This finish schedule provides specifications for a renovation project at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The project involves renovating Wing D2 of Building 200 to create an isolation ward. Finishes are specified for corridors, rooms, alcoves, and other spaces. These include luxury vinyl tile, carpet tile, porcelain tile, solid surface, paint, wall protection, and resilient flooring. Product brands and styles are designated for ceilings, walls, floors, and bases throughout the wing. Renovations will also include mechanical, electrical, and plumbing work. The solicitation number is 36C24923R0030 and invites bids for Project 621-20-107 to complete the work by renovating D Wing at the James H. Quillen VAMC in Mountain Home, Tennessee to create an isolation ward as outlined in the finish schedule.

View the file

Other files

File Type Posted
07.09_AE403 - CASEWORK ELEVATIONS.pdf PDF
P6.01 - PLUMBING DETAILS.pdf PDF
08.00_AI101 - SECOND FLOOR FINISH PLAN-1.pdf PDF
FXD2.02 - SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN.pdf PDF
08.05_WP101 - WALL PROTECTION PLAN.pdf PDF
P2.01 - FIRST FLOOR PLUMBING NEW WORK PLAN 02.pdf PDF
P3.02 - SECOND FLOOR MEDICAL GAS NEW WORK PLAN.pdf PDF
000110 Table of Contents.pdf PDF
FX2.02 - SECOND FLOOR FIRE PROTECTION NEW WORK PLAN.pdf PDF
102600 Wall and Door Protection.pdf PDF
FX1.00 - FIRE PROTECTION LEGEND AND NOTES.pdf PDF
07.08_AE402 - CASEWORK ELEVATIONS.pdf PDF
36C24923R0030 0006.docx DOCX document
Addendum 02 Summary R1.pdf PDF
07.05_AC141 - SECOND FLOOR REFLECTED CEILING PLAN.pdf PDF
07.07_AE401 - ENLARGED RESTROOM PLANS AND ELEVATIONS.pdf PDF
087100 Door Hardware.pdf PDF
E3.02 - SECOND FLOOR LIGHTING NEW WORK PLAN.pdf PDF
36C24923R0030 0005.docx DOCX document
M2-02 - SECOND FLOOR HVAC NEW WORK PLAN.pdf PDF
36C24923R0030 0004.docx DOCX document
08.01_AI601 - FINISH SCHEDULE.pdf PDF
08.00_AI101 - SECOND FLOOR FINISH PLAN.pdf PDF
09.04_QT403 - ENLARGED EQUIPMENT PLAN.pdf PDF
36C24923R0030 0003.docx DOCX document
36C24923R0030 0002.docx DOCX document
36C24923R0030 0001.docx DOCX document
CALCULATION OF SELF PERFORMED WORK.docx DOCX document
Contractor EMR Certification Form.docx DOCX document
C27_UUpdated 621-20-107 Drawings Part 3 of 3.pdf PDF
C27_Updated 621-20-107 Drawings Part 2 of 3.pdf PDF
C27 Updated 621-20-107 Drawings Part 1 of 3.pdf PDF
UEI _ TAX ID.docx DOCX document
36C24923R0030_1.docx DOCX document
C28_621-20-107 Specifications.pdf PDF
P07_Wage Determination_621-20-107 Renovate Bldg.-200 - Wing D2 for Isolation Ward.pdf PDF
RFI Form.docx DOCX document
PERFORMANCE QUESTIONNAIRE.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F I N I S H L E G E N D

MARK DESCRIPTION BASIS OF DESIGN STYLE/ COLOR COMMENTS

ACT-1 2X2 ACOUSTICAL CEILING TILE ARMSTRONG CALLA GASKETING GRIDS -

RB-2 MILLWORK BASE JOHNSONITE

MANDALAY 4 1/2" -

44 DARK BROWN

USED WITH CPT-1 AND

LVT-2

LVT-1 LUXURY VINYL TILE

MANNINGTON

COMMERCIAL

NATURE'S PATHS - ABSTRACT

COLORWAYS - VIA CAMINO

STAGGER - 4" x 36"

