P2.01 - FIRST FLOOR PLUMBING NEW WORK PLAN 02.pdf

PDF 579 KB Posted

Attached to
Y1DZ--Project 621-20-107 Renovate Bldg. -200_Wing D2 for Isolation Ward
Solicitation number
36C24923R0030
Issued by

About this file

This document includes a first floor plumbing new work plan and details for a federal construction project to renovate D Wing at the James H. Quillen VA Medical Center in Mountain Home, Tennessee for use as an isolation ward. The project number is 621-20-107. The solicitation number for the related federal contract opportunity is 36C24923R0030. The work outlined in the plan includes connecting new vent, sanitary, storm, and hot water return piping to existing systems and offsetting an existing stack. The contractor must coordinate any necessary shutdowns with facility staff and x-ray the floor before cutting the slab to coordinate penetrations with structural elements.

View the file

Other files

File Type Posted
07.09_AE403 - CASEWORK ELEVATIONS.pdf PDF
P6.01 - PLUMBING DETAILS.pdf PDF
08.01_AI601 - FINISH SCHEDULE1.pdf PDF
08.00_AI101 - SECOND FLOOR FINISH PLAN-1.pdf PDF
FXD2.02 - SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN.pdf PDF
08.05_WP101 - WALL PROTECTION PLAN.pdf PDF
P3.02 - SECOND FLOOR MEDICAL GAS NEW WORK PLAN.pdf PDF
000110 Table of Contents.pdf PDF
FX2.02 - SECOND FLOOR FIRE PROTECTION NEW WORK PLAN.pdf PDF
102600 Wall and Door Protection.pdf PDF
FX1.00 - FIRE PROTECTION LEGEND AND NOTES.pdf PDF
07.08_AE402 - CASEWORK ELEVATIONS.pdf PDF
36C24923R0030 0006.docx DOCX document
Addendum 02 Summary R1.pdf PDF
07.05_AC141 - SECOND FLOOR REFLECTED CEILING PLAN.pdf PDF
07.07_AE401 - ENLARGED RESTROOM PLANS AND ELEVATIONS.pdf PDF
087100 Door Hardware.pdf PDF
E3.02 - SECOND FLOOR LIGHTING NEW WORK PLAN.pdf PDF
36C24923R0030 0005.docx DOCX document
M2-02 - SECOND FLOOR HVAC NEW WORK PLAN.pdf PDF
36C24923R0030 0004.docx DOCX document
08.01_AI601 - FINISH SCHEDULE.pdf PDF
08.00_AI101 - SECOND FLOOR FINISH PLAN.pdf PDF
09.04_QT403 - ENLARGED EQUIPMENT PLAN.pdf PDF
36C24923R0030 0003.docx DOCX document
36C24923R0030 0002.docx DOCX document
36C24923R0030 0001.docx DOCX document
CALCULATION OF SELF PERFORMED WORK.docx DOCX document
Contractor EMR Certification Form.docx DOCX document
C27_UUpdated 621-20-107 Drawings Part 3 of 3.pdf PDF
C27_Updated 621-20-107 Drawings Part 2 of 3.pdf PDF
C27 Updated 621-20-107 Drawings Part 1 of 3.pdf PDF
UEI _ TAX ID.docx DOCX document
36C24923R0030_1.docx DOCX document
C28_621-20-107 Specifications.pdf PDF
P07_Wage Determination_621-20-107 Renovate Bldg.-200 - Wing D2 for Isolation Ward.pdf PDF
RFI Form.docx DOCX document
PERFORMANCE QUESTIONNAIRE.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

