This is a Statement of Work (SOW) table of contents for RFP #368624, a SLAC Job Order Contract issued by SLAC National Accelerator Laboratory (operated by Stanford University for the U.S. Department of Energy).

The document outlines the structure and components of the Job Order Contract SOW, which encompasses construction and design services at the SLAC facility in Menlo Park, California. The SOW includes a Job Order Construction Task Catalog that defines available construction tasks, along with eleven appendices covering technical standards and procedures: SLAC Electrical Design Standards, Design Procedures for Sewer Services, Design Procedures for Water Services, Space Standards, Landscape Vegetation and Planting Guidance, Seismic Design Specifications for Buildings/Structures/Equipment/Systems, Drawing Deliverables requirements, a Site Utilities Master document, and DOE Standard 1066-2023. The document itself is marked as DRAFT and does not provide specific response deadlines, award dates, pricing information, or other contractual terms; it serves solely as a reference guide to the SOW components and their associated design and construction standards applicable to work performed under this job order contract vehicle.

View the file

Other files

File Type Posted
B2_DRAFT_03.2_Section_C_Construction_Task_Catalog_INCORPORATED_BY_REFERENCE.pdf PDF
B2_DRAFT_03.7_Section_C_Appendix F_SLAC_Landscape_Vegetation_Planting_Guidance.pdf PDF
B2_DRAFT_03.9_Section_C_Appendix H_SLAC_Drawing_Deliverables.pdf PDF
B2_DRAFT_08.3_Sec_J_SF1413_exp_05-2027.pdf PDF
B2_DRAFT_08.4_Subcontractor_Safety_Qualification_Form.pdf PDF
B2_DRAFT_10.2_Section_L_Attachment_B_(Bid_Form).pdf PDF
B2_DRAFT_03.1_Section_C_Statement_of_Work_JOC.pdf PDF
B2_DRAFT_03.3_Section_C_Appendix_B_SLAC_Electrical_Design_Standards.pdf PDF
B2_DRAFT_03.4_Section_C_AppendixC_SLAC_Design_Procedures_Sewer_Services.pdf PDF
B2_DRAFT_03.5_Section_C_Appendix_D_SLAC_Design_Procedures_Water_Services.pdf PDF
B2_DRAFT_03.6_Section_C_Appendix E_SLAC_Space_Standards.pdf PDF
B2_DRAFT_03.11_Section_C_Appendix J_DOE-STD-1066-2023.pdf PDF
B2_DRAFT_08.1_Sec_J_DBA_WD_CA20260018_09172026_Mod_08.pdf PDF
B2_DRAFT_08.2_Sec_J_Subcontractor_IIPP_Form.pdf PDF
B2_DRAFT_08.6_Final_Inspection_Report.pdf PDF
B2_DRAFT_00_RFP_Cover_Letter_JOC.pdf PDF
B2_DRAFT_02_RFP_Section_B_(Supplies or Services and Price_Costs).pdf PDF
B2_DRAFT_03.8_Section_C_Appendix G_SLAC_Seismic_Design_Specifications.pdf PDF
B2_DRAFT_05.1_Fixed_Price_Construction_March2024.pdf PDF
B2_DRAFT_08.7_Final_Release.pdf PDF
B2_DRAFT_11_RFP_Section_M_(Evaluation_Factors).pdf PDF
B2_DRAFT_01_RFP_Section_A_(Subcontract_Form).pdf PDF
B2_DRAFT_03.10_Section_C_Appendix_I_INCORPORATED_BY_REFERENCE.pdf PDF
B2_DRAFT_04_RFP_Section_F_(Deliveries_Performance).pdf PDF
B2_DRAFT_05.0_RFP_Section_G_(General_TsCs).pdf PDF
B2_DRAFT_05.2_SLAC_General_Ts_Cs_Supplemental_Rider_Aug2026.pdf PDF
B2_DRAFT_07_RFP_Section_H_(Special_Terms_Conditions).pdf PDF
B2_DRAFT_08.0_RFP_Section_J_Cover.pdf PDF
B2_DRAFT_08.5_NTP_Submittal_Checklist.pdf PDF
B2_DRAFT_09.0_RFP_Section_K_(Rep_and_Certs_Cover).pdf PDF
B2_DRAFT_09.1_RFP_Section_K_Reps_and_Certs_Supplement_08.25.22.pdf PDF
B2_DRAFT_10.0_RFP_Section_L_(Instructions_to_Offerors).pdf PDF
B2_DRAFT_10.1_Section_L_Attachment_A_(Past_Performance).pdf PDF
B2_DRAFT_10.3_Section_L_Attachment_C_(Q&A_Log).pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SLAC NATIONAL ACCELERATOR LABORATORY • 2575 SAND HILL ROAD • MENLO PARK • CALIFORNIA • 94025 • USA

Operated by Stanford University for the U.S. Department of Energy

SECTION C (REV. 6/01/12) SLAC-SCM-GEN-030 PAGE 1 OF 1

SUPPLY CHAIN MANAGEMENT

Section C – Statement of Work

RFP # 368624 SLAC Job Order Contract

1. Job Order Contract Statement of Work

2. Job Order Construction Task Catalog

3. Appendix B_SLAC Electrical Design Standards

4. Appendix C_SLAC Design Procedures for Sewer Services

5. Appendix D_SLAC Design Procedures for Water Services

6. Appendix E_SLAC Space Standards

7. Appendix F_SLAC Landscape Vegetation and Planting Guidance

8. Appendix G_SLAC Seismic Design Specification for Buildings, Structures, Equipment, and

Systems

9. Appendix H_SLAC Drawing Deliverables

10. Appendix I_SITE-UTILITIES-MASTER

11. Appendix J_DOE-STD-1066-2023

DRAFT

File details come from the government source that posted it. Updated .