P-2 PAINT - TYPE 2 PPG FOOTHILLS PPG1105-4

PT-1 PORCELAIN TILE FLORIDA TILE

RUSTIC SLATE AESTHETIC -

DELTA HAZE - FTI2991412X24

12"x24" FIELD WALL TILE

RF-1 RESINOUS FLOORING STONHARD STONTEC UTF - SANTA CRUZ INTEGRAL BASE

C-1 SOLID SURFACE CORIAN ARTISTA CANVAS -

PT-2

WP-1 WALL PROTECTION ACROVYN

WALL COVERING + PANEL SYSTEM

LINEN - NANTUCKET

ACT-2 2X2 ACOUSTICAL CEILING TILE ARMSTRONG ULTIMA WHITE, LAY-IN -

CG-1 CORNER GUARD C/S ACROVYN OYSTER GRAY 929 -

LVT-2 LUXURY VINYL TILE SHAW CONTRACT JEOGORI - BLACK TIE - 90590 QUARTER TURN - 18" x 18"

P-1 PAINT - TYPE 1 PPG COOL CONCRETE PPG1023-2

GENERAL WALL PAINT -

LATEX EGGSHELL

GENERAL WALL PAINT -

LATEX EGGSHELL

P-3 PAINT - TYPE 3 PPG DELICATE WHITE PPG1001-1

GENERAL WALL PAINT -

LATEX EGGSHELL

P-4 PAINT - TYPE 4 PPG COTTON TAIL PPG0998-1

GENERAL WALL PAINT -

LATEX EGGSHELL

P-5 PAINT - TYPE 5 PPG

CEILING PAINT -

LATEX FLAT

P-6 PAINT - TYPE 6 PPG

DELICATE WHITE PPG1001-1

CEILING PAINT -

EPOXY

DELICATE WHITE PPG1001-1

PORCELAIN TILE FLORIDA TILE

RUSTIC SLATE AESTHETIC -

COASTAL SAND - FTI2993612X24

12"x24" ACCENT WALL TILE

RB-1 RUBBER BASE JOHNSONITE A530 - 66 EITHER OR USED WITH LVT-1

CPT-1 CARPET TILE SHAW CONTRACT

BROADLOOM - JOIN -

68500 SMOKE

HR-1 HANDRAIL ACROVYN

HRB-4C -

688 LIGHTHOUSE GRAY

EXP EXPOSED STRUCTURE - - -

PL-2 PLASTIC LAMINATE WILSONART

DARK BROWN WALNUT -

NEMSCHOFF, OW

RUSTIC SLATE AESTHETIC -

COASTAL SAND - FTI2993612X24

RF-2 RESINOUS FLOORING STONHARD STONTEC UTF - SANTA CRUZ

INTEGRAL BASE - TOILET ROOM

WITH CEMENT BOARD BACKER

P-7 PAINT - TYPE 7 PPG

HM DOOR FRAME PAINT -

SEMI-GLOSS

DELICATE WHITE PPG1001-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1100 Boulders Pkwy | Suite 503 Richmond, VA 23225

804.355.2067

A u to d e s k D o c s /M t H o m e

I s o la ti o n W a rd

D

/F F

E

M t H o m e

D rv t

/1

/2

:0

:3

P

M

AI601

FINISH SCHEDULE

11/04/2022 ET NM

RENOVATE D-WING FOR ISOLATION

WARD

621-20-107

MOUNTAIN HOME, TENNESSEE

BID DOCUMENTS

JAMES H.