29A-C

30.1

32.8

P O N M L K I H G F E D C B.5 B A.5 A

2" SAN UP

2" V UP

(E)2" V DN

(E)2" SAN DN

(E)2" V DN

2" V UP

2" SAN UP

(E)2" SAN DN

(E)2" SAN DN

(E)2" V DN

2" SAN UP

2" V UP

4" V UP

4" SAN UP

(E)4" SAN DN(E)4" V DN

2" V UP

(E)2" V DN

3" SAN UP

(E)3" SAN DN

(E)2" V DN

2" V UP

2" SAN UP

2" V UP

(E)2" V DN

(E)2" SAN DN

(E)6" SD DN

6" SD UP

(E)6" SD DN

6" SD UP

(E)6" SD DN

6" SD UP

(E)6" SD DN

(E)4" V DN (E)4" SAN DN

(E)6" SD DN

6" SD UP

4" SAN UP

4" V UP

2" SAN UP

(E)2" SAN DN

(E)4" SAN DN

(E)4" V DN

4" V UP

4" SAN UP

(E)4" SAN DN

(E)6" SD DN

6" SD UP

(E)4" SAN DN

4" SAN UP

4" V UP

(E)4" V DN

6" SD UP

2" SAN UP1

1 1

2 2

2" SAN2" SAN 2" V2" V

6" SD6" SD 6" SD6" SD

4" V4" V

(E)4" V DN

4" V4" V

4" SAN4" SAN

2" TRAPPED SAN UP

4" SAN UP

2" SAN UP

2" SAN UP

4" S

A N

4" S

A N

4" V

4" V

(E)4" SAN DN (E)4" V UP

(E)4" SAN DN

4" SAN UP

4" V UP

4" V

4" V

4" V

4" V

4" SAN4" SAN

(E)4" V DN

4" V UP

4" SAN UP

4" V UP

4" SAN UP

4" V UP

4" SAN UP

(E)4" SAN DN

(E)4" V DN(E)4" SAN DN(E)4" V DN

(E)4" SAN DN

(E)4" V DN

1 1 1

(E)4" V DN

(E)4" V DN

4" SAN UP

4" V UP

2" SAN UP

2" SAN UP

2" SAN UP4" SAN UP

4" SAN UP

2" SAN UP

4" SAN UP

3" TRAPPED SAN UP

3" TRAPPED SAN UP

2" V UP

2" V UP

1(E)4" SAN DN

2" SAN UP

2" SAN2" SAN 2" SAN UP

2" SAN UP

4" SAN UP

2" SAN UP

3" TRAPPED SAN UP

3" TRAPPED SAN UP

2" SAN UP

4" SAN UP

2" SAN UP

2" V UP2" V UP

4" V UP

4" SAN UP

(E)2"V STACK

(E)2"SAN STACK

3" TRAPPED SAN UP

3" TRAPPED SAN UP

2" SAN UP

2" SAN UP

4" SAN UP

2" SAN UP

4" SAN UP

2" SAN UP

2" SAN UP

2" V UP

4" S

A N

4" S

A N

2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

3" TRAPPED SAN UP

3" TRAPPED SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

3" TRAPPED SAN UP

3" TRAPPED SAN UP

2" SAN UP

4" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

4" SAN UP

2" SAN UP

3" TRAPPED SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

4" SAN UP

(E)2" V UP

(E)4" SAN DN

(E)4" SAN DN

3" TRAPPED SAN UP

4" SAN UP

(E)4" V DN

(E)4" V DN

4" V UP

4" V UP

2" SW2" SW

2" SW UP

2" SW UP

2" SW UP

2" SW2" SW

2" SW UP

2" S

W 2"

S W

2" SW2" SW

2" SW UP

2" SW UP

2" SW UP 2" SW2" SW

2" SW UP

2" SW UP

2" SW2" SW

2" SW2" SW

2" SW UP

2" SW UP

2" SW UP 2" SW2" SW

2" SW2" SW

4" SAN UP4" SAN UP

4" SAN UP

4" SAN UP

(E)3" A.T.VTR

6" SD6" SD

2" V

2" V

4" V

4" V

2" V

2" V

4" V

4" V

4" V

4" V

2" V

2" V

4" V

4" V

2" SAN2" SAN

2" SAN UP

2" SAN2" SAN2" SAN2" SAN

4" SAN4" SAN

2" S

A N

2" S

A N

2" SAN2" SAN

4" SAN4" SAN

2"

2"

2"

4"

2"

2"

2"

2"

4"

4" SAN4" SAN

4" 4"

4" 2"

4"

4" SAN4" SAN

2"

2"

3"

4"4"

4"

2"

3"

4" 4"

2"

2" S

A N

2" S

A N

2"

2" SAN UP

3/4" DHWR UP

3/4"

(E)3/4" DHWR DN

6" SD

4" V

4" V 2

4" S

S

2" SAN UP

2" SAN2" SAN

2" SAN UP

4" SAN UP

4" 2"

2"

2"

4"

2" V UP

2" V UP

2" V UP

2" V UP

2" V UP

2" V UP

2" SAN2" SAN4"

2" V UP

2"

2"

4"

3"

2"

2" SAN2" SAN

4" SAN UP

2" SAN UP

4" S

A N

4" S

A N

3"

2" V UP

4" V UP

3"

2" SAN2" SAN

3" SAN3" SAN

2" 4"

3"

3" TRAPPED SAN UP

3" SAN UP

4" S

A N

4" S

A N

2" S

A N

2" S

A N

2" SAN UP

A. COORDINATE WITH FACILITIES ANY SHUTDOWN REQUIRED. REFER TO SPECIFICATIONS

FOR MORE DETAILS.

B. CONTRACTOR SHALL XRAY FLOOR PRIOR TO ANY CUTTING OF THE SLAB TO

COORDINATE PENETRATIONS WITH STRUCTURAL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

G E N E R A L P L A N N O T E S

KEYPLAN

1100 Boulders Pkwy | Suite 503 Richmond, VA 23225

804.355.2067

A u to d e s k D o c s /M t H o m e

I s o la ti o n W a rd

D /W

S P

M t H o m e

D rv t

/1

/2

:3

:5

P

M

P2.01

FIRST FLOOR PLUMBING NEW

WORK PLAN

11/04/2022 IGM TIP

RENOVATE D-WING FOR ISOLATION

WARD

621-20-107

MOUNTAIN HOME, TENNESSEE

BID DOCUMENTSJAMES H.

QUILLEN VA

MEDICAL

CENTER

Approved: Owner

N

1/8" = 1'-0"

FIRST FLOOR NEW WORK PLUMBING PLAN

D R A W I N G N O T E S :

1 CONNECT NEW VENT PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.

2 CONNECT NEW SANITARY PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.

3 CONNECT NEW STORM PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.

4 CONNECT NEW HOT WATER RETURN PIPING TO EXISTING. VERIFY EXACT SIZE AND LOCATION.

5 OFFSET THE EXISTING STACK IN THE NEAREST WALL.

No. Revisions: Date:

1 BID DOCUMENTS 11/04/2022

2 ADDENDUM 02 07/13/2023

jmpeay Snapshot jmpeay Text Box 07/13/2023

Sheets
P2.01 - FIRST FLOOR PLUMBING NEW WORK PLAN
P6.01 - PLUMBING DETAILS

File details come from the government source that posted it. Updated .