B2_DRAFT_08.7_Final_Release.pdf

PDF 670 KB Posted

Attached to
SLAC Job Order Contract
Solicitation number
SLAC_RFP_368624
Issued by

About this file

This is a Final Release form template used by SLAC National Accelerator Laboratory for subcontract completion and payment finalization.

The document serves as a legal waiver and release executed by a subcontractor upon receipt of final payment from SLAC, a federally funded research and development center operated by Stanford University on behalf of the U.S. Department of Energy. The subcontractor releases Stanford University, SLAC, and the Department of Energy from all claims, adjustments, demands for payment, damages, stop notices, and bond rights related to work performed under the specified subcontract. The form includes fields for the subcontract number, project title, written payment value, and subcontractor name. The subcontractor certifies that all labor and materials have been fully paid, including all required welfare, pension, and vacation contributions, and agrees to indemnify and defend Stanford University and the DOE from any claims, liens, or liabilities arising from work performed by the subcontractor or its lower-tier subcontractors. The subcontractor acknowledges that all improvements, equipment, and facilities at the SLAC site are owned by the United States Government and are exempt from state lien laws or stop payment provisions. The form requires signature, title, and date from an authorized representative of the subcontractor and includes a provision for documenting any disputed claims for additional work that have been submitted in writing to SLAC.

View the file

Other files

File Type Posted
B2_DRAFT_03.2_Section_C_Construction_Task_Catalog_INCORPORATED_BY_REFERENCE.pdf PDF
B2_DRAFT_03.7_Section_C_Appendix F_SLAC_Landscape_Vegetation_Planting_Guidance.pdf PDF
B2_DRAFT_03.9_Section_C_Appendix H_SLAC_Drawing_Deliverables.pdf PDF
B2_DRAFT_08.3_Sec_J_SF1413_exp_05-2027.pdf PDF
B2_DRAFT_08.4_Subcontractor_Safety_Qualification_Form.pdf PDF
B2_DRAFT_10.2_Section_L_Attachment_B_(Bid_Form).pdf PDF
B2_DRAFT_00_RFP_Cover_Letter_JOC.pdf PDF
B2_DRAFT_02_RFP_Section_B_(Supplies or Services and Price_Costs).pdf PDF
B2_DRAFT_03.8_Section_C_Appendix G_SLAC_Seismic_Design_Specifications.pdf PDF
B2_DRAFT_05.1_Fixed_Price_Construction_March2024.pdf PDF
B2_DRAFT_11_RFP_Section_M_(Evaluation_Factors).pdf PDF
B2_DRAFT_03.1_Section_C_Statement_of_Work_JOC.pdf PDF
B2_DRAFT_03.3_Section_C_Appendix_B_SLAC_Electrical_Design_Standards.pdf PDF
B2_DRAFT_03.4_Section_C_AppendixC_SLAC_Design_Procedures_Sewer_Services.pdf PDF
B2_DRAFT_03.5_Section_C_Appendix_D_SLAC_Design_Procedures_Water_Services.pdf PDF
B2_DRAFT_03.6_Section_C_Appendix E_SLAC_Space_Standards.pdf PDF
B2_DRAFT_03.11_Section_C_Appendix J_DOE-STD-1066-2023.pdf PDF
B2_DRAFT_08.1_Sec_J_DBA_WD_CA20260018_09172026_Mod_08.pdf PDF
B2_DRAFT_08.2_Sec_J_Subcontractor_IIPP_Form.pdf PDF
B2_DRAFT_08.6_Final_Inspection_Report.pdf PDF
B2_DRAFT_01_RFP_Section_A_(Subcontract_Form).pdf PDF
B2_DRAFT_03.0_RFP_Section_C_SOW_Cover_JOC.pdf PDF
B2_DRAFT_03.10_Section_C_Appendix_I_INCORPORATED_BY_REFERENCE.pdf PDF
B2_DRAFT_04_RFP_Section_F_(Deliveries_Performance).pdf PDF
B2_DRAFT_05.0_RFP_Section_G_(General_TsCs).pdf PDF
B2_DRAFT_05.2_SLAC_General_Ts_Cs_Supplemental_Rider_Aug2026.pdf PDF
B2_DRAFT_07_RFP_Section_H_(Special_Terms_Conditions).pdf PDF
B2_DRAFT_08.0_RFP_Section_J_Cover.pdf PDF
B2_DRAFT_08.5_NTP_Submittal_Checklist.pdf PDF
B2_DRAFT_09.0_RFP_Section_K_(Rep_and_Certs_Cover).pdf PDF
B2_DRAFT_09.1_RFP_Section_K_Reps_and_Certs_Supplement_08.25.22.pdf PDF
B2_DRAFT_10.0_RFP_Section_L_(Instructions_to_Offerors).pdf PDF
B2_DRAFT_10.1_Section_L_Attachment_A_(Past_Performance).pdf PDF
B2_DRAFT_10.3_Section_L_Attachment_C_(Q&A_Log).pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLY CHAIN MANAGEMENT

FINAL RELEASE

Subcontract No: <<SUBCONTRACT #>>

Project Title: <<PROJECT TITLE>>

In consideration of the sum of <<WRITTEN VALUE>> Dollars and 00/100s <<$NUMERIC VALUE>> paid or to be paid by check from SLAC National Accelerator Laboratory (SLAC), a federal research center,to <<SUBCONTRACTOR>>, which is in full and final payment for work done and services provided on the above referenced subcontract, the undersigned hereby releases Stanford University SLAC, and the Department of Energy from its and any lower-tier subcontractor or agent claims, adjustments, demands for payments, damages, stop notices, or bond rights on the work covered by Subcontract No. <<SUBCONTRACT #>>, located at SLAC . Further, the final payment to the undersigned constitutes complete and entire compensation for all labor, services, equipment, or material furnished or any and all other compensation due, except for disputed claims for additional work in the amount of:

(If none, state none), which have been submitted in writing to SLAC.

The undersigned does hereby represent and warrant that the undersigned has fully paid for all labor and materials, any and all welfare, pension, vacation, or other contributions required to be made on account of the employment of such laborers or mechanics so provided by the undersigned and does hereby agree to indemnify, defend, and hold harmless Stanford University and the U.S. Dept. of Energy, the Project, and any affected real property from any and all claims, liens, claims of lien, liabilities, obligations, and demands arising from any of the work performed by the undersigned or its subcontractors on said subcontract.

This waiver and release is for the benefit of, and may be relied upon by, Stanford University and the U.S.

Dept. of Energy. The Subcontractor recognizes and acknowledges that the SLAC National Accelerator Laboratory is a Federally Funded Research and Development Center, owned by the U.S. Department of Energy, and operated by Stanford University on behalf of the U.S. DOE; that all construction work on the site is performed for and all improvements, equipment, and facilities are totally owned by the United States Government and are exempt from the application of state lien laws or stop payment provisions; and that Stanford University, as the owner of only the reversionary interest in the acreage, has no interest subject to lien.

Our work is complete on the project at this time and there will be no further billing to the above named Owner and/or Contractor. The person signing this release on behalf of the undersigned warrants and represents to have the full legal authority to act for and bind the undersigned firm to the terms hereof.

GC/Company Name:

<<SUBCONTRACTOR>>

By:

Title:

Dated:

DRAFT

File details come from the government source that posted it. Updated .