B2_DRAFT_08.2_Sec_J_Subcontractor_IIPP_Form.pdf

PDF 292 KB Posted

Attached to
SLAC Job Order Contract
Solicitation number
SLAC_RFP_368624
Issued by

About this file

This is a form used by SLAC (Stanford Linear Accelerator Center) National Accelerator Laboratory to document subcontractor acknowledgement of injury and illness prevention program (IIPP) requirements and capture occupational medicine information. The form is mandatory for both green and non-green work and must be submitted with the proposal as a prerequisite for issuance of the notice to proceed.

The form requires subcontractors to certify compliance with Department of Energy (DOE) Worker Safety and Health Program requirements under 10 CFR 851, which are more stringent than California OSHA IIPP requirements. Subcontractors may either adopt SLAC's 851-compliant IIPP or submit their own 851-compliant IIPP for SLAC review and approval. Additionally, if the subcontractor will have employees working on-site at SLAC for 30 or more 8-hour days within a 12-month period, or employees enrolled in any federally, state, or locally mandated medical or exposure monitoring program (such as hearing conservation, respiratory protection, lead exposure, or beryllium exposure monitoring), the subcontractor must provide comprehensive occupational medicine services and supply occupational medicine provider contact information. Prime subcontractors are required to flow these requirements down to any sub-tier subcontractors they hire, with each entity completing a separate form. The form must be completed by an authorized representative of the subcontractor, preferably the supervisor or foreman for the job.

View the file

Other files

File Type Posted
B2_DRAFT_00_RFP_Cover_Letter_JOC.pdf PDF
B2_DRAFT_02_RFP_Section_B_(Supplies or Services and Price_Costs).pdf PDF
B2_DRAFT_03.8_Section_C_Appendix G_SLAC_Seismic_Design_Specifications.pdf PDF
B2_DRAFT_05.1_Fixed_Price_Construction_March2024.pdf PDF
B2_DRAFT_08.7_Final_Release.pdf PDF
B2_DRAFT_11_RFP_Section_M_(Evaluation_Factors).pdf PDF
B2_DRAFT_03.2_Section_C_Construction_Task_Catalog_INCORPORATED_BY_REFERENCE.pdf PDF
B2_DRAFT_03.7_Section_C_Appendix F_SLAC_Landscape_Vegetation_Planting_Guidance.pdf PDF
B2_DRAFT_03.9_Section_C_Appendix H_SLAC_Drawing_Deliverables.pdf PDF
B2_DRAFT_08.3_Sec_J_SF1413_exp_05-2027.pdf PDF
B2_DRAFT_08.4_Subcontractor_Safety_Qualification_Form.pdf PDF
B2_DRAFT_10.2_Section_L_Attachment_B_(Bid_Form).pdf PDF
B2_DRAFT_03.1_Section_C_Statement_of_Work_JOC.pdf PDF
B2_DRAFT_03.3_Section_C_Appendix_B_SLAC_Electrical_Design_Standards.pdf PDF
B2_DRAFT_03.4_Section_C_AppendixC_SLAC_Design_Procedures_Sewer_Services.pdf PDF
B2_DRAFT_03.5_Section_C_Appendix_D_SLAC_Design_Procedures_Water_Services.pdf PDF
B2_DRAFT_03.6_Section_C_Appendix E_SLAC_Space_Standards.pdf PDF
B2_DRAFT_03.11_Section_C_Appendix J_DOE-STD-1066-2023.pdf PDF
B2_DRAFT_08.1_Sec_J_DBA_WD_CA20260018_09172026_Mod_08.pdf PDF
B2_DRAFT_08.6_Final_Inspection_Report.pdf PDF
B2_DRAFT_01_RFP_Section_A_(Subcontract_Form).pdf PDF
B2_DRAFT_03.0_RFP_Section_C_SOW_Cover_JOC.pdf PDF
B2_DRAFT_03.10_Section_C_Appendix_I_INCORPORATED_BY_REFERENCE.pdf PDF
B2_DRAFT_04_RFP_Section_F_(Deliveries_Performance).pdf PDF
B2_DRAFT_05.0_RFP_Section_G_(General_TsCs).pdf PDF
B2_DRAFT_05.2_SLAC_General_Ts_Cs_Supplemental_Rider_Aug2026.pdf PDF
B2_DRAFT_07_RFP_Section_H_(Special_Terms_Conditions).pdf PDF
B2_DRAFT_08.0_RFP_Section_J_Cover.pdf PDF
B2_DRAFT_08.5_NTP_Submittal_Checklist.pdf PDF
B2_DRAFT_09.0_RFP_Section_K_(Rep_and_Certs_Cover).pdf PDF
B2_DRAFT_09.1_RFP_Section_K_Reps_and_Certs_Supplement_08.25.22.pdf PDF
B2_DRAFT_10.0_RFP_Section_L_(Instructions_to_Offerors).pdf PDF
B2_DRAFT_10.1_Section_L_Attachment_A_(Past_Performance).pdf PDF
B2_DRAFT_10.3_Section_L_Attachment_C_(Q&A_Log).pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

