typical detail. The areas depicted in the detail change between isolation rooms. Please provide a proper layout and location for wainscoting.
A: Finish schedule has been updated to show wainscoting wall protection. WP101 shows location. Updated drawing will be issued in Addendum #2.
25. Per Finish Schedule on sheet AI-601, it designates a WP-2 but WP-2 cannot be located on plan.
Please advise WP-2 is should be provided and if so, please designate locations.
A: WP-2 has been removed from the finish legend. Updated drawing will be issued in Addendum #2.
26. Per Detail 5 on Sheet QT-401, the headwall elevation includes monitor, surge monitor, a charting monitor and keyboard/mouse. Please advise if these items will be provided by the VA or if they are to be provided by the GC, please provide specifications.
A: Monitors and keyboard/mouse will be provided by the VA, installed by GC. [VA]
27. If the GC is to provide labor and materials for the monitors with the specifications that would given in PCG RFI #001 response, please advise if the GC is responsible for supplying the monitor channels for the monitors and the labor for mounting the charting monitor and keyboard.
A: Monitors and keyboard/mouse will be provided by the VA, installed by GC. [VA]
28. Per note E on GI-002, it states that all penetrations are to be sleeved and packed with airtight safing insulation and sealant. Please confirm that this applies to all ductwork, conduit, plumbing piping, and mechanical piping. If so, please provide details for sleeving required for ductwork, piping, and conduit.
A: Note E will be removed in Addendum #2. Note D will be revised to show acoustic sealant at all penetrations below the ceiling and at the perimeter of the wall below the ceiling. [PRQ]
29. On Sheet E-302, there is a new light fixture shown being installed in Mechanical Room 37. This room is outside of the project scope of work area. Please clarify if this light fixture is part of the project scope of work or not.
A: Lighting in Mechanical Room 37 is outside of the project scope. Drawing sheet shows an MCC installed in this room. [SAH]
30. Please advise if there are any existing patient lifts within the workspace that will need to be demolished. If so, please advise on location, quantity, and scope of work.
A: The existing D2 Wing does not have patient lifts. [PRQ]
31. Please advise if GC is to provide cubicle curtain tracks or not. I realize there is a specification section for the Cubicle Curtain Tracks (section 10 21 23), but I do not see where they are clearly identified on the drawings. If we are to provide them, please advise on the product and manufacturer. Are the cubicle curtains to be provided by the VA? If not, please advise on the product and manufacturer.
A: Specification Section 10 21 23 Cubicle Curtain Tracks will be removed in Addendum #2. All Cubicle Curtains Track will be portable and provided and installed by the VA. [PRQ]
32. On sheet AC-141, Anteroom D208A indicates that the ceiling type is Note #4 which is a regular 2x2 ACT. However, the finish schedule on sheet AI-601 and Floor Finish Plan A-101 denotes an ACT-1 which is the Armstrong Calla tile with gasketing grids. Please confirm which ACT type should be specified for Room D208A.
A: Anteroom D208A ceiling is ACT-1. Updated drawing will be issued in Addendum #2.
33. On sheet AI-601, on the Finish Legend ACT-2 is stated as "Armstrong Standard." Please advise on the ACT product number and please confirm that ACT-2 is the tile referenced in drawing note #4 of the RCP shown on sheet AC-141.
A: Note 4 refers to ACT-2. Basis of Design for ACT-2 is Armstrong – ULTIMA White, Lay-in.
Updated drawing will be issued in Addendum #2.
34. On sheet AC-141, X-Ray Alcove (D225), Alcove (D213), and Alcove D217 indicate note #3 for a
Gypsum board ceiling. However, on sheets AI-601 and AI-101, they indicate a ceiling type of ACT-2. Please clarify the correct ceiling type.
A: Ceiling type to be Gypsum board ceiling painted P-5. Updated drawing will be issued in Addendum #2.
35. Please confirm that metal backing can be used in walls per general finish note B on sheet AI-101 in lieu of using fire treated wood in walls per general plan note H on sheet AE-101.
A: Yes, provide either metal backing or fire-resistant treated wood can be used.
36. Drawing note 2 on sheet AC-141 states to "omit ceiling in this location." However, there is a corridor (D2C3B) to the plan north of room D222 that is in the project work area but does not have ceiling type shown. Is this corridor supposed to have a note #2 in this area? Sheet AI-601 (Finish Schedule) and AI-101 (Finish Plan) not this area to have a ceiling type ACT-2. Please confirm what ceiling type if any is required in this room.
A: Corridor D2C3B ceiling to be AT-2. Updated drawing will be issued in Addendum #2.
37. Per Sheet AE-401, Note B under Restroom Accessory Notes states "Equipment totals for both small and large isolation room restrooms are the same." The following accessory items contradict this note - A5082 paper towel dispenser, A5175 Soap dish, A5145 Hooks, and A5030 Bench, since they are included on the Typ. Iso Room Large Restrooms elevations but not on the Typ. Iso Room Small Restrooms elevations. Please confirm the elevations are correct as drawn or provide updated details.
A: Contradicting marks have been corrected per Addendum 2. Equipment totals for both are now the same.
38. Per sheet AE-401, Mark A5115, A5080, and F2010 are located on typical bathroom elevation 1 but are not on the schedule. Please advise proper identification of each item and if they are Contractor or Owner provided. If they are contractor provided, please advise if A5080 and F2010 are also to be on the Typ. Iso Room Large restrooms to match per note B under Restroom Accessory Notes.
