B2_DRAFT_08.6_Final_Inspection_Report.pdf

PDF 603 KB Posted

Attached to
SLAC Job Order Contract
Solicitation number
SLAC_RFP_368624
Issued by

About this file

This is a Final Inspection Report template required by SLAC (Stanford Linear Accelerator Center) Procurement to authorize final payment release on subcontract construction projects. The report documents completion and acceptance of work performed by a subcontractor at SLAC's Menlo Park, California facility.

The report requires verification and sign-off on eight key completion items: the final inspection meeting date and attendees from both SLAC and the subcontractor; receipt and acceptance of red-line as-built drawings; receipt and acceptance of operation and maintenance manuals; return of all ID badges and dosimeter badges (with a $500 penalty for unreturned dosimeters); return of keys if applicable; completion and finalization of certified payrolls via LCP Tracker; approval of the punch list by the Architect/Engineer, Facilities & Operations, and the subcontractor; and issuance of the SLAC Building Inspection Office Final Certificate of Occupancy or Permit Card. The report concludes with an acknowledgement and acceptance section requiring signatures and dates from the SLAC Project Manager, SLAC Field Construction Manager, and Subcontractor Project Manager. The document is addressed to Contract Administrator Catharina Bjelovitic at SLAC's Supply Chain Management office, with contact information provided for reference.

View the file

Other files

File Type Posted
B2_DRAFT_03.2_Section_C_Construction_Task_Catalog_INCORPORATED_BY_REFERENCE.pdf PDF
B2_DRAFT_03.7_Section_C_Appendix F_SLAC_Landscape_Vegetation_Planting_Guidance.pdf PDF
B2_DRAFT_03.9_Section_C_Appendix H_SLAC_Drawing_Deliverables.pdf PDF
B2_DRAFT_08.3_Sec_J_SF1413_exp_05-2027.pdf PDF
B2_DRAFT_08.4_Subcontractor_Safety_Qualification_Form.pdf PDF
B2_DRAFT_10.2_Section_L_Attachment_B_(Bid_Form).pdf PDF
B2_DRAFT_03.1_Section_C_Statement_of_Work_JOC.pdf PDF
B2_DRAFT_03.3_Section_C_Appendix_B_SLAC_Electrical_Design_Standards.pdf PDF
B2_DRAFT_03.4_Section_C_AppendixC_SLAC_Design_Procedures_Sewer_Services.pdf PDF
B2_DRAFT_03.5_Section_C_Appendix_D_SLAC_Design_Procedures_Water_Services.pdf PDF
B2_DRAFT_03.6_Section_C_Appendix E_SLAC_Space_Standards.pdf PDF
B2_DRAFT_03.11_Section_C_Appendix J_DOE-STD-1066-2023.pdf PDF
B2_DRAFT_08.1_Sec_J_DBA_WD_CA20260018_09172026_Mod_08.pdf PDF
B2_DRAFT_08.2_Sec_J_Subcontractor_IIPP_Form.pdf PDF
B2_DRAFT_01_RFP_Section_A_(Subcontract_Form).pdf PDF
B2_DRAFT_03.0_RFP_Section_C_SOW_Cover_JOC.pdf PDF
B2_DRAFT_03.10_Section_C_Appendix_I_INCORPORATED_BY_REFERENCE.pdf PDF
B2_DRAFT_04_RFP_Section_F_(Deliveries_Performance).pdf PDF
B2_DRAFT_05.0_RFP_Section_G_(General_TsCs).pdf PDF
B2_DRAFT_05.2_SLAC_General_Ts_Cs_Supplemental_Rider_Aug2026.pdf PDF
B2_DRAFT_07_RFP_Section_H_(Special_Terms_Conditions).pdf PDF
B2_DRAFT_08.0_RFP_Section_J_Cover.pdf PDF
B2_DRAFT_08.5_NTP_Submittal_Checklist.pdf PDF
B2_DRAFT_09.0_RFP_Section_K_(Rep_and_Certs_Cover).pdf PDF
B2_DRAFT_09.1_RFP_Section_K_Reps_and_Certs_Supplement_08.25.22.pdf PDF
B2_DRAFT_10.0_RFP_Section_L_(Instructions_to_Offerors).pdf PDF
B2_DRAFT_10.1_Section_L_Attachment_A_(Past_Performance).pdf PDF
B2_DRAFT_10.3_Section_L_Attachment_C_(Q&A_Log).pdf PDF
B2_DRAFT_00_RFP_Cover_Letter_JOC.pdf PDF
B2_DRAFT_02_RFP_Section_B_(Supplies or Services and Price_Costs).pdf PDF
B2_DRAFT_03.8_Section_C_Appendix G_SLAC_Seismic_Design_Specifications.pdf PDF
B2_DRAFT_05.1_Fixed_Price_Construction_March2024.pdf PDF
B2_DRAFT_08.7_Final_Release.pdf PDF
B2_DRAFT_11_RFP_Section_M_(Evaluation_Factors).pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLY CHAIN MANAGEMENT

SUPPLY CHAIN MANAGEMENT

SUPPLY CHAIN MANAGEMENT

Date: MM/DD/YYYY 2575 Sand Hill Road, MS: 01

Menlo Park, CA 94025 Tel: (650) 776 – 2774 Contract Administrator:

Catharina Bjelovitic Email: cvb@slac.stanford.edu

FINAL INSPECTION REPORT

(Required by Procurement to release Final Payment)

Subcontractor Name Project Name Subcontract No

SLAC Project Manager SLAC Field Construction Manager SLAC Subcontract Administrator

The work was found to meet the requirements of the Subcontract as indicated below:

1. The Final Inspection was held on (Date): ; and attended by:

a. Attendees for SLAC:_____________________________________________________________

b. Attendees for Subcontractor:_______________________________________________________

2. Red-Line As-Built Drawings:

a. Received on: ; by:

b. Accepted on: ; by:

3. Operation & Maintenance Manuals:

a. Received on: ; by:

b. Accepted on: ; by:

4. All ID Badges & Dosimeter Badges received on: ($500/dosimeter not returned to SLAC)

5. Keys (if applicable) received on:

6. Certified Payrolls are complete and finalized via LCP Tracker on:

7. Punch List approved:

a. A/E: By: Signature

b. Facilities & Operations By: Signature

c. Subcontractor By: Signature

8. SLAC Building Inspection Office Final Certificate of Occupancy or Permit Card issued on:

ACKNOWLEDGEMENT AND ACCEPTANCE OF THIS FINAL INSPECTION REPORT:

Title Name Signature Date

SLAC PM

SLAC FCM

Subcontractor PM

DRAFT