QUILLEN VA

MEDICAL

CENTER

Approved: MT Home VA

F I N I S H S C H E D U L E

ROOM NAME

ROOM

NUMBER FLOOR CEILING WALL FINISH WALL BASE

WALL FINISH

N E S W

CORRIDOR D2C1 LVT-1 ACT-2 * RB-1 P-1/WP-1 - P-1/WP-1 -

CORRIDOR D2C2 LVT-1 ACT-2 * RB-1 - P-3/WP-1 - -

CORRIDOR D2C3 LVT-1 ACT-2 * RB-1 P-1/WP-1 P-1/WP-1 P-1/WP-1 -

CORRIDOR D2C3A LVT-1 ACT-2 P-2 RB-1 - P-2 P-2 P-2

CORRIDOR D2C3B LVT-1 ACT-2 P-3 RB-1 P-3 P-3 P-3 P-3

CORRIDOR D2C4B LVT-1 ACT-2 * RB-1 P-3 - - -

CORRIDOR D2C5 LVT-1 ACT-2 * RB-1 P-3 - - -

ELEVATOR LOBBY D2EL2 LVT-1 ACT-2 - RB-1 - - - -

ANTEROOM D201A RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

ISO ROOM 1 D201B RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

TOILET D201C RF-2 P-6 PT-1 RF-2 PT-1 / PT-2 PT-1 PT-1 / PT-2 PT-1

CHART ALCOVE D201D LVT-1 ACT-2 P-2 RB-1 P-2 P-2 P-2 P-2

ANTEROOM D202A RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

ISO ROOM 2 D202B RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

TOILET D202C RF-1 P-6 PT-1 RF-2 PT-1 / PT-2 PT-1 PT-1 / PT-2 PT-1

ANTEROOM D203A RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

ISO ROOM 3 D203B RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

TOILET D203C RF-1 P-6 PT-1 RF-2 PT-1 / PT-2 PT-1 PT-1 / PT-2 PT-1

CHART ALCOVE D203D LVT-1 ACT-2 P-2 RB-1 P-2 P-2 P-2 P-2

ANTEROOM D204A RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

ISO ROOM 4 D204B RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

TOILET D204C RF-1 P-6 PT-1 RF-2 PT-1 / PT-2 PT-1 PT-1 / PT-2 PT-1

ANTEROOM D205A RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

ISO ROOM 5 D205B RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

TOILET D205C RF-1 P-6 PT-1 RF-2 PT-1 / PT-2 PT-1 PT-1 / PT-2 PT-1

CHART ALCOVE D205D LVT-1 ACT-2 P-2 RB-1 P-2 P-2 - P-2

ANTEROOM D206A RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

ISO ROOM 6 D206B RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

ANTEROOM D207A RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

ISO ROOM 7 D207B RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

TOILET D207C RF-1 P-6 PT-1 RF-2 PT-1 / PT-2 PT-1 PT-1 / PT-2 PT-1

CHART ALCOVE D207D LVT-1 ACT-2 P-2 RB-1 P-2 P-2 - P-2

ANTEROOM D208A RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

ISO ROOM 8 D208B RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

TOILET D208C RF-1 P-6 PT-1 RF-2 PT-1 / PT-2 PT-1 PT-1 / PT-2 PT-1

ANTEROOM D209A RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

ISO ROOM 9 D209B RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