A: Mark A5115 refers to Flip-Up Grab Bars and is CC. Mark A5080 is A5082 Paper Towel Dispenser and is CC. Mark F2010 refers to Step-on Wastepaper Basket and is VV. Updated drawing will be issued in Addendum #2.
39. Per sheet AE-401, mark A5109 and mark A5115 are shown on the Staff Restrooms elevations #9 and #10. Please advise identify the marks shown since they do not appear in the Staff Restroom Accessories Schedule. Also, please advise it these items are to be Contractor or Owner provided.
A: Mark A5109 is A5111 and is Contractor furnished and installed (CC); Mark A5115 refers to the Flip-up Grab Bars and is CC. Updated drawing will be issued in Addendum #2.
40. Per sheet AE-401, Mark A5111 is listed on the "Staff Restroom Accessories" schedule as Contractor Furnished, Contractor Installed (CC) but the mark is not indicated on the elevations.
Please advise location or if this mark designation is to be omitted.
A: Mark A5111 refers to the SS Grab Bars on the elevations and are CC. Updated drawing will be issued in Addendum #2.
41. Per sheet AE-401, Mark A5111 and Mark A5115 are shown on Restroom 18 elevations #13 and #16 but are not listed on the “Restroom 18 Accessories” schedule. Please provide mark descriptions for these items and identify if these marks are to be Contractor or Owner provided.
A: Mark A5111 refers to 1-1/4” Dia. SS Grab Bars (2’-0” & 3’-0”) and are CC; Mark A5115 refers to a Heavy Duty Flip-Up Grab Bar and is CC. Updated drawing will be issued in Addendum #2.
42. Per sheet AE-401, Mark A5109 (grab bar) is listed under the "Restroom 18 Accessories" schedule as to be provided Contractor Furnished, Contractor Installed (CC) but this mark is not shown on the elevations. Please advise on Mark A5109’s location or if this mark is to be omitted.
A: Mark A5109 is A5111 and will be CC. Updated drawing will be issued in Addendum #2.
43. Per sheets FX-2.02 and FXD-2.02, there appears to be a distinction in the work areas with different hatching, possibly indicating phases. Please provide a phase legend for each of these work areas indicated.
A: The diagonal hatching indicates Sprinkler and Fire Alarm Zone 20. The cross hatching indicates the area extents of the hydraulically calculated remote area. A legend will be added to these sheets as part of Addendum 2. [TGS]
44. Please confirm that there is no roof demolition required on this project. If there are existing items on the roof that will need to be removed and/or relocated for this project, please provide a roof demolition plan along with the roof plan as-builts. The concern is that there may be some existing equipment, piping, …in place that may need to be rerouted so that the new equipment for this project can be installed.
A: Roof demolition work is shown on PD2.03 to coordinate vent locations with new mechanical equipment. [JMP]
45. Per detail #5 on sheet AE-502, it indicates gypsum wallboard and plywood filler strips at restroom resinous floor applications. However, in the finish schedule on sheet AI-601- RF2 (restroom resinous flooring) mentions "integral base – toilet room with cement board backer."
Please clarify the board backing type and if the plywood filler strip is required or not.
A: Either cement board or plywood are acceptable provided they meet the product manufacturer’s substrate requirements. [PRQ]
DRAWING MODIFICATIONS
GI002
1. General notes D and E have been combined and edited to remove the sleeve requirement and only pertains to penetrations below the ceiling. Bracing on wall partitions has been removed.
AC141:
2. Ceiling types changed to align with finish schedule.
AE401:
3. Garment hook added to small restroom for typical accessories to remain the same. Handrails remarked to correctly show in schedule.
AE402:
4. Detail 7 revised to show a drawer.
AE403:
5. Detail 6 added SB-1.
AI101:
6. Finishes changed to align with ceiling plan and finish schedule.
AI601:
7. Finishes corrected on schedule. Finish legend edited to remove materials not in the project.
WP101:
8. Extent of Wall Protection WP-1 shown. Language about acrylic corner guard has been removed. In corner guard detail, Acrovyn is changed to be basis of design for corner guards instead of implying it was sole sourced.
FX1.00
9. Revised Note 20 to remove the requirement for flushing the underground fire line.
FX2.02
10. Added the Hatch Legend.
FXD2.02
11. Added the Hatch Legend.
P2.01
12. Note #3 added near the drinking fountains at column lines 33I.
P3.02
13. Med gas quantities at the headwall revised to match architectural elevation on
QT401.
P6.01
14. Lineweights modified for clarity.
E3.02
15. General Note I has been removed. Additional exit signs (beyond what is shown in the plan) is not required.
SPECIFICATION MODIFICATIONS
01 00 00 TABLE OF CONTENTS (TOC)
1) Specification Sections 10 21 23 Cubicle Curtain Tracks has been removed from the TOC and the project.
2) Specification Sections 12 24 00 Window Shades has been removed from the TOC and the project.
3) Specification Sections 23 40 00 HVAC Air Cleaning Devices has been added to the TOC. This section was already included in the specification book.
08 71 00 DOOR HARDWARE
4) Door Hardware Sets revised.
10 28 00 WALL AND DOOR PROTECTION
5) Specification has been modified to coordinate with the items shown on the Finish Legend on the drawings.