27 May 2026 SLAC-I-730-0A21J-032-R002 1 of 1

ENVIRONMENT, SAFETY & HEALTH DIVISION

Chapter 42: Subcontractor Safety Injury and Illness Prevention Plan Acknowledgement Form Product ID: 509 | Revision ID: 2865 | Date Published: 27 May 2026 | Date Effective: 27 May 2026 URL: https://www-esh.slac.stanford.edu/eshmanual/references/subcontractorFormIIPP.pdf

This form is used for documenting subcontractor acknowledgement of injury and illness prevention program requirements and capturing occupational medicine information. The form is required for both green and non-green work. Procurement maintains the completed form for the awarded subcontractor. (See Subcontractor Safety: Green Work Procedure [SLAC-I-730-0A21C-025] and Subcontractor Safety: Non-green Work Procedure

[SLAC-I-730-0A21C-024].)

1. Prime subcontractors must flow these requirements down to sub-tier subcontractors they hire.

2. All subcontractors, prime and sub-tier, must complete a separate form.

3. The form must be completed by an authorized representative of the subcontractor, preferably the supervisor / foreman for the job.

4. Submission of this completed form with the proposal is a prerequisite for issuance of the notice to proceed.

Project name

Company name

Superintendent / foreman

Name Phone E-mail

Point of contact

Name Phone E-mail

1 Injury and Illness Prevention Program Compliance While their workers are physically located at SLAC, subcontractors to SLAC must comply with the requirements of the Department of Energy (DOE) Worker Safety and Health Program (10 CFR 851). These requirements are more stringent in some areas than Cal/OSHA IIPP requirements (8 CCR 1509 and 8 CCR 3203). (See Subcontractor Safety: Additional IIPP Requirements [SLAC-I-730-0A21S-062] for the differences.)

Subcontractors have the option to adopt SLAC’s 851-compliant IIPP or to submit their own 851-compliant IIPP to SLAC for review and approval.

This information is provided only as a guide: it is your responsibility to ensure you have read and understood the regulatory requirements.

I certify that that I have read the requirements of the SLAC IIPP and attest that

Our work on this subcontract will comply with the requirements of the SLAC IIPP, or We have developed an IIPP that is as protective as the SLAC IIPP (attach)

Prepared by (foreman / supervisor for the job if possible)

Name Signature Date

2 Occupational Medicine Will you have any employees who will work on site at SLAC for 30, 8-hour days in a 12-month period, or who are enrolled for any length of time in a medical or exposure monitoring program required by federal, state, or local regulations (for example, hearing conservation, respiratory protection, lead exposure, or beryllium exposure)? No Yes If yes, you must

1. Have comprehensive occupational medicine services for your workers and comply with the occupational medicine requirements of the SLAC

IIPP.

2. Provide your occupational medicine provider (clinic / physician) contact information:

Name Phone E-mail

Energy Employees’ Occupational Illness Compensation Program Act (EEOICPA) and Former Worker Medical Screening Program (FWP) Information Dissemination: Participants seeking information on potential compensation, visit the FWP website.

https://esh.slac.stanford.edu/general/subcontractor/ https://www-internal.slac.stanford.edu/esh/docreview/reports/revisions.asp?ProductID=509 https://www-esh.slac.stanford.edu/eshmanual/references/subcontractorFormIIPP.pdf https://www-esh.slac.stanford.edu/eshmanual/references/subcontractorProcedGreen.pdf https://www-esh.slac.stanford.edu/eshmanual/references/subcontractorProcedNonGreen.pdf https://www.ecfr.gov/current/title-10/chapter-III/part-851 https://www.dir.ca.gov/Title8/1509.html https://www.dir.ca.gov/Title8/1509.html https://www.dir.ca.gov/Title8/3203.html https://www-esh.slac.stanford.edu/eshmanual/references/subcontractorReqIIPP.pdf https://esh.slac.stanford.edu/iipp https://www.energy.gov/ehss/former-worker-medical-screening-program-0

Injury and Illness Prevention Plan Acknowledgement Form
1 Injury and Illness Prevention Program Compliance
2 Occupational Medicine
Our work on this subcontract w: Off
We have developed an IIPP that: Off
Superintendent_Name:
Superintendent_Phone:
Superintendent_Email:
POC_Name:
POC_Phone:
POC_Email:
Preparer_Name:
Preparer_Date:
Medical_Name:
Medical_Phone:
Medical_Emai:
OccHealth: Off
Project_Name: Job Order Contract
Company_Name:

File details come from the government source that posted it. Updated .