P2.01 - FIRST FLOOR PLUMBING NEW WORK PLAN 02.pdf
PDF 579 KB Posted
- Solicitation number
- 36C24923R0030
About this file
This document includes a first floor plumbing new work plan and details for a federal construction project to renovate D Wing at the James H. Quillen VA Medical Center in Mountain Home, Tennessee for use as an isolation ward. The project number is 621-20-107. The solicitation number for the related federal contract opportunity is 36C24923R0030. The work outlined in the plan includes connecting new vent, sanitary, storm, and hot water return piping to existing systems and offsetting an existing stack. The contractor must coordinate any necessary shutdowns with facility staff and x-ray the floor before cutting the slab to coordinate penetrations with structural elements.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
29A-C
30.1
32.8
P O N M L K I H G F E D C B.5 B A.5 A
2" SAN UP
2" V UP
(E)2" V DN
(E)2" SAN DN
(E)2" V DN
2" V UP
2" SAN UP
(E)2" SAN DN
(E)2" SAN DN
(E)2" V DN
2" SAN UP
2" V UP
4" V UP
4" SAN UP
(E)4" SAN DN(E)4" V DN
2" V UP
(E)2" V DN
3" SAN UP
(E)3" SAN DN
(E)2" V DN
2" V UP
2" SAN UP
2" V UP
(E)2" V DN
(E)2" SAN DN
(E)6" SD DN
6" SD UP
(E)6" SD DN
6" SD UP
(E)6" SD DN
6" SD UP
(E)6" SD DN
(E)4" V DN (E)4" SAN DN
(E)6" SD DN
6" SD UP
4" SAN UP
4" V UP
2" SAN UP
(E)2" SAN DN
(E)4" SAN DN
(E)4" V DN
4" V UP
4" SAN UP
(E)4" SAN DN
(E)6" SD DN
6" SD UP
(E)4" SAN DN
4" SAN UP
4" V UP
(E)4" V DN
6" SD UP
2" SAN UP1
1 1
2 2
2" SAN2" SAN 2" V2" V
6" SD6" SD 6" SD6" SD
4" V4" V
(E)4" V DN
4" V4" V
4" SAN4" SAN
2" TRAPPED SAN UP
4" SAN UP
2" SAN UP
2" SAN UP
4" S
A N
4" S
A N
4" V
4" V
(E)4" SAN DN (E)4" V UP
(E)4" SAN DN
4" SAN UP
4" V UP
4" V
4" V
4" V
4" V
4" SAN4" SAN
(E)4" V DN
4" V UP
4" SAN UP
4" V UP
4" SAN UP
4" V UP
4" SAN UP
(E)4" SAN DN
(E)4" V DN(E)4" SAN DN(E)4" V DN
(E)4" SAN DN
(E)4" V DN
1 1 1
(E)4" V DN
(E)4" V DN
4" SAN UP
4" V UP
2" SAN UP
2" SAN UP
2" SAN UP4" SAN UP
4" SAN UP
2" SAN UP
4" SAN UP
3" TRAPPED SAN UP
3" TRAPPED SAN UP
2" V UP
2" V UP
1(E)4" SAN DN
2" SAN UP
2" SAN2" SAN 2" SAN UP
2" SAN UP
4" SAN UP
2" SAN UP
3" TRAPPED SAN UP
3" TRAPPED SAN UP
2" SAN UP
4" SAN UP
2" SAN UP
2" V UP2" V UP
4" V UP
4" SAN UP
(E)2"V STACK
(E)2"SAN STACK
3" TRAPPED SAN UP
3" TRAPPED SAN UP
2" SAN UP
2" SAN UP
4" SAN UP
2" SAN UP
4" SAN UP
2" SAN UP
2" SAN UP
2" V UP
4" S
A N
4" S
A N
2" SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
3" TRAPPED SAN UP
3" TRAPPED SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
3" TRAPPED SAN UP
3" TRAPPED SAN UP
2" SAN UP
4" SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
4" SAN UP
2" SAN UP
3" TRAPPED SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
4" SAN UP
(E)2" V UP
(E)4" SAN DN
(E)4" SAN DN
3" TRAPPED SAN UP
4" SAN UP
(E)4" V DN
(E)4" V DN
4" V UP
4" V UP
2" SW2" SW
2" SW UP
2" SW UP
2" SW UP
2" SW2" SW
2" SW UP
2" S
W 2"
S W
2" SW2" SW
2" SW UP
2" SW UP
2" SW UP 2" SW2" SW
2" SW UP
2" SW UP
2" SW2" SW
2" SW2" SW
2" SW UP
2" SW UP
2" SW UP 2" SW2" SW
2" SW2" SW
4" SAN UP4" SAN UP
4" SAN UP
4" SAN UP
(E)3" A.T.VTR
6" SD6" SD
2" V
2" V
4" V
4" V
2" V
2" V
4" V
4" V
4" V
4" V
2" V
2" V
4" V
4" V
2" SAN2" SAN
2" SAN UP
2" SAN2" SAN2" SAN2" SAN
4" SAN4" SAN
2" S
A N
2" S
A N
2" SAN2" SAN
4" SAN4" SAN
2"
2"
2"
4"
2"
2"
2"
2"
4"
4" SAN4" SAN
4" 4"
4" 2"
4"
4" SAN4" SAN
2"
2"
3"
4"4"
4"
2"
3"
4" 4"
2"
2" S
A N
2" S
A N
2"
2" SAN UP
3/4" DHWR UP
3/4"
(E)3/4" DHWR DN
6" SD
4" V
4" V 2
4" S
S
2" SAN UP
2" SAN2" SAN
2" SAN UP
4" SAN UP
4" 2"
2"
2"
4"
2" V UP
2" V UP
2" V UP
2" V UP
2" V UP
2" V UP
2" SAN2" SAN4"
2" V UP
2"
2"
4"
3"
2"
2" SAN2" SAN
4" SAN UP
2" SAN UP
4" S
A N
4" S
A N
3"
2" V UP
4" V UP
3"
2" SAN2" SAN
3" SAN3" SAN
2" 4"
3"
3" TRAPPED SAN UP
3" SAN UP
4" S
A N
4" S
A N
2" S
A N
2" S
A N
2" SAN UP
A. COORDINATE WITH FACILITIES ANY SHUTDOWN REQUIRED. REFER TO SPECIFICATIONS
FOR MORE DETAILS.
B. CONTRACTOR SHALL XRAY FLOOR PRIOR TO ANY CUTTING OF THE SLAB TO
COORDINATE PENETRATIONS WITH STRUCTURAL.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
G E N E R A L P L A N N O T E S
KEYPLAN
1100 Boulders Pkwy | Suite 503 Richmond, VA 23225
804.355.2067
A u to d e s k D o c s /M t H o m e
I s o la ti o n W a rd
D /W
S P
M t H o m e
D rv t
/1
/2
:3
:5
P
M
P2.01
FIRST FLOOR PLUMBING NEW
WORK PLAN
11/04/2022 IGM TIP
RENOVATE D-WING FOR ISOLATION
WARD
621-20-107
MOUNTAIN HOME, TENNESSEE
BID DOCUMENTSJAMES H.
QUILLEN VA
MEDICAL
CENTER
Approved: Owner
N
1/8" = 1'-0"
FIRST FLOOR NEW WORK PLUMBING PLAN
D R A W I N G N O T E S :
1 CONNECT NEW VENT PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.
2 CONNECT NEW SANITARY PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.
3 CONNECT NEW STORM PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.
4 CONNECT NEW HOT WATER RETURN PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.
5 OFFSET THE EXISTING STACK IN THE NEAREST WALL.
No. Revisions: Date:
1 BID DOCUMENTS 11/04/2022
2 ADDENDUM 02 07/13/2023
jmpeay Snapshot jmpeay Text Box 07/13/2023
| Sheets |
| P2.01 - FIRST FLOOR PLUMBING NEW WORK PLAN |
| P6.01 - PLUMBING DETAILS |
File details come from the government source that posted it. Updated .