TOILET D209C RF-1 P-6 PT-1 RF-2 PT-1 / PT-2 PT-1 PT-1 / PT-2 PT-1

CHART ALCOVE D209D LVT-1 ACT-2 P-2 RB-1 - P-2 P-2 P-2

ANTEROOM D210A RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

ISO ROOM 10 D210B RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

TOILET D210C RF-1 P-6 PT-1 RF-2 PT-1 / PT-2 PT-1 PT-1 / PT-2 PT-1

ANTEROOM D211A RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

ISO ROOM 11 D211B RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

TOILET D211C RF-1 P-6 PT-1 RF-2 PT-1 / PT-2 PT-1 PT-1 / PT-2 PT-1

CHART ALCOVE D211D LVT-1 ACT-2 P-2 RB-1 - P-2 P-2 P-2

ANTEROOM D212A RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

ISO ROOM 12 D212B RF-1 ACT-1 P-3 RF-1 P-3 P-3 P-3 P-3

TOILET D212C RF-1 P-6 PT-1 RF-2 PT-1 / PT-2 PT-1 PT-1 / PT-2 PT-1

ALCOVE D213 LVT-1 P-5 P-2 RB-1 - P-2 P-2 P-2

EQUIPMENT D214 RF-1 ACT-2 P-3 RB-1 P-3 P-3 P-3 P-3

NOURISHMENT D215 LVT-2 ACT-2 P-3 RB-2 P-3 P-3 P-3 P-3

HUDDLE D216 LVT-2 ACT-2 P-4 RB-2 P-4 P-4 P-4 P-4

ALCOVE D217 LVT-1 P-5 P-2 RB-1 - P-2 P-2 P-2

RESTROOM D218 RF-1 P-6 PT-1 RF-2 PT-1 PT-1 / PT-2 PT-1 PT-1 / PT-2

CLEAN D219 RF-1 ACT-2 P-3 RF-1 P-3 P-3 P-3 P-3

LINEN D220 RF-1 ACT-2 P-3 RF-1 P-3 P-3 P-3 P-3

SOILED D221 RF-1 ACT-2 P-3 RF-1 P-3 P-3 P-3 P-3

OIT D222 RF-1 EXP P-3 RF-1 P-3 P-3 P-3 P-3

NURSE STATION D223 LVT-1 ACT-2 P-2 RB-1 - P-2 P-2 P-2

MED D224 LVT-2 ACT-2 P-3 RB-2 P-3 P-3 P-3 P-3

X-RAY ALCOVE D225 LVT-1 P-5 P-2 RB-1 - P-2 P-2 P-2

LAB ALCOVE D226 LVT-1 ACT-2 P-2 RB-1 P-2 P-2 P-2 P-2

NURSE MANAGER D227 LVT-1 ACT-2 P-2 RB-1 P-2 P-2 P-2 P-2

LOUNGE D228 LVT-1 ACT-2 P-4 RB-1 P-4 P-4 P-4 P-4

STORAGE D229 LVT-1 ACT-2 P-4 RB-1 P-4 P-4 P-4 P-4

STAFF TOILET D230 RF-1 P-6 PT-1 RF-2 PT-1 PT-1 / PT-2 PT-1 PT-1 / PT-2

WOMEN'S LOCKER D231 LVT-2 ACT-2 P-4 RB-2 P-4 P-4 P-4 P-4

MEN'S LOCKER D232 LVT-2 ACT-2 P-4 RB-2 P-4 P-4 P-4 P-4

ELECTRICAL D233 RF-1 EXP P-3 RB-1 P-3 P-3 P-3 P-3

CONSULT D234 CPT-1 ACT-2 P-2 RB-2 P-2 P-2 P-2 P-2

BIOMED D235 CPT-1 EXP P-3 RB-2 P-3 P-3 P-3 P-3

TOILET D-206C RF-1 P-6 PT-1 RF-2 PT-1 / PT-2 PT-1 PT-1 / PT-2 PT-1

F I N I S H L E G E N D N O T E S

1. ALL PRODUCTS LISTED IN THE FINISH LEGEND ARE BASIS OF DESIGN ONLY UNLESS NOTED OTHERWISE.

2. PROVIDE TRANSITION STRIPS AT TRANSITIONS FOR ALL DISSIMILAR FLOORING MATERIALS, TYPICAL. SEE DIVISION 9 SPECIFICATIONS.

3. REFER TO WALL PROTECTION PLAN FOR EXTENT OF WP-1.

No. Revisions: Date:

BID DOCUMENTS 11/04/2022

1 ADDENDUM #1 06/28/2023

2 ADDENDUM #2 07/13/2023

Sheets
AI601 - FINISH SCHEDULE

File details come from the government source that posted it. Updated .